MEETING TO REVIEW FLOOD

PREPAREDNESS-2020

MEETING AGENDA CHAIRMANSHIP: HON’BLE CHIEF MINISTER,

DATE:-04.06.2020 TIME:-11:00 A.M.

VENUE: 4th FLOOR, MAIN CIVIL SECRETARIAT,HARYANA,.

Irrigation and Water Resources Department, Haryana Sinchai Bhawan, Sector-5, Panchkula.

Ph.No. : 0172-2582541, Fax No. 0172- 2567259 Email: [email protected], Official website: www.hid.gov.in Agenda items for the review meeting to be held on 04.06.2020 under the Chairmanship of Hon’ble Chief Minister, Haryana.

1. Run off on account of Snow Melt in catchment area of Bharkra /Pong

Dam and Monsoon forecast by IMD, Chandigarh.

2. Issue regarding shortage of stone boulder in district Karnal and

Yamunanagar.

3. Status of short term flood protection works alongwith budget requirement.

4. Status of pumps and internal clearance of drains.

5. Regarding balance amount pending with other departments like HSVP,

HSIIDC, ULB for execution of deposit work approved in HSDR&FCB meetings

(Relates to Town & Country Planning Department, Industries Department,

Urban Local Bodies Department).

1

Agenda Note: Snowmelt- Position of Bhakra and Pong Reservoirs of BBMB.

BBMB has anticipated huge Snowmelt to the tune of 5-7 BCM in Satluj catchment and upto 1.83 BCM in Beas catchment during this year besides normal monsoon rainfall prediction (i.e. about 7 to 10 BCM). This has led to management of Reservoirs Levels of Bhakra and in an efficient manner so as to contain the resultant inflow by allowing calculated outflow so as to attain the Reservoir levels as per rule curve.

The levels in Reservoir on dated 27.5.2020 is 1561.13 fti.e. lower by 53.17 ft than the last year. Similarly Pong Dam Reservoir is 1346.06 fti.e. higher by 9.16 ft. Average depth of Snow in Satluj Catchment is 450 mm in 2020 against 243 mm in 2019 which is approximately double than last year. BBMB first flagged the issue as early as during the month of December 2019 and requested all the partner states to utilise maximum water. Accordingly, to cater the expected snow runoff and to create the space, it was decided to gradually increase the releases to 35,000 cusec of water from Bhakra reservoir and 15,000 cusec from Pong reservoir, which are being reviewed on weekly basis based on inflows coming into the reservoirs. In the process the Bhakra reservoir has been depleted from 1594 feet to 1561 feet and Pong reservoir has been depleted from 1360 feet to 1346 feet. With the anticipated inflows and decided releases BBMB may be able to achieve the targeted levels before the onset of monsoon. This will create sufficient storage for the coming rainy season and is likely to save area downstream of from the probable flooding due to any excessive spillage.

From Haryana point of view regarding regulating the reservoirs keeping in consideration the runoffs on account of snow melt and rain fall on year on year basis snow accumulation/rain fall/climatic condition, a portion of precious water on account of spill goes waste by entering in Pakistan through Punjab. While it causes spate in Neighbouring state of Punjab besides going waste to international boundary through d/s Madhopur Headworks/ Firozepur Headworks (about 1.6 BCM from Satluj river (based on an annual average of 10 year) +0.72 BCM from (as per report of committee constituted by Govt. of headed by Member (Design and Research) CWC in the year 2012). It could have been used beneficially, had SYL Canal been constructed.

Thus from flood protection point of view due to anticipated huge releases, there is no issue as far as Haryana is concerned regarding Bhakra catchment. Further in Yamuna Catchment also there is no issue as snowmelt will be upto 30th June and the resultant runoff will either utilized or allowed to flow downstream HKB.

2

Status of Flood Schemes Involving Stone Boulder

Sr. Name of District No. of Status of No. of Quantity of Quantity Quantity of Balance No. Circle short- Agreeme works stone boulder of stone stone boulder Requireme term nt Physically in cum boulder required per nt of Stone flood started required per in cum Boulder (in day for schemes day (upto 15th being cum.) balance works June) for received which are not Works at site physically physically per day started started

1300 cum HKB Circle Yamuna 1200 1 34 Done 27 400 Cum (7 no. 35000 Jagadhri Nagar Cum works)

YWS 1900 Cum 1200 2 Circle Karnal 07 Done 02 300 Cum (5 no. 43900 Cum Karnal works)

Grand Total 78900

3 Physical Progress % of In Progress and Completed Schemes

Sr. No. Name of District 0-25% 25-50% 50-75% 75-100% Total no. of IP & Completed Schemes BWS 1 AMBALA 15 1 4 2 22 2 HISAR 0 0 0 2 2 3 KAITHAL 2 0 0 1 3 4 KURUKSHETRA 6 0 0 0 6 5 PANCHKULA 16 2 0 0 18 6 SIRSA 1 2 0 0 3 Total 40 5 4 5 54 CONSTRUCTION 7 JHAJJAR 0 0 0 1 1 8 KAITHAL 2 1 0 0 3 9 KARNAL 1 0 0 0 1 Total 3 1 0 1 5 LCU 10 BHIWANI 1 0 0 0 1 11 Charkhi Dadri 2 0 0 0 2 12 JHAJJAR 1 0 1 0 2 13 ROHTAK 6 2 2 0 10 Total 10 2 3 0 15 YWS (N) 14 BHIWANI 1 1 1 0 3 15 JIND 0 0 0 1 1 16 KARNAL 6 1 0 0 7 17 PANIPAT 3 0 1 1 5 18 YAMUNANAGAR 6 6 3 12 27 Total 16 8 5 14 43 YWS (S) 19 FARIDABAD 0 0 0 0 0 20 MEWAT 6 0 0 3 9 21 PALWAL 0 0 0 1 1 22 SONIPAT 1 0 0 0 1 Total 7 0 0 4 11 G.Total 76 16 12 24 128

4 Districtwise Abstract of Ongoing Schemes(Short Term) Approved upto 51st Meeting of HSDR & FCB

Related To : Short Term Head:Flood Protection Works (Rs. In Lac) Sr. Name of District Name of Circle No. of Estimated In Prog. Yet to Completed Phy Progress % No Scheme Cost Start Ss S S S BWS 1 AMBALA SYL CIRCLE AMBALA 22 2110.46 22 0 0 27.27 2 HISAR BWS CIRCLE HISAR 2 134.75 0 0 2 100 3 KAITHAL* BWS CIRCLE KAITHAL 3 123.07 3 0 0 40 4 KURUKSHETRA SYL CIRCLE AMBALA 7 154.32 6 1 0 6.67 5 PANCHKULA SYL CIRCLE AMBALA 18 549.40 18 0 0 5.27 6 SIRSA BWS CIRCLE SIRSA 4 111.23 3 1 0 31.67 Total 56 3183.23 52 2 2 CONSTRUCTION 7 JHAJJAR CONSTRUCTION CIRCLE GURGAON 1 109.81 0 0 1 100 8 KAITHAL* SARASWATI HERITAGE CIRCLE 3 64.01 2 0 1 KURUKSHETRA 16.16 9 KARNAL* SARASWATI HERITAGE CIRCLE 1 39.71 1 0 0 KURUKSHETRA 0

Total 5 213.53 3 0 2 LCU 10 BHIWANI LWS CIRCLE BHIWANI 1 33.00 1 0 0 11 Charkhi Dadri LWS CIRCLE BHIWANI 2 297.00 2 0 0 15 12 JHAJJAR JWS CIRCLE JHAJJAR 2 375.70 2 0 0 7.5 13 ROHTAK* LWS CIRCLE BHIWANI 1 52.00 1 0 0 15 14 ROHTAK* YWS CIRCLE ROHTAK 11 187.64 9 2 0 27.72 Total 17 945.34 15 2 0 YWS(N) 15 BHIWANI YWS CIRCLE BHIWANI 3 243.00 3 0 0 31.66 16 JIND YWS CIRCLE JIND 1 322.79 0 0 1 100 17 KARNAL* YWS CIRCLE KARNAL 7 865.02 7 0 0 7.14 18 PANIPAT YWS CIRCLE KARNAL 5 447.55 4 0 1 34 19 YAMUNANAGAR HKB CIRCLE JAGADHRI 34 4761.68 27 7 0 54.62 Total 50 6640.04 41 7 2 YWS(S) 20 FARIDABAD YWS CIRCLE FARIDABAD 2 305.00 0 2 0 0 21 MEWAT YWS CIRCLE FARIDABAD 9 530.68 7 0 2 38.33 1 1238.26 0 0 1 22 PALWAL YWS CIRCLE FARIDABAD 100 3 169.00 1 2 0 23 SONIPAT YWS CIRCLE SONEPAT 0 Total 15 2242.94 8 4 3 Grand Total 143 13225.08 119 15 9

5 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB

BWS AMBALA 1 AMBALA SYL Construction of main nallah 48th S 524.90 201.17 50 % IP CANTT. CIRCLE from railway line near village AMBALA Nanhera upto nh-1 near Shamshan gath in ward no. 16 ambala cantt (MC Ambala).

