HIMACHAL PRADESH, INDIA CASE STUDY Harnessing Hydropower

Total Page:16

File Type:pdf, Size:1020Kb

HIMACHAL PRADESH, INDIA CASE STUDY Harnessing Hydropower HIMACHAL PRADESH, INDIA CASE STUDY Harnessing Hydropower Anthony Hurford, Steven Wade and James Winpenny August 2014 This report has been produced by HR Wallingford for the UK Department for International Development (DFID) Adaptation Knowledge and Tools programme and published through Evidence on Demand. The Adaptation Knowledge and Tools programme is a DFID-funded programme intended to maximise the effectiveness of UK and international investment in climate change adaptation and resilience. The knowledge and tools generated through this programme are expected to promote greater understanding of what constitutes best practice in adaptation, as well as better international cohesion and coordination around adaptation. Through these entry points the programme expects to increase the quality of international and UK adaptation programming and reduce its risk. The views expressed in the report are entirely those of the author and do not necessarily represent DFID’s own views or policies, or those of Evidence on Demand. DFID welcome comments and suggestions, and any feedback on these documents should be sent to the ICF Secretariat ([email protected]). This report has been produced for Evidence on Demand with the assistance of the UK Department for International Development (DFID) contracted through the Climate, Environment, Infrastructure and Livelihoods Professional Evidence and Applied Knowledge Services (CEIL PEAKS) programme, jointly managed by DAI (which incorporates HTSPE Limited) and IMC Worldwide Limited. DOI:http://dx.doi.org/10.12774/eod_cr.august2014.hurfordaetal01 First published August 2014 © CROWN COPYRIGHT 2 Contents Report Summary ........................................................................................................iv SECTION 1 ............................................................................................. 1 Introduction ................................................................................................................ 1 1.1 Hydropower’s role in world energy systems .......................................... 1 1.2 Objectives of the project ....................................................................... 1 1.3 Objectives of the report ......................................................................... 1 1.4 A framework for analysis ....................................................................... 1 1.5 Structure of the report ........................................................................... 2 SECTION 2 ............................................................................................. 4 Case study context ..................................................................................................... 4 2.1 Development status .............................................................................. 4 2.2 Regional context ................................................................................... 4 2.3 Development policy and planning ......................................................... 4 2.4 Water, energy and food security status ................................................ 8 2.5 Hydropower in HP ............................................................................... 10 2.6 Climate change impacts and adaptation .................................................. 13 2.7 Selected case study basin: the Sutlej Basin ....................................... 15 2.8 Section summary ................................................................................ 19 SECTION 3 ........................................................................................... 20 Systematic mapping ................................................................................................. 20 3.1 Systemic interactions between water, energy and food security ......... 20 3.2 Future forcing of the system ............................................................... 25 SECTION 4 ........................................................................................... 28 Hydropower performance and its influencing factors ............................................... 28 4.1 Power generation ................................................................................ 28 4.2 Economic impacts ............................................................................... 31 4.3 Social and environmental impacts ...................................................... 35 4.4 Water use ........................................................................................... 36 4.5 Greenhouse gas emissions ................................................................ 37 4.6 Section summary ................................................................................ 37 SECTION 5 ........................................................................................... 39 Ongoing interventions to improve hydropower performance .................................... 39 i 5.1 Addressing clearance delays .............................................................. 39 5.2 Integrating development ..................................................................... 46 5.3 Resettlement and Rehabilitation ......................................................... 46 5.4 Forestry ............................................................................................... 47 5.5 Water management ............................................................................ 47 5.6 Cumulative Environmental Impact Assessment (CEIA) ...................... 48 5.7 Section summary ................................................................................ 48 SECTION 6 ........................................................................................... 