UNIT 5, 266,570 sq ft under construction and available to let

London Commercial Park Medway,

Serviced plots totalling 112 acres to accommodate 2 million sq ft of industrial / distribution / warehouse space in multiple units To M2 (J1) & M25 (J2) A228

Detailed planning Ropers Lane consent for a single unit of 1.225 million sq ft Completed infrastructure works provide improved access Thamesport Strategic location B1/B2/B8 industrial/ with direct access to warehouse/distribution Junction 1 of the M2 Stoke Road

17 miles to Junction 2 of the M25 via fast dual Plot 1 1,225,000 61.6 carriageway access Plot 2 450,000 21.2

7.5 miles to London Plot 5 266,570 14.2 Thamesport for Rail Plot 8 95,000 5.8 and Port uses 4 6/7 Plot 4 90,000 4.1 Readily available and skilled labour force 5 Available early 2016 Plot 6/7 - 4.8

On-site infrastructure complete 8 B1 / B2 / B8 planning consent

2 Existing 10MVA electricity supply with the ability to increase 1 Completed infrastructure works provide improved access from the A228

Established developer with unrivalled track record The most economic big

Leasehold and freehold, sheds in the South East design and build unrivalled fl exibility+ unrivalled benefi ts+ Big Sheds or Freehold Land = Flexibility to meet customers’ needs Opportunity A new commercial park that will provide over 2 million sq ft of potential accommodation A commercial park with 112 acres (45.3 hectares) of service land with planning consent to accommodate approximately 2 million sq ft (190,451 sq m) of B1, B2 and B8 fl oorspace. Design and build opportunities and land sales are available. Flexible design 25,000 sq ft to Small, medium Leasehold Buildings and use 1,225,000 sq ft and large units or freehold or land A new 266,570 sq ft industrial/logistics facility is being developed in partnership with the Anglesea Logistics Fund available for occupation Q1 2016.

To M2 (J1) Infrastructure 6/7 Park infrastructure is complete. New road links to the A228 . Park roads, services (gas, water, electricity, drainage) and level plateaued plots ready for development. 4 8

Stoke Road Timing 5 Ready to go with infrastructure, services and planning. Individual units On-site infrastructure complete within the consented development have a construction programme of approximately 6-9 months. 1 Grants 2 For further information on grants and funding, please contact Locate in Kent or :

Chris Broom Richard Kidd [email protected] [email protected] +44 (0)1732 520 727 +44 (0)1634 338 177

Further information and plans can be viewed at londonmedwaycp.com unrivalled labour force+ Competitive gross weekly earnings Competitive gross weekly earnings London Medway rea labour market t A Workforce Gross Weekly Wage (£) = 488 e k r London Medway a

M London Medway a labour market re £488 r M25 belt A Workforce Gross Weekly Wage (£) = 488 u t Dartford Gravesend e o Workforce Gross Weekly Wage (£) = 528

k b g e r a Rochester a

a g L in rk M London Medway o Gillingham w r M25 belt f 3 o u £528

0 o Workforce Gross Weekly Wage (£) = 528 0

Chatham 0 Workforce Gross Weekly Wage (£) = 566 b

g e m ,0 a Rochester a

g 0 L in rk in 3 o 2 w u Gillingham - f Crawley t Dartford

3 o £566 e n 0 Chatham 0 s 0 Workforce Gross Weekly Wage (£) = 566 o Workforce Gross Weekly Wage (£) = 559 d i m ,0 r t iv a 0 e l i 3 n u 2 u p Sittingbourne - te Dartford o

£559 P n s Workforce Gross Weekly Wage (£) = 481 o Workforce Gross Weekly Wage (£) = 559 d i Maidstone 0

t r 0

iv a l 0 e ,

u 0

p 5

o

Maidstone £481 Potential labour pool 3

P Workforce Gross Weekly Wage (£) = 573

Workforce Gross Weekly Wage (£) = 481

Maidstone 0

0 e 0

, iv 0 r d

5 Croydon s

3 £573 Population within 30 minute drive time of London Medway Potential labour pool te u Workforce Gross Weekly Wage (£) = 573 in Commercial Park 350,000 with 230,000 of working age 30 m London Medway labour market

e

v ri d All usual residents s

Population within 30 minute drive time of London Medway te aged 16 to 74 inu Commercial Park 350,000 with 230,000 of working age 30 m London Medway labour market 210,000

