Solano Transportation Authority

Member Agencies: Benicia ♦ Dixon ♦ Fairfield ♦ Rio Vista ♦ Suisun City ♦ Vacaville ♦ Vallejo ♦ Solano County

One Harbor Center, Ste. 130, Suisun City, CA 94585-2473 ♦ Phone (707) 424-6075 / Fax (707) 424-6074 Email: [email protected] ♦ Website: sta.ca.gov

INTERCITY TRANSIT CONSORTIUM 1:30 p.m., Tuesday, April 23, 2019 Solano Transportation Authority One Harbor Center, Suite 130 Suisun City, CA 94585

MEETING AGENDA

ITEM STAFF PERSON 1. CALL TO ORDER Lori Damassa, Vice Chair 2. APPROVAL OF AGENDA 3. OPPORTUNITY FOR PUBLIC COMMENT (1:30 –1:35 p.m.) 4. REPORTS FROM MTC, STA STAFF AND OTHER AGENCIES (1:35 – 1:50 p.m.) • Metropolitan Transportation Commission (MTC) Plan Bay Area William Bacon, MTC 2050 – Transit Needs Assessment • Solano County Transit (SolTrans) Update on the Red Line John Sanderson, SolTrans • SR 37 Corridor Transit Demand Study Anthony Adams, STA 5. CONSENT CALENDAR Recommendation: Approve the following consent items in one motion. (1:50 – 1:55 p.m.) A. Minutes of the Consortium Meeting of March 26, 2019 Johanna Masiclat Recommendation: Approve the Consortium Meeting Minutes of March 26, 2019. Pg. 5

CONSORTIUM MEMBERS Vicky Jacobs Diane Feinstein Brandon Thomson Beth Kranda Lori Damassa Joyce Goodwin Debbie McQuilkin VACANT (Chair) (Vice Chair) Dixon Fairfield and Rio Vista Solano County Vacaville County of Solano Solano Mobility STA Readi-Ride Suisun Transit Delta Breeze Transit City Coach (FAST) (SolTrans) Ron Grassi STA Staff

The complete Consortium packet is available1 on STA’s website: www.sta.ca.gov 6. ACTION – NON FINANCIAL ITEMS

A. STA’s Draft Overall Work Plan (OWP) for FY 2019-20 and Daryl Halls FY 2020-21 Recommendation: Forward a recommendation to the STA TAC and STA Board to distribute the STA’s Draft Overall Work Plan for FY 2019-20 and FY 2020-21 for review and comment. (1:55 – 2:05 p.m.) Pg. 9

B. STA Plan Bay Area 2050 Workshop Robert Guerrero 1. Designate Committee spokesperson; and 2. Select Transit Priorities for Plan Bay Area 2050. (2:05 – 2:15 p.m.) Pg. 69

7. ACTION – FINANCIAL ITEMS

A. None.

8. INFORMATIONAL ITEMS

A. FY 2019-20 Intercity Funding Agreement and FY 2017-18 Ron Grassi/ Reconciliation Mary Pryor (2:15 – 2:25 p.m.) Pg. 83

B. Review of SolanoExpress Performance Measures – FY 2019-20 Cost Daryl Halls/ per Hour Brandon Thomson (2:25 – 2:35 p.m.) Pg. 103

C. SolanoExpress Intercity Fiscal Year (FY) 2019-20 Mid-Year Report Brandon Thomson (2:35 – 2:40 p.m.) Pg. 109

D. Solano Community College (SCC) Transportation Student Fee Lloyd Nadal Update (2:40 – 2:45 p.m.) Pg. 117

E. Employer Program Update Katelyn Costa (2:45 – 2:50 p.m.) Pg. 119

F. Solano Mobility Call Center/Transportation Info Monthly Update Amy Antunano (2:50 – 2:55 p.m.) Pg. 123

The complete Consortium packet is available2 on STA’s website: www.sta.ca.gov NO DISCUSSION

G. Metropolitan Transportation Commission (MTC) Plan Bay Area Ron Grassi 2050 – Transit Needs Assessment Pg. 127

H. Legislative Update Vincent Ma Pg. 131 I. Summary of Funding Opportunities Triana Crighton Pg. 143

9. TRANSIT CONSORTIUM OPERATOR UPDATES AND COORDINATION ISSUES

10. FUTURE INTERCITY TRANSIT CONSORTIUM AGENDA ITEMS Group

May 2019 A. FY 2019-20 Intercity Funding Agreement and FY 2017-18 Reconciliation B. SolTrans Lyft Strategy/Vision, Phase I C. Approval of the STA’s OWP for FY 2019-20 and FY 2020-21 D. Update on CTSA Medical Trips E. Water Transit Feasibility Study and Conceptual Plan F. Intercity Taxi – Scrip and Card Ridership G. Solano TDA Matrix for FY 2019-20 H. Programming of STAF Population Based Funds for FY 2019-20 I. Solano County Commuter Profile J. CTP Equity Chapter A. City of Benicia’s Local Service Plan Request - SolTrans June 2019 A. Parking Study Update B. Coordinated Short Range Transit Plans (SRTP) C. SolanoExpress Performance Benchmark – Discussion of On-Time Performance

11. ADJOURNMENT The next regular meeting of the SolanoExpress Intercity Transit Consortium is scheduled for 1:30 p.m. on Tuesday, May 28, 2019.

Meeting Schedule for the Calendar Year 2019 1:30 p.m., Tues., January 29, 2019 1:30 p.m., Tues., February 26, 2019 1:30 p.m., Tues., March 26, 2019 1:30 p.m., Tues., April 23, 2019 1:30 p.m., Tues., May 28, 2019 1:30 p.m., Tues., June 25, 2019 No Meeting in July 1:30 p.m., Tues., August 27, 2019 1:30 p.m., Tues., September 24, 2019

The complete Consortium packet is available3 on STA’s website: www.sta.ca.gov No Meeting in October 1:30 p.m., Tues., November 19, 2019 (Special Date) 1:30 p.m., Tues., December 18, 2019 (Special Date)

Translation Services: For document translation please call: Para la llamada de traducción de documentos: 對於文檔翻譯電話 Đối với tài liệu gọi dịch: Para sa mga dokumento tawag sa pagsasalin: 707-399-3239

The complete Consortium packet is available4 on STA’s website: www.sta.ca.gov Agenda Item 5.A April 23, 2019

INTERCITY TRANSIT CONSORTIUM Meeting Minutes of March 26, 2019

1. CALL TO ORDER Chair Kranda called the regular meeting of the SolanoExpress Intercity Transit Consortium to order at approximately 1:30 p.m. in the Solano Transportation Authority Conference Room.

Members Present: Beth Kranda, Chair Solano County Transit (SolTrans) Lori DaMassa, Vice Chair Diane Feinstein Fairfield and Suisun Transit (FAST) Debbie McQuilkin Solano Mobility Joyce Goodwin County of Solano – Health & Social Services

Members Absent: Vicky Jacobs Dixon Readi-Ride Brandon Thomson

Also Present (In Alphabetical Order by Last Name): Anthony Adams STA Janet Adams STA Amy Antunano STA/Solano Mobility Kristina Botsford SolTrans Erika Dohina STA/Solano Mobility Ron Grassi STA Robert Guerrero STA Johanna Masiclat STA Jim McElroy STA Project Manager - SolanoExpress John Sanderson SolTrans Debbie Whitbeck City Coach

2. APPROVAL OF AGENDA On a motion by Diane Feinstein, and a second by Joyce Goodwin, the SolanoExpress Intercity Transit Consortium approved the agenda. (5 Ayes)

3. OPPORTUNITY FOR PUBLIC COMMENT None presented.

4. REPORTS FROM MTC, STA STAFF AND OTHER AGENCIES Anthony Adams distributed information and provided an update on the following: • Electrification Study for SolanoExpress • 2019 Solano Parking Demand Plan

5 Robert Guerrero also provided an update on the following: • Plan Bay Area 2050 Call for Projects related to Transit Needs Assessment • Water Transit Study

5. CONSENT CALENDAR On a motion by Debbie McQuilkin, and a second by Lori DaMassa, the SolanoExpress Intercity Transit Consortium approved Consent Calendar Item A. (5 Ayes)

A. Minutes of the Consortium Meeting of February 26, 2019 Recommendation: Approve the Consortium Meeting Minutes of February 26, 2019.

6. ACTION FINANCIAL ITEMS

A. Development of Update of Coordinated Short Range Transit Plans (SRTPs) Brandon Thomson outlined the funding allocation and development schedule to update the SRTP. He noted that STA will receive $130,000 in 5303 funds from MTC and will recommend setting aside State Transit Assistance Funds (STAF) in the amount of $70,000 toward this effort. The set aside of STAF funds will cover the required local match of $18,138 and the remaining $51,862 of STAF funds will be used if necessary to conduct the Coordinated SRTP.

Recommendation: Forward a recommendation to the STA TAC and Board to: 1. Proceed with development of an update of Coordinated Short Range Transit Plans for Solano County transit operators, per MTC Resolution No. 4364; 2. Allocate $70,000 of State Transit Assistance Funds (STAF) towards the Coordinated Short Range Transit Plans; 3. Authorize the Executive Director to enter into a funding agreement with MTC to receive $130,000 of FTA 5303 funds for development of the Coordinated SRTPs; and 4. Authorize the Executive Director to issue an RFP and enter into a contract for the Coordinated Short Range Transit Plans for an amount not-to-exceed $200,000.

On a motion by Diane Feinstein, and a second by Lori DaMassa, the SolanoExpress Intercity Transit Consortium unanimously approved the recommendation. (5 Ayes)

7. ACTION NON FINANCIAL ITEMS

A. 2018 SolanoExpress Ridership and Analysis Study Ron Grassi reported that the SolanoExpress Ridership survey was conducted during October, November and December of 2018, by Quantum Market Research (QMR). He cited that QMR was able to conduct 2,598 on-board surveys throughout the five route SolanoExpress system. He summarized the findings from the survey stating that the routes are an important transportation resource, both for Solano County residents and others, and serve a valuable function in providing an alternative to the automobile for commuters on I- 80/I-680 and I-780.

6 Recommendation: Forward a recommendation to the STA TAC and Board to approve the following: 1. Approve the 2018 SolanoExpress Ridership and Analysis Study as shown in Attachment B; and 2. Update the Intercity Funding formula based upon the updated SolanoExpress Ridership by City.

On a motion by Diane Feinstein, and a second by Debbie McQuilkin, the SolanoExpress Intercity Transit Consortium unanimously approved the recommendation. (5 Ayes)

8. INFORMATIONAL ITEMS – DISCUSSION

A. SolTrans Service Plan Update Beth Kranda distributed and reported on SolTrans Comprehensive Operational Analysis (COA) Revised Local Improvement Proposals. She outlined the proposed changes to local routes 1 through 8 in Vallejo, Route 20 and the general public dial-a-ride in Benicia. She noted that due to its poor performance and unproductive ridership, Route 20 and the general public dial-a-ride is proposed to being replaced with subsidized-Lyft/Taxi service within Benicia.

B. American Disability Act (ADA) In-Person Eligibility Mid-Year Program Update Debbie McQuilkin provided a mid-year program update to the ADA In-Person Elibility Program. She reported on the applicant volume and productivity, completed application breakdown, eligibility results by area and the impact on paratransit.

C. Update on Intercity Taxi Card Program Debbie McQuilkin provided an update to the Intercity Taxi Card Progam.

D. Solano Mobility Call Center/Transportation Info Monthly Update Erika Dohina reported that for January Fiscal Year (FY) 2018-19, the Solano Mobility Call Center assisted 926 customers, of which 109 were ADA/Mobility related. The Call Center also assisted 304 walk in customers, processed 12 Regional Transit Connection (RTC) applications, sold 13 Clipper cards and 2 Bike Link cards. In addition, the Call Center processed 13 POYNT transactions and 29 PEX card transfers.

NO DISCUSSION

E. STA Legislative Update

F. Summary of Funding Opportunities

9. TRANSIT CONSORTIUM OPERATOR UPDATES AND COORDINATION ISSUES The Committee members provided transit updates for their respective jurisdiction.

10. FUTURE INTERCITY TRANSIT CONSORTIUM AGENDA ITEMS

11. ADJOURNMENT The meeting adjourned at 2:30 p.m. The next regular meeting of the Solano Express Intercity Transit Consortium is scheduled for 1:30 p.m. on Tuesday, April 23, 2019.

7 This page intentionally left blank.

8 Agenda Item 6.A April 23, 2019

DATE: April 15, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Daryl Halls, Executive Director RE: STA’s Draft Overall Work Plan (OWP) for Fiscal Years (FY’s) FY 2019-20 and 2020-21

Background: Each year, the Solano Transportation Authority (STA) Board and staff identify and update the STA’s priority plans, projects and programs. These tasks provide the foundation for the STA’s Overall Work Plan for the forthcoming two fiscal years. In July 2002, the STA Board modified the adoption of its list of priority projects to coincide with the adoption of its two-year budget. This marked the first time the STA had adopted a two-year Overall Work Plan. The most recently adopted STA Overall Work Plan (OWP) for Fiscal Years (FYs) 2018-19 and FY 2019-20 included a list of 45 priority projects, plans and programs.

Over the past 19 years, the STA's OWP has continued to evolve based on changing Board priorities, requests from the eight member agencies that comprise the STA’s Joint Powers Authority (JPA), and to address priorities, policies and requirements emanating from the federal, state, and the region. The focus of the STA during the timeframe of 2000 to 2005 was to complete the first Solano County Comprehensive Transportation Plan, initiate various corridor studies, and identify a handful of priority projects to fund and advance into construction. From 2005 to the present, the STA has taken a more proactive role in advancing projects through a variety of project development activities and has expanded its transit coordination role in partnership with Solano's five local transit operators, the Capitol Corridors and the Bay . For the past decade (2009 to 2019), STA has initiated and is now managing several mobility programs designed to improve mobility and access for seniors, people with disabilities, low income residents traveling to work, shopping, medical appointments, and school age children and their parents traveling to and from school.

Planning FY 2018-19 STA’s planning activities during FY 2018-19 included the initiation of the final elements of the Comprehensive Transportation Plan, the Equity and Land Use Chapters and the Executive Summary. The 2019 update of the Congestion Management Program and a Countywide Active Transportation Plan were initiated. The Countywide Traffic Model was updated and is scheduled to be brought to the STA Board in May 2019. The Solano County Water Transit Plan has been initiated and is underdevelopment with a project completion date of June 2019 and the Solano Safe Routes to Transit Plan was amended to add additional projects.

9 Projects FY 2018-19 In 2009, the STA’s eight member agencies approved an update and modification to the STA’s Joint Powers Agreement that authorized the STA to perform all aspects of project development and delivery, including right of way functions for specified priority projects. This past fiscal year, the STA's project development activities included the following: Initiating the design phase for two new stops at SR 37/Fairgrounds to be ready for construction in support of phase 2 (the Red Line) of the SolanoExpress Service plan and awarding the construction contract, starting the design phase for the upgrade to the SR 37/Fairgrounds Interchange and obtained a commitment of $15 million of Regional Measure 3 funds for the construction phase. The STA also entered into a second memorandum of understanding with three other county transportation agencies, Caltrans and MTC for the initial funding and delivery of segments of the SR 37 Corridor, including the environmental document for segment B (Mare Island Interchange to SR37/121 and the SR 37/Fairgrounds Interchange in segment C. The STA and Caltrans partnered to complete the design phase of Phase 2A of the I-80/I-680/SR 12 Interchange through a Construction Management/General Contract project delivery approach with STA agreeing to serve as the lead for the right of way phase for the project.

The Projects Department also obtained and began implementation of a $10 million State TIRCP grant for Solano Express Service Integration and Electrification and entered into a master agreement with the State Transportation Agency (CalSTA). The department also completed the fifth annual report for the Regional Transportation Impact Fee (RTIF) program which passed the $6 million milestone in funds generated for the program. The Abandon Vehicles Abatement (AVA) Program reimbursed for 8,022 vehicles abated during the first six months of the fiscal year.

Programs FY 2017-18 The STA’s First and Last Mile Program partnership with LYFT expanded to provide connections to the Capitol Corridors two rail stations and to connect to the new service areas for Solano Express Blue Line, Green Express and Yellow Line. Additional connections are being planned in partnership with Soltrans for the City of Benicia and Mare Island in Vallejo. The Safe Routes to School (SR2S) Program is working with 69 schools with over 15,000 participating students located in Solano County. 49 schools with 8,793 students participated in International Walk to School Day, 19 “Rock the Block” shows and 7 Bike Mobile Repair Events were held across Solano County and a fourth round of enforcement grants were provided to Benicia and Suisun City.

A series of eight Older Adults and Persons with Disabilities Mobility Summits were held, one countywide and one in each of the seven cities. Over 300 participants and another 2,200 individuals responded to surveys. The number one mobility issue identified in all seven cities was medical trips.

STA worked with Soltrans and FAST to successfully implement phase 1 of the new SolanoExpress Service implementation with the introduction of the new Blue, Green Express and Yellow Lines. This included a marketing plan and a consolidated fare structure for all SolanoExpress Routes. STA worked with Vacaville City Coach, FAST and Soltrans, and Solano Community College (SCC) to successfully implement a SCC student ride free with the SCC identification with the recent passage of the SCC student fee for transit. An update to the Ridership Survey for Solano Express was completed and the STA Board authorized staff to initiate the third Coordinated Short Range Transit Plan

10 (SRTP) in FY 2019-20. The Intercity Paratransit Taxi Card Program transitioned from paper scrip to the taxicard and non-ambulatory service was implemented in the cities of Benicia, Dixon, Rio Vista and Vallejo. The service is scheduled to expand to the cities of Fairfield, Suisun City and Vacaville later this year.

The Solano Mobility Program included the following: The Solano Mobility Call Center assisted over 8,611 individuals, and supported 107 vanpools and started 3 new vanpools. A total of 533 individuals were assessed for ADA eligibility through nine months of FY 2018-19 with 73 qualifying for the new auto renewal program, and 33 individuals participating in the STA’s travel training program during the first six months of this fiscal year. 13 employers have enrolled in the STA’s updated employer program with 52 employees participating in the Solano Mobility incentive programs available for the new Ride Amigos incentives program offered by STA. Participation in the Travel Training program significantly increased in FY 2018-19 with 15 travel training events and 69 participants. The Board also authorized Solano Mobility to implement A Vehicle Share Program for medical trips and STA is partnering with local hospitals to implement additional programs to assist in providing enhanced mobility to medical trips as part of the STA’s efforts through the Consolidated Transportation Service Agency (CTSA).

Federal and State Four years ago, the Republicans led US Congress and President Obama authorized a five year Transportation Authorization Bill called Fixing America's Surface Transportation Act or the "FAST Act". In 2019, President Trump and the new Democratic led Congress have begun discussions on a new transportation infrastructure bill. In 2017, the State Legislature and Governor Jerry Brown agreed on a $5.2 billion per year transportation bill (Senate Bill 1) that has restored funding for local streets and roads, transit, the State Transportation Improvement Program (STIP), maintenance of the state highway system and other transportation programs. Several new program categories were established that include grant funding for freight projects and congested corridors. The STA, working with Caltrans District IV and with the support of MTC, was approved by the California Transportation Commission (CTC) for $53.2 million SB 1 funded freight grant for construction of Phase 2A of the I-80/I-608/SR 12 Interchange. In 2018, California and Solano County voters passed Proposition 69 to protect the revenues from SB 1 for transportation. In November of 2018, California and Solano County voters subsequently rejected Proposition 6 that would have repealed SB 1. With SB 1 transportation funds now protected by the voters, STA has supported Caltrans submittal of the Solano I-80 Express Lanes for competitive Federal INFRA grant funding and for future rounds of SB 1 competitive grant funds.

