East Side Coastal Resiliency

Community Board 6 Land Use & Waterfront Committee

433 1st Avenue (NYU School of Dentistry), Room 210

May 28, 2019 PRESENTATION AGENDA

PROJECT OVERVIEW & SCHEDULE

DESIGN REVIEW

ENVIRONMENTAL REVIEW & APPROVALS

2 PROJECT OVERVIEW & SCHEDULE

3 PROJECT GOALS & ORIGIN

Provide a reliable, integrated flood protection system; minimize use of closure structures.

Improve waterfront open spaces and access. 25TH STREET Achieve implementation milestones and project funding allocations as established by HUD. ESCR

Respond quickly to the urgent need for increased flood protection and MONTGOMERY STREET resiliency.

4 PROVIDE FLOOD PROTECTION

5 OVERALL PROJECT AREA PROJECT AREA 1 AND 2

MONTGOMERY ST

14TH ST 20TH ST 23RD ST

DELANCEY ST

FDR DRIVE

HOUSTON ST

6TH ST

FDR DRIVE

10TH ST

FDR DRIVE

(Not to scale)

6 FLOOD PROTECTION PROJECT AREA 2

14TH ST 20TH ST 23RD ST

10TH ST FDR DRIVE

PROJECT AREA 1 PROJECT AREA 2

(Not to scale)

SWING GATE ROLLER GATE

FLOODWALL (ABOVE GRADE) FLOODWALL (BELOW GRADE)

7 IMPROVED WATERFRONT ACCESS REPLACING, IMPROVING AND CREATING NEW CONNECTIONS

2 3R D S T 2 0T H S T PRESERVE E. 20TH STREET CONNECTION E V I 14 T R H S D T

R 10 T D H S F T

6T H S E. 20TH STREET FERRY T C U E REPLACE E N E. 10TH ST. BRIDGE AV

H O U S TO N CREATE S T PROJECT FLYOVERAREA 2 BRIDGE AT PINCH POINT PRESERVE PROJECT AREA 1 E. 6TH ST. BRIDGE E D E V L R I A N D C E D R Y F S T

REPLACE DELANCEY ST. BRIDGE

IMPROVE REPLACE E. BRIDGE LANDING CORLEARS HOOK BRIDGE LEGEND

FDR DRIVE Park Access (Bridge)

MONTGOMERY ST Park Access (At Grade) Floodwall Protection CORLEARS Existing VA Hospital Floodwall HOOK FERRY

8 2019 2020 2021 2022 2023 2024

EAST RIVER PARK IMPROVED SCHEDULE OPERABLE SYSTEMS FOR 2023 HURRICANEMURPHY BROTHERS SEASON PLAYGROUND, & ASSER LEVY PLAYGROUND

