Company Profile Innotrans 2016

Total Page:16

File Type:pdf, Size:1020Kb

Load more

Limited Edition Company Profile InnoTrans 2016 1 List of contents About Ansaldo STS Key Data Worldwide Presence Main References Competencies “Connecting pieces of your world” Business Lines System Integration Activities Mass transit High speed lines Freight Portfolio Copenhagen Metro Genoa Metro Brescia Metro 2 3 Complete Transportation Solutions - Passengers and Freight All around the world, Ansaldo STS supports its clients to create and develop more reliable and sustainable networks that ease urban mobility and solve the challenges of today’s population and cities’ rapid growth. From passenger to freight transportation networks, from urban to intercity and cross-border high speed lines, Ansaldo STS designs and deploys cutting-edge technologies to meet operators’ needs and optimize performance independently of traffic density and complexity. Ansaldo STS has left its mark in the rail industry by implementing advanced technologies on major projects such as: More than 270 Km • ERTMS/ETCS solutions combined with High Speed Rail, Conventional of Unattended Metro contracts all over the world lines or Heavy Haul technologies for safer and interoperable networks • Satellite positioning technology for safer and more accurate rail traffic management • Driverless solutions to improve operational efficiency and flexibility and reduce operation and maintenance costs Ansaldo STS’s Key • CBTC signalling technology to increase performances and reduce success factors: headway through a real moving block • Advanced technology • Catenary free combined with tramway technology (TramWave®) to • Innovative approach to preserve the environment and historical city centers highly complex projects • International presence • Broad Components portfolio, covering all aspects of signalling and and global capability systems solutions (such as Switch Machines, Signals, Level Crossings, • System interoperability Relays, etc.) and efficiency • Compliance to safety That’s how Ansaldo STS moves the rail industry forward, that’s how we and environmental connect pieces of your day to day life. standards • Full system integration A leading international technology company which specializes in railway capabilities signalling and integrated transport systems for passenger and freight rail operations. Ansaldo STS plans, designs, manufactures, installs and commissions signalling components, systems and integrated mobility solutions for the management and control of new and upgraded Railway, Transit and Freight lines worldwide and acts as a lead contractor and turnkey provider on major projects worldwide. Ansaldo STS is listed on the Milan Stock Exchange. 4 5 Railway and Mass Transit Ansaldo STS is a global leader in passenger rail systems, designing, building, operating and maintaining Railway and Mass Transit solutions that range from fully integrated turnkey solutions to traditional signalling systems. These systems can include any of the technological subsystems that make up a transport system, including signalling, power supply, telecommunications, rolling stock and other technologies. Globally, Ansaldo STS supports clients with every type of signalling solution, from track circuits to Communications Based Train Control (CBTC) and from High Speed Railways to Driverless and Conventional Metro Systems. Freight Ansaldo STS has a history in the design and production of a full range of signalling solutions and components and provides operation and maintenance services for Heavy Haul and Freight customers around the world. From the wayside, on-board and office products that comprise a Heavy Haul or Freight network, to complete turnkey systems, Ansaldo STS is a leader in freight rail solutions. Our advanced, modular and scalable planning and control systems have improved network safety, reliability and efficiency to new levels. 6 7 Key Data as of December 2015 REVENUES NEW ORDERS BACKLOG Mln€ 1,383.8 Mln€ 1,336.0 Mln€ 6,410.4 OPERATING INCOME NET FINANCIAL HEADCOUNT (N.) POSITION Mln€ 135.8 (positive net cash) 3,772 Mln€ (338.7) Copenhagen Driverless Metro Order Backlog as of December 2015 Revenue as of December 2015 9% 18% Italy Italy 27% 32% Rest of Europe 19% Rest of Europe 8% North Africa | Middle East North Africa | Middle East Americas Americas Asia Pacific | South Africa Asia Pacific | South Africa 6,410 Mln€ by Geographic area 1,384 Mln€ by Geographic area 17% 23% 24% 23% 8 9 Worldwide Presence “Share the passion” (tot. 2015 headcount 3,772) Worldwide presence Europe, North Africa & Middle East: Genoa, Naples, Turin, Potenza, Paris, Riom, Copenhagen, London, Madrid, Munich, Stockholm, Thessaloniki, Ankara, Tunis, Oran, Rabat, Abu Dhabi, Riyadh, Seul, Shanghai, Guangzhou, Zaragoza Beijing New Delhi Taipei Kolkata Americas: Bangalore