East Side Coastal Resiliency
Community Board 6 Land Use & Waterfront Committee
433 1st Avenue (NYU School of Dentistry), Room 210
May 28, 2019 PRESENTATION AGENDA
PROJECT OVERVIEW & SCHEDULE
DESIGN REVIEW
ENVIRONMENTAL REVIEW & APPROVALS
2 PROJECT OVERVIEW & SCHEDULE
3 PROJECT GOALS & ORIGIN
Provide a reliable, integrated flood protection system; minimize use of closure structures.
Improve waterfront open spaces and access. 25TH STREET Achieve implementation milestones and project funding allocations as established by HUD. ESCR
Respond quickly to the urgent need for increased flood protection and MONTGOMERY STREET resiliency.
4 PROVIDE FLOOD PROTECTION
5 OVERALL PROJECT AREA PROJECT AREA 1 AND 2
MONTGOMERY ST
14TH ST 20TH ST 23RD ST
DELANCEY ST
FDR DRIVE
HOUSTON ST
6TH ST
FDR DRIVE
10TH ST
FDR DRIVE
(Not to scale)
6 FLOOD PROTECTION PROJECT AREA 2
14TH ST 20TH ST 23RD ST
10TH ST FDR DRIVE
PROJECT AREA 1 PROJECT AREA 2
(Not to scale)
SWING GATE ROLLER GATE
FLOODWALL (ABOVE GRADE) FLOODWALL (BELOW GRADE)
7 IMPROVED WATERFRONT ACCESS REPLACING, IMPROVING AND CREATING NEW CONNECTIONS
2 3R D S T 2 0T H S T PRESERVE E. 20TH STREET CONNECTION E V I 14 T R H S D T
R 10 T D H S F T
6T H S E. 20TH STREET FERRY T C U E REPLACE E N E. 10TH ST. BRIDGE AV
H O U S TO N CREATE S T PROJECT FLYOVERAREA 2 BRIDGE AT PINCH POINT PRESERVE PROJECT AREA 1 E. 6TH ST. BRIDGE E D E V L R I A N D C E D R Y F S T
REPLACE DELANCEY ST. BRIDGE
IMPROVE REPLACE E. HOUSTON STREET BRIDGE LANDING CORLEARS HOOK BRIDGE EAST RIVER LEGEND
FDR DRIVE Park Access (Bridge)
MONTGOMERY ST Park Access (At Grade) East River Park Floodwall Protection CORLEARS Existing VA Hospital Floodwall HOOK FERRY
8 2019 2020 2021 2022 2023 2024
EAST RIVER PARK IMPROVED SCHEDULE OPERABLE SYSTEMS FOR 2023 HURRICANEMURPHY BROTHERS SEASON PLAYGROUND, STUYVESANT COVE PARK & ASSER LEVY PLAYGROUND
GROUND FINISH BREAKING
2019 2020 2021 2022 2023 2024
EAST RIVER PARK
MURPHY BROTHERS PLAYGROUND
STUYVESANT COVE PARK
ASSER LEVY PLAYGROUND
OPERABLE FINISH GROUND FLOOD PROTECTION BREAKING SYSTEM
9 PROJECT SCHEDULE OVERVIEW
GRO N ES GN ONSTR T ON RE NG