GROUND FINISH BREAKING

2019 2020 2021 2022 2023 2024

EAST RIVER PARK

MURPHY BROTHERS PLAYGROUND

STUYVESANT COVE PARK

ASSER LEVY PLAYGROUND

OPERABLE FINISH GROUND FLOOD PROTECTION BREAKING SYSTEM

9 PROJECT SCHEDULE OVERVIEW

GRON ESGN ONSTRTON RENG

ONSTRTON ONET REMNRY ESGN N ESGN ROREMENT ONSTRTON

ENRONMENT REE

ES ES RT SOE O RT SSE SSE OR ES REE

5 TY NNNG OMMSSON ONT RES HERNG ROS ERMTTNG

ONET R REMNRY ONT ERMT TY ON N RERTON ESGN ERTTON ESGN TON REE ENS ESGN

22

OMMNTY ENGGEMENT

NTERTE OMMNTY ES R OMMNTY OMMNTY MEETNGS HERNG MEETNGS MEETNGS OEN HOSES

OMMNTY OR MEETNGS

OMMTTEES ORS OMMTTEES ORS ORS

2 NTER 2 SRNG 2 SMMER 2 2 NTER 22 SRNG 22

10 STAKEHOLDER & COMMUNITY ENGAGEMENT

MEETINGS TO DATE

STAKEHOLDER COMMUNITY BOARD AND COUNCIL MEMBER MEETINGS • Peter Stuyvesant Little League • CB6 Land Use/Waterfront Committee • Waterside Plaza Tenants Association Leadership • CB6 Full Board • Waterside Plaza Management • CB6 Working Group • Stuyvesant Town- Peter Cooper Village • CB3/CB6 Joint Waterfront Task Force Tenants Association • Council Member Keith Powers • Solar One • Council Member Daniel Garodnick • Peter Cooper Village • Stuyvesant Town • Stuyvesant Town-Peter Cooper Village Management • Design and Programming workshops for Murphy Brothers and Asser Levy Playgrounds • Multiple Asser Levy Alignment Meetings • VA Hospital • NYU Langone • Large-scale Public Engagement Meetings: Most recent meetings held 12/10/2018; 12/11/2018 • Project Open Houses 05/14/2019 & 05/15/2019 • Various other targeted Stakeholder Meetings • Public School Athletic League (PSAL) 11 DESIGN REVIEW

12 OVERALL PROJECT AREA PROJECT AREA 1 AND 2

MONTGOMERY ST

14TH ST 20TH ST 23RD ST

DELANCEY ST

FDR DRIVE

HOUSTON ST

6TH ST

FDR DRIVE

10TH ST

FDR DRIVE

(Not to scale)

13 AREA PRELIMINARY DESIGN

14 CORLEARS HOOK TO PRELIMINARY DESIGN

RE-CONSTRUCTED DELANCEY ST. BRIDGE

NATURE EXPLORATION

MAINTENANCE AREA FIREBOAT HOUSE

CORLEARS HOOK PARK BRIDGE BASKETBALL COURTS

NEIGHBORHOOD GATHERING LAWN

AMPHITHEATER

EMBAYMENT

15 HOUSTON STREET PRELIMINARY DESIGN

FIELDS 5 & 6

FIELDS 3 & 4

MULTI-USE FIELD HOUSE

TENNIS COURTS TENNIS COURTS

RECONSTRUCTED TRACK HOUSE & ESPLANADE TRACK AND FIELD GREENWAY STEP DOWN RE-CONSTRUCTED DELANCEY ST. BRIDGE EMBAYMENT

HOUSTON BASKETBALL LAWN COURTS

16 Reaches E-G Preliminary Redesign TRACK & EAST 10TH STREET PRELIMINARY DESIGN

RE-CONSTRUCTED E. 10TH STREET BRIDGE BASKETBALL MANHATTAN COURTS GREENWAY RE-CONSTRUCTED TRACK HOUSE E. 10TH S T. MAINTENANCE YARD PLAYGROUND & COMFORT STATION RECONSTRUCTED FIELD 7 TRACK & FIELD

CHALLENGE COURSE

FITNESS FIELD 6 E. 6TH S T. AREA BRIDGE

BBQ

STEP DOWN

17 Reaches H-J Preliminary Redesign FLYOVER BRIDGE PRELIMINARY DESIGN

STUYVESANT COVE PARK

20TH STREET FERRY AVENUE C

14TH STREET MURPHY BROTHERS PLAYGROUND

CON ED

18 PROJECT AREA 2 PRELIMINARY DESIGN

25TH STREET

23RD STREET ASSER LEVY PLAYGROUND

20TH STREET

SOLAR ONE

FDR DRIVE STUYVESANT COVE PARK

20TH STREET FERRY

AVENUE C

MURPHY BROTHERS PLAYGROUND

CON ED FACILITY

19 Reaches L-N Aerial View MURPHY BROTHERS PLAYGROUND PRELIMINARY DESIGN

20 MURPHY BROTHERS PLAYGROUND PRELIMINARY DESIGN

21 STUYVESANT COVE PARK PRELIMINARY DESIGN

22 STUYVESANT COVE PARK PRELIMINARY DESIGN

23 STUYVESANT COVE PARK 20TH STREET PARK GATES

24 ASSER LEVY PLAYGROUND PRELIMINARY DESIGN

TIE-IN WITH EXISTING ASSER LEVY VA HOSPITAL PLACE AMENITIES FLOODWALL

EXISTING ASSER EXISTING PLAYGROUND HANDBALL COURT LEVY BATH HOUSE VEHICLE YARD BASKETBALL OPEN & INVITING LANDSCAPE COURT EDGE TO PARK INTEGRATION WITH FLOODWALL

