PIER 42 PHASE 1B: UPLAND PARK Located along the , from Montgomery St to Jackson St, in the borough of COMMUNITY BOARD #3 PRESENTATION 11 JULY 2019 MNLA, NYCEDC, LMDC CONTENTS 1. UPDATES TO PHASE 1B SITE PLAN & MATERIALS 2. UPDATES TO PHASE 1B PLAYGROUND 3. UPDATES TO COMFORT STATION 4. RESILIENCY & SUSTAINABILITY 5. COORDINATION & SCHEDULE 6. APPENDIX: MASTER PLAN OUTREACH PROCESS & ALTERNATES

Pier 42 Phase 1B: Upland Park Community Board #3 17 June 2019 2 of 34 CLINTON STREET

MONTGOMERY STREET GOUVERNEUR STREET JACKSON STREET

EAST RIVER PARK

CORLEARS HOOK PARK CHERRY STREET AMPHITHEATER WATER STREET

EAST RIVER PARK COMPOST (LESEC) FDR DRIVE

SOUTH STREET PIER 42 PHASE 1B

PIER 42 PHASE 1A

BASKETBALL CITY/ PIER 36 NYC FERRY - LOWER CORLEARS HOOK STOP CONED AIR VENT STRUCTURE NYCDOT MAINTENACE YARD

EAST RIVER

Pier 42 Phase 1B: Upland Park Neighborhood Activity Update Community Board #3 17 June 2019 3 of 34 MONTGOMERY STREET GOUVERNEUR SLIP WEST GOUVERNEUR SLIP EAST JACKSON STREET

FDR DRIVE

LIMIT OF WORK FUTURE SHARED PATH (ESCR) 2 7 1 4 5 3 11 8 EAST RIVER PROMENADE 6 10

NYCDOT BASKETBALL PIER 42 SHED DEMOLITION MAINTENANCE 9 NYC FERRY CITY/ PIER 36 PHASE 1A YARD

EAST RIVER N 100’

Key 1. ENTRY PLAZA 6. VIEWING PLAZA 10. CON ED AIR VENT 2. COMFORT STATION 7. PICNIC KNOLL 11. EXISTING TREES TO REMAIN 3. PLAYGROUND 8. FERRY LANDING WITH BOULDER TERRACE 4. LOWLAND GARDENS 9. RETAINED SHED STRUCTURE FROM PHASE 5. LAWN 1A

Pier 42 Phase 1B: Upland Park Site Plan Phase 1B (12 July 2018 CB#3 Meeting) Community Board #3 17 June 2019 4 of 34 MONTGOMERY STREET GOUVERNEUR SLIP WEST GOUVERNEUR SLIP EAST JACKSON STREET

FDR DRIVE

LIMIT OF WORK FUTURE SHARED PATH (ESCR) 2 7 1 4 5 3 11 8 EAST RIVER PROMENADE 6 10 13 13 NYCDOT PIER 42 SHED DEMOLITION NYC FERRY BASKETBALL 9 MAINTENANCE PHASE 1A 12 CITY/ PIER 36 YARD

EAST RIVER N 100’

Key 1. ENTRY PLAZA 6. VIEWING PLAZA 10. CON ED AIR VENT 2. COMFORT STATION 7. PICNIC KNOLL 11. EXISTING TREES TO REMAIN 3. PLAYGROUND 8. FERRY LANDING WITH BOULDER TERRACE 12. ELEVATED DECK 4. LOWLAND GARDENS 9. RETAINED SHED STRUCTURE FROM 13. ELEVATED DECK MAINTENANCE ACCESS 5. LAWN PHASE 1A

Pier 42 Phase 1B: Upland Park Site Plan Phase 1B Community Board #3 17 June 2019 5 of 34 12 FDR ON RAMP

14 FUTURE SHARED PATH (ESCR) 8 LIMIT OF WORK 6 7 2 5 1

13 4

3

10

9 5 15

BASKETBALL CITY/ PIER 36 NYCDOT MAINTENANCE PIER 42 PHASE 1A YARD 11 N 30’

