Wateridge Village Absorption

Total Page:16

File Type:pdf, Size:1020Kb

Wateridge Village Absorption BLOCK 13 Available For Sale Get more information Tom Brethour Broker, Vice-President D +1 613 696 2760 Wateridge Village [email protected] Ottawa, ON Gillian Burnside Sales Representative, Vice-President D +1 613 696 2734 • PRIME DEVELOPMENT OPPORTUNITY [email protected] • 3.92 ACRES Ron Milligan Sales Representative, Vice-President • MINIMUM DENSITY OF 166 UNITS D +1 613 696 2750 [email protected] • DEVELOPMENT-READY RESIDENTIAL BLOCK AVAILABLE avisonyoung.ca OPPORTUNITY Avison Young Commercial Real Estate Services, LP, Brokerage (the “Advisor”) has been retained by Canada Lands Company CLC Limited (the “Vendor”) to facilitate the sale of the next release of development land at Wateridge Village. Wateridge Village is a ground-breaking 310 acre vibrant and sustainable new community minutes from the downtown core. The site celebrates Algonquin heritage, the military legacy of the lands, and the brilliance of modern urban design while overlooking the Ottawa River. Visionary and masterful in scope, Wateridge Village will be home to design-forward residences, retail and office space, unparalleled amenities, beautiful parks, trails and so much more. Wateridge Village includes Single Family, Townhomes, Low-Rise Residential and Mixed-Use Development. The Vendor is pleased to release Block 13 at this time, with R5Y {2312} zoning, permitting a maximum of six stories and minimum of 166 units. This development parcel will be fully serviced to the perimeter of the block and we invite all residential developers to participate in the offering. WATERIDGE VILLAGE A VILLAGE WITHIN THE CITY Key Highlights Development-Ready, with services to the perimeter of the block Uniquely planned community to support approx. 10,000 Residents Designed to provide easy access to Downtown and Ottawa’s Light Rail Sustainable community design Designed to include open spaces, wooded areas, and parks Retail and commercial spaces Includes three future school sites Location Map Carleton University Gatineau Dow’s Lake Parliament Hill/ Downtown Core 417 W Rideau Canal Byward Market S N University of Ottawa E Rockcliffe Park Ottawa River 417 St. Laurent Blvd. Montfort Hospital Aviation Parkway Canada Aviation and Space Museum Blair Road Montreal Road 417 Transit Map minutes minutes minutes minutes minutes 10 4km to 11 5km to 13 7km to 14 8km to 15 9km to Parliament Hill Blair Station Tremblay Station Hurdman Station UOttawa Station & Parliament Hill Station Planning and Development Overview Parliament Hill 15 Minutes BLOCK 13 Wateridge Village Absorption 2018 36 19 23 70 148 Sales Total 2019 69 49 118 Sales Total YTD 2020 101 Condo Apartments 23 24 6 Data Provided by: 20 174 Sales Total Milestones Milestone Date Description No access will be provided to the CIM/dataroom Confidentiality Agreement N/A without satisfactory completion of this agreement. All available upon completion and acceptance of the Release of CIM and November 2020 Confidentiality Agreement. Dataroom Download Here Starting in Property Tours By appointment upon request. November 2020 December 18, Letter of Intent (LOI) Complete details regarding the offering process is 2020 by 3:00 p.m. Submission Date fully outlined in the CIM Bid Date The Advisor will contact all parties shortlisted Selection of Shortlisted January 8, 2021- Bidders January 22, 2021 *A second round of bidding from shortlisted bidders may occur during this period Firm Agreement of Purchase March 24, 2021 Firm Agreement of Purchase and Sale (APS) reached and Sale (APS) reached Closing Between April 1 - Between April 1 - June 30, 2021 June 30, 2021 Offering Process TERMS OF SALE The Vendor has elected to offer the development lands as defined in this CIM for sale on an un- priced offering in form of aLetter of Intent (‘LOI’). LOIs are to be submitted on the Vendor’s Standard Form to be completed in accordance with the LOI Template available in the dataroom and delivered by hand to the Advisor, packag- es to include three (3) hard copies and one (1) USB on submission date. Following the review of LOIs, which may include discussions, negotiations and resubmissions, it is the current intent of the Vendor to select a preferred bidder and to negotiate and enter into legal binding Agreement of Purchase and Sale (APS). All Prospective Purchasers should satisfy themselves with all matters related to the Property, including but not limited to: • The current planning status • Official Plan designation • Community Design Plan (‘CDP’) • Zoning • Development charges/levies • Geotechnical and environmental conditions • Title As part of its LOI submission the Prospective Purchaser will be required to provide: • Confirmation that the Prospective Purchaser has reviewed and satisfied