Pittsburgh, Batesburg, Honolulu, Kansas City, Los Angeles, Rockville, Toronto, Kuala Lumpur Kingston, Sao Paulo, Lima Gaborone Karratha Johannesburg Brisbane Perth Newcastle Sydney Global Headquarters Main Offices & Sales Representations Factories 10 11 Main References and Projects Worldwide UK Italy France Greece High Speed One - Cambrian High Speed network: High Speed network Metro: Thessaloniki line- Ferriby-Gilberdyke line Milan-Bologne, Rome-Milan, including: Metro: Glasgow subway Milan-Naples, Florence- Tours-Bordeaux (SEA), Le Spain Bologne, Turin-Milan, Brescia- Mans-Rennes (BPL), Paris- Madrid-Lerida HSLFigueras- Germany Treviglio Metros: Rome L A & Strasbourg (East Europe) Perpignan line - Madrid Saarbrücken - Mannheim HSL, LC, Naples L1& L6, Milan L5, Metro: Paris Line 3 Atocha by-pass, HSL La Berlin-Rostock HSL Brescia, Genoa Robla-Pola de Lena Sweden China Boden-Haparanda line Shijiazhuang-Taiyuan DPL (Shi-Tai) Metro: Stockholm Red line Zhengzhou-Xian DPL Metros: Shenyang lines 1 & 2, Denmark Chengdu lines 1 & 2, Hangzhou Metros: Copenhagen M1, line 1, Xian line 2, Zhengzhou line 1 M2, new City-Ring, Aarhus LRT Tramway: TramWave® phase 1 Zhuhai South Korea Seoul-Busan HSL, Osong-Gwangju USA (Honam) HSL, Rotem on-board SEPTA PTC commuter line program , Sudokwon HSL Long Island Rail Road commuter line, Metro: Ui Shinseol LRT East side access Speonk to Montauk Metros: Los Angeles Metro (Green Taiwan Line), Honolulu rapid transit , New Metro: Taipei Circular Line York Metro WMATA Silver Springs India WMATA Dulles Phase 2 TPWS Northern railway, PAAC North Shore Connector TPWS Southern railway NYCT Chambers Street Metros: Kolkata metro, Mumbai monorail, Navi Mumbai metro Venezuela Metro: Los Teques Malaysia North double track Peru Metro: Lima lines 2 - 4 Australia Rio Tinto Brazil Roy Hill Iron Ore Metro: ARTC Sao Paulo CPTM ATP lines 7 - 12 Butler turnkey railway signalling Sao Paulo CPTM ATO lines 7 - 9 - 12 extension, PTA Turkey Botswana Saudi Arabia Gebze - Köseköy line Integrated Safeworking System Metros: Riyadh Princess Metro: Ankara lines (maintenance) Botswana Railways Noura Bint Abdulrahman 1,2,3,4 women’s university metro, Libya Riyadh metro Line 3 Algeria Coastal line Ras Ajdir - Sirth e Oued Tlelat - Tlemcen line Al-Hisha-Sabha U.A.E. Etihad rail stage one Morocco South Africa (Shah - Habshan - Ruwais “Ride the rail” Tangiers - Kenitra HSL Viljoensdrift line) 12 13 Competencies Contractual Capabilities Ansaldo STS’s “full system approach” optimizes strategies, resources and As an expert in Railway, Mass Transit investments and rationalizes technology types to provide state-of-the-art, and Freight signalling and turnkey viable and integrated transportation solutions within a municipality, region projects, Ansaldo STS manages all or country. We act as lead contractor (or consortium partner) and system integrator of the phases of the project, from for major projects around the world, under the following contractual the design to the manufacturing and schemes: installation, testing and commissioning • Contracting for Design & Build • Project Financing and operations and maintenance, • Public Private Partnerships (PPP) independently of network size and • Build, Operate and Transfer (BOT) complexity. • Design, Build, Operate and Maintain (DBOM). Prime Technological Contractor leadership in safety Rolling stock: Solid roots and Technological no Legacy, but preferred track record Integrator access where demand is Subsystem Other Partnering along the complete Vehicles Signalling client value Civil Works chain Operation & Maintenance Serving future Global organization Easing client clients needs financial constraints Copenhagen Metro Driverless 14 15 Business Lines Ansaldo STS delivers a full range of Railway & Mass Transit and Freight Solutions, such as… HIGH SPEED FREIGHT Ansaldo STS is present in over 50% of all High Speed lines built around world (Japan excluded). Ansaldo STS is a leader in the freight transportation market. In Australia, it provides innovative heavy- haul freight rail solutions for several of the country’s key iron ore mining operations. MAIN LINES DRIVERLESS UTO METRO Ansaldo STS provides full-service capabilities to large railway networks. So far, Ansaldo STS has developed more than 250 km of driverless unattended metro lines, with more than 245 stations, 12 control and maintenance centers and 380 trains. SUB-URBAN CATENARY FREE (TramWave®) Commuter rail, also called suburban rail, is a passenger rail transport service that primarily TramWave® is the innovative traction power supply system without overhead catenaries. operates between a city center and the middle to outer suburbs beyond 15 km. CONVENTIONAL METRO TRAMWAY A complete portofolio of solutions where the driver runs the trains up to
Recommended publications
  • Tram Potential