Key 1. COMFORT STATION 6. NYCDPR M&0 PARKING 11. RETAINED SHED STRUCTURE, PAINTED. PHASE 1A 2. MAIN PEDESTRIAN ENTRY WITH BOULDER "TOTEM" 7. BIKE PARKING 12. FERRY DIRECTIONAL SIGNAGE (BY OTHERS) 3. VEHICULAR ACCESS WITH REMOVABLE BOLLARDS 8. BENCHES, TYP. 13. SPECIALTY PAVING, TYP. 4. ENTRY PLAZA 9. 8' HEIGHT CHAIN LINK FENCE AT NYCDOT YARD 14. CURB WALL 5. BUFFER PLANTING 10. PLAYGROUND (SEE ENLARGEMENT 2) 15. ELEVATED DECK MAINTENANCE ACCESS KEY PLAN

Pier 42 Phase 1B: Upland Park Plan Enlargement: Entry Plaza Community Board #3 17 June 2019 6 of 34 1

KEY PLAN

Pier 42 Phase 1B: Upland Park Perspective 1: Park Entry Community Board #3 17 June 2019 7 of 34 2

KEY PLAN

Pier 42 Phase 1B: Upland Park Perspective 2: Comfort Station Community Board #3 17 June 2019 8 of 34 15 LIMIT OF WORK 14 2 FUTURE SHARED PATH (ESCR) 2 8 2 2

1

6 13 3

5 4 EAST RIVER ESPLANADE TO CORLEARS HOOK PARK TO MONTGOMERY STREET AND EAST RIVER PARK 7 11 12 17 17 16 10 9

EAST RIVER NYC FERRY N 30’

Key 1. PICNIC KNOLL 4. FERRY LANDING WITH SEATING 9. BULKHEAD WITH MARINE RAIL 14. CURBWALL AT FUTURE SHARED PATH 2. TWO (2) 1964 WORLD'S FAIR BENCHES, 5. EXISTING TREES TO REMAIN, TYP. 10. BACKLESS 1964 WORLD'S FAIR BENCHES 15. LES FERRY ELECTRICAL BOX (BY OTHERS) BACKED AND SPACE FOR COMPANION 6. BOULDER SEATING 11. VIEWING PLAZA 16. LES FERRY GATE + SIGNAGE (BY OTHERS) SEATING 7. TRASH RECEPTACLE 12. CON ED AIR VENT 17. EXISTING BENCHES AT EAST RIVER 3. TERRACED BOULDERS ESPLANADE 8. PLANTING SCREEN 13. LAWN KEY PLAN

Pier 42 Phase 1B: Upland Park Plan Enlargement: Ferry Landing Community Board #3 17 June 2019 9 of 34 3

KEY PLAN

Pier 42 Phase 1B: Upland Park Perspective 3: View of Ferry Landing from Shared path Community Board #3 17 June 2019 10 of 34 BOULDERS

1 Large Entry ‘Totem’ 2 Boulder seating 3 Stepping stones through planting area

1 6 6 3 4 5 2

4 Natural cut boulders in lawn 5 Boulder Terrace 6 Small Boulder Scramble

Pier 42 Phase 1B: Upland Park Proposed Site Materials Community Board #3 17 June 2019 11 of 34 SITE FURNISHINGS BENCHES RECEPTACLES TRASH RACK BIKE 1964 World’s Fair Bench (Backed and Backless) Big Belly Solar Receptacles NYC DOT City Rack Bicycle Rack Finish: Galvanized Recycled Plastic Lumber Color: Weathered Wood PAVING PATHWAY PAVING PATHWAY PAVING ACCENT Standard Concrete - Major Pathways and Plazas Concrete with Exposed Aggregate - Plazas Hex Block - Esplanade Transition Colored Concrete - Water Play