25 ASSER LEVY PLAYGROUND PRELIMINARY DESIGN

26 ENHANCING DRAINAGE INFRASTRUCTURE INTERIORSTORMWATER DRAINAGE SYSTEM COMPONENTS DRAINAGE AND DESIGN CRITERIA AKRF

2 3R THE INTERIOR DRAINAGE SYSTEM IS D S DESIGNED TO WITHSTAND A 5-YEAR T 2 0T NOAA RAINSTORM OCCURRING AT THE H S SAME TIME AS A 100-YEAR STORM SURGE T INTERCEPTOR

1 GATE BUILDING 4T H S THE INTERIOR DRAINAGE IS ALSO T 1 0T DESIGNED TO WITHSTAND THE H S FUTURE RISK OF A 2-YEAR NOAA T

RAINSTORM OCCURRING AT THE 6T H S SAME TIME AS A 100-YEAR STORM T C SURGE AND 2050s SEA LEVEL RISE U E E N AV

H O UPLAND DRAINAGE STRATEGY: U S TO N PARALLEL CONVEYANCE S T PROJECT AREA 2

PROJECT AREA 1

E D E V L R I A N D C E D R Y F S T

LEGEND

Existing Interceptor

New Parallel Conveyance

Interceptor Gate Building

EAST RIVER INTERCEPTOR New Flood Protection

FDR DRIVE GATE BUILDING

MONTGOMERY ST Floodwall

Existing VA Hospital Floodwall

2015 FEMA 100-YEAR Flood Hazard Boundary 2050s FEMA 100-YEAR Flood Hazard Boundary

27 IMPROVED DRAINAGE NORTH INTERCEPTOR GATE CHAMBER BUILDING

GATE BUILDING

STUYVESANT TOWN

PETER COOPER VILLAGE

20TH STREET

AVE C

28 NORTH GATE BUILDING SITE PLAN

20TH STREET 5’-8” 64’

MOBILE

28’ GENERATOR

10’-8” AREA

INTERCEPTOR SEWER 5’-8”

RESIDENTIAL ENTRANCE 20TH STREET LOOP STREET 20TH

620 E. 20THST.

N 0’ 5’ 20’ 40’

SCALE: 1/16” = 1’

29 NORTH GATE BUILDING PERSPECTIVE VIEW FROM NORTH

30 ENVIRONMENTAL REVIEW & APPROVALS

31 ENVIRONMENTAL REVIEW STANDARDS

COORDINATED ENVIRONMENTAL REVIEW UNDER 3 STATUTES:

Environmental Impact Statement (EIS) will satisfy requirements of all three statutes • National Environmental Policy Act (NEPA) • State Environmental Quality Review Act (SEQRA) • City Environmental Quality Review (CEQR)

LEAD AGENCIES:

Environmental review coordinated by head agencies, with cooperating, involved and inter- ested Federal, State and City agencies • NEPA - NYC Office of Management and Budget • SEQRA/CEQR - Department of Parks & Recreation

32 OVERVIEW OF EIS ALTERNATIVES

ALTERNATIVE 1: No Action Alternative

ALTERNATIVE 2: Flood Protection System on the West Side of East River Park – Baseline

ALTERNATIVE 3: Flood Protection System on the West Side of East River Park – Enhanced Park and Access

ALTERNATIVE 4: Flood Protection System with a Raised East River Park (Preferred Alternative)

ALTERNATIVE 5: Flood Protection System East of FDR Drive

33 UNIFORM LAND USE REVIEW PROCEDURE PROPOSED ACTIONS ACQUISITION (EASEMENTS): Project Area One • Gouverneur Gardens Cooperative • East River Housing Corporation • NYCHA (Riis Houses and )

Project Area Two • Con Edison – For Operations & Maintenance of the Flood Protection System • Con Edison Power Station • Con Edison Office and Parking Lot • VA Medical Center – For Operations & Maintenance of the Flood Protection System • VA Hospital • Captain Patrick J. Brown Walk – For Construction of the Flyover Bridge

A zoning text amendment is necessary to acknowledge compliance of the pro- posed design with the City’s Zoning regulations for a portion of the project area

City Map change (anticipated at a later date) for reconstruction of pedestrian bridges. 34 DEIS IMPACT ANALYSIS OVERVIEW