2 AMBALA SYL Constructing RCC open 48th S 550.00 444.42 95 % IP CANTT. CIRCLE Trough from RD 36000 to AMBALA 30000 (Sub reach of Mahesh Nagar drain)

3 AMBALA SYL Scheme for constructing 49th S 415.00 51.45 15 % IP CANTT. CIRCLE open trough from RD 30000 AMBALA to Gate at RD 26000 of Mahesh Nagar drain

4 AMBALA CITY SYL Construction of Inlet at KM 50th S 60.00 16.28 95 % IP CIRCLE 11.956 on Left Bank of SYL AMBALA Canal

5 NARAINGARH SYL SCHEME FOR 51th S 15.08 0.00 0 % IP CIRCLE REPLENISHING OLD AMBALA STONE STEINING FOR THE PROTECTION OF TOKA GURUDWARA AND APPROACH ROAD OF GURUDWARA FROM ROON NADI.

6 NARAINGARH SYL SCHEME FOR 51th S 33.74 0.00 70 % IP CIRCLE REPLENISHING 5 NO. OLD AMBALA STONE STUDS FOR THE PROTECTION OF AGRICULTURAL LAND OF VILLAGE DEHAR FROM RIVER MARKANDA

7 NARAINGARH SYL SCHEME FOR 51th S 31.31 0.00 75 % IP CIRCLE REPLENISHING 1 NO. AMBALA STONE STUD AND CONSTRUCTING STONE STEINING FOR THE PROTECTION OF AGRICULTURE LAND OF VILLAGE SADIKPUR FROM RIVER BEGNA

6 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 8 NARAINGARH SYL SCHEME FOR 51th S 22.51 0.00 75 % IP CIRCLE CONSTRUCTING 3 NO. AMBALA STONE STUDS FOR THE PROTECTION OF AGRICULTURE LAND OF VILLAGE AMBLI FROM RIVER MARKANDA. 9 MULLANA SYL SCHEME FOR 51th S 20.71 0.00 0 % IP CIRCLE RESTORATION OF DESIGN AMBALA SECTION OF GOLA-GOLI BUND FOR THE PROTECTION OF ABADI AND AGRICULTURE LAND OF VILLAGE GOLA-GOLI AND NAHONI FROM RIVER BEGNA

10 NARAINGARH SYL SCHEME FOR 51th S 29.39 0.00 5 % IP CIRCLE RESTORATION OF DESIGN AMBALA SECTION OF BANOUNDI BUND FOR THE PROTECTION OF ABADI AND AGRICULTURE LAND OF VILLAGE BANOUNDI AND TANDWAL FROM RIVER BEGNA

11 MULLANA SYL SCHEME FOR 51th S 6.58 0.00 10 % IP CIRCLE RESTORATION OF DESIGN AMBALA SECTION OF GOKALGARH DRAIN FOR THE PROTECTION OF VILLAGE ABADI AND AGRICULTURE LANDA OF VILLAGE GOKALGARH.

12 AMBALA SYL SCHEME FOR RAISING 51th S 20.22 0.00 0 % IP CANTT. CIRCLE AND STRENGTHENING OF AMBALA RAMPUR SIRSHERI BUND FROM RD 900 TO 5150 FOR THE PROTECTION OF VILLAGE RAMPUR AND ADJOINING AREA

13 MULLANA SYL SCHEME FOR 51th S 17.73 0.00 10 % IP CIRCLE RESTORATION OF DESIGN AMBALA SECTION OF TAMROLI BUND FOR THE PROTECTION OF ABADI AND AGRICULTURE LAND OF VILLAGE TAMROLI AND NAHOUNI FROM RIVER BEGNA.

7 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 14 AMBALA CITY SYL SCHEME FOR 51th S 53.10 0.00 0 % IP CIRCLE CONSTRUCTING 656 FEET AMBALA LONG THREE TIER STONE STEINING FOR THE PROTECTION OF LMB TANGRI D/S NARWANA BRANCH AT RD 3344 TO 4000 VILLAGE GORSIAN

15 AMBALA SYL SCHEME FOR 51th S 51.85 0.00 0 % IP CANTT. CIRCLE CONSTRUCTING STONE AMBALA STEINING FOR THE PROTECTION OF ABADI OF AMBALA CANTT. FROM RIVER TANGRI FROM RD 4650 TO 5000 OF BABYAL BUND.

16 MULLANA SYL SCHEME FOR 51th S 39.92 0.00 0 % IP CIRCLE CONSTRUCTING STONE AMBALA STEINING FOR THE PROTECTION OF ABADI OF VILLAGE ROLANHERI.

17 MULLANA SYL Scheme for constructing 51th S 37.16 0.00 10 % IP CIRCLE stone steining for the AMBALA protection agriculture land of village Gokalgarh from River Begna. 18 NARAINGARH SYL Scheme for const. stone 51th S 15.03 0.00 0 % IP CIRCLE steining for the protection of AMBALA Agriculture land of village Nagawan from River Begna.

19 NARAINGARH SYL Scheme for Const. stone 51th S 19.99 0.00 10 % IP CIRCLE steining for the protection of AMBALA agriculture land of village Batoura from River Begna.

20 NARAINGARH SYL Scheme for Const. stone 51th S 62.12 0.00 5 % IP CIRCLE steining for the protection of AMBALA agriculture land of village Laha from River Begna.

21 NARAINGARH SYL Scheme for Const. stone 51th S 42.89 0.00 0 % IP CIRCLE steining for the protection of AMBALA agriculture land of village Bhareri Khurd from River Begna.

8 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 22 NARAINGARH SYL Scheme for Const. 552 ft. 51th S 41.23 0.00 75 % IP CIRCLE long and 2 Nos. 3 tier stone AMBALA stud for the protection of agriculture land of village Nagouli from River Begna

District Total 2110.46 713.32 HISAR 23 HANSI BWS Procuring one No. Poclaine 50th S 60.00 45.00 100 % Completed CIRCLE 230 Excavator. HISAR 24 HANSI BWS Procurement of HDPE 200 50th S 74.75 74.75 100 % Completed CIRCLE mm dia pipe. Total 134.75 119.75 KAITHAL 25 GUHLA BWS Scheme for laying RCC pipe 51th S 25.12 0.00 80 % IP CIRCLE line to drain out the flood KAITHAL water of low lying area of village Urlana from RD 0- 1800 and out fall in Ghaggar River.

26 GUHLA BWS Scheme for providing stone 51th S 23.18 0.00 20 % IP CIRCLE pitching from RD 105625 to KAITHAL 106125 on right side of Ghaggar Bund for protection of village Bhatian, Kheri- Daban and Hamu Majra

27 GUHLA BWS Scheme for providing 02 No. 51th S 74.77 0.00 20 % IP CIRCLE stone studs at RD 52550 to KAITHAL RD 52950 of Ghaggar Bund on left side of Ghaggar River for protection village Urlana, Kasour and Ramthali.