All usual residents Workforce skills Labour force aged 16 to 74 150,000 210,000 40% 39% London Medway labour market Employed Workforce skills Labour force 140,000 150,000 Logistics sector 29% 40% 39% Job seeking London Medway labour market Employed 10,000 19% 19% 140,000 18% Logistics sector 16% 29% 13% ‘Want a job’ Job seeking 20,000 10,000 19% 19% 18% 16% 13% ‘Want a job’ Level 4 & above Level 3 Level 2 Level 1 & below 20,000

Level 4 & above Level 3 Level 2 Level 1 & below Plot 1+ 61.6 acres up to 1,225,000 sq ft

Indicative and Flexible

Detailed planning consent for a single Detailed planning consent for a single distribution facility of 1.225 million sq ft distribution facility of 1.225 million sq ft Plot 2+ 21.2 acres up to 450,000 sq ft

Indicative and Flexible

Other layout options available Plot 5+ A speculative building of 266,570 sq ft 260 miles

240 miles

220 miles

200 miles

180 miles

T S ALL RD Leeds L MALMAYNES H 160 miles A London Medway M Preston A H S Manchester Commercial Park 140 miles A228 Immingham Liverpool S TO K Medway, Kent (M25 J2) E Holyhead Sheffield RD 120 miles M1 London Medway Commercial Park is situated in R LONDON MEDWAY Lincoln O P COMMERCIAL PARK M6 E Y R A ’ W S RD Medway approximately 6 miles from the M2. A E L L K Wrexham 100 miles U N O NS ST I N E P

D Hoo R L CO Norwich H The site benefits from fast and convenient access to J ES A 80 miles C O A228

B S the M2 motorway at Junction 1 via the dualled A228 Great L N Wolverhampton Yarmouth

Peterborough and A289. Junction 2 of the M25 is 17 miles to the M6 ILL Birmingham Huntingdon 60 miles H To M2 J1 MS Cambridge EL UR west providing access to London and the national FO Ipswich A289 M5 motorway network. M40 M1 40 miles Felixstowe Harwich Cheltenham A228 To the south the is within 50 miles Gloucester A1(M) M11 ColchesterCo B To M2 J2 E Carmarthen R and the Port of is within 56 miles. W M25 W London Medway A I Y C Swindon M40 Commercial Park K Swansea Reading VANGUARD M4 London ThamesportThaTh mesporp t Rochester WAY M4

Distances from London Medway Commercial Park Cardiff D R Sat Nav: ME3 9ND K C M25 M20 O M3 D RD P M5 Y IER RD + M2 (J1) 6 miles Dover WA ED M D A289 R BR Ilfracombe K O + C M M2 (J2) 6 miles O Salisbury TO D N R D

+ London Thamesport 7.5 miles Gillingham LO WE R A231 RA IN H H + M20 (J4) 12 miles IGH ST A NE M Exeter W RD (A2) R A22229 D + M25 (J2) 17 miles To M2 J3 To M2 J4 A2 + Central London 36 miles All enquiries + Folkestone/Channel Tunnel 50 miles + Dover 56 miles Paul Farrow James Haestier + Southampton 119 miles [email protected] [email protected]

+ London City Airport 34 miles Sam Smith Len Rosso Mark Coxon + 49 miles [email protected] [email protected] [email protected] + This document has been prepared by Goodman Logistics Developments (UK) Limited (registered in with company number 3921188) (“Goodman”) for general information purposes only. Whilst every care 73 miles has been taken in relation to its accuracy, no warranty of accuracy is given or implied. Images used in this document have been included for the purposes of enabling you to visualise the development concepts. Further, you should obtain your own independent advice before making any decisions about any of the properties referred to in this document. These particulars are believed to be correct at publication date (May Source: AA Route Planner 2015), but their accuracy is in no way guaranteed neither do they form part of any contract. All areas, distances and travel times are approximate.

800 acres+ 16.5 million sq ft+ good to go+ competitive+ 0121 506 8100 www.goodman.com/uklogistics available land bank at capacity for delivering £130 million invested in site our global scale allows us prime distribution locations bespoke developments infrastructure works and to offer unrivalled terms www.londonmedwaycp.com across the UK planning consents @Goodman_Group