DEIS Impact Analysis Overview

DEISDEIS OPERATIONALOPERATION ANALYSES: ANALYSES DEISDEIS CONSTRUCTIONCONSTRUCTIONAL NALYSES: ANALYSES Socioeconomics • Land Use, Zoning, and Public Policy (Ch. 5.1) • (Ch. 6.1) Open Space** • Socioeconomics (Ch. 5.2) • (Ch. 6.2) Historic and Cultural Resources • Open Space (Ch. 5.3) • (Ch. 6.3) Urban Design and Visual Resources (views) • Historic and Cultural Resources (Ch. 5.4) • (Ch. 6.4) Natural Resources • Urban Design and Visual Resources (Views)** (Ch. 5.5) • (Ch. 6.5) Hazardous Materials • Natural Resources (Ch. 5.6) • (Ch. 6.6) Water and Sewer Infrastructure • Hazardous Materials (Ch. 5.7) • (Ch. 6.7) Energy • Water and Sewer Infrastructure (Ch. 5.8) • (Ch. 6.8) Transportation* • Transportation (Ch. 5.9) • (Ch. 6.9) Air Quality • Neighborhood Character (Ch. 5.10) • (Ch. 6.10) Greenhouse Gas Emissions • Environmental Justice (Ch. 5.11) • (Ch. 6.11) Noise and Vibration** (Ch. 6.12) *Potential for Significant Adverse Effects • Public Health (Ch. 6.13) **Unavoidable • 19

35 NYCNYC PARKS ANTICIPATED ANTICIPATED NEIGHBORHOOD NEIGHBORHOOD IMPROVEMENTS IMPROVEMENTS INTERIMINTERIM RECREATION RECREATION PARK UPGRADES MORE PROGRAMMING, NEW PARK SPACES

BEFORE

AFTER Precedent Images: Van Alst, PRECEDENT: STROUD SPORTS COATING RAIN GARDENS ACCOMMODATING FIELD USERS LAGUARDIA BATH HOUSE

BEFORE

AFTER Precedent Images: Fountain of Youth, Bronx PAINTING TREE PLANTING MORE RECREATIONAL PROGRAMMING PIER 42 PHASE 1: UPLAND PARK

BEFORE

AFTER Precedent Images: JJ Byrne, Brooklyn Image courtesy of SHoP Architects ASPHALT TO TURF SOLAR FIELD LIGHTS MORE NEIGHBORHOOD PARK STAFF PIER 35

36 NYC PARKS ANTICIPATED NEIGHBORHOOD IMPROVEMENTS

1. Sports Coating 7. BBQs 2. Painting 8. Tennis 3. Trees and Rain Gardens 9. Cool Pools: Dry Dock 4. Ballfields 10. New Spaces: • Increased Lighting • LaGuardia Bathhouse • Asphalt to Turf • Baruch Bathhouse • Turf improvements • Pier 42 5. Park Staffing • Pier 35 • Flyover Bridge 6. Recreational Programming

37 DEIS - CONSTRUCTION PERIOD EFFECTS PROJECT AREA 2 - ANALYSES, ASSUMPTIONS AND RESULTS

TRANSPORTATION

1ST AVENUE • Traffic impacts during construction identified at the following intersections (and effects could be fully * mitigated with signal timing changes): • East 23rd Street and First Avenue • East 23rd Street and Avenue C

• Maintenance and Protection of Traffic (MPT) Plans

E 20TH STREET E 23RD STREET are being developed to ensure safety of the public and maintenance of traffic flow during construction

AVENUE C *

FDR DRIVE (ABOVE)

38 REROUTING DETOUR ROUTE DURING CONSTRUCTION

DETOUR DURING EAST RIVER DETOUR DURING FLYOVER PARK CONSTRUCTION CONSTRUCTION SIGNS WILL BE INSTALLED AT SIGNS ON AND OFF THE SOUTHBOUND CYCLISTS THE KEY DECISION POINTS IN GREENWAY WILL DIRECT WISHING TO TRAVEL THE BIKE NETWORK TO INFORM CYCLISTS AND PEDESTRIANS TO BEYOND 23RD STREET CYCLISTS OF THE CLOSURE USE 10TH STREET AVENUE C SHOULD USE THE PROTECTED BIKE LANES E 34 St SIGNS WILL BE INSTALLED ONE ON 2ND AVENUE BLOCK WEST OF THE GREENWAY TO INFORM PEDESTRIANS OF THE CLOSURE Waterside Plaza E 10 St