itself with the form of APS or provide a blacklined copy and schedule outlining any material revisions. A pre- ferred form of APS for review by prospective purchasers will be provided in the electronic dataroom in due course. Agreements with no or limited conditions are preferred. • Closing date -Block 13 - March 24, 2021 or earlier • A minimum 14 day irrevocable period • Confirmation of Prospective Purchaser’s review and acknowledgment of theUrban Design Guidelines and Architectural Controls and Minimum Density requirements outlined • Demonstration of a proposed build-out outlining the number of units, design and con- struction of the dwelling units Preference will be given to offers that demonstrate an understanding of theVendor’s Urban Design and Architectural Control Guidelines and planning status with the highest cash pro- ceeds on closing. Agency Disclosure: All brokerages representing prospective bidders will be required to identify their clients and have their clients complete the Confidentiality Agreement prior to gaining access to the dataroom. The Advisor reserves the right to preclude cooperation with brokerages representing clients with whom communication has already been initiated. The Avison Young Team Tom Brethour Gillian Burnside Ron Milligan Broker, Vice-President Sales Representative, Vice-President Sales Representative, Vice-President D +1 613.696.2760 D +1 613.696.2734 D +1 613.696.2750 [email protected] [email protected] [email protected].
Recommended publications
  • 2019 City Wide Development Charges Background Study
    2019 City-Wide Development Charges Background Study Version for Public Consultation HEMSON C o n s u l t i n g L t d. March 15, 2019 Table of Contents List of Acronyms .......................................................................................... 1 Executive Summary ...................................................................................... 2 A. Purpose of 2019 Development Charges (DC) Background Study .. 2 B. City-Wide and Area-Specific DCs Have Been Calculated ............... 3 C. Development Forecast .................................................................... 4 D. Public Transit Ridership Forecast ................................................... 5 E. Calculated Development Charges .................................................. 5 F. Cost of Growth Analysis .................................................................. 6 G. Development Charges Administration & Policy Considerations ...... 7 I Purpose of 2019 Development Charges Background Study ............. 8 A. Introduction and Background .......................................................... 8 B. Legislative Context .......................................................................... 9 C. The 2019 DC Study is Intended to be an Interim Update ................ 9 D. Consultation And Approval Process ................................................ 9 E. Key Steps In Determining DCs for Future Development-Related Projects ......................................................................................... 10 F. Long-Term Capital
    [Show full text]
  • Ottawa Transportation Report.Pdf
    OTTAWA THE IMPACT OF TRANSPORTATION IMPROVEMENTS ON HOUSING VALUES IN THE OTTAWA REGION Don R Campbell, Senior Analyst Melanie Reuter, Director of Research Allyssa Epp, Research Analyst WWW.REINCANADA.COM AUTHORS Don R. Campbell, Senior Analyst, REIN Ltd Melanie Reuter, Director of Research, REIN Ltd Allyssa Fischer, Research Analyst, REIN Ltd © The Real Estate Investment Network Ltd. 6 – 27250 58 Cr Langley, BC V4W 3W7 Tel (604) 856-2825 Fax (604) 856-0091 E-Mail: [email protected] Web Page: www.reincanada.com Important Disclaimer: This Report, or any seminars or updates given in relation thereto, is sold, or otherwise provided, on the understanding that the authors – Don R. Campbell, Melanie Reuter, Allyssa Fischer, and The Real Estate Investment Network Ltd and their instructors, are not responsible for any results or results of any actions taken in reliance upon any information contained in this report, or conveyed by way of the said seminars, nor for any errors contained therein or presented thereat or omissions in relation thereto. It is further understood that the said authors and instructors do not purport to render legal, accounting, tax, investment, financial planning or other professional advice. The said authors and instructors hereby disclaim all and any liability to any person, whether a purchaser of this Report, a student of the said seminars, or otherwise, arising in respect of this Report, or the said seminars, and of the consequences of anything done or purported to be done by any such person in reliance, whether in whole or part, upon the whole or any part of the contents of this Report or the said seminars.