    Tram Potential

    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com JULY 2019 NO. 979 GROWING LONDON’S TRAM POTENTIAL Brussels congress debates urban rail safety and sustainability Doha launches Metro Red line service US raises Chinese security concerns India plans ‘Metrolite’ for smaller cities Canberra Energy efficiency £4.60 Realising a 100-year Reduced waste and light rail ambition greater profitability 2019 ENTRIES OPEN NOW! SUPPORTED BY ColTram www.lightrailawards.com CONTENTS 244 The official journal of the Light Rail Transit Association 263 JULY 2019 Vol. 82 No. 979 www.tautonline.com EDITORIAL EDITOR – Simon Johnston [email protected] ASSOCIATE EDITOr – Tony Streeter [email protected] WORLDWIDE EDITOR – Michael Taplin [email protected] 256 NewS EDITOr – John Symons [email protected] SenIOR CONTRIBUTOR – Neil Pulling WORLDWIDE CONTRIBUTORS Tony Bailey, Richard Felski, Ed Havens, Andrew Moglestue, Paul Nicholson, Herbert Pence, Mike Russell, Nikolai Semyonov, Alain Senut, Vic Simons, Witold Urbanowicz, Bill Vigrass, Francis Wagner, Thomas Wagner, Philip Webb, Rick Wilson PRODUCTION – Lanna Blyth Tel: +44 (0)1733 367604 [email protected] NEWS 244 saving energy, saVING COST 258 Doha opens Metro Red line; US politicians Len Vossman explains some of the current DESIGN – Debbie Nolan raise Chinese security concerns; Brussels initiatives driving tramway and metro ADVertiSING celebrates ‘tramway 150’; Arizona’s Valley energy efficiency. COMMERCIAL ManageR – Geoff Butler Tel: +44 (0)1733 367610 Metro extends to Gilbert Rd; Bombardier [email protected] UK to build new Cairo monorail; Luas-style SYSTEMS FACTFILE: london trams 263 PUBLISheR – Matt Johnston system proposed for Ireland’s Cork; Neil Pulling looks at developments on the Kent-Essex tramway is feasible; India UK network formerly known as Tramlink.
  • The Bulletin JOHN E