District Total 123.07 0.00 KURUKSHETRA 28 PEHOWA SYL Scheme for repair of inlet at 51th S 15.63 0.00 15 % IP CIRCLE KM 23.650/L SYL Canal AMBALA

29 PEHOWA SYL Scheme for strengthening of 51th S 31.00 0.00 0 % IP CIRCLE Left Marginal Bund at RD AMBALA 37000 U/S of River Markanda Bridge to protect village bodha etc (by providing steining).

9 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 30 PEHOWA SYL Scheme for construction of 51th S 11.00 0.00 0 % IP CIRCLE drainage syphon at RD 4450 AMBALA Ismailabad Link Drain.

31 PEHOWA SYL Scheme for construction of 51th S 10.98 0.00 25 % IP CIRCLE drainage syphon at RD AMBALA 15000 Lukhi Minor Drain.

32 PEHOWA SYL Scheme for construction of 3 51th S 30.90 0.00 0 % IP CIRCLE tier Stone Steining for AMBALA protection of RMB D/S Jhansa at RD 6000 for safety for village abadi and agriculture land of Rohti Nurpur Buchi Thaska Miraji, etc.

33 PEHOWA SYL Scheme for construction of 51th S 26.76 0.00 0 % IP CIRCLE inlet at KM 14.527/L of SYL AMBALA Canal.

34 PEHOWA SYL Scheme for replacement 51th S 28.05 0.00 0 % YTS CIRCLE Hindustan Excavator cum AMBALA loader HR -65- 0221 with JCB 3DX Extra Two Wheel Drive.

District Total 154.32 0.00 PANCHKULA 35 KALKA SYL Scheme for constructing 51th S 17.17 0.00 0 % IP CIRCLE 376ft (248 plus 128) double AMBALA tier steining for the protection for Vayayam Shala and abadi of village Kiratpur from river Baad Godam after flood 2019. 36 KALKA SYL Scheme for constructing 51th S 22.56 0.00 10 % IP CIRCLE 496ft double tier steining for AMBALA the protection of abadi of Ganga Colony Near Police Station Kalka from river Jhajjra after flood 2019.

37 PANCHKULA SYL Scheme for constructing 51th S 114.57 0.00 0 % IP CIRCLE 896ft four tier steining for the AMBALA protection of Golf Course, Panchkula from Ghaggar after flood 2019.

10 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 38 KALKA SYL Scheme for constructing 51th S 23.15 0.00 0 % IP CIRCLE 200ft double tier steining and AMBALA 256ft three tier steining for the protection of abadi of ward no. 4 Manakpur Nanak Chand Pinjore from river Jhajjra after flood 2019.

39 KALKA SYL Scheme for constructing 51th S 17.55 0.00 0 % IP CIRCLE 352ft double tier steining and AMBALA 160ft single tier steining for the protection of land from temporary bundhs for diversion of water flow for pumps house Nawa Nagar, Khokhran lift Irrigation scheme after flood 2019.

40 KALKA SYL Scheme for constructing 51th S 18.26 0.00 0 % IP CIRCLE 400ft (168 plus 136 plus AMBALA 96) double tier steining for the protection of village abadi and Sarswati Mandir at Balmiki Basti ward No. 1, Kalka from river Orian after flood 2019.

41 PANCHKULA SYL Scheme for constructing 51th S 20.97 0.00 10 % IP CIRCLE 256ft three tier steining for AMBALA the protection of village abadi in village Aasrewali from Aasrewali nadi tributary of river Ghaggar after flood 2019.

42 PANCHKULA SYL Scheme for constructing 128 51th S 69.90 0.00 0 % IP CIRCLE plus 352 plus 376 ft three tier AMBALA steining for the protection of abadi area of village Belwali from Belwali nadi tributary of river Ghaggar after flood 2019.

43 KALKA SYL Scheme for constructing 256 51th S 15.63 0.00 0 % IP CIRCLE ft double tier steining for the AMBALA protection of abadi area of village Bharuli from river Talan wali nadi tributary of river Tangri after flood 2019.

11 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 44 PANCHKULA SYL Scheme for constructing 51th S 10.26 0.00 0 % IP CIRCLE 224ft double tier steining for AMBALA the protection of Abadi area of village Manakyan from river Manakyan wali nadi tributary of river Ghaggar after flood 2019. 45 PANCHKULA SYL Scheme for constructing 51th S 30.76 0.00 0 % IP CIRCLE 376ft three tier steining for AMBALA the protection of Rehod Bundh and agriculture land of Village Rehod from rivver Tangri after flood 2019.

46 KALKA SYL Scheme for constructing 51th S 17.35 0.00 0 % IP CIRCLE 416ft double tier steining and AMBALA 3 Nos. crated bed bars (Double tier) for the protection of school and agriculture land of village Badhor from river Tangri after flood 2019.

47 KALKA SYL Scheme for constructing 51th S 34.05 0.00 35 % IP CIRCLE 416ft three tier steining for AMBALA the protection of abadi of village Mandlaya from river Begna after flood 2019.

48 KALKA SYL Scheme for constructing 51th S 24.43 0.00 0 % IP CIRCLE 536ft double tier steining for AMBALA the protection of Link Road of Raipur Rani to Rampur from river Tangri after flood 2019.

49 KALKA SYL Scheme of constructing 304ft 51th S 39.03 0.00 40 % IP CIRCLE four tier steining for the AMBALA protection of land near village-Burj Kotian, Panchkula from Ghaggar after flood 2019. 50 KALKA SYL Scheme for constructing 6 51th S 19.68 0.00 0 % IP CIRCLE nos crated bed bars (double AMBALA tier) steining for the protection of agriculture land of village Toda from river Tangri after flood 2019

12 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 51 KALKA SYL Scheme for constructing 5 51th S 19.58 0.00 0 % IP CIRCLE Nos. crated bed bars (Double AMBALA tier) for the protection of Agriculture Land of Village Damdama from river Kaushalya after flood 2019

52 KALKA SYL Scheme for construction. 752 51th S 34.50 0.00 0 % IP CIRCLE feet double tier steining for AMBALA the protection of abadi area of village Madhanwala from River Madhanwali tributary of River Sirsa after flood 2019.

District Total 549.40 0.00 SIRSA 53 ELLENABAD BWS Agenda Note for Internal 51th S 53.61 0.00 50 % IP CIRCLE Clearance of HGMPD from SIRSA RD. 0-141000.

54 KALANWALI BWS Clearance of Patera, 51th S 44.72 0.00 45 % IP CIRCLE Sarkanda and Jal Khumbi SIRSA from bed and side slope of Rangoi Kharif Channel from 153600-280700 an Desilting from RD 163000-180000.

55 RANIA BWS internal clearance of Rania 51th S 2.68 0.00 0 % IP CIRCLE Link Drain from RD 0 to SIRSA 13000 tail.

56 KALANWALI BWS Internal clearance of Rori 51th S 10.22 0.00 0 % YTS CIRCLE Ghaggar Drain from RD SIRSA 100000 to 130750 tail and its subsidiary Drains.

District Total 111.23 0.00 Unit Total 3183.23 833.07

CONSTRUCTION JHAJJAR 57 BAHADURGA CONSTRU Constructing Ditch Drain 49th S 109.81 33.00 100 % Completed RH CTION from KM 31.915 to 46.185 CIRCLE along NCR Channel GURGAON (Approved with condition that the water drained would be utilized for Irrigation)

13 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB District Total 109.81 33.00 KAITHAL 58 KAITHAL SARASWA Scheme for remodeling of 50th S 36.21 0.00 50 % Completed TI flood inlets and repair of HERITAGE adjoining lining at RD CIRCLE 197400/L and RD233500/L KURUKSH of Bhakhra Main Line-Hansi ETRA Branch- Butana Branch- Multi Purpose Link channel

59 KAITHAL SARASWA Scheme for construction of 51th S 13.90 0.00 0 % IP TI inlet/causeway at RD HERITAGE 135500/L of BML-HB-BB- CIRCLE MPLC to protect agriculture KURUKSH land of Village Nouch and for ETRA avoidance of damage to channel.

60 KALAYAT SARASWA Scheme for construction of 51th S 13.90 0.00 0 % IP TI inlet/causeway at RD HERITAGE 204900/L of BML-HB-BB- CIRCLE MPLC to protect agriculture KURUKSH land of Village Kakaut, ETRA Pundri etc. and for avoidance of damage to channel.