    [Show full text]
  • 300 Tremblay Road TIA Strategy Report
    300 Tremblay Road TIA Strategy Report Prepared for: TCU Development Corporation 150 Isabella Street, Suite 100 Ottawa, ON K1S 5H3 Prepared by: Parsons 1223 Michael Street North, Suite 100 Ottawa, ON K1J 7T2 477570 - 01000 1335 & 1339 Bank Street –Scoping Report 1 Document Control Page CLIENT: TCU Development Corporation PROJECT NAME: 300 Tremblay Road REPORT TITLE: TIA Step 4 Strategy Report PARSONS PROJECT NO: 477570-01000 VERSION: Draft DIGITAL MASTER: \\XCCAN57FS01\Data\ISO\477570\1000\DOCS\STEP3-Forecasting\300 Tremblay - TIA Step 3 Forecasting Report.docx ORIGINATOR Juan Lavin, E.I.T. REVIEWER: Matt Mantle, P.Eng. AUTHORIZATION: CIRCULATION LIST: Mike Giampa, P.Eng. 1. TIA Step 1 Screening Form – July 9, 2020 2. TIA Step 2 Scoping Report – July 27, 2020 HISTORY: 3. TIA Step 3 Forecasting Report – August 21, 2020 4. TIA Step 4 Strategy Report – September 18, 2020 300 Tremblay Road – Strategy Report i TABLE OF CONTENTS DOCUMENT CONTROL PAGE ...................................................................................................................................... I 1. SCREENING FORM .............................................................................................................................................. 1 2. SCOPING REPORT ............................................................................................................................................... 1 2.1. EXISTING AND PLANNED CONDITIONS .................................................................................................. 1
    [Show full text]
  • Recommended Plan.Pdf
    Blair Station 9-34 Maintenance and Storage Facility Track redundancy within the facility will be provided to ensure The proposed Maintenance and Storage Facility is an integral the ability to move LRVs under vehicle or system failure part of the project, as it will: conditions. • House and service all of the trains needed to operate the The preferred site for the Maintenance and Storage Facility has line been determined based on the following criteria: • Service vehicles to be used on future LRT lines • Site Characteristics (topography, grade, land use compatibility, expansion capability and environmental • House the operations control centre (signalling, considerations) communications) for the line • Facility Operations (turnaround loops, track redundancy, • Be the primary heavy maintenance facility for the LRT layout efficiency and municipal services) network Maintenance of the LRVs is crucial to maintain vehicle • System Operations (connectivity to the line, efficiency and manufacturer's warranties, minimize long term operating costs access to freight rail), and and provide for system safety and reliability. The Maintenance • Relative Costs (capital, operating, maintenance and and Storage Facility will accommodate the following elements property ownership and acquisition) on-site: The proposed Maintenance and Storage Facility for the DOTT 9-35 • Main facility building housing offices, roster areas, meeting project will be located on lands to the west of the existing OC rooms and control equipment Transpo headquarters and bus maintenance facility located on • Storage yard for regular cleaning and minor maintenance the north side of Belfast Road, west of St. Laurent Boulevard and south of the VIA rail corridor. In order to access this • Repair areas for heavy and light maintenance areas for location, a connecting track is required between the DOTT vehicles alignment and the Maintenance and Storage Facility.