    The Bulletin JOHN E

    ERA BULLETIN — SEPTEMBER, 2019 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 62, No. 9 September, 2019 The Bulletin JOHN E. PAPPAS, 1943-2019 Published by the Electric Railroaders’ by Alexander Ivanoff Association, Inc. P. O. Box 3323 John Emanuel Pappas, ERA First Vice itation of the two remaining Illinois Terminal Grand Central Station New York, NY 10163 President and Associate Editor of Head- PCCs that were used during a reconstruction lights magazine, died on the morning of project on the Shaker Heights Line (one of For general inquiries, or Bulletin submissions, Monday, July 29, 2019 at the age of 75. He these cars is now preserved at the Connecti- contact us at had been battling cancer for almost a year. cut Trolley Museum). At the close of the bulletin@erausa. org John was a latecomer to the Electric Rail- 1970s, John moved to Texas where he or on our website at erausa. org/contact roaders’ Association, having joined in 2000. worked for Houston METRO for almost two He quickly rose to the position of First Vice decades before returning to Ohio where he Editorial Staff: President, a title he held for 10 years until his worked for several years as head of opera- Jeffrey Erlitz death. As Associate Editor of Headlights, his tions for the Greater Dayton Regional Transit Editor-in-Chief prolific content contributions since 2006 con- Authority. Ronald Yee tinued growing until he wrote and mostly It was his role as Senior Director of Sched- Tri-State News and photographed full issues himself. He collabo- ules for the New York City Transit Authority Commuter Rail Editor rated with Sandy Campbell on the multi-year that took John to New York City.
  • Useful Informatin

    Useful Informatin

    How to get Rome from the “Leonardo Da Vinci” Fiumicino Airport The main airport Leonardo da Vinci (Fiumicino) is located about 26 km from the city centre. The centre of city is easily reached: FROM AND TO FIUMICINO AIRPORT BY TRAIN At the airport’s railway station the Shuttle-Train Leonardo Express direct service (without calling at other stations) takes just 31 minutes to get to Termini Station (intersecting with the Metro Lines A & B) and leaves every half hour from 6.36 a.m. to 11.36 p.m. FROM AND TO FIUMICINO BY TAXI Taxis licensed by Rome City Council are white and have a sign bearing the word “TAXI” on their roofs and by the identifying licence number on the doors, on the back and inside the car. The symbol of the Rome City Council is clearly visible on the front doors and the license inside the back left. Other vehicles waiting on exiting the airport may well be driven by unauthorized persons and the fare could therefore be a great deal higher. Taxis for Rome are found at the exits of both the domestic and international arrival terminals. Fares: • to and from Fiumicino Airport – Ostiense Railway Station €45 • to and from Fiumicino Airport – The Aurelian Wall €48 • to and from Fiumicino Airport – Tiburtina Railway Station €55 A maximum fare of €70 has moreover been set for journeys starting from inside the Rome Ring Road (Grande Raccordo Anulare) and heading to Fiumicino airport in the event that the taxi metre should display a higher sum. The number to dial a taxi is: +39 06 0609 / +39 06 3570 Click for further information: http://www.3570.it http://www.agenziamobilita.roma.it/en/app.html http://www.agenziamobilita.roma.it/en/taxi-fares-in-rome.html Events srl Congress&Communication – Via Mantegna 1, 60019 Senigallia (AN) P.I./C.F.
  • San Giovanni Report

    San Giovanni Report

    San Giovanni Living Next to a Transit Corridor Brooke Shin Madeleine Galvin Raphael Laude Shareef Hussam Rome Workshop 00 Introduction San Giovanni in the urban context of Rome Image Subject Rome Workshop Outline Contents 00 Introduction 1 Outline Getting Oriented A Transit Corridor Methodology Hypotheses 01 History 15 Summary Timeline A Plan for San Giovanni Construction Begins A Polycentric Plan Metro Construction 02 Statistics 19 Summary Key Data Points Demographics & Housing Livability Audit 03 Built Form 25 Summary Solids Voids Mobility 04 Services 37 Summary Ground-Floor Use Primary Area Services Secondary Area Services Institutions 05 Engagement 49 Summary Key Stakeholders Intercept Interviews Cognitive Mapping 06 Conclusion 57 Key Takeaways Next Steps Bibliography, Appendix 3 Introduction Graphics / Tables Images Urban Context Study Area Broader / Local Transit Network 1909 Master Plan 1936 Historical Map 1962 Master Plan Population Density Population Pyramids Educational Attainment Homeownership San Giovanni Transit Node Building Typologies/Architectural Styles Public Spaces Sidewalks, Street Typologies, Flows Primary Area Services Secondary Area Services Ground Floor Use Map Daily Use Services Livability Audit Key 4 Rome Workshop Introduction The Rome Workshop is a fieldwork-based course that takes students from the classroom to the city streets in order to conduct a physical assess- ment of neighborhood quality. Determining the child and age-friendliness of public spaces and services was the main goal of this assessment. The San Giovanni neighborhood starts at the Por- ta San Giovanni and continues over two kilome- ters south, but this study focused specifically on the area that flanks the Aurelian Walls, from the Porta San Giovanni gate to the Porta Metronio gate.
  • Italferr S.P.A. 2019 ANNUAL REPORT