Bay Area Region In June of 2018, Bay Area voters passed Regional Measure 3 which includes a number of specific projects and regional programs to be funded by future increases to the bridge tolls on the seven state owned bridges located in the Bay Area. This specifically includes funding for I-80/I-680/SR 12 Interchange ($150 million), Westbound Truck Scales ($105 million), and SR 37 ($100 million), plus additional operating for expanded ferry service between Vallejo and San Francisco, and Solano Express Bus Service, competitive transit capital funding potential for the Phase B and other transit facilities.

11 Discussion: Attached for review is the STA's Draft OWP for FY’s 2019-20 and 2020-21. The plans, projects and programs contained in the current OWP have been updated to reflect milestones achieved in FY 2018-19 and contain new additions approved by the STA Board during FY 2018-19.

PROJECT DELIVERY/COMPLETE PROJECTS/NEAR TERM CONSTRUCTION PROJECTS Based on the Budget for FY 2018-19 and FY 2019-20, the following four OWP projects were fully funded and are now completed, currently under construction or slated to be in construction in FY 2019-20 or FY 2020-21:

- Jepson Parkway – Vacaville (Segment 1 ) – Completed FY 2018-19 - Fairfield (Segment 2) – Under construction with completion in FY 2019-20 or FY 2020-21 - I-80/I-680/SR 12 Interchange – Phase 2A – Design with construction to begin 2020 - SR 12/SR 113 Roundabout – Construction to Begin by May 2019

There are several projects that are currently in the project development phase with a specific project development phase currently funded so that work can continue, but the project is not fully funded and the STA is seeking additional future funds for construction. Two projects were submitted for competitive state SB 1 funds.

- I-80 Express Lanes (HOT Lanes) – Conversion of HOV Lanes to Express Lanes from Red Top Road to Air Base Parkway and the New Express Lanes from Air Base Parkway to I-505 (Ready for Construction) – STA/Caltrans/MTC – INFRA Grant/SB 1/RM 3 - SR 37/Fairgrounds 360 Access Project –– Fairgrounds Drive (Design phase and Construction/Per MOU) – STA/County/Vallejo/Caltrans – RM 3/STIP/Local Match - I-80/I-680/SR 12 Interchange – Package 3 (design near completion) – STA- RM 3 - I-80 Westbound Truck Scales – STA (environmentally cleared)-RM 3 - SR 12/Church (Funding plan developed for design phase) – STA/Rio Vista – SHOPP/STIP - SR 37 Segment B (Includes Mare Island Interchange - Corridor Study Completed- PID Document Completed/Environmental Document to be initiated per MOU) – Caltrans/MTC/STA/SCTA/NVTA – RM 3 - Jepson Parkway – remaining segments City of Vacaville – Vacaville – STIP/RTIF/TIF

Finally, there are several projects that are included in the OWP, but the initial or next phase of the project is not currently funded in the current two year budget. - I-80 Express Lanes Project – Carquinez Bridge to SR 37 - Jepson Parkway – remaining segments located in City of Fairfield - North Connector – West Segment

TRANSIT CENTERS In recent years, STA has partnered with local transit operators and cities to improve and upgrade regional transit centers. There are several priority transit centers that the STA has successfully pursued and obtained or programmed federal, state or regional funds for. Several of these projects are fully funded and are either in construction or moving through the project development stage into construction.

12 STA has initiated the design and issued the construction contracts for two new bus stops at the SR 37/Fairgrounds Interchange in FY 2018-19 in preparation for phase 2 of the SolanoExpress Service Plan

Several of these projects are initial phases of larger planned transit projects that are not fully funded. The larger, long range transit centers are as follows: - Vallejo Station – Phase B - Fairfield/Vacaville Rail Station – Phase 2 (Station Building) - Fairfield Transit Center - Dixon Park and Ride Lot - Transit Center at Curtola/Lemon Street – Future Phases

STA PLANNING ACTIVITIES The following planning studies are currently underway, funded in the currently proposed budget, and scheduled to be undertaken or completed in FY 2019-20: - Coordinated Short Range Transit Plan (SRTP) - Update of Priority Development Area Plans/Coordination with Housing Production Efforts - Development of Priority Production Areas (Jobs) - Completion of Solano Seniors and People with Disabilities Mobility Plan - Solano Pothole Report

The following plans are scheduled to be considered as part of the two year work plan. - Update of Safe Routes to Schools Plan - Emergency Responders and Disaster Preparedness Study - Coordination with SMART Rail Feasibility Study - Bus Rapid Transit Plan for I-80/I-680 Corridors

STA PROGRAMS Some of the major program milestones this past fiscal year included the following: - Completed First Full Year of College Fee program for SCC students - The Solano Mobility Management Call Center handled 1,813 calls through the 3rd quarter of FY 2018-19; - Implemented new Solano Mobility Website that received 15,716 views from FY – 2018-19 with an average of 1,746 views/per month. - Completion of Fifth Year of In-Person ADA Eligibility Program with over 1,227 individuals assessed in FY 2017-18. - Implementation of New Ride Amigos Incentive Platform - Transportation Info Depot at Historic Suisun Station with 4,082 customers served in FY 2017-18. - Developed 11 Successful HSIP Safety Grants for 6 cities totaling $8.8 million - Completion of Fifth Annual RTIF Report, RTIF Revenues Passed $6 million milestone - 8th Year of STA’s Local Preference Policy Implementation with $2.2 million total local dollars invested in local businesses through June 30, 2018 - STA completed fourth year of managing Solano Intercity Taxi Program which provided 10,035 passenger trips in FY 2017-18.

13 There are three primary tasks for STA working with the transit operators in FY 2019-20. First will be implementing phase two of the SolanoExpress Service Plan (Red Line) and reviewing the performance measures and ridership in preparation for future service adjustments in FY 2020-21. Second will be completing the expansion of the the Intercity Taxi Scrip Program for Non-Ambulatory Riders through use of a debit card countywide. Finally, STA is preparing to work with all five transit operators to update the Coordinated Short Range Transit Plan (SRTP).

Staff is recommending the Consortium review the STA’s Draft OWP and forward comments to the STA TAC and Board.

Recommendation: Forward a recommendation to the STA TAC and STA Board to distribute the STA’s Draft Overall Work Plan for FY 2019-20 and FY 2020-21 for review and comment.

Attachment: A. STA’s Draft Overall Work Plan for FY 2019-20 and FY 2020-21

14 SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

[JM1][JM2] CATEGORY PROJ PROJECT DESCRIPTIONS LEAD FUND SOURCE FY FY EST. PROJECT DEPT. LEAD ECT# AGENCY 2018- 2019- COST STAFF 192019- 22020- 20 21

STA Lead - 1. I-80/I-680/SR 12 Interchange STA X X By Construction Projects Projects A. Manage Construction Closeout Initial Construction Package (ICP) $8M RM3 Package: Janet Adams B.A. Begin Reporting for Suisun Creek Mitigation Site C.B. Design package 2A $56 M SB1 #1) $111 M D. Seek funding and Build Package 2A $9 M STIP #2A) $76 M E.C. Seek funding for Packages 2B and 3 #2B) 67 M #3) $176 M Milestones: #4 – 7) $403 ICP open to publicPackage 2 awarded SB1 funding. Caltrans began design of Package 2 and STA to initiate R/W

Status: ● Package 1 (Initial Construction Package (ICP) –facility open to the public fall 2016 ● Submitted Package 2A for SB1 Trade Corridors Grant = ● Packages 2B and 3 design in process ● Funding for Packages 2B and 3 future cycles SB1 ● Wetland Mitigation Site Dispute for Endowment and R/W still in progress ● RM3 $150M for I-80/I-680/SR 12 Interchange on hold pending litigation resolution by MTC

Estimated Completion Date (ECD): ICP Construction Closeout 2018Package 2 to begin construction in 2020

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 1 15

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

CATEGORY PROJ PROJECT DESCRIPTIONS LEAD FUND SOURCE FY FY EST. PROJECT DEPT. LEAD ECT# AGENCY 2018- 2019- COST STAFF 192019- 22020- 20 21

STA Lead – 2. I-80 Express/High Occupancy Vehicle (HOV) Lanes STA $16.4 M Bridge Tolls X X A. 210 263 M Projects Projects A. Convert Existing I-80 HOV Lanes to Express Lanes (Red Top Rd to PA/ED Janet Adams Air Base Pkwy) and build new Express HOV lanes Air Base Pkwy to I- Design $17.8 M BAIFA B. $8 M (PA/ED) 505 – Segment 1 Funds for PS&E B. I-80 - Carquinez Bridge to SR 37 – Segment 2 Segments 1 B.C. I-80 – I-505 to Yolo County Line – Segment 3

Milestones: PSR – COMPLETED (Segment 1) ED - COMPLETED (Segment 1)PS&E – COMPLETED (Segment 1)

Status: ● Design Complete Segment 1 ● Seeking funding from SB 1 Congested Corridors/Trade Corridors Grant and Federal BUILD/INFRA for Segment 1 ($123 151.5M) ● Seeking funding for environmental document – Segment 2 ● Seeking funding for Project Initiation Document (PID) – Segment 3 ● MTC lead for Express Lanes Integrator

PS&E – COMPLETED (Segment 1)

ECD:

CON Start – Summer 2018 2020 Segment 1 (pending funding)

STA Lead 3. I-80 Westbound Cordelia Truck Scales X X Projects Projects 1. WB Truck ScalesConstruct new WB Truck Scales ½ mile to the east of WB Scales ($2100 M): Janet Adams existing location. Work includes new braided ramps, relocation of North Bay PS&E $17 M Aqueduct, R/W acquisition.

Milestones:

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 2 16

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

CATEGORY PROJ PROJECT DESCRIPTIONS LEAD FUND SOURCE FY FY EST. PROJECT DEPT. LEAD ECT# AGENCY 2018- 2019- COST STAFF 192019- 22020- 20 21

● RM 3 included $105 M for project on hold pending litigation resolution by MTCAdded WB Scales to Federal, State and MTC Regional Goods Movement Plan.

Status: ● Seeking funding for WB Scales (RM3 and SB1) ● WB included in Regional Goods Movements Plan ● RM 3 $105M WB Scales

ECD: Pending allocation of RM3 funds for design

STA Lead – 4. Managed Lanes Implementation PlanSolanoExpress and Traffic Demand MTC TPI (swapped for X X $3,312k 912k STAF Projects Projects Management (TDM) Capital Improvements STA STAF) and $75k YSQAMD Anthony Adams Transportation projects that support facilities such as transit hubs and park and YSAQMD RTIF Lloyd ride lots in an effort to attract and support a greater capacityincreased ridership TIRCP $1M (pending MTC) NadalJanet on of express lane users and SolanoExpress ridersand decrease in single Advanced OBAG 3 Adams occupant vehicles. A. SolanoExpress Bus Stops/Ped Improvements B. Countywide Parking Study C. System Capital Improvements D. I-80 Ramp Metering E. SolanoExpress/BRT Analysis and Transit Plan F. Transit Signal Prioritization (TSP)

Milestones:  Funding in place for two Two Community College bus stops locations (Fairfield and Vacaville) - COMPLETED  Funding in place for Bbus stops at SR 37/Fairgrounds Dr. construction begun  Submitted TIRCP Application for SolanoExpress Capital/Approved by CalSTA for TIRCP funding

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 3 17

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

CATEGORY PROJ PROJECT DESCRIPTIONS LEAD FUND SOURCE FY FY EST. PROJECT DEPT. LEAD ECT# AGENCY 2018- 2019- COST STAFF 192019- 22020- 20 21

 Improvements Casual Carpool surveys done at two Solano locations (FTC and Curtola),York Street Bus Facility and Completed Streets design and funding package– COMPLETED  Funding Agreement w Fairfield for TIRCP for I-80 FTC Gateway Project – EXECUTED  Funding Agreement w Fairfield for TSP - EXECUTED

Status:  STA staff continued participation on MTC MLIP Working Group  Initiating SolanoExpress stops at SR 37/Fairgrounds Dr. on/off ramps  In Construction SolanoExpress stops at Fairfield Community College – Fairfield lead implementing agency  In Construction SolanoExpress stops at Vacaville Community College – Vacaville lead implementing agency.  MTC and STA coordination on marketing Casual Carpools; including signage, web and radio campaign as well as bus and freeway sign ads  Casual Carpooling Marketing Project w MTC – Fall 2018SR 37/Fairgrounds construction to be completed in 2019, bus stops to be opened by July 1, 2019.  York Street construction to begin in May 2019  Fairfield design completed for FTC Gateway Project

ECD:  Two Community College stops – June 2018  SR37/Fairgrounds Dr. SolanoExpress bus stops – Summer 2019  Casual Carpool marketing campaign anticipated in Fall 2018York St. Bbus stopsFacility/Complete Streets end of 2019  FTC Gateway Project fall 2010.  Countywide Parking Study early 2020  TSP end 2019

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 4 18

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

CATEGORY PROJ PROJECT DESCRIPTIONS LEAD FUND SOURCE FY FY EST. PROJECT DEPT. LEAD ECT# AGENCY 2018- 2019- COST STAFF 192019- 22020- 20 21

STA Lead – 5. I-80 Corridor Management Freeway Performance Initiative (FPI) Caltrans Regional SRTP and X X N/A Projects Projects This includes; ITS Elements, Ramp Metering and Outreach tools, HOV STA State SHOPP Funds Anthony Adams Definition, and Visual Features (landscaping and aesthetic features). MTC

Milestones: ● Phase 2 Implementation Completed 2017

Status: ● Phase 2 Ramp Metering After Study COMPLETED ● Seeking Grant to Update I-80 Operations Study, will wrap FPI into MLIP ● SoHIP responding to local input which is on-going

ECD:

STA Lead - 6. SR 37 STA Gas Tax X X Projects Projects Improve SR 37 between I-80 in Solano County and SR 101 in Marin County to MTC RM3 Janet Adams address Sea Level Rise and reduce congestion. STIP Anthony Adams

Milestones:  SR 37 Corridor Financial Opportunities Analysis Consultant (PFAL) Selected and financial assessment anticipated completed in June 2017  SR 37 37 Transportation and Sea Level Rise Corridor Improvement Plan Approved by STA Board- COMPLETED  Solano Guiding Principles for SR 37 Adopted by STA BoardProject Initiation Document (PID) Segment B - COMPLETED  MOU for Project Delivery of corridor – COMPLETED  $15M of RM3 funding for SR 37/Fairgrounds Dr. concurred with by all four north bay sponsor agencies through MOU

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 5 19

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

CATEGORY PROJ PROJECT DESCRIPTIONS LEAD FUND SOURCE FY FY EST. PROJECT DEPT. LEAD ECT# AGENCY 2018- 2019- COST STAFF 192019- 22020- 20 21

Status:  SR 37 Corridor Financial Opportunities Analysis - COMPLETED  SR 37 Design Alternatives Assessment (SR 37 Transportation and Sea Level Rise Corridor Improvement Plan) – COMPLETED  STA Board Programmed $5M of STIP for PA/ED of Segment B/Mare Island Interchange.  Project Initiation Document for Segment B in process.  STA Funded $80,000 Caltrans Oversight of PID  Segment B Identified as Priority Segment by SR 37 Policy Committee  Regional Measure 3 (RM 3) $100 M for SR 37 Identified  Focus for year is to complete PID and begin PA/ED on Segment B/Mare Island Interchange.  Transit Behavior Study to begin this yearunderway in partnership with NVTA and SolTrans  Water Transit Study led by the STA underway  Initiate Bike/Ped Corridor Feasibility Study in FY 2018-19 in Partnership with the Bay Trail and local stakeholders.Segment B interim project PA/ED to begin this year  Mare Island Interchange improvements to be completed as part of ultimate Segment B project  Caltrans SHOPP projects along corridor in PID phase

STA Lead – 7. Redwood Parkway – Fairgrounds Drive Improvement Project STA Federal Earmark X X $2M design initial Projects Projects Improve I-80/Redwood Rd IC, Fairgrounds Dr, SR 37/Fairgrounds Dr. IC Local Funds package Janet Adams 1A. Phase 1 – SR 37/Fairgrounds Dr. Improvement Project Anthony Adams 2B. Phase 2 – I-8-/0/Redwood Pkwy Improvement Project

Milestones:  Phase 1 – SR 37/Fairgrounds Dr. Improvement Project design is fully funded, expected to begin in 20182019.  PM for Interchange Project under contract.

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 6 20

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

CATEGORY PROJ PROJECT DESCRIPTIONS LEAD FUND SOURCE FY FY EST. PROJECT DEPT. LEAD ECT# AGENCY 2018- 2019- COST STAFF 192019- 22020- 20 21

 $15M RM3 funds for construction secured through MOU, pending litigation resolution by MTC.  $5M STIP to be programmed to project with 2020 STIP Programming Cycle

Status:  Environmental Document – COMPLETED  Solano County/Vallejo/STA Funding Plan for Phase 1 Project - COMPLETED  Funding needed for Phase 1 Project design (COMPLETED) andPlan for Construction will be completed once the design is complete and an updated estimates can be produced construction 

ECD:  SR 37/Fairgrounds Dr. IC PS&E – July 2020 STA Lead – 8. State Route (SR) 12 East X X Projects Projects SR 12 Corridor (I-80 to I-5). Janet Adams A. STA SHOPP Priorities CT SHOPP $8 M Anthony Adams a. SR 12/SR 113 Intersection CT $75M b. Somerset to Druin shoulders and Downtown Rio Vista (Gap Closure) STA B. SR 12/Church Road CT Rio Vista – Fed a. PS&EPS&E and CON Phase for SR 12/Church Rd. in partnership with EarmarkSHOPP $5 M the Citytransferred to Caltrans SHOPP project

Milestones: ● SR12/113 PS&E - COMPLETED ● SR 12/Church Rd PS&E -– INITIATEDPS&E and CON to Caltrans ● Gap Project PA/ED - UNDERWAY

Status:

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 7 21

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

CATEGORY PROJ PROJECT DESCRIPTIONS LEAD FUND SOURCE FY FY EST. PROJECT DEPT. LEAD ECT# AGENCY 2018- 2019- COST STAFF 192019- 22020- 20 21

● Caltrans completed PS&Eto begin construction on the SR 12/113 intersection improvements in April 2019. SHOPP SB1 Monies will advance this project construction to FY 2018-19 ● STA initiated the SR12/Church PS&E in partnership with Rio Vista/CaltransSTA and Caltrans coordinated to get SR12/Church Rd intersection project included in the larger SHOPP project along SR12. ● STA working with Rio Vista to develop a funding plan for the PS&E of SR 12/Church Project - COMPLETED ● Caltrans initiated the PA/ED for Gap Closure Project ● STA to work with Caltrans to include elements of Rio Vision in Gap Closure Long Lead SHOPP Project. Sent Letter to Caltrans requesting partnership on this Project. ● STA/Caltrans to execute Cooperative Agreement for enhancement funding of elements in downtown Rio Vista ● STA/City of Rio Vista to execute Funding Agreement for enhancements elements in downtown Rio Vista

EDC: Construction of SR 12/113 Intersection Improvements to begin AprilMay 20198

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 8 22

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Co-Lead 9. Vallejo Station (Phase B) City of Vallejo X X $25M- Construction Projects Projects Revitalize Vallejo’s 92-acre waterfront with a dynamic mix of new housing, Cost Janet Adams retail, office, and light industrial jobs, plus new parks and improved open space. Phase B includes a separate Parking Structure.