49 Conclusions .............................................................................................................. 49 6.1 Build on the State Strategy and Action Plan for Climate Change ....... 49 6.2 Build partnership approach between people and hydropower projects ............................................................................................................ 49 6.3 Improve water and catchment management coordination .................. 50 6.4 Support definition, monitoring and enforcement of environmental flows ............................................................................................................ 51 6.5 Analyse trade-offs associated with water storage developments ........ 51 6.6 Identify opportunities to develop payments for ecosystem services (PES) approach .................................................................................. 54 6.7 Power sector structural reform ............................................................ 54 References ............................................................................................................... 56 List of Boxes Box 1 Climate change projections and impacts in India ........................................................................ 13 Box 2 Example of community management of water resources ........................................................... 47 Box 3 Potential benefits for project affected families (PAFs) ................................................................ 50 List of Figures Figure 1 A framework for assessing hydropower performance in the context of water, energy and food security............................................................................................................................................ 2 Figure 2 Topographic map of Himachal Pradesh showing the location of major hydropower dams in operation on the Sutlej River. Inset map shows location of the state (black) within India. ..................... 5 Figure 3 Reliance on hydropower and access to electricity with water availability per headrepresented by the size of the circles .......................................................................................................................... 6 Figure 4 Climate change projections for India with HP shown in the north of the country .................. 14 Figure 5 Topographic overview of the Himalayan mountains, showing the location of the Sutlej Basin straddling the Indian border. ................................................................................................................. 16 Figure 6 Estimated long term water balance of the Sutlej basin to Bhakra Dam (assuming no change in storage) ................................................................................................................................................. 17 Figure 7 Cross section of the Sutlej main river channel and the proposed, approved and operational dams showing how the river length and elevation will be fully exploited ............................................. 18 ii Figure 8 Hydropower system interactions in Himachal Pradesh impacting on water, energy and food security both within the state and downstream. .................................................................................. 21 Figure 9 Changes to the current system shown in Figure 8 resulting from socio-economic changes – arrow thickness increase/ decrease compared to Figure 8 indicates increased/ decreased influence . 26 Figure 10 Changes to the current system shown in Figure 8 resulting from climate changes – arrow thickness increase/ decrease compared to Figure 8 indicates increased/ decreased influence ........... 27 Figure 11 Hydropower generation on the Sutlej River standardised by the installed capacity in MW between 1986-2013.
Recommended publications
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY ZL-w, l l Public Disclosure Authorized Report No. 7383-IN STAFF APPRAISAL REPORT Public Disclosure Authorized I,)A NATHPA JHAKRI POWER PROJECT JANUARY 25, 1989 Public Disclosure Authorized Asia Country Department 1V (India) Public Disclosure Authorized Transport and Energy Operations Division Thisdocument has a restricted distribudon and may be used by recipients only in theperforanmce of their official duties. Its contents may not otberwise be discosed without World Bank authofitdion. CURRENCY EOUIVALENTS Currency Unit - Rupees (Rs) Rs 1.00 - Paise 100 US$1.00 - Rs 13.30 Rs 1,000,000 - US$76,923 MEASURES AND EOUIVALENTS 1 Kilometer (km) - 1,000 meters (m) - 0.6214 miles (mi) 1 Meter (m) - 39.37 inches (in) 1 Cubic Meter (m3) - 1.31 cubic yard (cu yd) - 35.35 c.ft. 1 Thousand Cubic Meter (MCM)- 1,000 cubic meters 1 Barrel (Bbl) - 0.159 cubic meter 1 Normal Cubic Meter - 37.32 Standard Cubic Feet (SCF) of Natural Gas (Nm3) 1 Ton (t) - 1,000 kilogiams (kg) - 2,200 pds. (lbs) 1 Metric Ton (39 API) - 7.60 barrels 1 Kilocalorie (kcal) - 3.97 British ThermalUnits (BTU) 1 Kilovolt (kV) - 1,000 volts (v) 1 Kilovolt ampere (kVa) - 1,000 volt-amperes(VA) 1 Megawatt (MW) - 1,000 kilowatts (kW) - 1 million watts 1 Kilowatt-hour(kWh) - 1,000 watt-hours 1 Megawatt-hour(MWh) - 1,000 kilowatt-hours 1 Gigawatt-hour(GWh) - 1,000,000kilowatt-hours 1 Ton of Oil Equivalent (toe)- 10 million kilocalories ABBREVIATIONSAND ACRONYMS CEA - Central ElectricityAuthority CWC - Central Water Commission GOHP - Governmentof Himachal Pradesh GOI - Government of India GSI - Geological Survey of India HPSEB - Himachal Pradesh State ElectricityBoard ICB - InternationalCompetitive Bidding LCB - Local Competitive Bidding LRMC - Long Run Marginal Cost MMCMD - Million Cubic Meter per day MOU - Memorandum of Understanding MPPD - MultipurposeProjects and Power Department NHPC - National HydroelectricPower Corporation,Ltd.