    Italferr S.P.A. 2019 ANNUAL REPORT

    Italferr S.p.A. (Translation from the Italian original which remains the definitive version) Italferr S.p.A. 2019 ANNUAL REPORT 2019 Annual Report 1 Italferr S.p.A. Italferr S.p.A. Single-member company managed and coordinated by Ferrovie dello Stato Italiane S.p.A. Share capital: €14,186,000, fully paid up Registered office: Via Vito Giuseppe Galati 71, 00155 Rome Tax code and company registration no.: 06770620588 REA no.: 541241 VAT number: 01612901007 Web site: www.italferr.it 2019 Annual Report 2 Italferr S.p.A. MISSION Italferr is the Ferrovie dello Stato Italiane group’s engineering company with over 30 years of consolidated experience in large infrastructural projects for traditional and high-speed railways, underground and road transport and the design of ports and stations in Italy and abroad. Its mission is to build infrastructure in accordance with high quality standards, deadlines and the budget, covering all technical and management activities for the planning, design, execution, inspection and commissioning of the works. Italferr offers innovative, high-tech services ranging from design to contracting, works management and supervision, inspection and commissioning of lines, stations and intermodal and interport hubs, project management, organisational consultancy, training and the transfer of specialised, avant-garde know-how. 2019 Annual Report 3 Italferr S.p.A. COMPANY OFFICERS Board of directors: Chairman Mario Serio Chief Executive Officer Aldo Isi Director Sabrina De Filippis 1 Director Claudia Eccher Director Sergio Salvio Board of statutory auditors: Chairwoman Roberta De Felice Standing statutory auditor Fabio Mastrangelo Standing statutory auditor Davide Rossetti Alternate statutory auditor Luca Provaroni Alternate statutory auditor Federica Silvestri INDEPENDENT AUDITORS 1 KPMG S.p.A.
  • Vomero, but Right by a Funicular Ride Into the Centre

    Vomero, but Right by a Funicular Ride Into the Centre

    Page 66 S1 Escape: Budget break Daily Mail, Saturday, March 2, 2019 Naples for less than £100 a night WITH Mount Vesuvius looming in the distance, Mediterranean waves slapping on the harbour walls, ancient castles, trips of Pompeii and labyrinthine lanes, Naples is perfect for an intriguing weekend away. The capital of the Campania region in southern Italy is famous for its manic edginess — as well as the invention of pizza — and can be an affordable choice for a short dei Tr break ... if you know where to look. Via ibu nali aribaldi Where to stay omero G ÷ Attico Partenopeo V tation IN THE heart of the old town, this S bijou eight-room hotel/B&B is hidden at the top of an apartment Vibrant: Clockwise block; you take a lift to the fifth floor reception. Rooms have comfortable from top left, Neapolitan beds, modern art and balconies (in pizza, a traditional street some) facing Vesuvius. Organic unicular scene and minimalist breakfast is served in a bright dining F Hotel Palazzo Caracciolo room or on a suntrap terrace. B&B doubles from £61; add £17.50 for Vesuvius views (atticopartenopeo.it) ÷ Hotel Cimarosa ON A hill in the peaceful residential district of Vomero, but right by a funicular ride into the centre, Getting there Y Cimarosa is an arty hotel with 16 modern rooms. This is a great British AirwaYS has ett return flights from / G hideaway for those seeking to escape the old town’s bustle. London Gatwick to Naples alli B&B doubles from £69 from £48 (ba.com).
  • International Students Guide 2021 2022