Milestones:  Construction ($25 M pending RM3 Funding)

Status:  Post Office Relocation - COMPLETED  Environmentally cleared – CEQA EIR Certified  STA to work with City update of Phase B Design Update – FUNDING AGREEMENT APPROVED- COMPLETED  Seeking construction funding - $25 M  City to demo the Old Post Office Building 2018, Funded with RM2  SolanoExpress transit stop to be incorporated into the Vallejo Priority Development Area adjacent to Vallejo Transit Center and Phase B of Vallejo Station.  Improvements for transit capital provided by TIRCP grant.  Working w City/WETA for funding from RM 3 STA Co-Lead 10. SR 29 SR2S Corridor Coordination City of Vallejo SR2S Projects Projects Projects Improve SR 29 in multiple capacities, including pavement quality, bike and ped SolTrans funded through ATP X X Anthony Adams access, safety, and transit operations. for both transit and capital CaltransNVTA safety/efficiency investments. A. STA to work with City of Vallejo to implement HSIP and ATP Cycle 2 SR2S and HSIP pProjects along corridor to improvement pedestrian safety. B. Coordinate with Caltrans to advance State Highway Operations Protection Program (SHOPP) funding for SR29 rehabilitation. A.C. Collaborate with Vallejo and Caltrans to implement Sonoma Blvd Specific Plan elements along SR29 with the goal of transforming it into a “complete street.” Milestones: SR2S Project CON funding allocated in March 2019. SR2S and HSIP project along Sonoma Blvd is to be constructed in Summer 2019. funding secured through Active Transportation Program grant funds Status:

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 9 23

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

●A. The City of Vallejo has received a HSIP and SR2S grants at various intersections along the corridor. The City will begin construction in 2018 on HSIP project and 2018 for SR2S project.Both Projects expected to be complete by August 2019. B. Caltrans has indicated willingness to advance SHOPP funding for SR29 from FY 2022/23 to FY 2020/21. STA is the Project Manager for the SR2S Project (includes City of Benicia Improvements) ●C. STA coordinating with the City and Caltrans to decide on project elements and local funding commitments.

EDC: SR2S & HSIP Project Completion – Fall 20198

STA Co-Lead 11. Future Bridge Toll Project Priorities (Regional Measure 3) STA X Projects: Projects ● I-80 Corridor Goods Movement Improvements (Freight)I-80/I-680/SR Vallejo Janet Adams Program 12 Interchange $150 M Fairfield Anthony Adams ● I-80 WB Truck Scales - $105 M ● I-80 Express Lanes - $75 M ● North Bay Transit Capital $3820 M a. $12 M Fairfield/Vacaville Train Depot Completion b. $10 M Vallejo Station Phase B c. $12 M SolanoExpress Capital Improvements at Fairfield Transportation Center d. $4 M SolanoExpress Bus Replacement ● Trail/Safe Routes to Transit a. $1.2 M Bay Trail/Vine Trail through Vallejo b. $3 M West Texas Safe Routes to Transit c. $5 M West Texas Gateway/Heart of Fairfield d. $3 M Bluff Trail through Vallejo e. SR 37 Access Improvements (amount based on results from SR 37 Active Transportation Master Plan) ●f. $5 M Solano County Safe Routes to Transit (Implementation of the STA’s Safe Route to Transit Plan) ● SolanoExpress Operating – Competitive ● a. Annual Operating request $3M – for added 23,000 operating hours ● SR 37 Corridor - $100M a. $15M for Fairgrounds Dr (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 10 24

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● Ferry Enhancements Program - $300M ●a. $15M for Vallejo Station Phase B

Milestones:Milestones: RM3 is currently under litigation. Funds are being collected, but will not be distributed until the lawsuit is decided. Estimated RM3 money availability in 2020 or beyond. Bay Area Vote June 6, 2018

STA Co-Lead – 12. Jepson Parkway Project STA STIP X X $185 M Projects Projects A. Vanden.to Leisure Town Rds - Fairfield (Segments 2A, 2B and 2C) 2006 STIP Aug Janet Adams B. Leisure Town Rd. from Vanden to Orange Dr. - Vacaville Partners: Fed Demo (Segments1A, 1B and 1C) Vacaville Local C. Cement Hill/Walters Rd. Extension Fairfield (Segment 3) Fairfield

Milestones:  PA/ED- COMPLETED by Vacaville  STA MOUs with Fairfield, Vacaville and County – COMPLETED  Funding Agreements (Phases 1 & 2A) – COMPLETED  Concept Plan Update – COMPLETED  Construction Segments 1A and 2A -– UNDERWAY- COMPLETED  Construction Segment 2A -– UNDERWAY by Fairfield  R/W Segments 1A and 2A, 2B – COMPLETED  Funding Agreement Segment 2B - COMPLETED

Status: ● Segment 1A (Vacaville) – To be Completed Summer 2018 ● Segment 2A Fairfield – To Be Completed Summer 2018Fall 2019 ● Segment 1B and 1C Funding Agreement Completed with Vacaville; Construction to begin in 2021

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 11 25

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● Funding/Construction for Segments 2B by Developer ● Funding for Segment 2C – TBD ● Work with City of Fairfield for possible Federal Lands Access Program (FLAP) grant for Segments 2B and C

ECD: Construction Segments1A and 2A – late 20182019

STA Monitoring 13. Monitor Delivery of Local Projects/Allocation of Funds STA STIP-PPM X X N/A Projects – Programs A. Monitor and manage local projects. STP Anthony Adams B. Manage Solano Project Online Tracker (SPOT) Management Erika McLitus Webtool and integrate into STA Website as main landing for active projects information. C. Implement OBAG 1 Projects D. Implement PCA Project (OBAG 1) E.B. Approvale and Program 12 OBAG 2 Projects F.C. Monitor Implementation of 4 STIP projects (SR37 Environmental, Fairgrounds Dr, Jepson Parkway Phase 2A, 1B and C, and SR12/Church Rd) G.D. Monitor Implementation of ATP Grants E. Support local grants application production for ATP/Cap and Trade/Green Communities, etc. H.F. Support and monitor implementation of TIRCP funded projects

Status: ● Monitoring of local projects is an on-going activity; STA developed tracking system for these projects and holds PDWG monthly meetings with local sponsors. ● Monitor OBAG 1 and OBAG 2 projects implementation ● Monitor and Manage SR2S projects implementation ● Monitor ATP Project Implementation ● Monitor HSIP Cycle 9 projects implementation ● Aid Agencies, as needed, in development of Funding Strategies for projects with shortfalls ● Monitor pilot PCA project – in construction by Solano County ● Participate in PDT’s for projects to insure successful delivery

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 12 26

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● Work with locals to develop applications as needed for ATP/Cap and Trade/ Green Communities, etc. ● Work with CTC and MTC to get appropriate allocations and extensions for state funded projects. ● Initiate One Bay Area Grant 3 criteria with TAC and Board

ECD:  On-going

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 13 27

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Lead- Data 14. Highway Performance Monitoring System (HPMS) Data Collection STA X Projects Collection Part of the Federal MAP-21 requirements, MTC required implementation of Member Anthony Adams this federal requirement with OBAG 2. STA coordinates with member Agencies agencies to collect local data related to Traffic, Facility Inventory and Pavement Data. Primarily traffic counts.

Milestones:  Kick off withWork with PDWG Members and beganto continue data collection –June 20197  Input data – June through September

Status: Continue to monitor and collect datae from member agencies and submit to MTC.7

ECD: On-Going requirement of OBAG2

STA Lead - 15. Solano County Pothole Report STA PPM X $12,500 Projects Studies Semi-Annual report on countywide rating roadways (mapped by street/by Anthony Adams jurisdiction), summary of annual investments in roadway infrastructure and summary of financial shortfall. Status  The first Solano County Pothole report was completed in December 2014  2nd Solano County Pothole report draft currently being developed for 20189 in coordination with SB1 Implementation  Subsequent updates to the Pothole Report are anticipated every four years-similar to MTC’s schedule  20189 Solano County Pothole Report estimated completion in September 2018May 2019

STA Lead – 16. Regional Traffic Impact Fee (RTIF) Program STA PPM/RTIF X Projects Program ● Working Group Coordination Anthony Adams ● Strategic Implementation Plan (SIP) ● Annual Reporting ● Fund Distribution and management ● Project monitoring

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 14 28

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

Milestones: ● 54th Annual Report - October 20187 ● Updated Nexus Report ● $1.2M Average Collected Annually

Status: ● Revenue Estimates Forecast completed and will be updated annually. ● SIPs will be updated annually ● Development of Funding Sign completed and installed ● RTIF Working Groups coordinating to update SIPs on a couple of RTIF funded projects and develop RTIF funding agreements (as necessary) ● $6.24.9 Million collected to date (Q2 FY 20187/198); over 90% of available FY 20187/198 RTIF Funds committed to projects. ● New nexus study wasill be conducted in Summer Fall of 20198 by Solano County. This new study will described new projects and possibly recommend an updated RTIF fee amount.updated project costs. ● STA met with all working groups and discussed distribution to projects over the next 5 years.

ECD: RTIF Program is a five-year program that was re-approved in December 2018. and Aadministrative tasks will continue to be ongoing until the program expires.

STA Co-Lead 17. Rail Stations/Service & Rail Plan and Service CCJPA RM2 Planning/Project Projects Plan, market and implement rail service in partnership with CCJPA, SMART ADPE-STIP s/Programs Planning and STA member agencies. ITIP Janet Adams City of Fairfield Local Robert Guerrero Milestones RTIP $68 M FF/VV Station A. Fairfield/Vacaville Train Station: ECMAQ Vince Ma First phase Fairfield/Vacaville station - COMPLETED. Staff working City of Dixon YSAQMD Clean Air Ron Grassi with Fairfield on completing funding plan for additional phases, Funds including seeking Cap and Trade funding. (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 15 29

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

B. Dixon: station building and first phase parking lot completed; Dixon, STA $125,000 CCJPB and UPRR working to resolve rail/street issues. Funding Plan for downtown crossing improvements needed as next step. City of Vallejo STAF, PPM $66,050 C. Update Solano Passenger Rail Station Plan - COMPLETED. City of Suisun STP Planning, Vaca D. Monitor Vallejo’s Rail Service Plan for Mare Island City TDA, CCJPA $600,000 E. Suisun/Fairfield Train Station Upgrade -– COMPLETED CMAQ, TDA Article 3, STAF Status: MTC Rail Program A. Ongoing participation with CCJPA staff working group B. Upcoming participation in SMART Rail Feasibility Study for rail service west from Suisun City to Napa, Sonoma and Marin Counties. C. Monitor State Rail Plan for potential opportunities. D. Prepare future operations and custodial service plan for Suisun Train Depot E. Initiate Parking Assessment Study for two rail stations as part of six facilities study F. Coordination with CCJPA Board Members

E. ECD: Ongoing

STA Lead – 18. Abandoned Vehicle Abatement Program STA DMV X FY 2016-172017-18 Projects/ Programs $394,290396,968 Finance Milestones: countywide Brenda Ongoing – 3,5198,919 vehicles abated through 2nd Quarter ofin FY 2017- distribution McNicols 182017-18 $155,020396,968 distributed countywide to seven Cities and County.

STA Co-Lead - 19. Bay Trail Vine Trail Project – City of Vallejo STA, City of ABAG Bay Trail $74 M Projects Projects Project is being implemented by the City of Vallejo. Project is difficult due to Vallejo Vine Trail Anthony Adams alignment, encroachment, and environmental issues. Project budget is $5.2M, Partnership but total cost is closer to $7M+. STA is working with funding partners to identify funding to close the shortfall.

Milestones:

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 16 30

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● Project Construction to begin in FY 202019/202120 or FY 2021/2022 depending on CTC approval of requested extension.

Status: ● Adopted Feasibility Study completed by STASTA coordinating with Vallejo to request an 18 month delay in CON to deal with environmental issues and to identify funding. ● STA applied for BAAQMD funds for this project ● ATP funds to implement – OBTAINED ● PA/ED underway by the City of VallejoProject at 35% design, but still needs substantial environmental and design work.

ECD: 202220

STA Lead – 20. Comprehensive Transportation Plan Update (CTP) STA STP X X Planning Planning Adopted chapters – Introduction, Past Achievements, Active Transportation, TDA $75k85k Robert Guerrero Transit and Rideshare. The Solano Comprehensive Transportation Plan has STAF /Ryan three primary elements to guide transportation funding and policies: DodgeTriana 1) Arterials, Highways and Freeways Element Crighton 2) Transit Element Cory Peterson 3) Active Transportation Element

The STA is developing two new CTP will include two new chapters to include in the CTP:, Equity and Land Use. The consultant will also create an executive summary to connect all the chapters together cohesively.In addition, the updated CTP will include an executive summary to tie in previously approved elements with the new chapters.

Milestones: ● Arterials, Highways and Freeways Element recommended for approval by Sub Committee and STA TAC. Board action scheduled for June 2018- COMPLETED ● Active Transportation Element - COMPLETED Transit and Rideshare Element - COMPLETED Chose Consultant selected- s – Alta Planning + Design ● (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 17 31

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● Conducted firsttwo Equity Working Group formed and initial meetings held Meeting Active Transportation Committee reviewing Land Use Chapter Goals ● ●

Status: Arterials, Highways and Freeways Element  Draft Plan Approved by the STA Arterials, Highways and Freeways SubcommitteeElement Adopted

Active Transportation Element  Element Adopted

Transit and Rideshare Element ● Element adopted

New Chapters to develop in FY 2018-1, along with an Executive Summary9 Equity  Equity Chapter under development  Includes PDA/PCA Update Report Working Group has been established. First meeting was held on March 13th.Three Two remaining Working Group Meetings and one public workshop Literature review and analysis first draft currently in review ECD: October 2019

  Land Use Chapter under development Literature review and analysis first draft currently in reviews currently in progress  ECD: October 2019

ECD:

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 18 32

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● Equity and Land Use Chapters (includes PDA/PCA Update Report)- December 2018October 2019 ● Arterials, Highways and Freeways – June 2018 ● Final CTP Document – January 202019

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 19 33

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Lead – 21. Plan Bay Area (RTP/SCS) – Plan Bay Area 2050 MTC/STA STP X X Planning Planning Regional Transportation Plan that is updated every four years by MTC. STA Robert Guerrero adds selects transportation projects and programs through an to plan and Triana Crighton completes outreach and coordination with the cities and County of Solano for regional planfor the RTP. A new approach was created in developing the new RTP called the Horizon’s Initiative. The Horizon’s Initiative is an attempteffort to comprehensively plan for a future with uncertain conditions to inform the RTP development.

Milestones:

● MTC has released three Horizon’s Perspective Papers – AVs, TDM, and Regional Growth Strategies. They have also completed their Round 1 Analysis, followed by a series of public workshops. ● Horizon’s public workshop in Vallejo took place on March 20th. ● Submitted/Supported four Transformative Projects (Express Lanes, I- 80/680/12 Interchange, SR-37, SR-12) ● New Plan Bay Area anticipated to be adopted by MTC/ABAG 2020

Status:  Reviewing the Regional Growth Strategies paper and preparinged any STA comments. STA comments.  Tracking new MTC Plan Bay Area 2050 Plan and RHNA Housing discussions.  Currently oOpened a Call for Projects to be included in the RTPPlan Bay Area 2050. Tracking the remaining Horizon’s Papers and other discussions related to the PBA 2050. 

ECD: Ongoing  Solano RTPPBA Submittals Due to MTC June 30th  PBA 2050 Preferred Scenario completed by MTC March 2020  PBA 2050 Air Quality Analysis Draft completion December 2020  Final PBA 2050 adoption by MTC June 2021

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 20 34

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Lead – 22. Priority Development Area, Priority Production Area and Priority STA Regional TLC X X Planning Planning Conservation Area Planning and Implementation CMAQ Robert STA’s transportation and land use planning and implementation efforts are STP Planning Guerrero/Ryan concentrated in these growth and conservation designated areas. The PDA, Dodge PCAs and new PPAs are selected by STA member agencies and approved by TBD ABAG/MTC for special transportation funding consideration. A. Coordinate Development of PDA Plans for cities of Benicia, Dixon and Rio Vista $1.5 M B. Assist cities of Fairfield and Suisun City in developing their own PDA Plans $75,000 C. Develop Priority Conservation Areas (PCAs) assessment/implementation plan

Milestones: Benicia and Rio Vista PDA Plans adopted – 2017 PCA Assessment and Implementation Plan adopted - 2016PDA Update Report Kick Off – March 2018 ● Conducted a series of PDA and PCA presentations at the STA Board meetings between July 2018 through April 2019 ● Hired Transportation Land Use Project Manager through Solano EDC in October 2018 to assist in evaluating Solano PDAs and developing a Suburban Pilot: Housing Incentive Pool Program (SubHIP) ● City of Vacaville began development of Downtown Specific Plan for PDA in March 2019 Notified member agencies of PDA/PCA/PPA designation update availability through ABAG/MTC ● Coordinated with the City of Vallejo and Soltrans to agree to expand Downtown Vallejo PDA transit center at York St. in February 2019

● Status:

 Updating the status of PDA implementation as part of the Solano CTP Land Use chapter  Meetings scheduled for each city and county agencies to consider modifying PDA and PCA boundaries. Also, coordinating with them to designate PPAs with assistance from Solano Economic Development Corporation (EDC).

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 21 35

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 Coordinating with ABAG/MTC and Cities PDA and PCA Plans Completed in 4 of 7 cities ● Dixon’s is nearing adoption, Vacaville Downtown Plan recently started ● PDA Investment and Growth Strategy updated and submitted to MTC STA working on a Land Use Chapter for the CTP to assess status of PDAs ● Developing Report on overall PDA and PCA implementation status ● Tracking opportunities for additional PDA, PCA, or Priority Production Area (PPA) designations for Vallejo and Vacaville (as well as other interested cities)any interested cities, in conjunction with MTC’s Horizons efforts

ECD: Estimated February 2019New PDA/PCA/PPA Nominations due to MTC by August 2019, approval expected in December 2019

STA Lead – 23. Congestion Management Program (CMP) Update STA STP Planning X $835,000 Planning Programs The Solano CMP is updated Ryan A. bBi-annual update of the Solano CMP due to MTCto reflect existing DodgeCory transportation demand management programs, transit services, expanded active PetersonRobert transportation facilities, and congestion relief projects on the CMP network. in Guerrero 20198. New update will include updated vehicle counts. Triana Crighton B. Monitor impact on arterials of regional significance. Traffic counts C. Summarize programs and projects that will help mitigate congestion on Solano County’s roadways

Milestones: ● Scope of Work/RFP completed – initiation for Vehicle Counts – July 2018March 2019 Draft CMP Completion- December 2018 ● RFP released March 2019

Status: Seeking budget approval for FY 2018-19 for Vehicle Counts as part of 2018-19 budget revisionScope of Work/RFP Release: March 2019  Reviewing RFPs to chooseselect consultant  Forming CMP task force to assist in 2019 CMP development (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 22 36

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

ECD: December 2018October 2019

STA Lead – 24. Active Transportation Plan TDA Article 3 X X $600,000 Planning Planning Create a new countywide Active Transportation Plan to incorporate the separate Caltrans Sustainable Cory Safe Routes to Transit, Countywide Bike and Countywide Pedestrian plans. Communities Grant PetersonTriana Work with participating cities to develop community-specific Active Funds Crighton Transportation plans. Identify and prioritize projects for near-term and mid- STA Erika McLitus term funding and delivery. Ryan Dodge

Staff support for the Bicycle Advisory Committee and Pedestrian Advisory Committee

Milestones: ● Consultant selected ● RFP Distribution- April 2018 ● Caltrans funding agreement adoption- May 2018 ● Kickoff Meeting – June July 2018 ● Completed first round of Public Outreach in each city ● Held three PDT meetings

Status ● Obtained Grant funds to develop ATP (TDA and Caltrans funding- $6000k) ● Met with cities and County of Solano to develop scope of work ● RFP ready for distribution in April 2018Goals and objectives are under development and were presented to the STA Active Transportation Committee in March 2019 ● Active Transportation Projects currently being identified for FY 2019-20 TDA Article 3 fundingWork is approximately 50% complete ● STA continues to meet regularly with cities through the Plan’s established PDT

ECD: Summer 2019January 2020

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 23 37

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Lead – 25. Housing Production and Jobs Growth Coodination STA/ Solano STP Planning X X $35,000 Planning Planning Coordination with STA member agencies and MTC/ABAG to track and EDC Robert Guerrero incentivize housing and employment production near transit facilities.