    [Show full text]
  • 1 Report to Rapport Au
    1 Report to Rapport au: Transit Commission Commission du transport en commun 19 June 2019 / 19 juin 2019 Submitted on June 10, 2019 Soumis le 10 juin 2019 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: John Manconi, General Manager / Directeur général Transportation Services Department / Direction générale des transports 613-580-2424 ext./poste 52111, [email protected] Ward: CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2019-TSD-TS-0002 VILLE SUBJECT: Confederation Line: Customer Service Operational Readiness OBJET: Ligne de la Confédération : Préparation opérationnelle du service à la clientèle REPORT RECOMMENDATION That the Transit Commission receive this report for information. RECOMMANDATION DU RAPPORT Que la Commission du transport en commun prenne connaissance de ce rapport. 2 EXECUTIVE SUMMARY The opening of O-Train Line 1, the Confederation Line, will mark an exciting and historic transformation in the way transit service is delivered in the city of Ottawa. OC Transpo has been working with the Rideau Transit Group (RTG) and partners from across the city to transform the current transit service into a world-class multimodal transit system and ensure a positive end-to-end customer experience starting on day one. The opening of Line 1 and the major changes to the bus route network that will follow, will be the largest service change ever for OC Transpo customers. Because our customers are our priority and their experience through and beyond this transitional period is important to us, OC Transpo staff are committed to ensuring that customers are prepared, comfortable and knowledgeable about these changes and the transition period in which they will occur.
    [Show full text]
  • Capital Budget 13 Project Details 14 Transit Services 14 4 Year Forecast 34 Works-In-Progress Listing 36
    Transit Commission Tabled November 4, 2020 Table of Contents Transit Commission Service Area Summary 1 Operating Resource Requirement 3 User Fees 4 Capital Funding Summary 7 Operating & Capital Supplemental Information 8 Analysis 8 Explanatory Notes 10 Capital Budget 13 Project Details 14 Transit Services 14 4 Year Forecast 34 Works-In-Progress Listing 36 Transportation Services Department 2021 Service Area Summary - OC Transpo The Transportation Services Department brings together all services related to the mobility of the city, integrating the planning, implementation, operations and delivery of all modes of transportation. Every service and project delivered by the department impacts how people commute – whether by train, bus, car, bicycle, walking or a combination of these – both now and in years to come. The department operates the OC Transpo system to provide travel options that meet the needs and expectations of customers. All trains and buses are 100 per cent accessible. Both Ottawa and OC Transpo underwent a major transformation with the opening of O-Train Line 1, the Confederation Line last year. The transformation to a multimodal transit system marked a significant change to the way OC Transpo provides service to customers, and the way customers use public transit. OC Transpo works to provide a safe, reliable, comfortable, courteous and affordable transit service for all, to build and retain an engaged workforce, and to meet the policy objectives set by Council and the Transit Commission, all within the established budget.
    [Show full text]
  • Line 1 Preparations Continue
    Transpo Express FALL 2017_Layout 1 2017-Oct-20 10:42 AM Page 1 TRANSPO express WINTERFall 2017 2019 Line 1 preparations continue 2. Derek Stevens 3. Tony Spinello GARAGE ATTENDANT 1. Tim Wielinga PARA TRANSPO 1. 7150 Brian Ferguson 2. 7313 Hussein Suleiman reparations have been underway for some requirements that come with the transition to that have been created and how they will con- time for the highly anticipated launch a multi-modal transit system, made up of bus, tribute to the success of our new light rail line. PCONVENTIONALof O-Train Line 1. Many positions have diesel rail and light rail. Continue reading on been created and filled to meet the changing page 4 for an in-depth look at some of the roles 1. 2883 Manjit Nagra 2. 5833 Kulwinder Sidhu he 2017 Roadeo competition and weather competition this year. Manjit will compete in the In this issue was HOT! Competitors, spectators, staff and 2018 International Roadeo in Tampa, Florida. He 3. 2643 Terry Claesson Tvolunteers came out on a beautiful will be joined by William Castillo, Derek Stevens September Sunday for this year’s annual Roadeo. and Tony Spinello, who will compete in the Mechanical competition. Another successful OperatorPriority Manjit Seating Nagra, who Cards was runner-up in6 past years, won first place in the Conventional Transit Food Drive! 2 2017 ROADEO cont’d P. 4-5 Transecure stories 7 InThe charter this experience issue 2 Accessible entrances NewTraining Nova - onebuses track at at andNew parking Employee at OC Passes Transpo 7 4 OC Celebrates Ottawa cominga