Pier 42 Phase 1B: Upland Park Proposed Site Materials Community Board #3 17 June 2019 12 of 34 PLAYGROUND RES, I ONCR UCTU NC. ED C ETE TR OR S ONENTS OL Y SURFAC PE P C LA E A M D P C O L R S C IE E D Y F O T N A A A L C L S P W

ALL PA R EZ F HOCK D BE H S UB RFACE IT TURF R U W IC LL S L T E Y IL E H T F H C E N T I T F N I A O Y M N S S

OTHER PARK MATERIALS XPOSED ON ON E FO G TI C TI O UN D IN TA ICK: OBA TA NST NE DA S ERE WO M D S R L S E T AT TH O A E T B T T V IO L A D R R R D R A S E F : O E O R N T F F : H W D N Z U C : E I M A M N L H A O L O M E P S C C B P G C R

Pier 42 Phase 1B: Upland Park Proposed Site Materials Community Board #3 17 June 2019 13 of 34 CONTENTS 1. UPDATES TO PHASE 1B SITE PLAN & MATERIALS 2. UPDATES TO PHASE 1B PLAYGROUND 3. UPDATES TO COMFORT STATION 4. RESILIENCY & SUSTAINABILITY 5. COORDINATION & SCHEDULE 6. APPENDIX: MASTER PLAN OUTREACH PROCESS & ALTERNATES

Pier 42 Phase 1B: Upland Park Community Board #3 17 June 2019 14 of 34 FUTURE SHARED PATH (ESCR)

LIMIT OF WORK

16 TO COMFORT STATION

+15.50 10 +11.00 +11.60 9 +11.00 4 11 +13.00 8 8 +11.50 14 15 6 7 +17.50 13 18 2 1 +13.50 5

3 +12.00 +12.00 +11.25

17 19 21 12 21 20 19

PIER 42 PHASE 1A 20’ N

Key 1. WEEVOS PLAY STRUCTURE (2-5 YEARS) 7. SYNTHETIC TURF HILLSIDE 13. PIER BRIDGE INCLUSIVE ACCESS TO 17. WHILRLY GIG SPINNER 2. COZY DOME (2-5 YEARS) 8. ACCESSIBLE RAMP TOWERS WITH INCLUSIVE PLAY ELEMENTS 18. ECLIPSE NET CLIMBER (AGES 5-12) 3. SADDLE SPINNER (2-5 YEARS) 9. LANDING 14. WIDE SLIDE (AGES 5-12) INCLUSIVE 19. RHAPSODY DRUMS 4. WATER PLAY AREA (MIXED AGES, SEE 10. SCRAMBLE STEPS 15. TOWER PLAY STRUCTURE WITH SLIDES, 20. INTERACTIVE PANELS ENLARGEMENT 2.1) CLIMBING, AND GROUND LEVEL INCLUSIVE 11. CLIMBING WALL PLAY COMPONENTS (AGES 5-12) 21. BENCH (TYP) 5. BOULDER WALK/LOW SCRAMBLE 12. PIER POLE STEPPERS 16. TALK TUBES 6. 8' HEIGHT SWINGS (DPR STANDARD) KEY PLAN

Pier 42 Phase 1B: Upland Park Plan Enlargement: Playground Community Board #3 17 June 2019 15 of 34 Pier 42 Phase 1B: Upland Park Play Structures Ages 5-12 Community Board #3 17 June 2019 16 of 34 Pier 42 Phase 1B: Upland Park Play Structures Ages 5-12 Community Board #3 17 June 2019 17 of 34 4

KEY PLAN

Pier 42 Phase 1B: Upland Park Perpsective 4: 5-12 Play Area Community Board #3 17 June 2019 18 of 34 1 WAVE FOUNTAIN 2 MISTER FOUNTAIN 11

6

2 8 3 3 FOUNTAIN SPRAY TYPE 1 4 JET STREAM FOUNTAIN S

4

1 7 9

5 5 FOUNTAIN SPRAY TYPE 2 6 TURTLE STREAM 10 SWINGS

2-5 PLAY AREA

BOULDERS

PLANTING DRY CRAB POOL *SEQUENCING TBD 7 8 BEACHED SEALS **NO STANDING WATER 9 ACCESSIBLE BRIDGE N EXAMPLES OF OTHER PROPOSED SEALS: 10 BOULDERS 8' 11 1964 WORLD'S FAIR BENCH, TYP.