Milestones:  Hired transportation and land use project manager through Solano EDC in October 2018  Developed Suburban Housing Incentive Pool Program (SubHIP) for MTC consideration  Coordinated with Solano City County Coordination Council (4Cs) to host Housing Summit in February 2019  Formed a Transportation and Landuse Technical Group with City Managers, County CAO, Planning Directors, LAFCO and Solano EDC Status:  Coordinating with Transportation and Landuse Technical Group to develop a response to the CASA Compact and MTC Perspective Papers on Housing and Jobs Production  Working with STA member agencies to develop work scopes for SB2 housing and jobs production planning grants  Facilitating meetings highlighting Solano PDA Profiles with MTC/ABAG, Strategic Growth Council, Housing and Community Development (HCD)  Tracking Housing Production Legislation

ECD: Ongoing

STA Lead – 25. STA Legislative Program TFCA X X Planning Board directed coordination to monitor and analyze state and federal Gas Tax Jayne transportation and housing legislation for potential impacts to Solano County. Sponsors BauerVincent Establish STA’s Legislative Platform to provide policy guidance for legislative Ma advocacy in Sacramento and Washington DC Annual STA Board-adopted Legislative Platform serves as a guideline for legislative trips to Sacramento and Washington, D.C.  Monitor state and federal legislation that pertains directly to transportation and housing related issues.  Draft annual Legislative Platform for Board adoption (coordinate with staff, committees, member agencies and stakeholders) (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 24 38

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 Regularly update the STA Legislative Matrix that lists bills staff is $52,000 $520,00 currently monitoring and any position the STA has taken. 50,0002 0  Contract with and regularly correspond with legislative consultants 5,0200 25,0200 who advocate on behalf of STA:  State Legislative Services  Federal Legislative Services  Work closely with legislative consultants to arrange meetings for staff and board members in the district and the Capitol (including California Department of Housing and Community Development (HCD), Governor’s Office of Planning and Research), plan and execute letters $1,000 $1,000 of support and provide hearing testimony $500 $500 Research and prepare legislative materials for staff and Board Attend Legislative Conferences (e.g. CSAC) Attending Continuing Education  Milestones:  Prepared 8 Fact Sheets which resulted in the defeat offor Prop 6 and preserved regarding importance of SB 1 Funding – Nov 2018  2019 Legislative Platform adopted by Board – Feb 2019  City County Coordinating Council Summit on Housing – February 2019 Assisted member cities with SB2 Funding Established SubHIPP Pilot Program  Sacramento Lobby Trip focused onr Housing – Mar 2019  Worked with consultant to analyze housing and transportation legislation pertaining to the CASA Compact – March 2019

Status/Milestones: Staff State Legislative Meetings February December 2018, February 2020 Board State Legislatives Meeting June/July 2018March 2019, June/July 2020 Staff/Board Federal Legislative Trip September 2018May 2019, May 2020 Preparing for Staff/Board Federal Legislative Trip – May 2019 Continue to track housing and transportation legislation Ongoing letters of support provided to legislators/agencies Presentation on SB1/Proposition 69City County Coordinating Council Summit on Housing February 2019

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 25 39

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

ECD: Ongoing

STA Lead – 26. STA Marketing/Public Information Program STA TFCA X X Planning Planning Develop and design marketing and public information collateral including Gas Tax Jayne annual reports, monthly newsletters, fact sheets, and online content. Provides Sponsors BauerVincent internal and external communications Ma A. Agency Public Affairs and Media Relations Esther Wan B. STA/partner agency events C. Monthly Newsletter and Annual Report D. Project Fact Sheets and Public Outreach E. Annual Awards Program F. Marketing Plans/Programs: STA/SolanoExpress/Commuter Info/Solano Mobility/SR2S TBD $1,500 G. Marketing Materials for STA Programs (brochures, mailers, signs, cards, TBD $3,500 surveys, videos, phtographs, logos, ads, flyers, online promotions) TBD $4,500 H. Commuter Info website and Facebook page TBD $2,000 I. Solano Mobility website, Twitter and Facebook page $2,000 J. SolanoExpress website, and Facebook page and Twitter $4,250 $4,250 K. SR2S website, Instagram and Facebook page $4,250 $4,250 L. STA website, and Facebook page, Twitter and LinkedIN $4,250 $4,250 $4,250 $4,250 Milestones: ● Published 2017 Annual Report – Aug 2018 ● 20h 21st Annual 2017 2018 Awards Program in Suisun City, 155 registeredattendees – Nov 2018 ● Published 8 monthly STATUS newsletters – Aug to Mar 2018 ● Promoted 4C’s Housing Summit via Constant Contact, attended by 159 residents and elected officials ● Promoted 7 Older Adult & People with Disability Summits, received 2,0200 surveys ● Promoted SolanoExpress route realignment with Blue, Yellow, and Green Express Lines – Aug 2018 ● Produced Fact Sheets: ● 8 Prop 6 (7 Cities and 1 Countywide) ● 3 PDA (Fairfield, Suisun City, Vacaville) ● 1 SB2 (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 26 40

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● Launched STA Twitter Page and gained 53 followers – Aug 2018 ● Relaunched STA LinkedIN Page – Dec 2018 ● ● SolanoExpress Marketing Campaign ● Launched Twitter page for Solano Mobility ● Implemented Constant Contact online survey/email tool ● Second year of monthly STA newsletter “STATUS” via Constant Contact ● Coordinated with Caltrans on joint I-80 project media/public communications ● Assisted with Countyrollout of 7 community Mobility Summit October 2018s ● Continued radio ad campaign for Solano Mobility and SolanoExpress Developed seven Prop 6 Fact Sheets for Solano County and Cities New STA Twitter Account launched August 2018 ● Organized Ribbon Cutting for Jepson Parkway with City of Vacaville – November 2018 Organized SR113/12 Roundabout Groundbreaking with Caltrans ● New SR2S website launched with over 400 monthly page views: August 2018 with an average of 443 visitors per month ● New Solano Mobility website launched December 2018 with an average of 616 visitors per month ● New STA Website launched March 2019 with an average of 1.7k visitors per month ● Relaunched Solano Mobility Employer Program with updated collateral and promotional programs Assisted with Countywide Pedestrian Safety Symposium – February 2019 Assisted with public outreach for Active Transportation Plan Update ● Organized Holiday Open House – December 2018

Status: ● Publish 2018 Annual Report – May 2019 ● 22nd Annual 2019 Awards Program in Fairfield ● SolanoExpress Red Line marketing campaign o Brochure update $15,000 $15,000 o Movie theatre advertising $5,000 ● Organizing Ribbon Cutting with Caltrans for SR12/113 – May 2019 $1,500 ● Coordinating Tom Hannigan Platform Dedication – Sept 2019 $3,500 ● Development of STA’s Marketing Snapshot $4,500 (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 27 41

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● 4 5 websites and 7 9 social media pages being maintained $2,000 ● Project fact sheets / program materials developed on as-need basis $2,000 ● STA Annual awards hosted every November Providing more data via Constant Contact/Google Analytics tools ● Preparing promotional video production (est. May 2019 launch) ● Preparing online digital marketing campaign (includes animated collateral production) $15,000 ● Continue print advertising (e.g. Daily Republic, Your Town) $20,000 ● Movie theatre advertising – May 2019 ● Marketing research / community surveys and polling $60,000 Develop Public Outreach training for internal staff Develop and launch agency wide strategic marketing campaign to raise $5,000 awareness and public perception $50,000 Assist with Bike Month (Bike to School Day, Bike to Work Day, and $25,000 Community bike related events) $30,000 ● $20,000 ● Working on new STA website (to launch in 2018) ● Working on new Solano Mobility website (to launch by April 2018)* ● New SR2S website (to launch by April 2018) ● Rebranding/retargeting SNCI and Solano Mobility Facebook pages ● Coordinating Bay Area RM3 public information effort through June 2018

ECD: Ongoing *Includes updates to SolanoExpress and Commuter info websites

STA Lead – 27. Travel Safety Plan: Emergency Response Plan STA X TBD Planning Programs Plan to be developed in coordination with Primary Health Care Providers and Robert Guerrero EMS Providers. Scope to include: Anthony Adams  Critical emergency response corridors Ryan Dodge  Identify key supportive transportation projects  Coordination with other emergency responders (fire, police, city)

Milestone/Status:  Plan tentative start in FY 2019-20 or FY 2020-21 (pending budget and STA Board approval)

ECD: TBD based on Board approval and funding availability (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 28 42

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Lead - 28. STA Projects Economic Analysis STA TBD $25,000 $25,000 TBD Planning Studies Develop report, in partnership with the Solano Economic Development EDC Robert Guerrero Corporation (EDC), on economic impact and general analysis of the economic aspects of infrastructure improvement and augmentations in Solano County for the following three projects: 1. I-80 Westbound Cordelia Truck Scales Improvements 2. I-80/I-680/SR 12 Interchange Project 3. I-80 Express Lanes: West of Red Top Road to East of I-505

A fourth project is proposed: SR 37 Corridor Economic Analysis

Milestone/Status:  I-80 Economic Analysis – COMPLETED  SR 37 Corridor Economic Analysis – pending Board consideration and, approval, and funding

EDC:  I-80 Projects Report Completed in January 2018  SR 37 pending budget and STA Board approval

STA Lead – 29. Clean Air Fund Program and Monitoring Planning Planning Bay Area Air Quality Management District (BAAQMD) Transportation Fund STA TFCA  $332,000 FY 2018- Cory for Clean Air (TFCA) and Yolo Solano Air Quality Management District YSAQMD Clean Air Funds 1919-20 PetersonTriana (YSAQMD) Clean Air Fund (CAF) coordination and administration. (YSAQMD Clean Air) Crighton

Milestones:  $331,481$345,995  April 11, 2018- Board approved FY 2018-19 funding priorities for FY 18-1919-20 BAAQMD ($331,482): (TFCA) (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 29 43

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● $196,000 - Solano Mobility Program Approximately ● $100,482 - Solano First and Last Mile Program $35,000 – EV Readiness Implementation- Suisun City Charging StationCompletedInitiated a TFCA call for projects in February 2019, 5 applications received. Board approval anticipated inscheduled for May 2019 ● YSAQMD received five applications from Solano County agencies, including STA submittal for SR2S Microgrant. A. April 14, 2018 YSAQMD Clean Air Committee Review- Approximately $332,000 available for FY 18-19 ● Status:  Allocated annually.  STA staff assists in recommending funding for YSAQMD CAF  STA staff monitors implementation of TFCA funds until project completion.Clean Air Committee scheduled for April 2019  Board recommendations for TFCA Program Manager Funds anticipated in May 2019  Partnership with Travis Air Force Base to install 100 EV chargers on base in phases – the first phase STA will recommend providing e $120,000 as match to Travis AFB for first phase. YSAQMD/STA Screen Committee recommended funding for SR2S Microgrants ECD: Ongoing

STA Lead- TDA Article 3 Program STA TDA Article 3 Planning Planning STA staff programs TDA Article 3 funding through a countywide coordinated Ryan claim with input and recommendations from the STA BAC and PAC. DodgeTriana Crighton Milestones: Cory Peterson o Met with each city to discuss priority ATP projects / Status: o Allocate and administer FY 2019-20 funding: Fairfield Green Valley Rd Crossing, Benicia ATP Cycle 2 SR2S, Vallejo ATP Cycle 2 SR2S, Vallejo Bay Trail/Vine Trail, and STA SR2S Program

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 30 44

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 Administering FY 2017-18 Board approved TDA Article 3 funding priorities: W. Texas Gateway; Fairgrounds Drive and Vaca-Dixon Phase 6 Recommendations to be taken to the May BAC, PAC, TAC, Program and administerAdminister FY 2018-19 TDA Art. 3 funding: Vaca- Dixon Phase 6 and City of Vallejo Bay Trail  Allocate and administer FY 2019-20 funding: Fairfield Green Valley Rd Crossing, Benicia ATP Cycle 2 SR2S, Vallejo ATP Cycle 2 SR2S, Vallejo Bay Trail/Vine Trail, and STA SR2S Program  ECD: June 2019 to program TDA Article 3 projects8 STA Lead – 30. Countywide Traffic Model, Geographic Information System and Data X Planning Planning Collection Ryan  Maintenance and validation of models to support project delivery and STA, NVTA Funded by DodgeTriana funding applications. Maintenance of Model STA OBAG $150,000 Crighton  Approve Model User Agreements as submitted $24,000 Cory Peterson  Periodically convene STA Model TAC Robert Guerrero Update consultant contract and funding agreement with NVTA as needed  Track regional model activities as it relates to MTC’s RTP Update STA  Coordinate with the Solano County Regional Geographic Information Systems (ReGIS) consortium  Deploy and maintain Bicycle and Pedestrian Counters

Milestones:

 On Call Model ongoing- Contract expires June 2020

 Annual Report on Model Activities – December 2018  GIS Needs Evaluation and Coordination – Summer 2018  GIS Group Implementation Work Scope – Fall 2018

Status:  On Call Model ongoing- Contract expires June 2020  New Activity Based Model adopted.  TJKM Consultants Selected  Update of land use needed after adoption of PlanBayArea in the summer of 2017  Validation and split of Solano and Napa models is complete. Expected to go to TAC in Apr 2019 and Board in May 2019 for approval. (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 31 45

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 Approved work to create a centerline layer for use in GIS  New Activity-based Model adopted  STA supporting NVTA in validating the model for local Napa traffic and roads   GIS Mapping for SPOT Solano Contract with Brian Fulfrost and Associates ends June 30, 2019.  4 Pictomerety flights completed as of 5/21/2018, one is currently being completed. 66.67% of the contract expended.  Coordination with County GIS group pending County initiation of the process  Coordinating with Solano County on the creation of a countywide centerline layer for use in GIS  Re-evaluate Data needs for the agency, including coordination with SR2S Program data needs evaluation

ECD:  On Call Consultant ongoing until June 2020.  GIS Implementation TBD based on upcoming coordination meetings

 STA Lead – 31. Solano County Water Transit Plan STA OBAG X Planning/ Planning Plan to evaluate water transit services improvement opportunities in Solano STAF Ryan County with potential connections made to Marin County, Contra Costa DodgeTriana County, Alameda County and San Fracisco. Crighton

Milestones:  Consultant hired by STA  Consultant Selection Plan Kick off meeting in March 2018 2nd PDT Meeting – May 15th, 2018  3rd PDT Meeting – January 15, 2019  Ridership Projections completed by SFCTA  Draft Plan completed by EPS

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 32 46

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 Draft Plan reviewed and returned by STA

Status:  Rideship Forecast and data gathering underway  Plan Leadership Team meetings scheduledA second draft is being completed based on STA’s feedback.  Plans to take the plan to the May Consortium and TAC and June Board and SR-37 Policy Committee.

ECD: December 2018May June 2019

STA Lead – 32. EV Readiness Plan Implementation STA  TFCA X X  $35,000 for Suisun Planning Planning Plan to evaluate EV Charging station locations and sign placement. Plan also  YSAQMD CAF Train Depot and Cory focuses on permit streamlining for EV infrastructure.  (potential)PG&E City Center PetersenTriana and SGC grants  $67,000 for Vallejo Crighton Milestone: Station  Plan Adoption - April 11, 2018  Follow up Implementation Plan – June 2018  Allocated $35,000 for charging stations for two locations in Suisun – Lotz Way Parking Lot and City Hall.  Allocated $67,000 for charging stations for the Vallejo Parking Structure.  Funding recommended for charging stations on the Cal Maritime Campus and County of Solano Offices.Entered funding agreements with Vallejo and Suisun – December 2018. 

Status: o Formal EV Implementation/Strategy being developed o Funding recommended for charging stations on the Cal Maritime Campus ($31,050) and Travis Air Force Base ($120,000).  STA Board approval action on April 2018;  FY 2018-19 Implementation: o Suisun Train Depot o Suisun City Hall o Vallejo Station (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 33 47

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 FY 2019-20 Implementation Plan currently being developed

ECD:  FY 2018-19 Suisun EV Station Construction – June 2019  FY 2018-19 Vallejo EV Station Construction – October 2019  FY 2019-20 Implementation Plan – October 2018

STA Lead – 33. Solano Countywide Safe Routes to Schools (SR2S) Program STA CMAQ X X $644600,000 Transit/SNCI Programs The Solano SR2S Program currently works with 70 schools countywide to YSAQMD Encouragement, Programs increase the number of students walking and bicycling to school. The program TDA Education and focuses on activities and programs that educate students on active travel safety, ATP Enforcement Lloyd Nadal physical activity and health awareness and school infrastructure improvement OTS (Includes contracts Karin Bloesch projects to make it easier and safer to walk and bike to school. Using a with Solano Public Betsy Beavers comprehensive approach, the program operates using the 6 “E’s”: education, Health, Enforcement Tiffany Gephart encouragement, enforcement, engineering, evaluation and engagement. Grant Police Dept April WellsSue recipients, Bay Area Violette Milestones: Children’s Theater and ● The 2018-19 school year has engaged over 15,000 students and 70 Bay Area Bike schools participating in a SR2S event out of approximately 63,000 Mobile) students and 108 schools in Solano County.. ● 48 schools with over 8,600 students participated in International Walk $3.2M Engineering to School Day in October 2018, For the fourth year in a row, all cities (ATP 2 and OBAG 2 and school districts in Solano County participated. funding provided to ● A total of 363 Student Travel Surveys were collected at 29 schools in the cities of Benicia, October 2018. Dixon, Vallejo and ● Since 2009, 28 SR2S Infrastructure Projects have been completed to Fairfield to support improve bike and pedestrian safety for students countywide SR2S Infrastructure ● Received an $85,000 grant from the Office of Traffic Safety (OTS) to Projects from 2018- host community pedestrian safety workshops across Solano County. 2020) ● SR2S Enforcement Grant Round 4 began in 2018-2019 with the Police Departments in Benicia and Suisun City as awardees ● Executed contracts with the Benicia Unified School District and the Vacaville Unified School District to pilot a new Walking School Bus Sustainable Program Model ● IniitiatedInitiated SR2S Micro-Grant Pilot Program to fund SR2S mini-projects and capital needs across the County

Status: (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 34 48

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

A. Education and Encouragement ●1. Continue to Wwork with Solano Public Health to conduct new Educational and Encouragement events like bike rodeos, walk and roll events and parent workshops. Include program and evaluation support to coordinate countywide physical activity related activities and campaigns like National Bike Month in May. ●2. Contracting with Bay Area Children’s Theater to do “Rock the Block” Assemblies teaching walk and bike safety. To date, there have been 19 40 total shows at 10 22 schools countywide with the goal to provide middle school assemblies next year.. ●3. Continue implementation of Walking School Buses and monthly and weekly WOW (Walk or Wheel) Programs; Looking to workPartnered with Fairfield-Suisun CityBenicia Unified and Vacaville Unified School District to pilot a sustainable model paying a part-time school staff to implement for the 2018-2019 school year ●4. Provide Bike Mobile events at selected schools and community events with Bay Area Bike Mobile.