District Total 64.01 0.00 KARNAL 61 ASSANDH SARASWA Scheme for construction of 51th S 39.71 0.00 0 % IP TI inlet at RD 308500/R of BML- HERITAGE HB-BB-MPLC to protect CIRCLE agriculture land of Village KURUKSH Fafdana, Thrii, Zabala etc. ETRA and for avoidance of damage to channel.

District Total 39.71 0.00 Unit Total 213.53 33.00 LCU BHIWANI 62 BAWANI LWS Agenda Note for providing 51th S 33.00 0.00 15 % IP KHERA CIRCLE Brick Pitching over Cement BHIWANI Concrete 1:3:6 on side slope and Toe wall in Bed of Kalinga Drain No-I from RD 0 to 1650 near village Abadi out falling at RD 250-L Kharak kalan Sub Minor.

District Total 33.00 0.00 Charkhi Dadri 14 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 63 DADRI LWS Agenda Note for purchase of 50th S 147.00 0.00 0 % IP CIRCLE EP and DP sets for flood BHIWANI Dewatering.

64 DADRI LWS Agenda Note for Drainage 51th S 150.00 0.00 15 % IP CIRCLE cum Irrigation Scheme for BHIWANI the village Bond Khurd along Bond Unn Road from RD 0 to 5400 outfall at RD 4500-R of Sanjarwas Minor.

District Total 297.00 0.00 JHAJJAR 65 JHAJJAR JWS Agenda note for constructing 49th S 92.00 14.98 70 % IP CIRCLE Pump House Beldar Hut JHAJJAR rehabilitation of civil structures and fixing of steel grantings at 11 Nos. of flood pump houses .

66 JHAJJAR JWS Agenda note for providing 49th S 283.70 51.69 25 % IP CIRCLE Brick Lining on both banks of JHAJJAR JLN Escape Channel KM 0.100 to KM 2.000

District Total 375.70 66.67 ROHTAK 67 MEHAM LWS Agenda Note for providing 51th S 52.00 0.00 15 % IP CIRCLE Brick Pitching over Cement BHIWANI Concrete 1:3:6 on Bed and side slope and Toe wall in Bed of Escape channel from RD 0 to 1100 offtake at RD 107200 tail Bhiwani Sub Branch.

68 KALANAUR YWS Agenda Note for laying 51th S 9.20 0.00 0 % IP CIRCLE undeground PVC pipeline ROHTAK from fields to Drain No.8 at RD 141400/Right for Dewatering flood water of Village Madodhi, Dist Rohtak. (CM Announcement Code No. 24923)

15 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 69 KALANAUR YWS Agenda Note for laying 51th S 12.25 0.00 50 % IP CIRCLE underground P.V.C Pipe line ROHTAK from Baliyana Dhani to Drain No. 8 RD 148600 for dewatering flood water of village Patwapur, District Rohtak.(CM Announcement code No. 24925)

70 KALANAUR YWS Agenda note for laying 51th S 23.50 0.00 80 % IP CIRCLE underground P.V.C. Pipe line ROHTAK from fields of Meham Drain at RD 10500/L for dewatering flood waterof village Patwapur District Rohtak.

71 KALANAUR YWS Agenda Note for 51th S 12.25 0.00 0 % IP CIRCLE Construction of pump house ROHTAK for dewatering of Balmiki pond in village Kahanaur, District-Rohtak. (CM Announcement code No. 24922)

72 MEHAM YWS Agenda Note for laying 51th S 18.00 0.00 0 % IP CIRCLE underground Pipeline and ROHTAK constructing Pump house at RD 68100/R Bhiwani Sub Branch.

73 KALANAUR YWS Agenda note for construction 51th S 31.00 0.00 0 % YTS CIRCLE of Embankment of Drain ROHTAK No.8 from RD 187000 to 188250

16 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 74 GARHI YWS Agenda note for constructing 51th S 22.49 0.00 0 % YTS SAMPLA - CIRCLE Mattan Link Drain from RD 0 KALOI ROHTAK to 3000 outfalling into KCB Drain at RD 57000.

75 ROHTAK YWS Agenda Note for laying 51th S 19.70 0.00 50 % IP CIRCLE underground P.V.C Pipe line ROHTAK from Dahar to Drain No 8 at RD 151500/R for dewatering flood water of village Patwapur, District Rohtak. (CM Announcement code no. 24926)

76 GARHI YWS Agenda note for laying 51th S 13.00 0.00 70 % IP SAMPLA - CIRCLE underground P.V.C Pipe line KALOI ROHTAK from fields of village Chiri to Chapra Drain at RD 18050/Right for dewatering flood water of village Chiri District Rohtak.

77 KALANAUR YWS Agenda note for laying 51th S 18.25 0.00 65 % IP CIRCLE underground P.V.C Pipe line ROHTAK from fields to Drain No 8 at RD 143500/Right for dewatering flood water of village Patwapur District. Rohtak. 78 MEHAM YWS Agenda note for laying 51th S 8.00 0.00 0 % IP CIRCLE underground PVC pipeline ROHTAK from field to LML drain at RD 41260/R for dewatering flood water of village Madina Gindran District Rohtak.

District Total 239.64 0.00 Unit Total 945.34 66.67 YWS(N) BHIWANI 79 TOSHAM YWS Flood Agenda for Purchase 49th S 44.00 14.00 30 % IP CIRCLE of New Machinery for Flood BHIWANI Protection Works During 2018-19

17 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 80 BHIWANI YWS Procurement of New Earth 49th S 110.00 70.00 65 % IP CIRCLE Moving Machine for internal BHIWANI clearance of drains and bank strengthening of canal/drain (Supplementary Agenda).

81 BAWANI YWS PROJECT ESTIMATE FOR 51th S 89.00 0.00 0 % IP KHERA CIRCLE PROVIDING BRICK BHIWANI PITCHING OF SAIMAN DHANANA LINK DRAIN FROM RD 80575 TO 83575 OUTFALLING AT RD 55400/R BHIWANI GHAGGAR DRAIN

District Total 243.00 84.00 JIND 82 SAFIDON YWS Flood agenda note for 49th S 322.79 234.38 100 % Completed CIRCLE construction of Head JIND Regulator at RD 354760/R B.M.L., Hansi Branch , Butana Branch, M.P.L.C. and Inlet at RD 61000/R Hansi Branch including bringing to design section of New Nai Nallah Abondoned Drain from RD 0 to 3600.

District Total 322.79 234.38 KARNAL 83 GHARAUNDA YWS Agenda for providing 51th S 60.80 0.00 40 % IP CIRCLE protection to Dakwala KARNAL Complex by constructing 1 No. new stone stud and repairing of 3 No. damaged stone stud on river Yamuna after flood 2019.

84 GHARAUNDA YWS Agenda for providing 51th S 310.18 0.00 10 % IP CIRCLE protection to Mustafabad KARNAL Complex by constructing 3 No. new stone stud and repairing of 7 No. damaged stone stud and constructing 1365’ stone revetment on river Yamuna after flood 2019

18 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 85 INDRI YWS Agenda for providing 51th S 175.95 0.00 0 % IP CIRCLE protection to Shergarh Tapu KARNAL Complex by constructing 9 No. new stone studs on river Yamuna after flood 2019.

86 GHARAUNDA YWS Agenda for the work of 51th S 60.29 0.00 0 % IP CIRCLE providing protection to Kunda KARNAL Kalan complex by 4 no repairing of damaged stone stud on river Yamuna after flood 2019. 87 INDRI YWS Agenda for the work of 51th S 176.27 0.00 0 % IP CIRCLE providing protection to KARNAL Kalsora complex by 3 no repairing of damaged stone stud and constructing 840’ stone revetment on river Yamuna after flood 2019.