    [Show full text]
  • General Awareness Capsule for AFCAT II 2021 14 Points of Jinnah (March 9, 1929) Phase “II” of CDM
    General Awareness Capsule for AFCAT II 2021 1 www.teachersadda.com | www.sscadda.com | www.careerpower.in | Adda247 App General Awareness Capsule for AFCAT II 2021 Contents General Awareness Capsule for AFCAT II 2021 Exam ............................................................................ 3 Indian Polity for AFCAT II 2021 Exam .................................................................................................. 3 Indian Economy for AFCAT II 2021 Exam ........................................................................................... 22 Geography for AFCAT II 2021 Exam .................................................................................................. 23 Ancient History for AFCAT II 2021 Exam ............................................................................................ 41 Medieval History for AFCAT II 2021 Exam .......................................................................................... 48 Modern History for AFCAT II 2021 Exam ............................................................................................ 58 Physics for AFCAT II 2021 Exam .........................................................................................................73 Chemistry for AFCAT II 2021 Exam.................................................................................................... 91 Biology for AFCAT II 2021 Exam ....................................................................................................... 98 Static GK for IAF AFCAT II 2021 ......................................................................................................
    [Show full text]
  • Repairing the Spillway at Nathpa Jhakri Dam in India
    IDEAS IN ACTION Repairing the Spillway at Nathpa Jhakri Dam in India N athpa Jhakri is a concrete gravity dam on the Satluj River in Himachal Pradesh, India, about 500 km northwest of Delhi. The primary purpose of the dam, which was completed in 2004, is to impound a reservoir that supplies water for a 1,500-MW (2,000,000 hp) underground hydropower station. ByLes Faure ater flow through the itc ar high Understanding the situation m3 .The dam impounds a reservoir with a total velocity and coutaill significant Construction of the Nathpa Jhakri project volume of 3.4 billion m3• The dam has five Wsilt coHtcnt. Over rime, this has began in 1993, and the final two 250-MW spillway gates and a design spillway capacity resulted in significant erosion of the dam's (340,000 hp) Francis turbine-generators went of 5,660 m3/s. concrete spillway piers. Owner SJVN needed online in March 2004. It is owned by Satluj The headworks consist of the dam, power to remedy this situation and, after reviewing Jal Vidyut Nigam Ltd. (SJVN Ltd.) and cost intake structures and four large underground a variety of options, chose to use Megamix USS2 billion to develop. desilting chambers. The Satluj River has a II mortar from Xypex to patch and resurface The dam is 67.5 m high by 185 m long. It high concentration of silt. The tender speci­ the concrete structures. contains a total concrete volume of 200,000 fications, based on observations for 20 years (from 1970 to 1990), specified an average silt concentration for the high inflow months of J une,July and August as 932 parts per million after desiltation through desilting chambers.1 Water flows from the reservoir and through a 27.4-km-long headrace tunnel with a design discharge of 405 m3/s.
    [Show full text]
  • Annual Report 2009-10
    Central Electricity Authority Annual Report 2009-10 ANNUAL REPORT 2009-10 lR;eso t;rs GOVERNMENT OF INDIA MINISTRY OF POWER CENTRAL ELECTRICITY AUTHORITY September 2010 I Central Electricity Authority Annual Report 2009-10 CENTRAL ELECTRICITY AUTHORITY Sewa Bhawan, R.K. Puram New Delhi – 110 066 CEA website: www.cea.nic.in Sub ordinate Offices : Regional Power Committees: 1. Member Secretary, Northern Regional Power Committee, 18-A, Shaheed Jit Singh Marg, Katwaria Sarai, New Delhi-110016. 2. Member Secretary, Eastern Regional Power Committee, 14 Golf Club Road, Tollygunge, Kolkata-700033. 3. Member Secretary, Western Regional Power Committee, Plot No. F-3, Opposite SEEPZ Complex, MIDC Area Marol, Andheri (East), Mumbai-400093. 4. Member Secretary, Southern Regional Power Committee, 29 Race Course Cross Road, Near Anand Rao Circle, Bangalore-560009. 5. Member Secretary, North-Eastern Regional Power Committee, Nongrimbah Road, Laitumkhrah, Shillong-793003. Regional Power Survey Offices: 1. Dy. Director, Regional Power Survey Office (North), 3rd Floor, 18-A, Shaheed Jit Singh Marg, Katwaria Sarai, New Delhi-110016. 2. Dy. Director, Regional Power Survey Office (East), Room No.201, C.G.O. Complex, ‘DF’- Block, Salt Lake City, Kolkata-700064. 3. Dy. Director, Regional Power Survey Office (West), 5th Floor, Plot No. F-3, Opposite SEEPZ Complex, MIDC Area Marol, Andheri (East), Mumbai-400093. 4. Dy. Director, Regional Power Survey Office (South), Letter Box No. 38, 6th Floor, ‘F’ Wing, Kendriya Sadan, Koramangala, Bangalore – 560034. Regional Inspectorial Organisations: 1. Superintending Engineer, Regional Inspectorial Organisation (North), 18-A, Shaheed Jit Singh Marg, Katwaria Sarai, New Delhi-110016. 2. Superintending Engineer, Regional Inspectorial Organisation (East), 14 Golf Club Road, Tollygunge, Kolkata-700033.