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 35 49

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

B. Enforcement The 43rd th Public Safety Enforcement Grants with the Rio Vista Benicia and Suisun City Police Department are wrapping up in 2017.began in July 2018. ● The 4th Round of Grants start in July 2018 C. Engagement ●1. Launch newContinue to promote the program using the SR2S Website, Facebook and Instagram. in April 2018 ●2. Coordinate SR2S Community Task Forces and SR2S Advisory Committee. Meeting with each city’s Community Task Force in 2018 to update/ and prioritize projects to be included in the SR2S Master Plan Update D. Engineering ●1. SR2S Advisory Committee recommended a SR2S Infrastructure Project at Grange Middle School in Fairfield for OBAG2 funding for $260,000. This project is scheduled for construction in 2020. ●2. SR2S Program provided grant support to the City of Fairfield’s East Tabor SR2S infrastructure project application which received ATP-3 funding. Safety improvements will be made along the Tabor Avenue corridor from Grange Middle School to Tolenas Elementary School with construction to begin in 2019. ●3. SR2S Master Plan with potential engineering projects will be updated in 20198-202019 ●4. Monitor the implementation of ATP-2 engineering projects in Benicia and Vallejo. Continue to provide program support to 7 schools prior to construction which will begin in Fall 2019.8 E. Evaluation ● Received grant funds to evaluate SR2S projects and program implementation; Received an OTS Grant in Oct 2017 ● Hired an Evaluation consultant for 2018-2019. The project entails piloting a full-scale program evaluation model and looking at future engineering projects to provide wrap around programs/services that will increase walkers/bikers and decrease accidents in at at least 12 schools countywide. The Evaluation will be completed in Dec. 2019.

Milestones: (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 36 50

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● The 2017-18 school year saw over 15,000 students and 70 schools participating in a SR2S event out of approximately 63,000 students and 108 schools in Solano County. ● 38 schools participated in Bike to School Day events, totaling 878 students ● Expanded student outreach by launching a High School Youth Engagement Pilot Program working with approximately 50 students from 7 Solano County high schools in 2017 continued outreach to additional students for 2018-19 SY ● 36 schools with 5928 students participated in International Walk to School Day in October 2017. For the third year in a row, all cities and school districts in Solano County participated. ● 32 schools participated in the May 2017 Travel Survey. 30 Schools returned Travel Surveys for October 2017. Survey is available online. Goal is to have 40 schools participate for May 2018 Survey request ● Received $3.067M in competitive ATP Cycle 2 funding for SR2S Infrastructure Projects at 7 schools in Benicia and Vallejo with construction set to begin in 2018 ● SR2S Enforcement Grant Round 3 continues in 2017-2018 with the Police Departments in Rio Vista and Suisun City

ECD: ● SR2S OBAG 1 Engineering Project (Dixon) will be completed in Summer 2018 ● SR2S ATP Cycle 2 Engineering Projects (Benicia and Vallejo) to begin in 2018 and scheduled to be completed by Dec 2019 ● The Grange Middle School Project in Fairfield is scheduled for construction in 2020.

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 37 51

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Lead – 34. Countywide Transit Coordination/Consortium STA/ Dixon/ $573,344 Transit Studies STA works with MTC and transit operators to implement countywide and Fairfield/ Rio Ron Grassi regional transit coordination strategies. Vista/ Solano Brandon Milestones : County/ Thomson  Manage Intercity Transit Consortium SolTrans/ Lloyd Nadal  RM2 Transit Operating Fund Coordination Vacaville  Intercity Ridership Study Update MTC  TDA Matrix - Reconciliation and Cost Sharing FY2018 -19  Rio Vista Transit Service Outreach with medical facilities received $18,500 from Sutter Hospital to support deviated route  RFP for Rio Vista Service Contract – Completed STAF/Rio Vista X

 Updated the Rio Vista Delta Breeze Advertising Policy

 Replaced bus number #23 for the Rio Vista Delta Breeze X  Ribbon Cutting STA/Rio Vista  Implemented free rides on transit for Solano Community College students to encourage students to use fixed route transit. The program is subsidized through a Solano Community College Student Transportationit Fee.  Pilot-tested Countywide Transit application with the pilot ending on Student Fee X March 2019. Continuing discussion on the use of an app with the transit operators, regional partners, MTC and CalSTA.  Integrated fare coordination Replaced bus number #23 for the Rio X Vista Delta Breeze  Implement Enhanced Transit Coordination Strategies o -Standardized fare structure X o -Transit capital planning o -Transit Service planning

Status:  Manage Intercity Transit Consortium - ongoing X  TDA Matrix – SolanoExpress Reconciliation for FY 2017-18 and Cost Sharing to be approved for June 2018-19 and FY 2019-20  Develop RFP Countywide Coordination SRTP o Sustainability o Operating Plan and Budget o Service Performance  Implement Enhanced Transit Coordination Strategies (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 38 52

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

o -Standardized fare structure o -Transit capital planning o -Transit Service planning  I-80/I-680/I-780/SR12 Transit Corridor Study Update Phase 2 Red Line  Select service option for Solano Express from Transit Corridor Study  Rio Vista Transit Service Management  Rio Vista Transit Service Outreach for Kaiser and North Bay medical facilities  Develop/monitor Rio Vista’s Title VI Plan Due July 1, 2020  Replace bus number #23  Coordinate Rio Vista Transit Asset Management (TAM) Implement the Rio Vista Marketing Plan  Issue Rio Vista Advertising RFP  Develop new Delta Breeze schedules/map Develop Delta Breeze marketing Issue RFP for the Coordinated Short range Transit Plan  FY 2019-20 Coordinate with SolTrans on a MicroTransit Pilot in Benicia using Lyft.  Developing a mobile application for fare collection technology with FAST, SolTrans, Solano Express and Vacaville City Coach utilizing the Solano Community College students as the initial pilot audience

ECD:  Enhance Transit Coordination Strategies- OngoingI-80/I- 680/I-780/SR12 Transit Corridor Study Update Implement Phase 1 Service Plan – July 20197  Develop TDA Matrix for FY2018-19 & FY 2019-20 – May/June 20198

35. Management of Rio Vista Delta Breeze  Rio Vista Delta Breeze Management to enter into five year agreement  Rio Vista Transit Service Outreach for Kaiser, North Bay and Sutter medical facilities  Develop/monitor Delta Breeze’s Title VI Plan Due July 1, 2020 (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 39 53

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 Coordinate Rio Vista Transit Asset Management (TAM)  Implement the Delta Breeze Marketing Plan  Issue Rio Vista Advertising RFP  Develop new Delta Breeze schedules/map  Develop Delta Breeze marketing  FY 2019-20 Coordinate with SolTrans on a MicroTransit Pilot in Benicia using Lyft.

ECD:  Enhance Transit Coordination Strategies- OngoingI-80/I-680/I- 780/SR12 Transit Corridor Study Update Implement Phase 1 Service Plan – July 2019  Develop TDA Matrix for FY 2019-20 – May/June 2019

STA Lead – 35.36. Lifeline Program STA/MTC Lifeline STAF X X $965,927 Transit Program Lifeline Transportation Program supports projects that address mobility and Lifeline JARC $640,046 Ron Grassi accessibility needs in low-income communities throughout the Solano County. STAF Debbie McQuilkin Milestones:  Reestablished Lifeline Advisory Committee by STA Board February 14, 2018  Call for Projects- Issued March 9, 2018; Due April 4, 2018  Funds awarded to support SolTrans local route 1 & 2, Intercity Taxi Card Program and the Solano Express Blue Line Status:  Issue call for projects for FY 2019-20 and ConveneAward of Lifeline Projects call for projects completed March & April 2018 Lifeline Committee for Project Selection April 9, 2018 , STA Board Approval $500,000 May 9, 2018  STAF funds are no longer allocated separately for Lifeline they are now included in STAF Block Grant  JARC is no longer available in the FY 2019-20Monitor Projects

ECD: Lifeline Cycle 5 Funding For FY 2019-202017-18 – FY 2018-19

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 40 54

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Lead - 36.37. FTA 5311 STA/MTC FTA 5311 X X Est. $800,000 Transit Programs In Solano County, STA programs the 5311funding. These funds are used for Ron Grassi transit capital and operating purposes for services in non-urbanized areas.

Milestones:  5311 funds were programmed for FY 2016-17 and FY 2017-18- Completed  Operating funds were originally programmed for Dixon, FAST Rt. 30, and Rio Vista.  FAST lost 100k in 5311 grant through CalTrans

Status: ● At the request of FAST, STA Board on April 11, 2018 reallocated $100,000 of 5311 Funds for FY 2017-18 and FY 2018-19 to Dixon ($65,000) and Rio Vista ($35,000) to support intercity bus replacement and operations. ● Monitor Projects ● Coordinating future funding ● 5311 next call for projects FY 2019-20 through CalTrans

ECD: 5311 Funding for FY 2017-18 - Estimated June 2017 2018 and FY 2018-19 Estimated June 2019

STA Lead – 37.38. Paratransit Coordination Council (PCC); Seniors and People with STA STAF $ $128,993 Transit Programs Disabilities Transportation Advisory Committee? Ron Grassi STA to staff and provide administrative support to advisories committees that Debbie advocate and address transportation needs for seniors, people with disabilities McQuilkin and low-income individual, build community awareness and support, and locate funding sources to meet those needs.

Milestones: ● PCC Work Plan for 2018 ( adopted November 2017)= ● PCC Work Plan for 2019 (adopted March 2019) ● PCC Bylaws updated and adopted March 2019 ● PCC TDA claim review for FY2018-19 -May 2018

Status: (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 41 55

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

● Outreach and Marketing Mobility Management Programs are ongoing ● Update of Solano Mobility Study for Seniors, People with Disabilities outreach summits held in Rio Vista, Suisun City, Benicia, Dixon, Vallejo, and with H&SS. Summits scheduled in Vacaville and Fairfield for March & May with a Countywide event in October 2018 ● Operators & STA’s TDA Claims Review ● Provide input for Plan Bay Area 2050 and OBAG 3

ECD: PCC Work plans – FY 2019-208-19 TDA Claim Review – FY 2018-19 and FY 2019-20 JulyMay 2018 Solano Mobility Study for Seniors and People with Disabilities in progress estimated completion December 2018 2019

STA Lead – 38.39. Solano Express/Intercity Transit STA TDA $781,844 Transit Programs Coordinate to implement recommended strategies for Solano Express as RM2 Ron Grassi identified in the Countywide studies and agreements. STAF Brandon Thomson Milestones: ● Monitor Blue Line Consolidated routes ( 20, 30, 40), Yellow Line (78), Green Express (90) 80 &, 85 (future Red line) Intercity Funding Agreement Update for FY 20189-1920 ● Solano Express Intercity Transit Marketing initiated ● Development of multi-year Intercity funding plan underway ● ● Development of multi-year Intercity funding plan ● Monitor Intercity Bus Capital Replacement X X Plan X X ● Consolidated fare structure for Solano Express implemented July 2018 ● Implemented SolanoExpress Service Changes Phase 1 – July 1, 2018 X X (Blue, Green and Yellow Lines) X X  Completed SolanoExpress Ridership Survey – October 2018 approved X X by STA Board April 11, 2017 for implantation effective July 1, 2018 ● Manage SolanoExpress Facebook ● SolanoExpress Capital Bus Replacement Plan Updated ● Develop Solano Express Service Expansion Plan – January 2018 Monitor and Update SolanoExpress Facebook Implemented SolanoExpress Service Changes Phase 1-July 1, 2018 (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 42 56

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

Ridership survey – October 2018 ● ●

Status: ● Development of multi-year Intercity funding plan ● SolanoExpress Intercity Transit Marketing - in process/ongoing ● Update Intercity Transit Funding Agreement update for FY 2018-19- 209 and FY 2019-2020-21 with FAST and SolTrans in process ● SolanoExpress Service Plan Marketing for Phase 2 ● Intercity Transit Service Agreements – SolTrans and FAST – June 2019 ● Update Intercity Funding Agreement with funding agencies

EDC: ● Implement Phase II SolanoExpress Service Changes Phase 2 – July 1 2018une 30, 2019 ● Develop & Implement SolanoExpress Service Plan Marketing June 2018 through FY 2018-19 ● Intercity Transit Funding Agreement – SolTrans and FAST – June 2018 ● Monitor and update SolanoExpress Capital Bus Replacement Plan ● Ridership survey – December 20198 ● Monitoring of SolanoExpress through APC and AVL ● Coordinate with SolTrans and GAST on Performance Measures Update operating Agreement with Soltrans and FAST Work eith FAST and SolTrans and perfromance measures

July 2018

STA Lead – 39.40. Solano County Mobility Management Programs STA/ STAF/ 5310 X X $651,400 Transit Programs ● Support and Monitor Mobility Management Programs: Transit Operators Debbie ● Countywide ADA In-Person Eligibility Program McQuilkin ● Travel Training Program ● Senior Safe Driving ● Solano Mobility Website

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 43 57

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

Milestones: ● Support Ambassador Programs and coordinate with Transit operators on travel training - Ongoing Travel Training Programs-Ongoing 75 Travel Training referals 33 Completed Travel Training Trips ● 15Field trips Ongoing ● – ● Develop RFP for Travel Training Contractors FY 2018-19 ● Evaluate In Person ADA Eligibility Program - (6,832 individuals certified since beginning of program in 2013. ● Countywide In Person ADA Eligibility Program Contract RFP FY 2018-19 ● Solano Mobility Website Updated Implemented Go Go Grandparent concierge service un April 2019 ● AddDeveloped Vehicle Share Pprogram in July 2019 ● Status: ● Coordinate and report on Countywide ADA In-Person Eligibility Program – Program evaluation is currently in process – June 20182019 ● Support Transit Operators with Travel Training programs by providing bilingual; assistance ● Provide 30 outreach eventsoutreach on all Solano Mobility Programs and Call Center services ● Update Senior Safe Driving Information on Solanomobility.org and in partnership with California Highway Patrol’s Age Well Drive Smart Program provide information on transportation alternative and programs ● Conduct Outreach at community events and organizations throughout Solano County ● Countywide In Person ADA Eligibility Program Contract RFP FY 2018-19 ● New Gogo Granparents Program to be implemented

ECD: ● Update Solano Mobility Website to highlight Solano Mobility Programs (FY 2017-18)On Going

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 44 58

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Lead 40.41. Intercity Taxi Card Program STA TDA X 1,058,194 Transit Program Implementation of the Intercity Paratransit (formerly Taxi Scripcrip) Program Ron Grassi will be completed with a variety of toolssurvey including . Debbie A. Ddevelop and Implement Phase 2 on Intercity Taxi/Paratransit McQuilkin Program

Milestones:  Revised service option authorized by Consortium, CTSA, and STA Board  Roll out Implementation of Pre-Paid PEX Debit Card – October 2018  Accessible Vehicle access through new Intercity Taxi Card Program   MOU with Taxi Operators – June ly 2018  MOU with Transit Operators – Junely 2018  Non Ambulator Service impelemented in Benicia, Dixon, Rio Vista, and

Vallejo

 Debit purchasing card vendor identified

Status:

 Monitoring program - ongoing X  Debit purchasing card vendor identified  Develop online program information (website) -– underway  Non ambulatory service to be expanded to Fairfield, Suisun City and Vacaville  None ambultaor service to be expanded countywide by first quearter of FY 2019-20.

ECD:  Board approval of Intercity Taxi Scrip – Debit Card – May/June 2018  MOU with Taxi Operators – June 2018  MOU with Transit Operators – June 2018  Implementation of Phase 2 – SolTrans July 2018 - Completed Rio Vista/Dixon 2nd Quarter FAST 3rd Quarter – April 29, 2019 Roll out to Vacaville Vacaville 4th Quarter

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 45 59

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

STA Lead – 41.42. Solano Mobility Call Center STA Transit/SNCI Programs The Solano Mobility Call Center pProvides personalized assistance for traveling $315,427 Programs around Solano , Napa and neighboring counties, including services and TFCA Erika Dohina information about transportation resources for seniors and people with CMAQ X X Lloyd Nadal disabilities. Operate the Call Center from the Suisun Amtrak Depot. The Call 5310 Amy Antunano Center provides the following services: STAF X X Erika Dohina  Regional Transit Connection (RTC) discount cards to qualified Lloyd Nadal individuals with disabilities X X  Sell Clipper and Senior Clipper cards  ADA certification information X X  InterCity Taxi Scrip X X  Bikelink cards X X  Outreach to seniors & people w/disabilities through presentations and X X events X X X X  Vanpool support services  Vanpool Incentives  Display Racks  Website/facebook page with Call Center information  Advertising campaign – Radio & Online

Milestones: FY July 2018- February 2019  Assisted 7,750 people (2,748) in person and (5,002) over the phone  with transportation information or services for seniors and people w/ disabilities  Processed 102 RTC cards for qualified individuals with disabilities  Completed transactions 138 (37 Senior, 99 Adult, 2 Youth)  Answered 597 questions regarding the Taxi Scrip and 852 questions about ADA eligibility.  Processed 67 PEX card transfers (Oct 2018-Feb 2019)  Provided information brochures for transportation, services for seniors & people w/disabilities, biking, and schedules for transit at 148 display racks  Initiated a radio marketing campaign with KUIC and an online digital marketing campaign with AdTaxi. (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 46 60

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

October 2018 implemented the Pex card in Vallejo Benicia January 2019 implemented Pex card for Rio Vista and Dixon  Launched the updated Solano Mobility website in January of 2019  Sold 8 Bikelink cards, this is more than we have ever sold.  Implemented 2 3 new Vanpools in partnership with Enterprise.

Status:  Scheduled presentations at Senior facilities and safe driving workshops to educated people on Solano Mobility programs  Increase public awareness of program through online and radio marketing.  Assisted in staffing the eight Senior & Disabled Mobility Summits in Vacaville, Fairfield, and a Countywide.  Currently lLoadeding Intercity Subsidized Taxi Scrip for Vallejo and Benicia; Began implementation in , Dixon, Suisun City and Rio Vista, Suisun City and Fairfield and Vacaville will all be operational by July 2019.  Implement a feedback and evaluation system to assess/analyze promotions, events, etc through surveys.  Currently developing a reservation system for the Vehicle Share Program to be implemented by July 2019.

Status:  Hosted Senior & Disabled Mobility Summits in Rio Vista, Suisun City, Benicia, Dixon, Vallejo and Vacaville in 2017 and Fairfield in 2018.  Scheduled presentations at Senior facilities and safe driving workshops to educated people on Solano Mobility programs  Increase public awareness of program through online and radio marketing.  Implement a feedback and evaluation system to assess/analyze promotions, events, etc through surveys.  Support all vanpools with origin/destination in Solano and Napa Counties; coordinate with Enterprise Rideshare for vanpool starts and services

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 47 61

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 Currently updating the Solano Mobility website to make it easier for Solano County residents particularly Seniors and People with Disability to access our programs and resources

Milestones: 2017-2018  Assisted 8,319 people (5585) in person and (2734) over the phone  with transportation information or services for seniors and people w/ disabilities  Processed 150 RTC cards for qualified individuals with disabilities  Completed 225 Clipper card transactions (73 Senior, 142 Adult, 4 Youth)  Answered 350 questions regarding the Taxi Scrip and 592 questions about ADA eligibility.  Started 4 new vanpools and supported 156 vanpools through medical reimbursements and incentives  Provided information brochures for transportation, services for seniors & people w/disabilities, biking, and schedules for transit at 148 display racks  Initiated a radio marketing campaign with KUIC and an online digital marketing campaign with AdTaxi.  Seven community summits held.

ECD:  Countywide Summit scheduled for September 2018  Plan to be updated by June 2019.