88 GHARAUNDA YWS Agenda for the work of 51th S 66.27 0.00 0 % IP CIRCLE providing protection to KARNAL Sadarpur complex by repairing 5 no. old damaged stone studs on Yamuna after flood 2019 89 GHARAUNDA YWS Agenda for repairing of spur 51th S 15.26 0.00 0 % IP CIRCLE at RD 238000 river Yamuna KARNAL embankment after flood 2019

District Total 865.02 0.00 PANIPAT 90 PANIPAT YWS Protection of village pond, 48th S 13.05 0.00 0 % IP RURAL CIRCLE agriculture land and abadi of KARNAL village Mehrana from flood in Mehrana Drain at existing alignment from RD 0 to 3900

91 SAMALKHA YWS Purchase and supply of 49th S 87.50 25.20 100 % Completed CIRCLE Special TandP Machine i.e. 1 KARNAL No. Tata Hitachi EX200 Super Fitted Pocklain and 1 No. Tata Hitachi Model TH76 Excavator cum Bachoke Loader fitted with standard attachment and 1 No. Bolero Camper (Pick-Up) for use in Panipat Water Services Division, Panipat

19 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 92 SAMALKHA YWS Providing protection to 51th S 62.00 0.00 0 % IP CIRCLE Tamsabad Complex by KARNAL repairing 4 No. Old Stone Studs after Flood 2019

93 SAMALKHA YWS Providing protection to 51th S 158.00 0.00 0 % IP CIRCLE Nanhera Complex by KARNAL repairing 5 No. Old Stone Studs and 120 Ft long Constructing Revetment D/S of Stud No. 27 after Flood 2019

94 SAMALKHA YWS Providing protection to 51th S 127.00 0.00 70 % IP CIRCLE Mirzapur Complex by KARNAL repairing 5 No. Old Stone Studs and 275 Ft long Constructing Revetment U/S of Stud No. 10 after Flood 2019 District Total 447.55 25.20 YAMUNANAGAR 95 JAGADHRI HKB Work of repair of damaged 48th S 1800.00 622.00 50 % IP CIRCLE portion of Hathnikund JAGADHRI Barrage.

96 YAMUNA HKB Providing 09 no. stone studs 51th S 218.51 0.00 0 % YTS NAGAR CIRCLE for the protection of JAGADHRI agriculture land of village Gumthala Rao from River Yamuna. 97 YAMUNA HKB CONSTRUCTING 600 FT 51th S 13.00 0.00 80 % IP NAGAR CIRCLE STONE STEINING FOR JAGADHRI PROTECTION OF AZAT ASHRAM GAUSHALA FROM CHIKKEN KHOL (RIVER PATHRALA).

98 YAMUNA HKB CONSTRUCTING 1200 FT 51th S 30.00 0.00 80 % IP NAGAR CIRCLE STONE STEINING FOR JAGADHRI PROTECTION OF VILLAGE KALESAR and KALESAR MAHAMANTRA VALLEY FROM RIVER YAMUNA

99 YAMUNA HKB CONSTRUCTING 1000 FT 51th S 15.17 0.00 30 % IP NAGAR CIRCLE STONE STEINING FOR JAGADHRI PROTECTION OF AGRICULTURAL LAND AND ABADI OF VILLAGE MUKARAVPUR IN D/S OF MUKARAVPUR BRIDGE FROM PLASI KHOL (RIVER PATHRALA)

20 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 100 YAMUNA HKB CONSTRUCTING 550 FT 51th S 8.00 0.00 80 % IP NAGAR CIRCLE STONE STEINING FOR JAGADHRI PROTECTION OF VILLAGE NATHANPUR FROM KANSLI KHOL (RIVER PATHRALA).

101 YAMUNA HKB CONSTRUCTING 600 FT 51th S 9.16 0.00 80 % IP NAGAR CIRCLE STONE STEINING FOR JAGADHRI PROTECTION OF VILLAGE KOTRA KAHAN SINGH FROM RIVER PATHRALA

102 YAMUNA HKB CONSTRUCTING 1900 FT 51th S 44.39 0.00 40 % IP NAGAR CIRCLE BUND WITH STONE JAGADHRI PITCHING FOR PROTECTION OF VILLAGE MUKARVPUR AND ABADI IN THE U/S OF BRIDGE FROM PLASI KHOL (RIVER PATHRALA).

103 YAMUNA HKB PROVIDING 1400 Ft. 51th S 44.71 0.00 80 % IP NAGAR CIRCLE STONE STEINING FOR JAGADHRI PROTECTION OF AGRICULTURAL LAND AND ABADI NEAR LOHGARH GURUDWARA FROM LOHGARH KHOL. 104 YAMUNA HKB RESTORATION OF 51th S 3.89 0.00 80 % IP NAGAR CIRCLE KHANNUWALA BUND FOR JAGADHRI PROTECTION OF KHANNUWALA VILLAGE FROM RIVER SOMB. 105 YAMUNA HKB CONSTRUCTION OF 700 51th S 17.11 0.00 80 % IP NAGAR CIRCLE Ft. STONE STEINNING FOR JAGADHRI PROTECTION OF VILLAGE ABADI OF VILLAGE SANGHOLI FROM TRIBUTARY OF SADHOURA RIVER. 106 YAMUNA HKB PROVIDING 300 Ft. STONE 51th S 14.59 0.00 80 % IP NAGAR CIRCLE STEINNING FOR JAGADHRI PROTECTION OF AGRICULTURAL LAND OF VILLAGE JAIRAMPUR AND DAMUPURA FROM RIVER SOMB. 107 YAMUNA HKB PROVIDING 436 FT. 51th S 18.37 0.00 80 % IP NAGAR CIRCLE STONE STEINING FOR JAGADHRI PROTECTION OF VILLAGE RAMPUR GAINDA BUND FROM RIVER SOMB.

21 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 108 YAMUNA HKB PROVIDING 06 NOs BED 51th S 30.16 0.00 80 % IP NAGAR CIRCLE BARS FOR THE JAGADHRI PROTECTION OF AGRICULTURE LAND OF RAMGARH SAWAI AND VILLAGE ABADI OF BANKAT FROM RIVER SOMB

109 YAMUNA HKB Construction of 07 Nos. 51th S 220.74 0.00 0 % YTS NAGAR CIRCLE stone studs and 450 ft. JAGADHRI stone steining for the protection of village Tapu kamalpur from River Yamuna. 110 YAMUNA HKB Construction of 1400 ft. stone 51th S 171.17 0.00 0 % YTS NAGAR CIRCLE steining for the protection of JAGADHRI village Lal Chaper from River Yamuna.

111 YAMUNA HKB Construction of 08 Nos. 51th S 187.22 0.00 0 % YTS NAGAR CIRCLE stone studs for the protection JAGADHRI of village Bagwali from River Yamuna

112 YAMUNA HKB CONSTRUCTING 1000 FT 51th S 24.00 0.00 50 % IP NAGAR CIRCLE BUND WITH STONE JAGADHRI PITCHING FOR PROTECTION OF VILLAGE BANIYAWALA FROM KANSLI KHOL (RIVER PATHRALA). 113 YAMUNA HKB Providing protection to 51th S 18.00 0.00 30 % IP NAGAR CIRCLE agriculture land from Flood JAGADHRI water by providing Pump House in Village Shadipur in District Yamuna Nagar

114 YAMUNA HKB SCHEME FOR 51th S 214.50 0.00 20 % IP NAGAR CIRCLE CONSTRUCTION OF 900 JAGADHRI FT. STONE STEINING AND 06 NO. STONE STUDS FOR THE PROTECTION OF VILLAGE ODHRI FROM RIVER YAMUNA. 115 YAMUNA HKB Scheme for Providing 335 51th S 189.30 0.00 5 % IP NAGAR CIRCLE mtr. stone steining between JAGADHRI studs for the protection of agriculture land and village abadi of village Gumthla from River Yamuna.