    [Show full text]
  • Download Special Issue
    The Scientific World Journal Optimization Methods in Information and Management Sciences Guest Editors: Jung-Fa Tsai, C. Alec Chang, Chih-Chou Chiu, and Steve Hsueh-Ming Wang Optimization Methods in Information and Management Sciences The Scientific World Journal Optimization Methods in Information and Management Sciences GuestEditors:Jung-FaTsai,C.AlecChang,Chih-ChouChiu, and Steve Hsueh-Ming Wang Copyright © 2015 Hindawi Publishing Corporation. All rights reserved. This is a special issue published in “The Scientific World Journal.”All articles are open access articles distributed under the Creative Com- mons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Contents Optimization Methods in Information and Management Sciences,Jung-FaTsai,C.AlecChang, Chih-Chou Chiu, and Steve Hsueh-Ming Wang Volume 2015, Article ID 498951, 3 pages Virtual Goods Recommendations in Virtual Worlds, Kuan-Yu Chen, Hsiu-Yu Liao, Jyun-Hung Chen, and Duen-Ren Liu Volume 2015, Article ID 523174, 9 pages A Simulated Annealing Methodology to Multiproduct Capacitated Facility Location with Stochastic Demand, Jin Qin, Hui Xiang, Yong Ye, and Linglin Ni Volume 2015, Article ID 826363, 9 pages An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown, Singa Wang Chiu, Hong-Dar Lin, Ming-Syuan Song, Hsin-Mei Chen, and Yuan-Shyi P. Chiu Volume 2015, Article ID 621978, 13 pages A Two-Stage Method to Determine Optimal Product Sampling
    [Show full text]
  • Dams of India.Cdr
    eBook IMPORTANT DAMS OF INDIA List of state-wise important dams of India and their respective rivers List of Important Dams in India Volume 1(2017) Dams are an important part of the Static GK under the General Awareness section of Bank and Government exams. In the following eBook, we have provided a state-wise list of all the important Dams in India along with their respective rivers to help you with your Bank and Government exam preparation. Here’s a sample question: In which state is the Koyna Dam located? a. Gujarat b. Maharashtra c. Sikkim d. Himachal Pradesh Answer: B Learning the following eBook might just earn you a brownie point in your next Bank and Government exam. Banking & REGISTER FOR A Government Banking MBA Government Exam 2017 Free All India Test 2 oliveboard www.oliveboard.in List of Important Dams in India Volume 1(2017) LIST OF IMPORTANT DAMS IN INDIA Andhra Pradesh NAME OF THE DAM RIVER Nagarjuna Sagar Dam (also in Telangana) Krishna Somasila Dam Penna Srisailam Dam (also in Telangana) Krishna Arunachal Pradesh NAME OF THE DAM RIVER Ranganadi Dam Ranganadi Bihar NAME OF THE DAM 2 RIVER Nagi Dam Nagi Chhattisgarh NAME OF THE DAM RIVER Minimata (Hasdeo) Bango Dam Hasdeo Gujarat NAME OF THE DAM RIVER Kadana Dam Mahi Karjan Dam Karjan Sardar Sarover Dam Narmada Ukai Dam Tapi 3 oliveboard www.oliveboard.in List of Important Dams in India Volume 1(2017) Himachal Pradesh NAME OF THE DAM RIVER Bhakra Dam Sutlej Chamera I Dam Ravi Kishau Dam Tons Koldam Dam Sutlej Nathpa Jhakri Dam Sutlej Pong Dam Beas Jammu & Kashmir NAME
    [Show full text]
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 38178-IN PROJECT APPRAISAL DOCUMENT ON A Public Disclosure Authorized PROPOSED LOAN IN THE AMOUNT OF US$400 MILLION TO THE SATL JJ JAL VIDYUT NIGAM TD WITH THE GUARANTEE OF THE REPUBLIC OF INDIA Public Disclosure Authorized FOR RAMPUR HYDROPOWER PROJECT August 15,2007 Sustainable Development Department India Country Management Unit South Asia Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective: April 2007) Currency Unit = India Rupees (Rs.) Rs. 41.5 = US$] FISCAL YEAR April 1 - March31 ABBREVIATIONS AND ACRONYMS AAD Advance Against Depreciation MoU Memorandum ofUnderstanding CAG Comptroller and Auditor General MTR Mid Term Review CEA Central Electricity Authority MW Mega Watt CERC Central Electricity Regulatory Commission NGO Non-Governmental Organization co2 Carbon Dioxide NHPC National Hydroelectric Power Corp. cwc Central Water Commission NJHP Nathpa Jhakri Hydroelectric Project/ “Nathpa Jhakri” DPR Detailed Project Report NJPC Nathpa Jhakri Power Corporation DSCR Debt Service Coverage Ratio NO, Nitrogen Oxide EMP Environment Management Plan NPV Net Present Value ERR Economic Rate ofReturn PAPS Project Affected Persons ESIA Environment & Social Impact Assessment PCN Project Concept Note FIRR Financial Internal Rate ofReturn