42.43. Solano Mobility Employer Program Katelyn Costa The Solano Mobility Program is a program of the STA where staff works to TFCA Amy Antunano support the transportation needs and services of all Solano County residents CMAQ $350,000 Lloyd Nadal including commuters, employers, older adults and people with disabilities. This Napa TFCA Sean Hurley website serves as a one-stop shop of transportation programs and coordinated Napa FTA (Vanpool services offered in Solano County and beyond. Program) YSAQMD Outreach and support of Solano County employers to encourage the use of commute alternatives at the worksite.

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 48 62

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

a) Ongoing Bay Area Commuter Incentive Program b) Staff worksite events c) Assistance in complying with the Bay Area Commuter Benefits Program d) Emergency Ride Home (ERH) Program e) East Solano County Commuter Benefits Program pilot f) First/Last Mile Commute Solution/LYFT Pilot g) Bike to Work Promotion h) Coordination with Napa County – Napa Commute Challenge/Napa Valley Vanpool Program Milestones:  Launched the Capitol Corridor/Amtrak Promotion offering $20 for a 10-day pass and free Lyft ride for commuters willing to try alternative modes to work. Currently have 13 registered.  Created an Employer Program brochure and Employee Toolkit to assist staff when marketing our Employer Program services  Continue to Implement the First/Last Mile Lyft Program with businesses surrounding the Suisun City and Fairfield/Vacaville Amtrak Stations with 46 participants. Expanded the pilot to 14 Solano Express transit stops across the county.  Implemented 2018 Bike to Work campaign focusing now on Bike Month with activities happening throughout the County  Contracted with Ride Amigos to offer Employers an easy-to-use online platform to receive incentives for alternative modes of travel and to administer the Solano Commute Challenge  Conducted 20 worksite/outreach events from July-Dec 2018.  Added the use of TNCs for Emergency Ride Home in Feb 2018;  Add an employer incentive  Increase incentives  80% off Lyft Rides Launched $20 Rides for Capital Corridor

Status:  Launch theThe new year-round Employer Program to encourage active employer participation. The new year-round Solano Commute Challenge began Nov 2017 and currently has 24 employers enrolled

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 49 63

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

countywide and we are non converting 3,000+ commute users from 511 to the new Ride Amigos platform. An average of 90 commuters are qualifying for monthly drawings.  Assisted 3026 employers in Solano County through phone or in person consultations e to implement commute alternative programs like the Bay Area Commuter Benefits Program  Currently implementing the “First/Last Mile Lyft Shuttle” PilotProgram from the Suisun City Amtrak Station, Fairfield/Vacaville Amtrak Station and 14 Solano Express stops countywide to nearby business/work centers in Fairfield with 21 participants.using an 80% subsidized model.  Expanding opportunities to implement other First/Last Mile programs in Benicia, Dixon, Vacaville and Vallejo.  Implement the East Solano County Commuter Benefits program; Purchased new employer database in March 2018 to work with employers w/ 50+ employees throughout the area;  Continue to support Improve Vanpool Programs in both Solano County, and Napa; present at employer and community sites and; coordinate w/ Enterprise Rideshare for their $350/month subsidy.  Implement the 6th Annual Napa Commute Challenge  Promote and encourage the use of the Emergency Ride Home PProgram especially using; Added the use of TNCs to provide rides. in Feb 2018; Registered 3 new employers with 8 new employees  Currently updating theMerging the Solano Mobility website with Commuterinfo.net to make it easier for commuters and employers to access our programs and resources  Currently exploring partnerships with rideshare application companies to streamline process and make it easier for employers/employees to access our programs  Partnering with Solano’s Economic Development Corporation to help with marketing and outreach for Employer Program

Milestones:  Implemented the 1st Phase of the LYFT Pilot Program with businesses surrounding the Suisun Amtrak Station; Expanding the pilot in Benicia and Vacaville in 2018 and Vallejo and Dixon in 2019.

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 50 64

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 Implemented 2017 Bike to Work campaign. There were 13 Energizer Stations in Solano County that 422 cyclists visited.  Completed the 2017 Solano Commute Challenge with 23 employers and 406 employees participating  Conducted the 2017 Napa Commute Challenge with 17 employees, 224 employee participants and 163 commute Champions which were the highest totals to date  Conducted 15 worksite events in 2017  Added the use of TNCs for Emergency Ride Home in Feb 2018;  STA 43.45. WETA Ferry Support and Operational Funds Vallejo RTIP $65M Monitoring A. Ferry Service Fed Demo $10.8M Transit Programs Fed Boat $0.5M Brandon TCRP Thomson Milestones: Fed  Reappointment of Anthony Intintoli – 2014 RM2  Main ground breaking on Ferry Maintenance Facility – May 2014 RTIP  Provided feedback on WETA’s SRTP and Strategic Plan – 2016  Coordinated meeting with WETA, Vallejo, SolTrans and Napa to Funding Plan TBD discuss WETA service and Phase B of Vallejo Station

Status: ● RM 3 also will allow for increased and more frequent service to/from Vallejo and Mare Island to San Francisco ● Funding Phase B of the Vallejo Station is a priority

ECD: Ongoing

STA Lead 44.46. Implement Title VI Program $10,000 Brandon Program Translation of Documents (Vital and Informational) Thomson/Transi Annual Monitoring t Translator Services Jayne BauerVince Ma Milestones:  Title VI Plan Approved by Caltrans – COMPLETED  Add Title VI to websites, with complaint form – COMPLETED  Establish phone translation service - COMPLETED (STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 51 65

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

 Establish document translation service – COMPLETED  Translate Vital Documents – COMPLETED  Translate Informational Documents – ON-GOING  Annual Reporting – First Annual Report June 2015  Requirement as STA directly receives FTA Funding

Status:  Translation of Documents (Vital and Informational) - ongoing  Annual Monitoring - ongoing

 Translator Services- ongoing

 Title VI Plan 2020 Update needed017 Update

 Website X

EDC:  Title VI Plan 2017 2020 Update – June 20172020 X

STA Lead – 45.47. Consolidated Transportation Services Agency STA STAF/5310/OBAG X X $140,000 Transit Programs Ron Grassi Milestones: Erika Debbie o RFP for Travel Trainer Contractors May 2018 McQuilkinDebb o RFP for ADA in person eligibility contractor CTSA prioritized ie McQuilking medical trips as funding priority o STA programmed $250K of STAF funding for CTSA o Area Agency on Aging provided match funding for GoGo Gransparents o CTSA/STA covered meeting with medical providers o o Go Go Grandparents Service referral added to the Solano Mobility Call Center o Vehicle Share Status: A. Monitor and Evaluate Mobility Management Programs B. Assessment of ADA program completed C. Non-Profit Coordination

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 52 66

SOLANO TRANSPORTATION AUTHORITY FINAL OVERALL WORK PLAN (OWP) FY 2018-19 and FY 2019-202019-20 and FY 2020-21 (Board Approved June 13, 2018Pending Board Approval June 12, 2019)

1. Partnership with non-profit to provide medical trips for seniors (Faith in Action) 2. Current CTSA Programs 3. Ambassador Program and Transit Training 4. Solano Mobility Website 5. Solano Mobility Call Center 6. Senior Safety Driver Program Information 7. In-Person ADA Eligibility 8. Faith in Action Volunteer Driver Program 9. Intercity Taxi Card Program D. CTSA Work Plan Developed E. Provide input on Solano Mobility Study for Seniors, People with Disabilities estimated completion date December 2018Plan

F. Explore and Assess Future Mobility Programs after completion of Mobility Summits and Plan

G. Consideration expansion of Travel Training Programs.

H. Implementation of New Programs:

Vehicle Share Program

Older Adults Concierge Service – Service to provide transportation service to Low-Income Medicare recipients (not covered through MediCal) Uses 24/7 concierge service provided by GoGo Grandparents

F.

ECD:  Update CTSA Work Plan FY 2018-19-20 – September 2018  Update Mobility Transportation Study for Seniors, People with Disabilities and Low Income February 20192020  Extend Faith in Action contract for FY 2017-18 & FY 2018-19 – June 2018

(STA Board Approval on June 13, 2018) | FINAL STA’s Overall Work Plan for FY 2018-19 and FY 2019-20 53 67

This page intentionally left blank.

68 Agenda Item 6.B April 23, 2019

DATE: April 8, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Robert Guerrero, STA Planning Director RE: STA Plan Bay Area 2050 Workshop

Background: The Solano Transportation Authority is responsible for coordinating with the Metropolitan Transportation Commission (MTC) and Caltrans to develop the Regional Transportation Plan (RTP) for the Bay Area every four years. The RTP is a long range transportation plan that forecasts future transportation needs. As required by California Senate Bill 375, the RTP also includes a component that promotes sustainable communities and provides policies to reduce greenhouse gas emissions. Another important aspect of the RTP is that it is the required regional planning document for programming federal funds.

The last RTP, called the Plan Bay Area 2040, was completed in 2017. In early 2018, MTC begun to lay the ground work for the next RTP update by starting the Horizon’s initiative process. This process has multiple goals, but the primary goal is to get public input early in the RTP planning process. Their approach included an extensive process with the following components: 1. Guiding Principles 2. Future Scenarios 3. Identification of Transformative Projects 4. Perspective Papers that identify specific challenges associated with that topic (e.g. jobs growth, climate adaptation, housing production, autonomous vehicles, etc.)

Further detail on the Horizon’s Initiative can be viewed on the following weblink: https://mtc.ca.gov/our-work/plans-projects/horizon

Over the next several months, MTC will be transitioning from their Horizon’s Initiative to the RTP development called Plan Bay Area 2050. This will include forecasting transportation revenue for each county and identifying transportation projects beyond the transformative projects submitted through the Horizon’s Initiative.

Discussion: STA staff is inviting the Consortium to participate in the Solano RTP Workshop scheduled for May 8th with the STA Board members. STA’s Advisory and Technical Committees will have up to 5 minutes to talk about their committee’s priorities and what they recommend to add to STA’s Plan Bay Area 2050 submittal. The STA Board will consider the requests at the June 12th meeting, at which time they will be requested to approve the Plan Bay Area 2050 project submittals to MTC.

69 Previously, Solano County was forecasted to have $1.6 billion in State Transportation Improvement Program (STIP) Funds, Surface Transportation Program (STP), Congestion Mitigation Air Quality (CMAQ) Improvement Program and other potential transportation revenue sources. The new estimate of $2.4 billion in available transportation funds for Solano County was provided by MTC recently for the next RTP. The new estimate includes an additional 10 years from the previous RTP, from 2040 to 2050 and is subject to change.

There is also a list of transformative projects that are currently under consideration by MTC (Attachment A). As part of an earlier Bay Area wide call for projects, STA submitted the following three transformative projects: 1) SR 37 Corridor Resiliency Project (submitted in coordination with MTC) 2) Solano I-80 Express Lane Implementation 3) Hwy 12 (including Rio Vista Bridge Replacement)

The complete list of submitted transformative projects is attached. MTC has not yet made clear as to how the transformative projects would be included in the RTP, specifically regarding whether or not these projects will need to be included as part of the traditional RTP county share. In addition, Attachment B includes the current project list for Solano County from the 2040 RTP as a starting point for project consideration.

The deadline for project submittals to MTC is June 30th.

Fiscal Impact: None at this time.

Recommendation: 1. Designate Committee spokesperson; and 2. Select Transit Priorities for Plan Bay Area 2050.

Attachments: A. MTC Transformative Projects Submittal B. Solano County 2040 RTP Project List

70 ATTACHMENT A

METROPOLITAN TRANSPORTATION COMMISSION ASSOCIATION OF BAY AREA GOVERNMENTS

PROJECT PERFORMANCE ASSESSMENT

Attachment C: Index of Transformative Projects & Strategies Submitted Project names may have been updated slightly since submission. Incomplete submissions were omitted from this list. Not all projects shown met the criteria for the Transformative Projects competition.

Transformative Projects Aerial Lines (San Francisco to North Bay and ) Air Shuttle Network (Livermore to Central Valley) BART First/Last Mile Gondola Services Drone Delivery Network Dumbarton Gondola Line Electric Vertical Take Off and Landing Aircraft and Ports Flying Car Transit Network Mountain View International Airport Aerial Oakland/Alameda Gondola Network Regional Helicopter Network Automated Bus and Rail Service + Frequency Increase Autonomous TNC Service in Urban Areas AV Shuttle Circulators AV Shuttle System AV Shuttle System for BART Station Areas Autonomous Benicia Autonomous Bus Network Technologies Contra Costa Autonomous Shuttle Program I-80 Corridor Overhaul Mountain View AV Shuttle System AV Shuttles at Rockridge and 12th St BART Stations BART Evening Frequency Increase BART Extension from Civic Center to Ocean Beach BART Extension from E. Santa Clara to Transit Center BART Extension from Santa Clara to Tasman Drive BART Extension from Hayward to Millbrae BART Extension from Millbrae to San Jose (x4) BART Extension from Millbrae to Santa Clara BART Extension from Milpitas to Martinez (via I-680) BART Extension from Milpitas to Redwood City BART Extension from Richmond to Concord BART Extension from San Jose to Millbrae + Peninsula/South Bay LRT + AV Shuttle Network BART Extension from Union City to Millbrae (via Dumbarton Bridge) BART Extension from Union City to Millbrae (via San Mateo Bridge) BART Extension to Cupertino BART BART Extension to Gilroy BART Extension to Los Gatos + Monorail from Los Gatos to Santa Cruz BART Extensions to San Rafael, Sunset District, San Mateo, Piedmont, and Martinez BART Extension to Solano County BART Extensions to Vacaville, Mill Valley, and Mountain View BART Fare Reductions + BART Safety Program + BART Express Trains BART Oakland Airport Connector Extension to Oakland Hills, , and Alameda BART to Livermore BART Transfer Station in Oakland West of I-880 + SoMa BART Conversion to BART Technology Coliseum Station Redesign

1 71 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Projects Dublin/Pleasanton BART to Stockton with DMU eBART from Antioch to Brentwood with DMU BART Extensions in Lieu of Caltrain & LRT Expansion High-Speed Transit for 580 Corridor HOV/T Lane Conversion to BART Lines I-680 BART (Walnut Creek to Dublin/Pleasanton) (x2) South Bay BART Extensions in Freeway Medians + Quadruple Track Existing System Alameda County Trail Expansion Bay Area Bicycle Superhighways Bay Trail Completion Bicycle Highways Bike Lanes on All Bridges Bike Network Policy and Planning Improvements to Prepare for an Autonomous Future Bikes/e-Bikes/e-Scooters at Bus Stops Bike Path Conversion of Auto Lanes to Non-Motorized Facilities East Bay Greenway Food Desert Bicycle Network Improvements Low-Stress Contra Costa Bicycle Network Oakland-Alameda Bike-Ped Bridge and Estuary Boat Shuttles Bicycle & Parking Conversion to Bike Lanes Pedestrian Protected Bike Lanes along Major Roads and Freeways Regional Bicycle Network (x2) Regional Complete Streets Program Regional Network of Moving Walkways Regional Protected Bikeway Network Safe Routes for All 9-County Bay Area Trail Network San Francisco Bicycle Network San Francisco Complete Streets Program Santa Clara County Bicycle Superhighway Network Sonoma County Bicycle Network Special Lanes for Bikes/Pedestrians 15-Minute Headway Network + High Density Coverage Network 24/7/365 Bus Service + Frequent Bus Network (x2) AC Transit Rapid Network Alameda County BRT Network + CV Corridors Bridge Contraflow Lanes for Express Bus BRT along I-80 from East Solano to SF BRT on 19th Ave/Park Presidio/Lombard BRT BRT on All Bridges BRT Transfer Hubs Bus Service Frequency Improvements Bus Lanes on Freeways/Highways Buses on Dedicated Lanes between Capitol Corridor and BART stations Commuter Bus and Rideshare Infrastructure Improvements along US-101 Bus Comprehensive Regional Bus Service Detachable Pods for Buses Frequency Improvements Fixed-Route Bus Eliminate in Lieu of TNC-like Transportation Express Bus Lines to Multi-Employer Job Centers Express Bus Network to Business Parks I-680 Bus Lanes + BRT Integrated Regional Paratransit Network Livermore-to-BART Shuttle Bus

72 2 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Projects More Private-Sector Bus Services Muni Skip-Stop Bus Service Peak-Period I-80 Express Bus Line + GP-to-Bus Lane Conversion (Bay Bridge to Vallejo) Rapid Bus from CSU East Bay to Hayward BART Regional Bus Network Replacement for Rail Systems Regionwide Bus to BART Services + HOV/T Conversion to Bus-Only Lanes Surface Transit Prioritization SR-92 BRT (x2) Regional Bus Network for Rail Gap Closures Transbay Bus Expansion Transit Service Expansion with COC Focus Transportation in Transit-Limited Areas to Support Food Sector US 101 Bus Lanes US-101 Express Bus Network + Bus Lanes + SFO Intermodal Terminal US-101 North Bay Peak Period Bus Lanes ZEV Public Mini Buses ACE Expansion Caltrain Business Plan Caltrain Enhanced Blended System Caltrain Extension to Salinas Caltrain Grade Separations Capitol Corridor Frequency Improvements Commuter Rail Lines to Inland Cities + Megaregional Parking Garages Commuter Rail Transit Service to Low-Density Parts of North Bay Diridon Station Improvements DMU from Richmond to Vallejo/Napa Dumbarton Rail (x2) Dumbarton Rail Link between Redwood City and Fremont Electromagnetic Rail Elevation of Entire Caltrain Corridor I-80 Rail Line (San Francisco to Vacaville) Megaregional Rail Network Commuter New Commuter Rail Line (Livermore to San Mateo) Rail New Commuter Rail Line (Redwood City to Stockton) Rail Frequency Increase Reorienting existing rail services into a new service pattern SMART / Capitol Corridor Connection at Parkchester/Richmond SMART Extension to Richmond (x4) SMART Extensions to Canal District & San Anselmo SMART Extension to Ukiah South Bay Rail Loop through Megaregion South Bay Highway Capacity Reduction + Median Rail Lines Underwater Amtrak Line Urban Rail Along Existing Highway Corridors and Bridges Express Lane Network Capacity Increase (Dual Lanes) FAST Bay Area (Optimized Express Lane Network + TDM Strategies) Highways to Heaven (Optimized Tolling, PlusWays, Regional Bus Network, etc.) HOV/T Lane Conversions to GP Lanes I-280 HOT Lanes + Express Bus (San Francisco to San Jose) I-580 Altamont Pass HOV Lanes Express Open Express/HOV Lanes for GP Use During Non-Peak Lanes San Francisco GP-to-HOT Conversion Program Solano County Express Lanes