22 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 116 YAMUNA HKB SCHEME FOR THE 51th S 103.50 0.00 0 % YTS NAGAR CIRCLE CONSTRUCTION OF 5 NOS JAGADHRI STONE STUDS FOR THE PROTECTION OF VILLAGE KANALSI FROM RIVER YAMUNA. 117 YAMUNA HKB SCHEME FOR 51th S 60.69 0.00 0 % YTS NAGAR CIRCLE REPLENISHMENT OF 3 JAGADHRI NOS STONE STUD FOR THE PROTECTION OF VILLAGE MANDOLI FROM RYVER YAMUNA 118 YAMUNA HKB ESTIMATE FOR 51th S 39.14 0.00 80 % IP NAGAR CIRCLE CONSTRUCTING 02 NO. JAGADHRI STONE STUDS AND 600FT. STONE STEINING FOR PROTECTION OF VILLAGE BABURAMBASS FROM RIVER YAMUNA.

119 YAMUNA HKB ESTIMATE FOR 51th S 45.39 0.00 80 % IP NAGAR CIRCLE CONSTRUCTING 02 NO. JAGADHRI STONE STUDS AND 800FT. STONE STEINING FOR PROTECTION OF VILLAGE KALESAR FROM RIVER YAMUNA. 120 YAMUNA HKB SCHEME FOR 51th S 48.45 0.00 50 % IP NAGAR CIRCLE CONSTRUCTING 05 NO. JAGADHRI STONE STUDS FOR PROTECTION OF VILLAGE LAKKARMAI PARTAPPUR FROM RIVER YAMUNA. 121 YAMUNA HKB SCHEME FOR 51th S 58.14 0.00 80 % IP NAGAR CIRCLE CONSTRUCTING 6 NO. JAGADHRI STONE STUDS FOR THE PROTECTION OF VILL. KANNEWALA FROM RIVER YAMUNA. 122 YAMUNA HKB RESTORATION OF 51th S 20.34 0.00 80 % IP NAGAR CIRCLE NALLAH FROM JAGADHRI RD 29800 TO 47400.

123 SADHAURA HKB Providing 1200 ft. stone 51th S 29.36 0.00 80 % IP CIRCLE steining for the protection of JAGADHRI Agriculture land of Village Laharpur Dummawala from River Markanda.

124 JAGADHRI HKB Constg. apron for connecting 51th S 98.00 0.00 15 % IP CIRCLE the RLDSE Bund from RD JAGADHRI 1700 to 1900 after Flood 2019

23 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 125 JAGADHRI HKB Constg. Apron for connecting 51th S 466.00 0.00 20 % IP CIRCLE the RLDSE Bund from RD JAGADHRI 3750 to 4270 after Flood 2019. 126 JAGADHRI HKB Repairing of Damaged Apron 51th S 315.00 0.00 5 % IP CIRCLE of Gorden Groyne at Vill JAGADHRI Tajewala after Flood 2019.

127 JAGADHRI HKB Protection of Old Tajewala 51th S 140.00 0.00 10 % IP CIRCLE Head by constructing Apron JAGADHRI around the Head after Flood 2019 128 YAMUNA HKB Construction of 450 feet 51th S 45.68 0.00 0 % YTS NAGAR CIRCLE stone steining for the JAGADHRI protection of village Lapra from River Yamuna District Total 4761.68 622.00 Unit Total 6640.04 965.58 YWS(S) FARIDABAD 129 TIGAON YWS Repairing 5 no. new stone 51th S 80.00 0.00 0 % YTS CIRCLE studs to protect village abadi FARIDABA and its agricultre land of D village Rajpur Dungarpur and rainy well tubewell of Rajupr Dungarpur river complex after flood 2019

130 PRITHLA YWS Providing 06 no. stone studs 51th S 225.00 0.00 0 % YTS CIRCLE and 1000ft. edge protection FARIDABA to protect village abadi and D its agricultre land of village Latipur Sahupura khadar after flood 2019.

District Total 305.00 0.00 MEWAT 131 PUNHANA YWS RE-PLACEMENT OF 03 49th S 53.32 36.74 100 % Completed CIRCLE NOS. V.R. BRIDGES AT RD FARIDABA 6495, RD 11575 AND RD D 14961 OF MARYAKA DRAIN IN DISTRICT CONNECTING VILLAGES (I) NAI TO SHINGAR (II) JHAROKHARI TO SHINGAR (III) MARYAKA TO SHINGAR RESPECTIVELY.

132 PUNHANA YWS Internal Clearance and 49th S 199.00 107.66 100 % Completed CIRCLE bringing upto design section FARIDABA (inner) from RD.22600 to D 112600 of Ujina Drain.

24 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 133 FIROZEPUR YWS Flood agenda for 50th S 34.00 11.32 90 % IP JHIRKA CIRCLE replacement of V.R Bridge at FARIDABA RD 5700 of Ferozpur Jhirka D Link Drain. 134 PUNHANA YWS Flood agenda for providing 51th S 25.63 0.00 5 % IP CIRCLE side slope pitching from RD FARIDABA 4650 to 6650 of Hinganpur D Link Drain

135 NUH YWS Flood agenda for internal 51th S 9.30 0.00 15 % IP CIRCLE clearance of silt and slush of FARIDABA outfall channel RD.122200 of D Gurgaon Canal at RD.0- 32250 136 PUNHANA YWS Flood Agenda for Internal 51th S 51.65 0.00 10 % IP CIRCLE clearance of New Kot Drain FARIDABA from RD.0-64964. D 137 NUH YWS Flood agenda for internal 51th S 15.63 0.00 15 % IP CIRCLE clearance of silt and slush of FARIDABA outfall channel RD.146200 of D Gurgaon Canal at RD.0- 18725 138 NUH YWS Flood agenda for Internal 51th S 54.15 0.00 5 % IP CIRCLE clearance of silt of outfall FARIDABA channel RD.90000 of D Gurgaon Canal from RD.0- 19000. 139 NUH YWS Flood agenda for bringing 51th S 88.00 0.00 5 % IP CIRCLE design section of Landwa FARIDABA Nallah from RD 0 to 26956 ft. D (8216 Mtr.). District Total 530.68 155.72 PALWAL 140 PUNHANA YWS RE-PLACEMENT OF 04 NO. 49th S 1238.26 931.94 100 % Completed CIRCLE V.R. BRIDGES AT RD KM FARIDABA 12.208, KM 15.080, KM D 18.935 AND KM 21.953 OF UJINA DIVERSION DRAIN IN DISTRICT PALWAL AND NUH CONNECTING VILLAGES (I) BHULWANA TO UMRALA (II) HODAL GARHI PATTI TO LALPUR (III) BICHHOR TO LALPR (IV) BICHHOR TO NUNERA RESPECTIVELY.

District Total 1238.26 931.94 SONIPAT

25 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 51th meeting or HSDR & FCB

Related To : Short Term (Rs. in Head:Flood Protection Works lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Status No Constituency Irrigation in booked Prog. Circle meeting during year of HSFCB 141 GANAUR YWS Providing Protection to Bega 51th S 80.00 0.00 0 % IP CIRCLE Complex by constructing 4 SONEPAT No. new stone studs on River Yamuna after flood 2019 in district Sonipat.

142 RAI YWS Providing protection at Tikola 51th S 75.00 0.00 0 % YTS CIRCLE Complex by constructing 1 SONEPAT No. New stone stud and 350 ft revetment and repairing of 04 No. stone stud on River Yamuna after flood 2019 in District Sonipat.

143 RAI YWS Providing protection at 51th S 14.00 0.00 0 % YTS CIRCLE Mimarpur Complex by SONEPAT Repairing of 02 No. stone stud on River Yamuna after flood 2019 in District Sonipat.

District Total 169.00 0.00 Unit Total 2242.94 1087.66 Grand Total 13225.08 2985.98

26 Abstract of Yet to Start Schemes (Short Term)

(Rs. In Lac) Sr. Name of District Name of Circle No. of Estimated No Schemes(YTS) Cost S BWS 1 KURUKSHETRA SYL CIRCLE 1 28.05 AMBALA 2 SIRSA BWS CIRCLE 1 10.22 SIRSA Total 2 38.27 LCU 3 ROHTAK YWS CIRCLE 2 53.49 ROHTAK Total 2 53.49 YWS(N) 4 YAMUNANAGAR HKB CIRCLE 7 1007.51 JAGADHRI Total 7 1007.51 YWS(S) 5 FARIDABAD YWS CIRCLE 2 305.00 FARIDABAD 6 SONIPAT YWS CIRCLE 2 89.00 SONEPAT Total 4 394.00 Grand Total 15 1493.27

27 Reason for Yet to Start Schemes

Sr. Name of Name of Name of Work Est. Cost Remarks Status No Constituency Irrigation (Rs. In Circle Lacs)

BWS KURUKSHETRA 1 PEHOWA SYL CIRCLE Scheme for replacement Hindustan 28.05 Indent has been placed to YTS AMBALA Excavator cum loader HR -65- 0221 Procurement Division with JCB 3DX Extra Two Wheel Panchkula after complete all Drive. formalities.