    [Show full text]
  • Mahanagar Telephone Nigam
    Information updated as of 30 October, 2017 by Ministry of Heavy Industries and Public Enterprises (India) Public Sector Undertakings in India (List ) Maharatna Bharat Heavy Electricals Coal India Gas Authority of India Indian Oil Corporation Maharatna National Thermal Power Corporation Oil and Natural Gas Corporation Steel Authority of India Bharat Petroleum Corporation Navratna Bharat Electronics Container Corporation of India Engineers India Hindustan Aeronautics Hindustan Petroleum Corporation Mahanagar Telephone Nigam National Aluminium Company National Buildings Construction Corporation Navratna National Mineral Development Corporation NLC India Limited Oil India Power Finance Corporation Power Grid Corporation of India Rashtriya Ispat Nigam Rural Electrification Corporation Shipping Corporation of India Miniratna – I Airports Authority of India Antrix Corporation Balmer Lawrie Bharat Coking Coal Bharat Dynamics Bharat Earth Movers Bharat Sanchar Nigam Bridge & Roof Company (India) Central Warehousing Corporation Central Coalfields Chennai Petroleum Corporation Miniratna- Cochin Shipyard I Dredging Corporation of India Kamarajar Port Garden Reach Shipbuilders and Engineers Goa Shipyard Hindustan Copper HLL Lifecare Hindustan Newsprint Hindustan Paper Corporation Housing and Urban Development Corporation Indian Rare Earths Indian Railway Catering and Tourism Corporation Indian Renewable Energy Development Agency India Trade Promotion Organisation Ircon International India Tourism Development Corporation Kudremukh Iron Ore Company Mazagon
    [Show full text]
  • Bhakra Dam – a Different View
    Review 12 Bhakra dam – A different view Siddharth Narrain Unravelling Bhakra: Assessing the Temple of Resurgent India by Shripad Dharmadhikary, Manthan Adhyayan Kendra, Badwani, MP, 2005; pp 372, Rs.150. [B.E21a.D3] THE last two decades have seen an increasing number of questions being raised on the utility of big dams in India. In 2000, the World Commission on Dams (WCD) brought out its report "Dams and Development: A New Framework for Decision Making" after two years of work, which included interactions with non-governmental organisations (NGOs), people's movements, governments, and international organisations such as the World Bank. According to the India country study report submitted as part of this process, the planning process in India has not looked seriously at alternatives to big dams nor has it tried to find out whether big dams have been beneficial vis-a-vis their financial, social and environmental costs. One of the dams that is widely perceived to have played a crucial role in India becoming self- sufficient in food production is the Bhakra dam, the first of the large dams that Jawaharlal Nehru called "temples of modern India". 1 A recent report, "Unravelling Bhakra: Assessing the Temple of Resurgent India", has concluded that the spectacular growth in foodgrain production in Punjab and Haryana can be attributed to the Bhakra project only to a limited extent. The report, the first of its kind to evaluate comprehensively the costs and benefits of the Bhakra project, was put together after three years of research and field visits by the Manthan Adhyayan Kendra headed by Shripad Dharmadhikary.