73 3 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Projects 100 MPH Ferry Service between SF/Oakland and Delta Communities Amphibious Transit to Support Existing Ferry Network Auto Ferry Network Autonomous Electric Mini-Ferry Network Autonomous Mini-Ferry Network Delta Ferry Network Ferry Frequency Increases Ferry Service Expansion in South Bay (x3) Hayward-San Francisco Ferry Ferry Hovercraft and Other Aquatic Vehicles Hovercraft Network + Non-Commute Travel Ban in Peak + Local Freight Rail Depots Hydrofoil Ferry Network Larkspur-Albany Ferry Private Mini-Ferry Network San Jose-San Francisco Ferry (x2) Alameda County Freight Rail Improvements Auto-Loaded Truck Transport Network I-80/I-580 Truck Lanes + Rail Extensions to Communities of Concern Next-Generation Electric Regional Rail Network on Freight & Highway ROW Preparing Freight System for an Autonomous Future Freight Stockton Freight Distribution Hub 3rd Bore Tunnel between Oakland and Alameda AI-Powered Sleds on Freeways Bay Bridge Contraflow Lane Bay Bridge West Span Improvements (x2) Congestion Reduction Project Congestion Relief Project (x2) Cross-Bay Highway Tunnel (US-101 to I-238) Direct Road Link between Dumbarton Bridge and 101/Embarcadero/Oregon Expressway Double Deck US-101 Double-Deck Freeway Network + HSR to Brentwood, Davis, etc. + New Local Airports Double-Deck Freeways (x5) Double-Deck Freeways + Solar Roadways Downtown San Jose Interchange Consolidation Elevated Causeway over SR37 between Vallejo and Novato Express Tunnels Beneath Existing Freeways Freeway Shoulder Conversion to Added Capacity + HOV/T to GP Conversion + Toll Automation Highway 101 Tunnel in Downtown San Rafael Highway 25/101 Interchange Improvements Highway Tunnel between I-80 and I-280 in San Francisco HOV Lane Removal Highways I-5 Widening I-5 Widening in San Joaquin County I-580 + I-680 Corridor Enhancements Major Arterial Conversion to Expressway Network Motorcycle Lanes on Highways New Bay Bridge New Highway Designs New On/Off Ramp for I-680 at Grimmer New Ramp Construction on Freeways Posey & Webster Tube Replacements Redevelopment of I-980 Corridor (x3) Regional Freeway Cap Program Regionwide Highway Widening Reversible Lanes on I-680/Sunol Grade

74 4 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Projects Richmond-San Rafael Bridge Replacement Rush Hour Traffic Reduction Program San Francisco Bay Highway (San Rafael to San Jose) San Francisco Bay Highway (SR-37 to San Jose) San Francisco Bay Highway ( to San Jose) San Jose-Watsonville Freeway Shoulder Conversions to GP Lanes Silicon Valley Double-Deck Freeways Skinny Motorcycle / Three-Wheeler lanes Small-Vehicle Overpasses across Major Roads and Train Tracks South Bay Bridge (Fremont to Mountain View) + Connector Roadways South San Francisco-Marin Tunnel + Underground Downtown San Francisco Interchange SR-12 Rio Vista Bridge Replacement SR-12 Widening SR-130 Freeway (San Jose to Patterson) (x3) SR-152 Tollway SR-239 Freeway + M-580 SR-262 Freeway SR-87 Tunnel SR-92 Widening Toll Roads + Double-Deck Freeways Trail Network Conversion to AV Road Network in Contra Costa County US-101/I-880 Interchange Improvements US-101/SR-92 Congestion Reduction Project US-101/I-280 Freeway Capping US-101 Relief Arterial in East Palo Alto US-101 Widening for Express Bypass Lanes (SR-237 to SR-85) US-101/Dumbarton Bridge Southern Connector 5 Hubs HSR Connections Cancellation of California HSR Elevated HSR Lines (US-101, I-880, I-680) High Speed Rail Line from Altamont Pass to SFTC High Speed HSR Relocation to US-101 Median Rail and Hyperloop between Silicon Valley and San Francisco via BART ROW Hyperloop North Bay HSR (Santa Rosa to San Francisco) Regional Hyperloop Network Downtown San Jose LRT Bypass Free Shuttles to VTA Light Rail Freeway Lane Conversion to LRT Fremont-Newark LRT Geary LRT Geneva-Harney LRT I-680 LRT (Martinez to Dublin) 2.0 (x2) Light Rail Lines on the Dumbarton and Richmond-San Rafael Bridges Matrix Transit System Extensions to Daly City & SFO Light Rail Muni Metro Extension to South San Francisco Ferry Terminal (LRT) Muni Metro Extension to West Oakland Muni Metro Southwest Subway Regional Arterial Streetcar Network + BART Lines on All Highways SkyTrain from SJC Airport to Santana Row/Valley Fair South San Francisco Light Rail Underground Subway in San Francisco + High Speed Rail to Oakland

75 5 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Projects VTA Light Rail Subway (Downtown San Jose) VTA Light Rail Subway (North San Jose) VTA Light Rail Systemwide Elevation VTA LRT Automation VTA LRT Express Services VTA LRT Extension to Santa Cruz + HOV/T to Ramp Conversion VTA LRT Extension to Watsonville Autonomous Electric Pod Transport Capitol Corridor Monorail Line Group Rapid Transit (GRT) High-Speed PRT Network Freeway Monorail Lines Monorail from San Francisco to Sacramento Monorail Tube Network (Peninsula, East Bay, and North Bay) Regional Monorail Network Monorail and Personal AV Transit Personal Podway Personal Mass Transit Network Rapid Transit Self-Powered Personal Pods on a Regional Rail Network (PRT) PRT Network Single-Track Monorail Feeder Transit Lines South Bay PRT Network All-Express Rail System Auto Carts on Abandoned Rail Tracks Caltrain Grade Separations in Santa Clara County Construction of Rail Ringing the Bay Expansion of BART and Caltrain Fleets High-Frequency Commuter Rail Line between Fremont & San Jose High-Speed Link between San Francisco and San Jose Airports Megaregional Rail Network NYC-Style Subway Network in Bay Area Rail Corridor Trench (Oakland to Fremont) Santa Cruz-Los Gatos Rail Line South Bay Rapid Rail Network Rail (Other) SR-37 Rail State Rail Plan Improvements (Central Bay) State Rail Plan Improvements (North Bay) State Rail Plan Improvements (Transbay) Statewide Mass Transit Projects Stevens Creek Rail Line (x2) Tubular Rail Lines Underground All Rail Lines BART Caldecott Tunnel Retrofit Embarcadero Seawall Flood Control Barrier under SR-84 Highway Elevation Projects for SLR Marin Highways & Roads SLR Adaptation Program South Bay Sponge Resilience SR-37 Widening + Resilience Project Tidal Management in South Bay and High Speed Rail

76 6 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Projects Commuter Rail Bay Crossing from Oakland to Redwood City via Dumbarton Bridge Dual-Gauge Second MacArthur to Transbay Terminal BART Mid-Bay Bridge Multimodal Bay Crossing Rail/Auto Bridge from SFO to OAK Reduced-Depth Second Transbay Tube + Geary BART Second BART Transbay (MacArthur to San Francisco) Second BART Transbay Tube (Oakland to Outer Richmond) Second Transbay Tube (BART) (x2) Second Transbay Tube (BART + Commuter Rail) Second Transbay Tube (BART + Caltrain + HSR) Second Transbay Tube for Bus, BART, and Commuter Rail South Bay Floating Ferry Terminal with East/West Aerial to Shores Southern Crossing Bridge (Highway + BART) (x2) Southern Crossing Bridge (I-380 to I-880) (x2) Transbay Southern Crossing/ Butterfly Bridge (I-280 to I-880) Crossings Standard-Gauge Rail Tunnel in Transbay Corridor Transbay Aerial Connection between Millbrae and San Leandro/Hayward Transbay BART lines along East Bay/San Francisco Shorelines Transbay Crossing - BART on San Mateo Bridge (Hayward to Hillsdale) Transbay Crossing - BART on San Mateo Bridge (Bay Fair to SFO) Transbay Crossing - Bridge + BART from Alameda Island to Mission Bay Transbay Crossing - Southern Link Bridge Transbay Crossing - Alameda Naval Air Station to Cezar Chavez Transbay Crossing – I-380 to Hegenberger Road Transbay Rail Tunnel from Marin SMART to Richmond Amtrak/BART Transbay Rail Tunnel from Salesforce Center via Treasure Island to Berkeley/Richmond Transbay Rail Tunnel from San Francisco to Richmond Central Marin Multi Modal Regional Transportation Improvements I-680 Multimodal Improvements I-80 Busway + wBART + San Pablo BRT Oakland Transportation Center Other Regionwide Interchange Modernization Program + BART Extension to Santa Cruz San Pablo Corridor BRT/Streetcar + Land Use South Bay Rail Network (New BART + LRT Lines) Transit Network Expansion

77 7 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Operational Strategies

AV Lanes + Pricing + Supportive Infrastructure (x2) Connected Vehicle Public-Private Partnership Autonomous Technologies

BART Line Rerouting BART Skip-Stop Service via Ad-Hoc Decoupling (x2) Forced Transfers to Reduce Number of BART Lines in Transbay Tube BART Alameda County Safe Routes to School Program Competitive Grant Program for Bike Projects Decrease Asphalt Devoted to Bike Riders Electric Bicycle Distribution to All Adults Bicycle and Energy-Producing Sidewalks Pedestrian Traffic Rule Enforcement for Bicycle Riders Motorcycle, Scooter and Bike Rentals for Motorists Billboard Notifications about Carpool Opportunities Carpool Parking Discounts Carpool/Vanpool Ridematching Service Casual Carpooling App Casual Carpooling App + RFID Car Tags Discounted TNC Ride-Program with Government-Sourced Rate & Bidding Forced Customer Sharing between Carpool Apps HOV3+ Lanes on Bay Bridge Jitney and Shared Taxi Permits Ridematching + Carpooling Program (x2) Carpooling Rideshare Program App Ridesharing App for People Working in Same Area Single Customer TNC Trips Ban in Carpool Lanes TNC/Robotaxi Passenger Occupancy Feebate Various Robotaxi Policies Auto Ban in Cities + Remote Parking Facilities Ban TNCs Carbon Friendly Behavior Rewards Program App Controlled Balanced Growth Law to Limit Commutes to 5 Miles Maximum Driving Restrictions Based on License Plates Driving Tests for Non-Bay Area Natives EV Mandate for TNCs, etc. Expanded Enforcement of Safe Driving Highway Timeslot Allocation Requirement Mandatory Auto Commute Permit Process Mandatory Freeway Trip Reservation Policy Non-AV Restriction on Highways Controls & Once-a-Week Driving Restriction Regulations Rebates for Motorcycle Purchase Regional Drone Regulations Self-Flying Car Mandate Vehicle Decrease Policy Vehicle Replacement Program to Shift to MaaS

78 8 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Operational Strategies 24-Hour Work Day (x2) 80% Telecommute Requirement + Redevelopment of Office Buildings Alternate Business Hours + Telecommute Program Telecommuting, Telework, Telemedicine, and Distance Learning Incentives Incentives for Worker Productivity Growth + Tax Credits for Short-Distance Commuters Mandatory Once-a-Week Telecommute Policy Staggered Work Start Times Subsidies for Home Workstations Tax Breaks for Employer Telecommute Policies Tax Incentives for Private Employer Buses Employer Tax Incentives for Telecommuting and TDM Policies Policies & Tax Incentives for Work from Home on One Day Each Week Telecommute Tax Rebates for Telecommuting Telecommuting Subsidy Telecommuting Tax Credits (x2) Telecommuting Tax Incentives for Employers (x2) Tool to Design Work Schedules for Employees

Higher-Occupancy HOV Lanes HOV/T Lane Barriers HOV/T Lane Conversion to GP Express Lanes

Ban on Trucks During Rush Hours Ban on Truck Deliveries in Downtowns during Peak Hours Financial Incentives for Freight Delivery in Off-Peak Hours Truck Delivery Time Nighttime Mandate Freight Caltrain/BART System Integration Immigration Crackdown on Bay Area Transit Integrated Regional Fare, Service and Branding Increased Regional Leadership Increased Transfer Discounts + Inland Rail Extensions Regional Transit Integration/Consolidation (x5) Single Funding Agency for All Bay Area Transit Governance Sub-Regional TMA Funding Transit Federation Eliminate Signal Lights on Ramps and Cloverleaf Ramps Every Lane a Carpool Lane Metering Lights Elimination New Park-and-Ride Lots on Freeway Corridors Regional Wildlife Crossings & Habitat Preservation Program Reversible Lanes on Congested Bridges and Freeways Highways Pothole Repairs Self-Propelled Freeways + Reversible Lanes App for Parking Space Notifications Automated Ferris Wheel-Style Parking Automated Parking Systems for Rail & Ferry Stations Citywide Paid Parking in San Francisco Elimination of Free Employer Parking and Incentives for Environmentally-Friendly Modes Large Free Parking Garages near BART and Train Stations Parking Parking Lot Conversion to Parking Garages Parking Lots in Job-Rich Cities 79 9 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Operational Strategies $/mile charge for all Transit Users, regardless of system Alameda County Student Transit Pass Program Bay Bridge Toll Plaza Removal County-Based Progressive Tolling Implementation Demand-Based Tolls on All Highways & Bridges Elimination of Regressive Tolls on Bridges/Tunnels Free Transit (x4) Integrated Transit Fare Program Means-Based Fare Program (x2) Monetary Incentives to Change Behavior Online Transit Marketplace Pay-As-You-Drive Insurance & Fair Value Commuting (FVC) Payroll Tax Replacement for Tolls & Sales Taxes Pricing Peninsula Peak-Period Cordon Toll Pricing of All Highway/Expressway Lanes Public Transit Rewards Program (x2) Replacement of Bridge Toll Booths with Cameras Toll for City Roads based on VMT and Time of Day / Limited Free Miles on Transit Toll Plaza Elimination Program Universal Basic Income for Transportation VMT Pricing on All Lanes VMT Tax + Transit Expansion + Behavior Rewards Program 55-MPH Speed Limit during Peak Hours AI Traffic Cameras for Dynamic Signal Timing Artificial Intelligence for Traffic Signals Auto Yield Requirements for Public Transit Ban on Left-Turns in San Francisco Bus-Only Lanes on All Freeways Differentiated Speed Limits by Lane Dynamic Bridge Approach Lane Management Elimination Right Turn on Red Flexible ROW Arterial Network Flow Maximization on Arterials Parallel to Highways HOV Lane Hours Modification + Lane Drop Design Changes Improved Signage for Construction Lane Closures Lane Barriers to Prevent Excessive Switching Traffic Lane Swap for Right-Side-Running HOV Facilities Operations Management of Traffic Lights Minimum Speed Signage Reversible Lanes on Freeways Reversible Lanes on Most Congested Freeways Santa Clara County Roundabout Construction Program Skinny Car Lanes Synchronized Acceleration Strategy Dynamically-Routed Bus Network Prefabricated Subway Construction Modules Retail Construction in Transit Stations (x2) Sensor-based Technology Improvements in Transit Transit Stations in Freeway Airspaces Transit System Synchronization Unified Regional Bus Network + Service Expansion Transit Zero-Emission Bus Infrastructure Affordable Childcare Centers Other App/Phone service to Plan Journeys end-to-end

80 10 Horizon and Plan Bay Area 2050: Project Performance Assessment Attachment C: Index of Projects Submitted for Consideration (October 2018)

Transformative Operational Strategies BART Station Area Office Permitting Reforms Community-Focused Transit Station & Bike/Ped Programming Commute Time Reduction Project Complete Street Projects (1 Per County) Demand-Based Traffic Lights and Traffic Circles Distributed Job Centers Distributed Semi-Rural Communities (x2) Dorm-style and Pod Housing in Empty Buildings for Commuters Hotel Stay Vouchers for One Weeknight with Major Hotel Participation Housing Development in "Big 3" Cities Integrated Transportation + Land Use Planning Authority Local Consensus-Based Decision-Making Mental Health Improvements Pollution Reduction Program Regional Land Use Authority + 24-Hour Work Schedules Requests for More Federal Funding RV Park Creation Seamless App-Based Mobility Software to Manage Office Buildings and Shuffle Employees to Change Commutes Tax Incentives for Distributed Job Centers Tax Incentives for Office Park Development in Housing-Rich Suburbs Transit Value Capture Program Use of Contracting Process to Raise Funds for Green Infrastructure Projects Upzoning of BART/Caltrain Station Areas Work-Live Centers + Subsidized Childcare

81 11 This page intentionally left blank.

82 Agenda Item 8.A April 23, 2019

DATE: April 12, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Mary Pryor, STA Consultant RE: Fiscal Year 2019-20 Intercity Funding Agreement and FY 2017-18 Reconciliation

Background: The Intercity Transit Funding Agreement provides for the annual funding of intercity transit routes, and addresses the process for reconciling planned to actual revenues and expenditures and for sharing costs for the upcoming budget year. The Intercity Transit Funding Working Group (ITFWG) reviews the annual funding of intercity transit routes included in the Intercity Transit Funding Agreement. Members of the ITFWG include all funding participants: the Dixon Readi- Ride, Fairfield and Suisun Transit (FAST), and Solano County Transit (SolTrans), Vacaville City Coach, the County of Solano, and STA.

Discussion: Intercity Funding Process The annual funding process includes a reconciliation of planned (budgeted) intercity revenues and expenditures to actual revenues and expenditures. To allow for the completion of audits, the reconciliation for a given fiscal year takes place one year after the completion of the fiscal year and at the same time as the planned (budgeted) amounts are calculated for the upcoming fiscal year. In this cycle, FY 2017-18 audited amounts are reconciled to the planned FY 2017-18 amounts, and the planned amounts for FY 2019-20 will be estimated.

This year, STA is recommending a change in the methodology used to calculate the FY 2019-20 costs and subsequent subsidy requirements. Rather than using the cost allocation models to determine the costs by route, the previously agreed upon performance measure of hourly costs (with escalation) will be used. The details are discussed below, in the “FY 2019-20 Forecast” section of this staff report. The methodology for the reconciliation of FY 2017-18 budget to actuals will be unchanged from prior years.

FY 2017-18 Reconciliation The FY 2017-18 reconciliation compares the budgeted and audited actual revenue and expenditure amounts for the fiscal year for each intercity route. The difference results in credits or debits to the participating cities and the county for their FY 2019-20 intercity funding shares in the TDA Matrix. FAST and SolTrans Cost Allocation Models (CAMs) showing audited actual costs and revenues for FY 2017-18 form the basis for the reconciliation. The summary sheet from each operator’s FY 2017-18 CAM with actual costs and revenues are shown in Attachments A and B. Additional detail from the CAMs is available on request.

The calculations for reconciling the FY 2017-18 planned versus actual are shown in Attachment C, Tabs 3 and 4. As shown in Attachment C, Tab 3, 80% of the required subsidy is calculated

83 based on the residence of each route’s ridership. The most recent survey data prior to the implementation of the Blue Line and GX Line that includes residence information is from STA’s 2014 Solano Express Intercity Ridership Study dated June 25, 2014. The same 2014 data has been used in the calculations for the FY 2017-18 budget and actuals.

Attachments C Tab 3 and Tab 4 show that the actual required subsidies from the local jurisdictions are approximately $2,000 less than had been planned. However, there were differences between the FY 2017-18 budget and the actuals, as follows:

• FAST’s costs were approximately $144,000 greater than budgeted1, and fare revenues were approximately $91,000 less than budgeted. Other revenues were approximately $30,000 greater, resulting in a net increase in required subsidies of $204,000. • SolTrans’ costs were approximately $206,000 less than budgeted, and fares were approximately $166,000 less than budgeted. However, SolTrans applied $166,000 in other revenues including Solano College fees and parking revenue, resulting in a net decrease in required subsidies of $206,000. • Altogether, these changes result in a total subsidy reduction of approximately $2,000.

Using the subsidy allocation formula, several jurisdictions will receive a credit toward the subsidy required for FY 2019-20, while others will provide additional subsidies for FY 2017-18. Solano County’s contribution does not change. Attachment C, Tab 4 provides the changes by route. The results of the FY 2017-18 reconciliation calculations are as follows:

• Benicia: Credit of $40,698 (SolTrans) • Dixon: Increase of $4,005 • Fairfield: Increase of $81,116 (FAST) • Suisun City: Increase of $28,249 (FAST) • Vacaville: Increase of $41,936 • Vallejo: Credit of $116,535 (SolTrans)

FY 2019-20 Forecast Cost Trends STA continues to review cost trends for the SolanoExpress service. Attachment D provides the annual budgeted and actual cost per hour for the FAST and SolTrans elements of the service, as well as the total service. FAST generally has greater hourly operating costs than SolTrans. The following chart depicts the hourly rate trends for FAST and SolTrans local and SolanoExpress services, as calculated by the CAMs.