    International Students Guide 2021 2022

    Istituzione di Alta Formazione Artistica Musicale autorizzata con D.M. 144 del 1° agosto 2012 Ministero dell’Istruzione, dell’Università e della Ricerca STUDENT GUIDE Useful Information Before your departure and upon your arrival ---------------------------------------------------------------- Saint Louis College of Music Via Baccina, 47 - Via Urbana, 49/a - Via del Boschetto, 106 – Via Cimarra 19/b (00184, Roma) Tel +39 (0)6 4870017 - Fax +39 (0)6 91659362 www.slmc.it / www.saintlouiscollege.eu / [email protected] Sede legale: Via Cimarra 19b Roma Partita IVA 05731131008 – Registro Società del Tribunale di Roma n. 918703 . S i n c e 1 9 7 6 ---------------------------------------------------------------- Welcome to Saint Louis!………………………………………………………………… pag. 3 About Us….……………………………………………………………………………… pag. 3 Academic Programs……………………………………………………………………… pag. 3 Academic Calendar……………………………………………………………………… pag. 4 National Holidays and Breaks…………………………………………………………… pag. 4 Locations ………………………………………………………………………………… pag. 4 International Office ……………………………………………………………………… pag. 4 Orientation day…………………………………………………………………………… pag. 5 Dedicated services for Erasmus+ students ……………………………………………… pag. 5 CFA, ECTS and grading system ………………………………………………………… pag. 5 PRACTICAL INFORMATION Accommodation before arrival...………………………..……………………………… pag. 6 Visa / Residence Permit / Residence Registration ……………………………………… pag. 6 Codice fiscale…………………………………………………………………………… pag. 8 Health insurance ………………………………………………………………………… pag. 9 How to get to Saint Louis ………………………………………………………………
  • The Copenhagen Test and Treat Hepatitis C in a Mobile

    The Copenhagen Test and Treat Hepatitis C in a Mobile

    Open access Protocol BMJ Open: first published as 10.1136/bmjopen-2020-039724 on 9 November 2020. Downloaded from The Copenhagen test and treat hepatitis C in a mobile clinic study: a protocol for an intervention study to enhance the HCV cascade of care for people who inject drugs (T’N’T HepC) Jeffrey Victor Lazarus ,1 Anne Øvrehus,2 Jonas Demant,3 Louise Krohn- Dehli,4 Nina Weis 4,5 To cite: Lazarus JV, ABSTRACT Strengths and limitations of this study Øvrehus A, Demant J, et al. Introduction Injecting drug use is the primary driver of The Copenhagen test and hepatitis C virus (HCV) infection in Europe. Despite the ► This protocol presents one of the first studies glob- treat hepatitis C in a mobile need for more engagement with care, people who inject clinic study: a protocol for an ally to employ a peer-led integrated model of care, drugs (PWID) are hard to reach with HCV testing and intervention study to enhance with the latest point-of- care technology, to target treatment. We initiated a study to evaluate the efficacy for the HCV cascade of care people who inject drugs for hepatitis C testing, treat- testing and linkage to care among PWID consulting peer- for people who inject drugs ment and care outside of addiction treatment. (T’N’T HepC). based testing at a mobile clinic in Copenhagen, Denmark. BMJ Open ► The study will use both antibody rapid detection Methods and analysis In this intervention study, we will 2020;10:e039724. doi:10.1136/ tests and RNA point- of-care testing in order to sim- bmjopen-2020-039724 recruit participants at a single community- based, peer- run plify and expedite hepatitis C diagnosis.
  • DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website

    DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website

    EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor.
  • Omplete Pdf English Version

    Omplete Pdf English Version

    7th Technical-Scientific Conference Italian Army Transport and Material School - Conference Room Via dell’Esercito – Cecchignola - Roma 6-8 November 2007 MIMOS, a Society that associates who in Italy is interested and involved in modelling & simulation and virtual reality, is organizing its seventh annual edition of Technical and Scientific Conference. It is the first time that the Conference is moved from its historical site in Turin to be held in Rome in order to achieve a greater prominence and a wider audience involvement. The event aims at facilitating the exchange of experiences among the participants involved in specific sectors and encouraging the development of liaisons between the different sectors. The Conference is also conceived to offer to audience not familiar with specific topics the opportunity to increase their awareness and possibly to establish relationships between solution providers and end users. The 2007 edition spans over three days and includes several sessions dedicated to recent innovations and achievements in the following topics: • Defence • Medicine and Surgery • Cultural Heritage • Virtual World The first day is fully dedicated to Defence applications and is organised jointly with AFCEA Rome Chapter, which will focus on the support that modelling and simulation technologies provide to NCW, with particular regards to the use of Integrated Test Beds. National Stakeholders speakers, both military and industrial, will be present during the day. The session devoted to Medicine and Surgery applications is foreseen during the second day and covers the evolution of new methods and technologies in Augmented Reality, which are used as a support in surgery and application of simulation based training for innovative surgery techniques, with speakers coming from Universities and research centres on a national and international level.
  • Final Exploitation Plan