    [Show full text]
  • 2019-December-January
    December 2019 - January 2020 IMAGE decembre 2019 - janvier 2020 1 S A N D Y CCÔTE-DE-ÔTE-DE- H I L L SSABLEABLE DECEMBER 2019 - JANUARY 2020 DÉCEMBRE 2019 - JANVIER 2020 I MPhoto David Elden A G E Winds of change Crumbs whistle through Laurier Avenue from the shops City re Larry Newman rental ucas Nault is moving but he housing doesn’t know where. His hair salon has been in Sandy Hill at 232L Laurier East for 15 years, but will be Susan Young gone in 13 months. That wasn’t his plan. Lucas was a Sandy Hill resident in the t appeared promising, but in the end Versailles, on Henderson, when it was still Sandy Hill has little to celebrate. a family business. He just redecorated his Last fall, having engaged with shop and wasn’t planning on moving . stakeholdersI including Action Sandy Hill, ever. That was before the representative and having conducted an extensive study of Arnon Corp called and told him that of rental accommodation issues across they were not renewing his lease. town, Maclaren Municipal Consulting, Quel choc! Lucas said there was no room hired by the City, released an encouraging for negotiation: Arnon had another lessee. set of recommendations. I called Arnon at the number on the sign They endorsed taking a big step in on the second floor of the building next to the direction of a landlord licensing Lucas, and spoke to Michael Casey who is pilot program, something ASH in charge of leasing. He said that the new believes could be a comprehensive and tenant will likely be another franchise, proactive approach to improve quality probably controlled by MTY Food Group.
    [Show full text]
  • Ottawa Welcomes the Confeder
    OTTAWA WELCOMES THE CONFEDERATION LINE After delays and increasing political frustration, Ottawa’s first electrified light rail line is finally open – marking a new chapter for this Canadian transit pioneer. Vic Simons reports. aturday 14 September 2019 saw Mulroney said: “Ottawa residents deserve a passenger operations would be unachievable, the introduction of Ottawa’s latest world-class transportation system that gets by late 2016 enough track and overhead light rail service to the public – it both them and the economy moving… had been completed to allow LRV testing. was a day that many in the city had Today, that’s exactly what they are getting.” Coupled to infrastructure delays, the coming waited a long time for. winter months saw a number of problems SAlthough the city’s bus-served Transitways Approvals and delays identified with the chosen Alstom rolling have performed a valuable service for over 30 Approved by the city in late 2012, the current stock – a new ‘European-style’ low-floor years, planning for a more robust solution for CAD2.1bn (EUR1.5bn) east-west scheme was platform for the North American market, cross-city travel dates back to the early years originally scheduled to open to coincide with albeit based on a proven design – in the of the 21st Century. Indeed, a north-south the 150th anniversary of Canada becoming an form of heating and communications light rail route was designed, and contracts independent nation in 2017. This is reflected systems failures and carbody and brake awarded, in 2006. This project would have in the choice of the Confederation Line system issues.
    [Show full text]
  • Ottawa 2014 Air Quality and Climate Change Management Plan
    Air Quality and Climate Change Management Plan 2014 – City of Ottawa The following documents were released on the City of Ottawa website on May 13 in advance of the May 20 Environment Committee meeting at which they will be considered. At time of this writing (May 13, 2014) these documents have not been approved by City Council. The version posted on the city website was in 13 parts (plus 3 in French). Ecology Ottawa has here brought those parts together into one document. The parts are as follows: 1. A report to the Environment Committee introducing the main documents (page 2 of this PDF) 2. The 2014 Air Quality and Climate Change Management Plan itself (page 9 of this PDF) 3. Taking Action: a short‐list of recommended actions based upon Roundtable results, subsequent research and assessment, and one‐on‐one consultations with key stakeholders (page 43 of this PDF) 4. Appendix A ‐ GHG Inventory (page 48 of this PDF) 5. Appendix B ‐ 2005 Air Quality and Climate Change Management Plan Progress Report (page 63 of this PDF) 6. Appendix C ‐ Trends in Municipal Climate Change Action Plans (page 71 of this PDF) 7. Appendix D ‐ Existing Energy Incentive and Funding Programs (page 79 of this PDF) 8. Appendix E ‐ Energy Supply and Demand in Ottawa (page 93 of this PDF) 9. Appendix F ‐ Assessment of the Local Improvement Charge Mechanism (page 109 of this PDF) 10. Appendix G ‐ Risk Mitigation through the Protection of Natural Areas (page 123 of this PDF) 11. Appendix H ‐ Public Health Implications of Climate Change in Ottawa (page 131 of this PDF) 12.