KEY PLAN

Pier 42 Phase 1B: Upland Park Plan Enlargement: Tidal Pool Water Play Community Board #3 17 June 2019 19 of 34 5 12

KEY PLAN

Pier 42 Phase 1B: Upland Park Perspective 5: Water Play and 2-5 Playground Areas Community Board #3 17 June 2019 20 of 34 CONTENTS 1. UPDATES TO PHASE 1B SITE PLAN & MATERIALS 2. UPDATES TO PHASE 1B PLAYGROUND 3. UPDATES TO COMFORT STATION 4. RESILIENCY & SUSTAINABILITY 5. COORDINATION & SCHEDULE 6. APPENDIX: MASTER PLAN OUTREACH PROCESS & ALTERNATES

Pier 42 Phase 1B: Upland Park Community Board #3 17 June 2019 21 of 34 Pier 42 Phase 1B: Upland Park Comfort Station Perspective Community Board #3 17 June 2019 22 of 34 ROOF HATCH

GRAVITY VENTILATION HOODS

MECHANICAL VENT SCREEN

SLOPED ROOFING

CUSTOMIZED PERFORATED METAL SECURITY SCREEN WITH CLERESTOR GLAZING

MASONRY (COBALT)

180 SWING OUT DOOR

PERFORATED STAINLESS STEEL WINDOW SCREEN DRINKING FOUNTAIN AXONOMETRIC BULLETIN BOARD

Pier 42 Phase 1B: Upland Park Comfort Station Axon Community Board #3 17 June 2019 23 of 34 CONTENTS 1. UPDATES TO PHASE 1B SITE PLAN & MATERIALS 2. UPDATES TO PHASE 1B PLAYGROUND 3. UPDATES TO COMFORT STATION 4. RESILIENCY & SUSTAINABILITY 5. COORDINATION & SCHEDULE 6. APPENDIX: MASTER PLAN OUTREACH PROCESS & ALTERNATES

Pier 42 Phase 1B: Upland Park Community Board #3 17 June 2019 24 of 34 CLINTON STREET MONTGOMERY STREET GOUVERNEUR STREET JACKSON STREET

EAST RIVER PARK

CORLEARS HOOK PARK CHERRY STREET 500 YEAR FLOOD LEVEL EAST RIVER PARK WATER STREET AMPHITHEATER 100 YEAR FLOOD LEVEL

FDR DRIVE

LIMIT OF WORK PIER 42 PHASE 1B

PIER 42 PHASE 1A BASKETBALL CITY/ PIER 36 NYC FERRY - CORLEARS HOOK STOP CONED AIR VENT STRUCTURE

NYCDOT MAINTENACE YARD

EAST RIVER

Pier 42 Phase 1B: Upland Park Existing Flood Levels Community Board #3 17 June 2019 25 of 34 MONTGOMERY STREET GOUVERNEUR SLIP WEST GOUVERNEUR SLIP EAST JACKSON STREET

FDR DRIVE

COMFORT STATION LIMIT OF WORK FFE: 12.5

NYCDOT BASKETBALL MAINTENANCE PIER 42 PHASE 1A CITY/ PIER 36 NYC FERRY YARD AVERAGE DECK ELEVATION 9.1

EAST RIVER

100 YEAR FLOODPLAIN 11.00*

EXISTING UPLAND ELEVATION 6.65-8.65* N 100’ MEAN HIGH WATER MARK 1.96* *DATUM: NAVD88

Pier 42 Phase 1B: Upland Park Phase 1B Proposed Elevations Community Board #3 17 June 2019 26 of 34 40’

125° 30’

25° 30°

20’

10’

NORTH 0’

Proposed tree locations to be coordinated with solar light locations to not restrict light collection and output.