District Total 28.05 SIRSA 2 KALANWALI BWS Internal clearance of Rori Ghaggar 10.22 Work of internal clearnace is YTS CIRCLE Drain from RD 100000 to 130750 tail executed near the SIRSA and its subsidiary Drains. commencement of monsoon to avoid the regrowth of vegetation.

District Total 10.22 Unit Total 38.27 LCU ROHTAK 3 KALANAUR YWS Agenda note for construction of 31.00 Estimate sanctioned, Tender YTS CIRCLE Embankment of Drain No.8 from RD approved and agreement ROHTAK 187000 to 188250 done, but agency has not been start the work and refuse to execute. Tender re- called and to be opened on 04.06.2020.

4 GARHI YWS Agenda note for constructing Mattan 22.49 Dispute in alignment. The YTS SAMPLA - CIRCLE Link Drain from RD 0 to 3000 meeting was fixed with DRO, KALOI ROHTAK outfalling into KCB Drain at RD Jhajjar but demarcation of 57000. land not finalized.

District Total 53.49 Unit Total 53.49 YAMUNANAGAR 5 YAMUNA HKB CIRCLE Providing 09 no. stone studs for the 218.51 Agreement done and work YTS NAGAR JAGADHRI protection of agriculture land of taken in 2nd priority. village Gumthala Rao from River Yamuna. 6 YAMUNA HKB CIRCLE Construction of 07 Nos. stone studs 220.74 Agreement done and work YTS NAGAR JAGADHRI and 450 ft. stone steining for the taken in 2nd priority. protection of village Tapu kamalpur from River Yamuna. 7 YAMUNA HKB CIRCLE Construction of 1400 ft. stone 171.17 Agreement done and work YTS NAGAR JAGADHRI steining for the protection of village taken in 2nd priority. Lal Chaper from River Yamuna.

8 YAMUNA HKB CIRCLE Construction of 08 Nos. stone studs 187.22 Agreement done and work YTS NAGAR JAGADHRI for the protection of village Bagwali taken in 2nd priority. from River Yamuna 9 YAMUNA HKB CIRCLE SCHEME FOR THE 103.50 Agreement done and work YTS NAGAR JAGADHRI CONSTRUCTION OF 5 NOS taken in 2nd priority. STONE STUDS FOR THE PROTECTION OF VILLAGE KANALSI FROM RIVER YAMUNA.

28 Reason for Yet to Start Schemes

Sr. Name of Name of Name of Work Est. Cost Remarks Status No Constituency Irrigation (Rs. In Circle Lacs)

10 YAMUNA HKB CIRCLE SCHEME FOR REPLENISHMENT 60.69 Agreement done and work YTS NAGAR JAGADHRI OF 3 NOS STONE STUD FOR THE taken in 2nd priority. PROTECTION OF VILLAGE MANDOLI FROM RYVER YAMUNA

11 YAMUNA HKB CIRCLE Construction of 450 feet stone 45.68 Agreement done and work YTS NAGAR JAGADHRI steining for the protection of village taken in 2nd priority. Lapra from River Yamuna

District Total 1007.51 Unit Total 1007.51 YWS(S) FARIDABAD 12 TIGAON YWS Repairing 5 no. new stone studs to 80.00 Agency did not turned up for YTS CIRCLE protect village abadi and its agreement. FARIDABAD agricultre land of village Rajpur Dungarpur and rainy well tubewell of Rajupr Dungarpur river complex after flood 2019 13 PRITHLA YWS Providing 06 no. stone studs and 225.00 Agency did not turned up for YTS CIRCLE 1000ft. edge protection to protect agreement. FARIDABAD village abadi and its agricultre land of village Latipur Sahupura khadar after flood 2019.

District Total 305.00 SONIPAT 14 RAI YWS Providing protection at Tikola 75.00 Tender rates have been YTS CIRCLE Complex by constructing 1 No. New approved and agreement SONEPAT stone stud and 350 ft revetment and have been signed with repairing of 04 No. stone stud on agency and work is going to River Yamuna after flood 2019 in be started soon. District Sonipat.

15 RAI YWS Providing protection at Mimarpur 14.00 Tender rates have been YTS CIRCLE Complex by Repairing of 02 No. approved and agreement SONEPAT stone stud on River Yamuna after have been signed with flood 2019 in District Sonipat. agency and work is going to be started soon.

District Total 89.00 Unit Total 394.00 Grand Total 1493.27

29 POSITION OF DRAINAGE PUMPS IN I&WRD

Name of Unit Total Capacity in Pumps Capacity Pumps Pumps likely No. of Cs. in in under to be repaired Pumps workin Cs. repair g order DIESEL MOBILE PUMPS 20.06.2020 30.06.2020 BWS Unit 256 512 198 396 46 (18%) 36 10 YWS Unit (N) 26 52 26 52 0 YWS Unit (S) 122 244 101 202 21 (17.2%) 20 01 LCU Unit 314 580 210 420 80 (25.47%) 40 40 TOTAL 718 1388 535 1070 147 (20.47%) 96 51

ELECTRICAL MOBILE PUMPS BWS Unit 101 312 74 244 17 (17.1%) 07 10 YWS Unit (N) 43 211 43 211 0 0 0 YWS Unit (S) 73 268 68 258 5 (6.8%) 0 5 LCU Unit 404 1333 271 939 129 (32%) 109 20

TOTAL 621 2124 456 1652 151 (24.31%) 116 35 PERMANENT PUMPS BWS Unit 328 3030 287 2710 35 (10.67%) 20 15 YWS Unit (N) 34 180 34 180 0 0 0 YWS Unit (S) 71 977 67 957 4 (5.63%) 0 4 LCU Unit 207 1719 165 1444 42 (20.28%) 22 20 TOTAL 640 5906 553 5291 81 (12.60%) 42 39

G.Total (Diesel, 1979 9418 1544 8013 379 (19.15%) 254 125 Electrical & VT Pumps)

During the FY 2018-19 During the FY 2019-20 EP Sets = 70, DP Sets = 175, Total Pumps= 245 VT PUMPS =32 Sets =435 Cs. EP SETS= 45 Sets=225 Cs. (5Cs. each)

30 DRAIN STATUS IN HARYANA Total No. of Drains in State 833 Haryana

Drains in Yamuna Sub 567 Basin Drains in Ghaggar Sub 266 Basin No. of Drains cleaned 530 Drains not required to be 303 cleaned Budget required on Drains Rs. 05 Cr. + MANREGA clearance funds

31 Deposit Work of I&WRD

Sr. District Name of scheme Estimated Balance Requirement No. cost as on 04.06.2020 (Rs. in lakhs) 1 Jhajjar Increasing 404.18 HSIIDC – 257.20 lac capacity of Sarai HSVP- 140.08 lac Aurngabad Kassar Link Drain from RD 0 to 34052 out- falling into KCB Drain at RD 8103-L including its extension and Sump Well Pump House.

2. Hisar Construction of 1002.05 lac HSVP- 503.48 lac Satrod Mirka Drain RD 0 to 6450 and Dabra Link Drain RD 0-7525 (Deposit work of HUDA now HSVP) - Non depositing of balance funds of Rs. 503.48 lacs).

3. Panipat Bringing to design 2031 lac Urban Local Bodies-2031 section of Panipat lac Drain including lining from RD 55673 Ambala Railway line to RD 69100 village Kabri (CM Announcement code 22686).