    [Show full text]
  • A Long-Term Vision CONFEDERATION HEIGHTS 1950-2050
    A Long-Term Vision CONFEDERATION HEIGHTS 1950-2050 A Long Term Vision for Confederation Heights Presented by: John Caldwell | Nicolas Church | Jessica D’Aoust | Brad Holmes | Joseph Lefaive | NoorAli Meghani Graeme Muir | Yi Qin | Michael Shmulevitch | René Tardif | Barrett Wagar SURP 824 Project Course December 2015 School of Urban and Regional Planning Department of Geography and Planning Queen’s University SCHOOL OF Urban and Regional Planning In partnership with: Public Services and Services Publics et Procurement Canada Approvisionnement Canada The contents of this document do not necessarily reflect the views and policies of Public Service and Procurement Canda or of the National Capital Commission. The contents reflect solely the advice and views of the Queen’s University School of Urban and Regional Planning authors as part of the SURP 824 Project Course. EXECUTIVE SUMMARY A LONG-TERM VISION FOR CONFEDERATION HEIGHTS Produced by: the School of Urban and Regional Planning, Queen’s University OBJECTIVE FROM 1950 TO 2050 Public Services and Procurement Canada (PSPC) and the National In the 1950s, Jacques Gréber created the Plan for the National Capital Commission (NCC) requested the creation of a strategic Capital, which intended to decentralize federal employment in the long-term vision for Confederation Heights, an existing federal National Capital Region The plan resulted in the establishment of office node located in Ottawa, Ontario. The Project Team has been a single-use federal office node at Confederation Heights, which retained to develop a 35-year, long-term plan that will help guide was auto-centric and characterized by sprawling parking lots the future redevelopment of the site.
    [Show full text]
  • Robert Bateman School Council Meeting
    Hunt Club Park Community Association Board of Directors Meeting Minutes January 22, 2020 at 7 pm 2 Lorry Greenberg, 2nd floor, Room 350 Board Members’ Attendance Paul Norris, President & School Liaison Present Connie Ford, Secretary Present Kathy Fisher, Content Editor Absent Louise Pilon, Social Media Present Frank Gualtieri, Treasurer Present Andrew Tomayer, Communications Present (required to leave early) Austin Kattackal Absent Others in attendance Jana Atkinson (Councillor Deans’ Office), Michella Maragoni, Sylvain Bourdeau, Dr. Vineet Sidhu, Theodore Tomayer ITEM SUMMARY OF DISCUSSION Call to order The President called the meeting to order. Five of seven board members were present constituting a quorum and the meeting was declared duly constituted. The agenda for the meeting was approved. 1. Minutes of meeting Paul Norris moved to approve the Board of Director meeting minutes as of October 29, 2019 and December 10, 2019. Frank Gualtieri and Louise Pilon respectively, seconded the motion. All members agreed. 2. Councillor’s Report Diane Deans is doing well. She has completed three rounds of chemotherapy and is recovering from surgery before beginning her second round of chemotherapy. International Women’s Day – The date for Councillor Deans’ Annual International Women’s Day Breakfast is Thursday, March 5, 2020 at the Infinity Convention Centre. Email the Councillor’s office for tickets. LRT Stage 2 Construction Impact Meeting - Councillor Deans has been advised that the City is tentatively planning to host a meeting on February 13 to discuss impacts as a result of construction of Stage 2 of the LRT. Details will be circulated to the association once available. The O-Train is to be shut down as of May for 18 months.
    [Show full text]