Evergen Solar LED Light by Sol.

Pier 42 Phase 1B: Upland Park Solar Lighting Community Board #3 17 June 2019 27 of 34 FDR DRIVE

ESCR SHARED PATH* LIMIT OF WORK ESCR SHARED PATH*

EXISTING PROMENADE LIGHTING TO REMAIN

NYCDOT BASKETBALL MAINTENANCE CITY/ PIER 36 PIER 42 PHASE 1A NYC FERRY YARD

EAST RIVER

Legend

Solar Light and Photometric Reach

*Lighting for shared path to be designed and installed under ESCR contract N 100’

Pier 42 Phase 1B: Upland Park Solar Lighting Plan Community Board #3 17 June 2019 28 of 34 FDR DRIVE

LIMIT OF WORK

NYCDOT PIER 42 PHASE 1A MAINTENANCE NYC FERRY AREA PERCENTAGE YARD EXISTING IMPERVIOUS 130,672 SF 88.22% PROPOSED IMPERVIOUS 52,440 SF 35.40% EAST RIVER APPROX. REDUCTION 78,232 SF 52.82% EXISTING

FDR DRIVE

LIMIT OF WORK COMFORT STATION

NYCDOT PIER 42 PHASE 1A Legend MAINTENANCE NYC FERRY Permeable Area YARD

EAST RIVER N PROPOSED 100’

Pier 42 Phase 1B: Upland Park Impervious Reduction Community Board #3 17 June 2019 29 of 34 FDR DRIVE

LIMIT OF WORK

EXISTING TREES NYCDOT PIER 42 PHASE 1A Legend MAINTENANCE NYC FERRY YARD Proposed Canopy Tree

EAST RIVER Offset Zone for Existing Utility - No Tree Planting CANOPY TREES AND UTILITY OFFSET ZONE

FDR DRIVE

LIMIT OF WORK COMFORT STATION

NYCDOT PIER 42 PHASE 1A EXISTING TREES Legend MAINTENANCE NYC FERRY Plants with High Soil Salt YARD Tolerance Plants with Moderate Soil Salt EAST RIVER Tolerance N SALT TOLERANCE Plants with Low Soil Salt Tolerance 100’

Pier 42 Phase 1B: Upland Park Planting Considerations Community Board #3 17 June 2019 30 of 34 CONTENTS 1. UPDATES TO PHASE 1B SITE PLAN & MATERIALS 2. UPDATES TO PHASE 1B PLAYGROUND 3. UPDATES TO COMFORT STATION 4. RESILIENCY & SUSTAINABILITY 5. COORDINATION & SCHEDULE 6. APPENDIX: MASTER PLAN OUTREACH PROCESS & ALTERNATES

Pier 42 Phase 1B: Upland Park Community Board #3 17 June 2019 31 of 34 PARTIAL CONSTRUCTION OF PARK ENTRY. ENTRY CURB WALL - HEIGHT TO BE 18" AT TO ALLOW FOR ESCR FDR DRIVE INSTALLATION. CONSTRUCTION ACCESS. COMFORT STATION

Legend Curb Wall (Pier 42 Phase 1B) NYCDOT PIER 42 PHASE 1A MAINTENANCE NYC FERRY ESCR Construction Zone/Access Route YARD ESCR Manhole and Regulator Floodproofing (Work to occur during Pier 42 Construction) EAST RIVER PIER 42 PHASE 1B CONSTRUCTION

CONSTRUCTION OF ENTRY FLOOD WALL (ESCR) TO BE FINISHED AFTER ESCR CURB WALL - POST ESCR COMPLETION FDR DRIVE CONSTRUCTION HEIGHT COMFORT STATION VARIES (6" MIN).