Stuyvesant Cove

STUYVESANT COVE FERRY ACCESS WILL BE MAINTAINED ON 20TH STREET

East River Park

Williamsburg Bridge CONSTRUCTION CLOSURES CONVENTIONAL BIKE LANE NORTHBOUND CYCLISTS MAY USE PIKE/ OR CLINTON STREET, PROTECTED BIKE LANE SHARED LANE ST Brooklyn Manhattan AND DELANCEY STREET TO REACH 1 Bridge Bridge AVENUE 39 DEIS - CONSTRUCTION PERIOD EFFECTS PROJECT AREA 2 - ANALYSES, ASSUMPTIONS AND RESULTS

NORTH INTERCEPTOR GATE CHAMBER AND BUILDING

• 20th Street Gate/Gate House construction is GATE BUILDING anticipated to last for approximately 1 year

STUYVESANT TOWN • Approximately 11 parking spaces could be lost on East 20th Street during construction and completion of the Interceptor Gate House

20TH STREET • Potential air emission reduction measures include fugitive dust suppression program and an Air Emission AVE C Reduction Program (e.g., fuel and idling restrictions)

• Potential construction noise mitigation measures include specifying use of quieter equipment models or methods, as well as use of noise barriers and equipment enclosures

• Preliminary staging areas include existing parking areas under the FDR Drive and the median on East 20th Street 40 NIGHT WORK CONSTRUCTION

East Broadway

Essex St E 22n d St

R u tgers St

E 1 5th St

E 1 6th St

N orfol k St E 1 7th St

E 1 8th St Rutgers Slip E 8th St Fi rst Ave E 1 9th St Jefferson St E 9th St

t B room e St Su ffol k St S

d Aven u e A n Stan ton St 2 E 23rd St

E St E 24th St ton Cl i n E 3rd St Ch erry St E 4th St E 25th St Cl i n ton St E 26th St E 5th St 1 st A ve Lo op S E 7th St o u t h S

t Rivington St

p o E 1 1 th St

Pi er 36 o R idge St H ou ston St L Aven u e B E 1 2th St t oop S t L E 1 3th St th S h 0 t 2 St E 1 4th St 4 ery 1 Asser Levy tgom Pi tt St Mon Recreation Asser B ial ystoker Pl Center E 20th St H en ry St Levy E 6th St

Gouverneur St M sonadi St Playground Delancey St

Aven u e C E 1 0th St Reach A Sh eri ff St Pedestrian Aven u e C L Reach Q Water St oo Bridge t p Pi er 42 S Col u d m b i a St n

a

r G Reach O Jackson St Szol d Pl Reach B Lewi s St Aven u e D Stuyvesant Cove Park B aru ch D r Corlears Reach N Hook Park B aru ch Pl Murphy Brothers Pedestrian Playground E 5th Wal k Bridge M an gi n St Pedestrian Pedestrian Bridge Reach C Bridge Pedestrian FD R D ri ve Reach M Bridge Car Bridge East River Park Reach L Reach K Reach J Reach D Reach I Reach E Reach F Reach G Reach H

E a s t R i v e r

Williamsburg Bridge

Project Area One 0 1 ,000 FEET Project Area Two Potential Locations of Night Work Ferry Service Locations

Capital Project SANDRESM1 NOTE: PRELIMINARY/IN-PROCESS AND SUBJECT TO CHANGE Potential Locations of Night Work EAST SIDE COASTAL RESILIENCY PROJECT Figure41 1 NEXT STEPS: PUBLIC INPUT TO THE EIS/ULURP PROCESSES

Next Steps: Public Input to the EIS/ULURP Processes

22

42 PROVIDE FLOOD PROTECTION

43 Join us at the upcoming Project Open House!

June 5, 2019 (4 – 8 PM) June 6, 2019 (2 – 8 PM)

Peter Cooper Village 360 First Avenue - Lower Level (entrance on east side of First Avenue at E. 21st Street)

44 Website

Visit Us! www.nyc.gov/escr Twitter: @NYClimate

45