Name of Department Funds still not received (Rs. In Crore) HSIIDC 2.57 HSVP 6.44 ULB 20.31

32

PUBLIC HEALTH ENGINEERING DEPARTMENT

33

District-wise Abstract PHYSICAL PROGRESS OF URBAN FLOOD WORKS (PHED)

Sr. No. Name of Total No. Total No. of No. of Progress of works in %age Work completion schedule District of Works estimated completed works in cost works progress Works Works Works Works Upto Upto Upto After upto 25% upto 50% upto 75% with 30.06.20 31.12.20 31.03.21 31.03.21 progress progress progress more than 75% progress 1 Ambala 3 1765.37 1 2 1 - - 1 - 1 - 1

2 Bhiwani 3 1218.9 1 2 - - - 2 2 - - -

3 Hisar 1 1456 - 1 1 ------1

4 Jhajjar 1 31.15 1 ------

5 Kaithal 2 588.92 1 1 - - - 1 - - 1 -

6 Palwal 3 966.82 1 2 - 2 - - - 1 - 1

7 Rewari 1 305.82 1 ------

8 Rohtak 3 1678.72 - 3 1 - - 2 2 - - 1

9 Sonipat 1 1785 - 1 - - 1 - - - 1 -

Total 18 9796.7 6 12 3 2 1 6 4 2 2 4

34

PHYSICAL AND FINANCIAL PROGRESS OF URBAN FLOOD WORKS All Amt. Rs. in Lacs

Sr. Name of Name of Work/Adm statu Adm. Exp Upto Funds Exp. Exp. Cumulati Physical Likely date No. District Approval Date/Start s App.Amt 31/03/20 During durin Durin ve Exp. Progress of Dt./Work Closure Dt (Tech. 20- 21 g g Upto completion San.Amt) May 20- May 2020 21 2020 1 Ambala Ambala City - In 1093.62 746.33 99.59 0.00 0.00 746.33 All works 1 year after Construction of Nala Progres )1093.62( completed, revised s along G.T. Road from except rising administrativ

Kalka chowk to Banuri main for which e approval Nakka extension (RD revised 205.9 Km to 211.46 administrative Km)[Revised dt.- approval of 27/04/2017][21/03/20 estimate 12] -[23/12/2013]- amounting to [30/09/2019] Rs. 1922.40 required. 75% work completed. Estimate needs revision. Technical revised proposal sanctioned. Ambala City town- In 619.30 603.63 15.67 0.00 0.00 603.63 All works - Estimate for construction Progres )619.30( completed and s of RCC covered storm commissioned

water drain (Box Type) at Kalka Chowk area along HN-1(Vidhan Sabha Matter)[26/04/2016] - [21/07/2016]- [30/09/2019] Ambala Sadar - Laying of In 52.45 0.00 35.98 0.00 0.00 0.00 Work in 31.12.2020 800mm dia RCC storm Progres progress. s water drainage extended

pipe upto Mahesh Nagar drain for improvement drain[06/03/2019] -[]- [31/12/2020] District Total 1765.37 1349.96 151.24 0.00 0.00 1349.96 2 Bhiwani Bhiwani - Est. for In 693.90 692.81 1.09 0.00 0.00 692.81 Work - providing 5 No. Progres completed and s subsidiary pumping commissioned

station for disposal of storm of various low lying area[30/06/2017] - [17/11/2017]- [30/06/2020] Bhiwani : Estimate for In 298.00 185.23 58.83 0.00 0.00 185.23 95% Work 30.06.2020 providing storm water Progres completed s drainage system

including road gullies, intercepting manholes [27/05/2016] -[]- [31/03/2020] Siwani PHED Siwani – Prov. Storm In 227.00 160.52 41.59 0.00 0.00 160.52 95% Work 30.06.2020 water drainage system Progres )227.00( completed s for dewatering nearby

Ladwani Pond at 35

Parshuram Chowk Distt. Bhiwani[26/04/2018] –[01/06/2019]- [30/04/2020] District Total 1218.90 1038.56 101.51 0.00 0.00 1038.56 3 Hisar Rough cost estimate for In 1456.00 0.00 265.90 0.00 0.00 0.00 DNIT 31.03.2023 shifting of existing Storm Progres )1456.00( APPROVED s water drain on Bagla

Road required due to land acquisition by HSVP(CM Announcement)[04/01/ 2020] –[]- [31/03/2023] District Total 1456.00 0.00 265.90 0.00 0.00 0.00 4. Jhajjar Beri – Laying of 600 mm In 31.15 29.48 1.50 0.00 0.00 29.48 Work - i/d DI rising main for Progres )31.15( completed and s Storm Water Disposal commissioned

No.1 Point A to Drain No.8 [26/04/2018] – [03/09/2018]- [30/09/2019] District Total 31.15 29.48 1.50 0.00 0.00 29.48

5. Kaithal Pundri – Upgradation of In 513.10 383.21 63.97 0.00 0.00 383.21 80% work 31.03.2021 storm water system Progres completed s Pundri Town (under CM

announcement No. 10321)(CM Announcement)[Revised dt.- 21/06/2018][30/11/20 15] –[11/08/2016]- [31/03/2021] Supplementary estimate In 75.82 41.74 27.04 0.00 0.00 41.74 Work - for emodeling of Progres completed and s Katcha Manas drain from commissioned

Cheek road near Birpati Kund to Kaithal drain Balance [11/09/2019] –[15/09/2019]- [30/09/2021] District Total 588.92 424.95 91.01 0.00 0.00 424.95 6. Palwal Hodal – Proportionate In 306.32 180.22 62.83 0.00 0.00 180.22 Proportionate ------cost for SWD system by Progres )189.00( cost from s constructing RCC box NHAI awaited.

drain along NH-2 [Revised dt.- 50% work 04/01/2020][21/06/20 completed 18] –[10/01/2019]- [30/06/2020] Hodel-Providing storm In 418.00 388.29 24.85 0.00 0.00 388.29 Work - water drainage system Progres )418.00( Completed s by constructing RCC and

drain[03/12/2016] - commissioned [21/04/2017]- [31/03/2020] Palwal-Remodeling of In 242.50 147.56 52.98 0.00 0.00 147.56 Work in 31.12.2020 existing storm water Progres )242.50( progress. s drain and construction of

additional RCC box type 50% work drain for storm water completed system(CM Announcement)[22/07/ 2016] -[15/12/2016]- [30/06/2020] 36

District Total 966.82 716.07 140.66 0.00 0.00 716.07

7. Rewari Rewari - To provide In 305.82 236.54 42.71 0.00 0.00 236.54 Work - storm water drainage Progres )305.82( completed and s scheme for balance commissioned

existing drain/ Nallah from Bawal road to Garhi Bolani road(CM Announcement)[13/01/ 2016] -[01/05/2016]- [31/03/2020] District Total 305.82 236.54 42.71 0.00 0.00 236.54 8. Rohtak Laying of rising main DI In 1198.00 0.00 227.20 0.00 0.00 0.00 Tender 31.03.2023 pipe line from HUDA Progres invited, will be s Complex and Sandasar opened on

Disposal to Public Health dated Carrier Channel near 2nd 17.06.2020 W/W[04/01/2020] -[]- [31/03/2023] Rohtak – Rehabilitation In 382.22 381.41 0.81 0.00 0.00 381.41 95% work 30.06.2020 for storm water RCC Progres )382.22( completed s carrier channel Hisar

road and connecting to drain No.8.[27/04/2017] – [10/02/2018]- [31/03/2020] Rohtak – Special repair In 98.50 55.95 31.28 0.00 0.00 55.95 95% work 30.06.2020 and desilting of 64` i/d Progres )98.50( completed s storm water line from

PHED office to 2nd disposal Jhajjar road[26/04/2018] – [28/06/2018]- [31/03/2020] District Total 1678.72 437.36 259.29 0.00 0.00 437.36 9. Sonipat Ganaur – Providing In 1785.00 1171.80 139.48 0.00 0.00 1171.80 70% Work 31.03.2021 Storm Water Drainage Progres completed s System[24/11/2011] –

[18/01/2012]- [31/03/2021] District Total 1785.00 1171.80 139.48 0.00 0.00 1171.80 Grand Total 9796.70 5404.71 1193.3 0.00 0.00 5404.71 0