Legend Curb Wall (Pier 42 Phase 1B) NYCDOT PIER 42 PHASE 1A MAINTENANCE NYC FERRY ESCR Shared Path YARD ESCR Edge (Treatment Varies)

EAST RIVER N FINAL CONDITION 100’

Pier 42 Phase 1B: Upland Park ESCR Coordination Community Board #3 17 June 2019 32 of 34 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026

PIER 42 PHASE 1A Completed Spring 2019

EAST RIVER FERRY Opened Summer 2018

PIER 42 PHASE 1B Completion 2021

EAST SIDE Completion 2023 COASTAL RESILIENCY

BASKETBALL CITY Schedule TBD ENTRY

Pier 42 Phase 1B: Upland Park Adjacent Project Schedules Community Board #3 17 June 2019 33 of 34 CONTENTS 1. UPDATES TO PHASE 1B SITE PLAN & MATERIALS 2. UPDATES TO PHASE 1B PLAYGROUND 3. UPDATES TO COMFORT STATION 4. RESILIENCY & SUSTAINABILITY 5. COORDINATION & SCHEDULE 6. APPENDIX: MASTER PLAN OUTREACH PROCESS & ALTERNATES

Pier 42 Phase 1B: Upland Park Community Board #3 17 June 2019 34 of 34 STAKEHOLDER ENGAGEMENT PROCESS

CB3 Meeting #1 June 27, 2012

Pier 42 Walking tour w/ community September 30, 2012

CB3 Meeting #2: LISTENING PROGRAMMING October 4, 2012

CAAAV Meeting December 16, 2012

CB3 Meeting #3: LISTENING PROGRAMMING January 23, 2013

Seward Park Coop January 28, 2013

Local High Schools January 31, 2013

NYCHA Houses: LaGuardia, Vladeck, Baruch and Rutgers February 5, 2013

Lower East Side Ecology Center February 5, 2013

Blueway Plan, WXY architecture + urban design February 15, 2013

PS 134 February 27, 2013

CB3 Meeting #4: MASTER PLAN CONCEPTS May 9, 2013

CB3 Meeting #5: THE MASTER PLAN December 5, 2013

PDC Conceptual Meeting January 6, 2014 East River Park

1

3 2 3 4 PROGRAM LEGEND

1 Knoll 5 2 Picnic Lawn 6 3 Bikeway 4 East River Esplanade 8 7 5 Seating Steps 10 6 Marsh 7 Overlook 5 11 8 Buffer 9 13 9 Nature Walk 10 Bridge 6 12 10 11 Grove 12 River Promenade/Seating 14 13 13 Lawn 14 Habitat Restoration 15 15 Playground 16 17 16 Concession/ Comfort Station 17 Pier Pavillion 20 18 Artifi cial Turf 19 EAST RIVER 19 Fountain Plaza 18 20 Entrance Garden

CDOT Yard / EDC NYC Department of Parks and Recreation Pier 42 and Adjacent Landscape Enhanced Partial Deck Concept Mathews Nielsen Landscape Architects 12/5/2013 No Kayak Basin 46 East River Park

1

3 2 3 4 PROGRAM LEGEND

1 Knoll 5 2 Picnic Lawn 6 3 Bikeway 4 East River Esplanade 8 7 5 Seating Steps 10 6 Marsh 7 Overlook 5 11 8 Buffer 9 13 9 Nature Walk 10 Bridge 6 12 10 11 Grove 12 River Promenade/Seating 14 13 13 Lawn 14 Habitat Restoration 15 15 Playground 16 17 16 Concession/ Comfort Station 17 Pier Pavillion 20 18 Kayak Launch 19 EAST RIVER 19 Fountain Plaza 18 20 Entrance Garden

CDOT Yard / EDC NYC Department of Parks and Recreation Pier 42 and Adjacent Landscape Enhanced Partial Deck Concept Mathews Nielsen Landscape Architects 12/5/2013 with Kayak Basin 47