    Final Exploitation Plan

    D9.10 – Final Exploitation Plan Jorge Lpez (Atos), Alessandra Tedeschi (DBL), Julian Williams (UDUR), abio Massacci (UNITN), Raminder Ruprai (NGRID), Andreas Schmitz ( raunhofer), Emilio Lpez (URJC), Michael Pellot (TMB), Zden,a Mansfeldov. (ISASCR), Jan J/r0ens ( raunhofer) Pending of approval from the Research Executive Agency - EC Document Number D1.10 Document Title inal e5ploitation plan Version 1.0 Status inal Work Packa e WP 1 Deliverable Type Report Contractual Date of Delivery 31 .01 .20 18 Actual Date of Delivery 31.01.2018 Responsible Unit ATOS Contributors ISASCR, UNIDUR, UNITN, NGRID, DBL, URJC, raunhofer, TMB (eyword List E5ploitation, ramewor,, Preliminary, Requirements, Policy papers, Models, Methodologies, Templates, Tools, Individual plans, IPR Dissemination level PU SECONO.ICS Consortium SECONOMICS ?Socio-Economics meets SecurityA (Contract No. 28C223) is a Collaborative pro0ect) within the 7th ramewor, Programme, theme SEC-2011.E.8-1 SEC-2011.7.C-2 ICT. The consortium members are: UniversitG Degli Studi di Trento (UNITN) Pro0ect Manager: prof. abio Massacci 1 38100 Trento, Italy abio.MassacciHunitn.it www.unitn.it DEEP BLUE Srl (DBL) Contact: Alessandra Tedeschi 2 00113 Roma, Italy Alessandra.tedeschiHdblue.it www.dblue.it raunhofer -Gesellschaft zur Irderung der angewandten Contact: Prof. Jan J/r0ens 3 orschung e.V., Hansastr. 27c, 0an.0uer0ensHisst.fraunhofer.de 80E8E Munich, Germany http://www.fraunhofer.de/ UNIVERSIDAD REL JUAN CARLOS, Contact: Prof. David Rios Insua 8 Calle TulipanS/N, 28133, Mostoles david.riosHur0c.es
  • IMESA Electrical Engineering COMPANY PROFILE

    IMESA Electrical Engineering COMPANY PROFILE

    IMESA Electrical Engineering COMPANY PROFILE …ho sempre creduto che al “…my commitment and personal primo posto, nella mia azienda, belief is that in my company dovesse esserci la qualità: quality must always come first, as del prodotto, del servizio, dei for products, service and business rapporti con i clienti, con i quali è relationship alike. With customers necessario dialogare, coordinarsi, it is necessary to dialog, cooperate condividere. La qualità pensai, ci and share experiences. Quality deve differenziare. È quindi per must differentiate us. questo che, nel 1972, ho scelto As a matter of fact, in 1972, I di produrre tutto internamente: chose to manufacture on my controllare l’intero processo, own to get the whole process dall’acquisto della lamiera al under control from the purchase collaudo finale, avrebbe garantito of raw materials to final testing: la qualità e ci avrebbe aiutato a this would have guaranteed crescere. the quality of our products and Oggi, che l’azienda è una helped us to grow. Today, that the realtà mondiale, che ha clienti company is a worldwide reality , importanti in ogni settore e che which as important customers in dispone di molte sedi, uffici, every sector and that has many Sergio Schiavoni mezzi e, soprattutto di personale offices, equipment, and, above all, highly qualified staff, I can say that Presidente della Holding altamente qualificato, posso affermare che quella scelta si è choice has been a winning one: Holding’s President rivelata vincente: la qualità è il the quality is our true heritage, nostro vero patrimonio, che ci which has allowed us to arrive ha consentito di arrivare fino ad until today and allows us to look to oggi e ci permette di guardare al the future with optimism, knowing futuro con ottimismo, sapendo di that we are on the right way.