    [Show full text]
  • Probabilistic Predictions for Hydrology Applications
    Probabilistic Predictions for Hydrology Applications S. C. Kar NCMRWF, Noida (Email: [email protected]) International Conference on Ensemble Methods in Modelling and Data Assimilation (EMMDA) 24-26 February 2020 Motivation TIGGE Datasets ANA and FCST for Nov 30 2017 TIGGE Datasets ANA and FCST for Dec 01 2017 Analysis and Forecasts of Winds at 925hPa MSLP Forecast and Analysis (Ensemble members) Uncertainties in Seasonal Simulations (CFS and GFS) Daily Variation of Ensemble Spread Surface hydrology exhibit significant interannual variability River Basins in India over this region due to interannual variations in the summer monsoon precipitation. The western and central Himalayas including the Hindukush mountain region receive large amount of snow during winter seasons during the passage of western disturbances. Snowmelt Modeling: GLDAS models Variation in Snowmelt among Hydrology Models is quite large Evaporation from GLDAS Models For proper estimation Evaporation, consistent forcing to hydrology model (especially precipitation, Soil moisture etc) and proper modeling approach is required. Extended-Range Probabilistic Predictions of Drought Occurrence 5-day accumulated rainfall forecasts (up to 20 days) have been considered. Ensemble spread (uncertainties in forecast) examined for each model IITM ERPS at 1degree 11 members T382GFS 11 members T382 CFS 11 members T126 GFS 11 members T126 CFS Probabilistic extended range forecasts were prepared considering all 44 members Probability that rainfall amount in next 5-days will be within 0-25mm
    [Show full text]
  • Coaching Centre Shivamogga.Com
    WWW.Achievers coaching centre shivamogga.com Q 1) Which state government has recently set up toll-free helpline to provide information to students? A) Punjab B) Tamil Nadu C) Karnataka D) Maharashtra Tamil Nadu The Tamil Nadu Government has set up a 24-hour helpline that would provide information on education and offer guidance to students on March 1, 2018. Chief Minister K Palaniswami has formally launched the toll-free number – 14417 through the 24-hour Education Guidance Centre set up at the Secretariat that would offer information relating to school education and offer guidance to students. Q 2) Which city hosted the 27th Technological Conference of IJIRA on Shaping the Future of Jute? A) Patna B) New Delhi C) Kolkata D) Jaipur Kolkata The 27th Technological Conference of Indian Jute Industries‘ Research Association (IJIRA) on Shaping the Future of Jute was held in Kolkata, West Bengal. The function was focused on the promotion of geotextiles in the northeast region. Geotextiles are absorbent fabrics which, when used in association with soil, have the ability to separate, filter, reinforce, protect or drain. Q 3) What is the Zero Discrimination Day campaign for year 2018? A) What if … B) What sure … C) What not … D) What never … What if … The Zero Discrimination Day (ZDD) is observed every year on March 1 to promote the idea that everyone has a right to live with dignity. The day is also meant to highlight how everyone can be part of the transformation and take a stand towards a fair and just society. It recognizes that no one should ever be discriminated against because of their age, sex, gender identity, sexual orientation, disability, race, ethnicity, language, health 1 | P a g e WWW.Achievers coaching centre shivamogga.com (including HIV) status, geographical location, economic status or migrant status, or for any other reason.
    [Show full text]
  • Final Report 4.2 IN-24740-R13-073
    STUDY ON PLANNING OF WATER RESOURCES OF RAJASTHAN Contents Page Table of Contents I Abbreviations and Acronyms IX Executive Summary i 1. INTRODUCTION ............................................................................................................... 1 2. OBJECTIVES ................................................................................................................... 3 3. APPROACH AND METHODOLOGY ...................................................................................... 4 3.1 General ................................................................................................................ 4 3.2 Methodology ........................................................................................................ 4 3.2.1 General .................................................................................................. 4 3.2.2 Data Collection and Validation ................................................................ 5 3.2.3 Modelling for Assessment of Surface Water Potential............................. 9 3.2.4 Inter-state Water Sharing ...................................................................... 10 3.2.5 Groundwater Data Processing .............................................................. 11 3.2.6 Groundwater Abstraction Village-wise .................................................. 19 3.2.7 Assessment of Dynamic Ground Water Resources .............................. 19 3.2.8 Assessment of Static Ground Water Resources ................................... 20 4. APPLIED BACKGROUND
    [Show full text]