PLANNED ENGINEERING WORK and STATION CLOSURES from 1 JULY to 2 AUGUST 2013 STATION CLOSURES:  Edgware Road (Bakerloo Line) Closed for Lift Replacement

PLANNED ENGINEERING WORK and STATION CLOSURES from 1 JULY to 2 AUGUST 2013 STATION CLOSURES:  Edgware Road (Bakerloo Line) Closed for Lift Replacement

PLANNED ENGINEERING WORK AND STATION CLOSURES FROM 1 JULY TO 2 AUGUST 2013 STATION CLOSURES:  Edgware Road (Bakerloo Line) closed for lift replacement.  (Central Line) closed Saturday & Sunday 6/7 July 2013 for adjacent District Line track replacement work (District and Hammersmith & City lines suspended). SUSPENSIONS: Saturday & Sunday 6/7 July 2013, District Line suspended Olympia – Earl’s Court, – West Ham and Dagenham East – Upminster, Hammersmith & City Line suspended east of Moorgate, for track replacement at Olympia, track replacement at Bow Road and drainage work at Upminster. 41 trains instead of 61 (Saturday) and 58 (Sunday) District Line, 25 trains instead of 30 C&H. Replacement buses: . Tower Hill – Bromley-by-Bow all stations then Canning Town. . Tower Hill – Bow Road all stations then Stratford. Saturday & Sunday 6/7 July 2013, Northern Line suspended north of Hampstead for track replacement Brent Cross. 48 trains instead of 72. Replacement buses: . Canons Park – Edgware – Hendon Central all stations then Golders Green – Chalk Farm all stations. . Hendon Central – Chalk Farm all stations. Saturday & Sunday 13/14 July 2013, District Line suspended Tower Hill – East Ham and Hammersmith & City Line suspended east of Moorgate for track replacement and drainage work. 42 trains instead of 61 (Saturday) and 59 (Sunday) District Line, 26 trains instead of 30 C&H. Replacement buses: . Tower Hill – Bromley-by-Bow all stations then Stratford – Upton Park – East Ham. . Stratford – Plaistow – Canning Town – Bromley-by-Bow – Bow Road – Mile End. Saturday & Sunday 13/14 July 2013, Northern Line suspended East Finchley and Golders Green – Stockwell for line upgrade. 20 trains instead of 72. Replacement buses: . East Finchley – Camden Town all stations - King’s Cross . Finchley Central – West Finchley – North Finchley – Arnos Grove . Finchley Road – Golders Green and all stations to Euston including Mornington Crescent. . Stockwell – Oval – Kennington – Elephant & Castle. Waterloo & City Line operated until 22.00 (Saturday) and 10.00 to 20.00 (Sunday). Saturday/Sunday 20/21 July 2013, Metropolitan Line suspended Aldgate – Uxbridge/Northwood, Jubilee Line suspended West Hampstead – Stanmore, for track replacement and drainage work. Enhanced Piccadilly Line service to Uxbridge. 10 trains instead of 35 Metropolitan Line, 18 trains instead of 49 (Saturday) 41 (Sunday) Jubilee Line, 67 trains instead of 69 (Saturday) and 68 (Sunday) Piccadilly Line (enhanced Uxbridge service, reduced Heathrow T4 service). Replacement buses: . Rayners Lane – North Harrow – West Harrow – Harrow-on-the-Hill –Kenton. . Northwood – North Harrow all stations then West Harrow – Harrow-on-the-Hill – Northwick Park – Kenton – Preston Road – Wembley Park . Harrow-on-the-Hill – Stonebridge Park (Saturday) or Baker Street (Sunday). Early morning, late night only both days. . Stanmore – Wembley Park all stations then Stonebridge Park. . Wembley Park – Finchley Road all stations, except West Hampstead in northbound direction. Saturday/Sunday 20/21 July 2013, District Line suspended Tower Hill – Barking, Hammersmith & City Line suspended east of Liverpool Street (diverted to Aldgate), Circle Line reverts to ‘all-round’ operation, for track replacement and drainage work and line upgrade work at East Ham. 43 trains instead of 61 (Saturday) and 59 (Sunday) District Line, 21 trains instead of 30 C&H. Replacement buses: . Tower Hill – Bow Road all stations then Stratford – Upton Park – East Ham – Barking. . Mile End – Bow Road – Bromley-by-Bow – Canning Town – Plaistow – Stratford. Saturday/Sunday 27/28 July 2013, Northern Line suspended High Barnet & Golders Green – Kennington via Bank for track replacement Barnet branch, line upgrade City branch and Crossrail work at Tottenham Court Road. 17 trains instead of 72. Replacement buses: . High Barnet – Totteridge – Woodside Park – North Finchley – Arnos Grove. . Finchley Central – Camden Town all stations then King’s Cross. 456 Underground News

. Mill Hill East – Finchley Central – West Finchley – North Finchley – Arnos Grove. . Finchley Road then Golders Green – Euston all stations including Mornington Crescent. Waterloo & City Line operated until 22.00 (Saturday) and 10.00 to 20.00 (Sunday).

Sunday 28 July 2013, Bakerloo Line suspended north of Queen’s Park for Network Rail engineering. 18 trains instead of 27. Replacement buses: Queen’s Park – Harrow & Wealdstone all stations except South Kenton but plus Preston Road. NOTABLE TRAIN SERVICE VARIATIONS METROPOLITAN LINE (20/21 July 2013) 30 mins Amersham – Harrow-on-the-Hill (fast) 30 mins Amersham – Northwood via Watford 30 mins Chesham – Northwood via Watford 5-15 mins Amersham (combined services) * 5-10 mins Chalfont – Rickmansworth (combined services) * 15 mins Rickmansworth – Northwood via Watford * Includes 30-minute Chiltern Railways service. NORTHERN LINE (27/28 July 2013) 10 mins Edgware – Golders Green 4 trains 6 mins – Morden 13 trains Total: 17 trains