As shown in the chart, hourly costs for both local and express service were generally steady or declining from FY 2012-13 to FY 2015-16. From FY 2015-16 to FY 2017-18, the actual hourly costs for SolanoExpress as calculated by the CAMs increased 14% for FAST and 15% for SolTrans. This cost growth raises concerns that the service may become unsustainable.

1 FAST costs related to the Park & Ride lots and train station were removed from the CAM, as SolanoExpress does not provide service to the facilities.

84

The rates for FY 2018-19 are based on actuals for the first six months of the fiscal year. FAST projects a reduction in their SolanoExpress cost per revenue hour for FY 2018-19, while SolTrans shows a small increase. Both agencies’ SolanoExpress rates for FY 2018-19 are within fifty cents of each other at approximately $145 per hour.

Since FY 2012-13, both agencies calculate a cost per hour for local service that is lower than for SolanoExpress service. SolTrans’ express service hourly rate has been from -4% to 33% more than the local rate, while FAST’s variance has ranged from 46% to 71% more per revenue hour for the SolanoExpress service.

Performance Standard In October 2016, the STA Board approved performance benchmarks for SolanoExpress service including a cost rate of $135 per revenue vehicle hour. This rate was developed, discussed, and agreed to by the Consortium. Since 2017, the Consortium has discussed capping operating costs based on the performance standard as part of the Intercity Funding Agreement presentations.

Using an escalation rate of 2% per the October 2016 staff report, the projected rate for FY 2019- 20 would be $141 per revenue vehicle hour, as shown in the table below.

Year FY17-18 FY18-19 FY19-20 Escalation Rate 2.0% 2.0% Cost per Hour $ 135 $ 138 $ 141

As shown in Attachment G, the actual SolanoExpress cost of $150 per revenue hour exceeded the performance standard rate in FY 2017-18 by $15 per hour. In FY 2018-19, projections indicate that the cost per hour will exceed the performance standard again, although by a smaller margin than in FY 2017-18. Based on the second quarter unaudited actuals from FAST and SolTrans, the estimated cost of $145 per revenue hour is $7 greater than the performance standard.

85 Hourly Operating Costs As noted previously, the FY 2019-20 forecast includes a change in methodology. Costs per revenue hour are based on the escalated performance standard of $141 per hour, rather than the CAMs. The cost for each route is calculated as the revenue hours multiplied by the cost per revenue hour.

Planned Service Levels In Attachment C, Tab 5, the revenue hours, costs, and revenues are projected for each route. The new route designations are based on the following: • Yellow Line = former Route 78 • Blue Line = former Routes 20, 30, and 40 • Red Line = former Routes 80, 82, and 85 • Red Line Expansion = marginal increase in hour for half hour service on Route 85 • Green Express = former Route 90

The FY 2019-20 forecast assumes that service levels will remain unchanged from the FY 2018- 19 second quarter actuals provided by FAST and SolTrans, with the exception of the Red Line. The FY 2018-19 actuals include the SolanoExpress service and fare changes that were implemented in July 2018. The FY 2019-20 forecast includes an additional 4,400 revenue service hours to provide Red Line half hour service to the northern area of the county. STA anticipates subsidizing the cost of the expansion service with State Transit Assistance funds (STAF). The inclusion of the Red Line expansion in the forecast does not impact the subsidies owed, as the marginal cost of the new service is expected to be fully funded with fares and provided by STAF. Coordination with SolTrans is underway regarding the implementation of this service change.

FY 2019-20 Forecast Cost Sharing Calculations The financial information for each route is used in calculating funding shares for each of the participating jurisdictions. The gross cost of each route is offset by fares and route-specific funding to arrive at the net cost of the route to be shared. The intercity funding formula is based on 20% of the costs shared according to population and 80% of the costs shared according to ridership by residency. Population estimates are updated annually using the Department of Finance population estimates and are shown in Attachment C, Tab 1. Ridership by residency is based on on-board surveys conducted by an independent ridership estimating firm. The survey data used in the FY 2019-20 calculation, shown in Attachment C, Tab 2, was gathered in October and November 2018, following the implementation of the Blue, Green Express, and Yellow Lines.

The calculations for cost sharing for FY 2019-20 are shown in Attachment C, Tab 5. The final amounts due by jurisdiction, by route, for both reconciled FY 2017-18 and forecast FY 2019-20 are shown in Attachment C, Tab 6. A summary comparison of FY 2018-19 vs. FY 2019-20 total amounts due by jurisdiction is provided in Attachment C, Tab 7.

Using prior year data from the reconciliation process, Attachment E provides a summary of the total costs, revenues and subsidies by jurisdiction from FY 2009-10 through FY 2019-20. Attachment F provides a summary of the revenue hours by route from FY 2013-14 through FY 2019-20, and includes the changes in budgeted revenue hours by route from FY 2018-19 to FY 2019-20.

86 FY 2019-20 Amounts Owed The total subsidy contributions in FY 2019-20 are approximately $432,000 less than in FY 2018- 19.2 This decrease is due to a number of factors, but is primarily attributable to the use of the performance standard’s hourly operating cost to $141 per revenue hour. FY 2019-20 fare revenues are projected to fall between the estimates for FY 2017-18 and FY 2018-19. Additional revenues are included in the FY 2019-20 projections, including $324,000 from SolTrans’ Solano College fees and Curtola Park & Ride (FAST has opted not to contribute its SCC fee revenue to SolanoExpress), and STA’s use of approximately $458,000 in STAF funds for the Red Line expansion.

TDA Funding Matrix The intercity funding shares for FY 2019-20 are reflected in the annual TDA matrix which shows the amounts to be claimed by jurisdiction/transit agency, shown in Attachment C, Tab 0.

The FY 2018-19 TDA Matrix includes a section related to funding swaps and capital funding arrangements. Each row indicates the purpose of the transaction and the claimant. The amounts listed in each column are the amounts to be drawn from each jurisdiction’s TDA fund by the designated claimant.

When each operator’s TDA claims are prepared, the individual operator amounts claimed for local transit operating and capital will be added to the TDA matrix. The matrix will then be considered for adoption by the Paratransit Coordinating Council, the Solano Express Consortium, the Technical Advisory Committee, and by the STA Board. Once the TDA matrix is approved by the STA Board, it is submitted to Metropolitan Transportation Commission (MTC) to provide MTC guidance when reviewing individual TDA claims.

FY 2018-19 Mid-Year Review During last year’s reconciliation and budgeting process, STA staff recommended that the service and revenue data for the new routes be reviewed in the middle of FY 2018-19 to assess whether there are substantial differences from the budgeted projections. In April 2018, STA programmed $500,000 in FY 2018-19 STAF funds to minimize or mitigate any potential financial impact for both FAST and SolTrans under the new fare structure and service change for FY 2018-19 and FY 2019-20.

In March, both FAST and SolTrans provided cost and revenue data through the second quarter of FY 2018-19. Extrapolating this preliminary data for the full year (by multiplying the six-month data by two) indicated the following: • Total operating costs are close to the FY 18-19 projections. FAST’s costs are trending higher than projected, and SolTrans’ are trending lower. • Fare revenues are trending lower than projected, by approximately $85,000. FAST’s fares are lower than estimated, and SolTrans’ are higher. • SolTrans has included Solano College fees and Curtola Park & Ride revenues to subsidize the SolanoExpress service.

Altogether, the data from the second quarter in combination with the subsidies provided for FY 2018-19 indicate that either costs would need to be constrained in FY 2018-19 or additional

2 Rather than using the results of the cost and revenue modeling, the FY 2018-19 subsidy contributions were calculated based on a 2% inflationary increase over the FY 2017-18 gross amounts due, less the reconciliation of FY 2016-17 budget to actuals. This complicates direct comparisons of costs and revenues between FY 2018-19 and the FY 2019-20 forecast.

87 subsidies would be required to fully fund the SolanoExpress service. STA will be holding meetings with SolTrans, FAST, and City Coach to review the data and discuss solutions. Approval for the Intercity Funding Agreement by the STA Board is scheduled for June 2019.

Fiscal Impact: The STA is a recipient of TDA funds from each jurisdiction for the purpose of countywide transit planning. With the STA Board approval in June, the TDA matrix provides the guidance needed by MTC to process the TDA claim submitted by the transit operators and STA.

Recommendation: Informational.

Attachments: A. SolTrans FY 18-19 CAM with Actuals B. FAST FY 18-19 CAM with Actuals C. FY 2017-18 Reconciliation and FY 2019-20 Cost Sharing Tab 0: TDA Matrix Working Draft Tab 1: Population Estimates Tab 2: Ridership by Route by Residency Tab 3: FY 2017-18 Planned vs. Actual Costs and Revenues Tab 4: FY 2017-18 Reconciliation Summary by Jurisdiction Tab 5: FY 2019-20 Cost Sharing Forecast Tab 6: Reconciliation of FY 2017-18 Subsidies plus Subsidies Owed for FY 2019-20 Tab 7: Summary Comparison of FY 2018-19 vs. FY 2019-20 Total Amounts Due D. Solano Express Cost per Hour Budget vs. Actual History E. Annual Costs and Subsidies by Jurisdiction FY09-10 through FY19-20 F. Solano Express Revenue Service Hours by Route History

88

SolTrans Updated Bus Operations - Cost Allocations 5-Oct-18 FY 2017-2018 - For the period July - June

Planned Expenses Estimated Revenues Farebox & Farebox & Allocated Allocated Allocated Solano College Local Revenue Local Revenue YTD Costs - Veh Costs - Veh Costs - Peak Total allocated Farebox Fees for Parking FTA 5307 Net Costs by Recovery Ratio Recovery Ratio Revenue Cost per % of Total Route Hours Miles Vehicles Costs (Gross) Revenues Transit Fares Revenue JARC RM-2 STAF Lifeline Route (TDA) (RM2) YTD Ridership Hours Hour Costs 1 393,538 230,468 281,803 905,809 154,943 750,866 17% 17% 131,919 8,747 103.56 7.6% 2 533,056 271,868 394,525 1,199,450 180,587 - 1,018,863 15% 15% 162,913 11,848 101.24 10.0% 3/38 224,686 132,665 225,443 582,794 60,596 - 522,197 10% 10% 51,628 4,994 116.70 4.9% 4 199,941 104,852 225,443 530,236 65,414 - 464,821 12% 12% 59,275 4,444 119.31 4.4% 5 220,592 134,304 225,443 580,339 62,273 - 518,066 11% 11% 56,958 4,903 118.36 4.9% 6 170,652 80,408 112,721 363,782 39,780 - 324,002 11% 11% 33,105 3,793 95.91 Average 3.0% 7 527,207 239,647 225,443 992,297 156,497 - 835,800 16% 16% 131,976 11,718 84.68 Route 1-8 8.3% 8 168,672 118,961 112,721 400,354 38,874 - 361,480 10% 10% 31,213 3,749 106.79 $ 102.50 3.3% 15 38,513 20,456 112,721 171,690 6,254 - 165,436 4% 4% 6,143 856 200.57 Average 1.4% 17 35,678 20,291 112,721 168,690 12,880 - 155,810 8% 8% 10,786 793 212.72 Route 1-20 1.4% 20 141,452 89,146 112,721 343,320 11,122 - 332,198 3% 3% 5,336 3,144 109.20 $ 105.76 2.9% 78 658,337 616,103 450,885 1,725,325 365,405 98,897 731,700 - 529,323 27% 21% 100,424 11,930 144.62 14.4% 80 1,044,123 1,151,428 665,056 2,860,607 1,783,163 163,972 578,000 - 335,472 68% 62% 487,491 18,921 151.19 Average 23.9% 82 25,015 32,123 11,272 68,410 22,972 30,000 - 15,438 34% 34% 4,466 556 123.04 Intercity 0.6% 85 418,464 420,796 225,443 1,064,702 244,073 53,378 201,741 565,511 28% 28% 73,595 9,301 114.47 $ 140.49 8.9%

Totals 4,799,928 3,663,516 3,494,362 11,957,805 3,204,834 53,378 262,869 - 1,541,441 - 6,895,283 29% 27% 1,347,227 99,697 100.0% - -

13.20% Local Farebox Recovery (Routes 1-20) 13.66% Local Farebox Recovery (Routes 1-8 only) 46.83% Regional Farebox Recovery

Solano Express 2,145,939 2,220,450 1,352,656 5,719,045 2,415,613 53,378 262,869 - 1,541,441 - 1,445,744 48% 43% 665,976 40,708 140.49

89 .

Fairfield and Suisun Transit Cost Allocation Model Actuals - FY 17-18 - RECONCILED

Allocated Costs - Route Costs by Allocated Costs - Rev Revenue Hours Allocated Costs - Peak Total allocated Costs Farebox Revenues Farebox Net Costs by Route Revenue Veh Rev Veh Miles Route Costs by Rev Route Miles (Annual) (Annual) Vehicles (Annual) (Gross) (Annual) JARC Funding 5311 Funding RM2 Reimbursement (Annual) Recovery Ratio (Annual) Miles (Gross) Rev Veh Hours Veh Hours (Gross) 1 $ 192,817.60 $ 284,066.23 $ 167,735.27 $ 644,619.09 $ 118,695.03 18%$ 525,924.06 86,949 $ 7.41 7,272.57 $ 88.64 2 $ 191,453.78 $ 259,915.46 $ 167,735.27 $ 619,104.51 $ 86,000.32 14%$ 533,104.19 86,334 $ 7.17 6,654.27 $ 93.04 3 $ 181,004.47 $ 288,769.05 $ 167,735.27 $ 637,508.79 $ 97,986.81 15%$ 539,521.98 81,622 $ 7.81 7,392.97 $ 86.23 4 $ 145,871.13 $ 156,148.01 $ 91,790.96 $ 393,810.10 $ 18,055.77 5%$ 375,754.33 65,779 $ 5.99 3,997.65 $ 98.51 5 $ 106,382.43 $ 156,769.07 $ 91,790.96 $ 354,942.45 $ 35,649.43 10%$ 319,293.02 47,972 $ 7.40 4,013.55 $ 88.44 6 $ 232,106.72 $ 344,567.36 $ 167,735.27 $ 744,409.34 $ 89,616.64 12%$ 654,792.70 104,666 $ 7.11 8,821.50 $ 84.39 7 $ 304,675.27 $ 313,892.41 $ 395,568.20 $ 1,014,135.87 $ 81,707.35 8%$ 932,428.52 137,390 $ 7.38 8,036.17 $ 126.20 8 $ 121,768.10 $ 142,827.40 $ 91,790.96 $ 356,386.45 $ 22,853.05 6%$ 333,533.40 54,910 $ 6.49 3,656.62 $ 97.46 9 $ 72,969.94 $ 88,827.02 $ 91,790.96 $ 253,587.91 $ 7,292.26 3%$ 246,295.65 32,905 $ 7.71 2,274.12 $ 111.51 20 $ 199,452.64 $ 144,275.74 $ 91,790.96 $ 435,519.34 $ 42,306.00 $ 66,626.38 15%$ 326,586.96 89,941 $ 4.84 3,693.70 $ 117.91 30 $ 326,633.89 $ 174,716.33 $ 319,623.89 $ 820,974.11 $ 28,020.00 $ - $ 30,867.00 $ 117,775.36 14%$ 644,311.75 147,292 $ 5.57 4,473.03 $ 183.54 40 $ 523,498.59 $ 276,125.34 $ 303,777.24 $ 1,103,401.17 $ 433,100.00 $ 202,910.38 18%$ 467,390.79 236,066 $ 4.67 7,069.27 $ 156.08 90 $ 1,190,686.21 $ 605,904.60 $ 639,247.77 $ 2,435,838.58 $ 636,600.00 $ 1,144,468.73 47%$ 654,769.85 536,927 $ 4.54 15,512.17 $ 157.03

Totals $ 3,789,320.76 $ 3,236,804.00 $ 2,788,112.95 $ 9,814,236.71 $ 70,326.00 - $ 1,100,567.00 $ 2,089,637.51 21% $ 6,553,707.20 1,708,753 $ 6.47 82,867.59 $ 114.54 (Average) (Average) Actual Cost Per Revenue Actual Cost Per Hour Revenue Mile 155.97 $ 118.43 $ 5.74

Farebox Ratio (Overall) 21.29%

. 90 Attachment C Tab 1

SOLANO COUNTY POPULATION ESTIMATES DRAFT 12-Apr-19

Values for FY17-18 Calculations1 Values for FY19-20 Calculations2

Without Without County Uninc. County Uninc. And without And without Solano County DOF Value Share Rio Vista Share DOF Value Share Rio Vista Share Benicia 27,501 6.4% 27,501 6.82% 27,499 6.3% 27,499 6.69% Dixon 19,018 4.4% 19,018 4.72% 19,896 4.5% 19,896 4.84% Fairfield 112,637 26.1% 112,637 27.93% 116,156 26.4% 116,156 28.26% Rio Vista 8,601 2.0% 0 0.00% 9,188 2.1% 0 0.00% Suisun City 29,091 6.7% 29,091 7.21% 29,192 6.6% 29,192 7.10% Vacaville 97,667 22.6% 97,667 24.22% 98,977 22.5% 98,977 24.08% Vallejo 117,322 27.2% 117,322 29.10% 119,252 27.1% 119,252 29.02% Balance Of County 19,661 4.6% 0 0.00% 19,633 4.5% 0 0.00% Incorporated 411,837 95.4% 403,236 100.00% 420,160 95.5% 410,972 100.00% County Total 431,498 100.0% 403,236 100.00% 439,793 100.0% 410,972 100.00%

1. State of California, Department of Finance, E-4 Population Estimates for Cities, Counties, and the State, 2011-2015, with 2010 Census Benchmark. Sacramento, California, May 2016 2. State of California, Department of Finance, E-4 Population Estimates for Cities, Counties, and the State, 2011-2017, with 2010 Census Benchmark. Sacramento, California, May 2018

C (1) Population 91 Attachment C Tab 2

SOLANO TRANSPORTATION AUTHORITY DRAFT SOLANO EXPRESS COST SHARING 12-Apr-19 RIDERSHIP by JURISDICTION OF RESIDENCE

Values for FY17-18 Calculations1 WITHOUT 1) OUTSIDE COUNTY, 2) RIO VISTA, AND 3) UNINCORPORATED AREA Route 78 Route 20 Route 30 Route 40 Route 80 Route 85 Route 90 Total 209 111 122 98 1049 256 434 2279 Ridership Percent Ridership Percent Ridership Percent Ridership Percent Ridership Percent Ridership Percent Ridership Percent Ridership Percent Benicia 80 43.2% 1 0.9% 0 0.0% 1 1.2% 23 2.7% 4 1.7% 0 0.0% 109 5.5% Dixon 1 0.5% 1 0.9% 26 23.6% 0 0.0% 0 0.0% 1 0.4% 4 1.0% 33 1.7% Fairfield 2 1.1% 37 34.6% 25 22.7% 39 46.4% 25 2.9% 51 21.8% 238 59.9% 417 21.1% Suisun City 0 0.0% 6 5.6% 7 6.4% 14 16.7% 5 0.6% 13 5.6% 89 22.4% 134 6.8% Vacaville 0 0.0% 58 54.2% 40 36.4% 30 35.7% 3 0.3% 8 3.4% 64 16.1% 203 10.2% Vallejo 102 55.2% 4 3.7% 12 10.9% 0 0.0% 808 93.5% 157 67.1% 2 0.5% 1085 54.8% Total 185 100% 107 100% 110 100% 84 100% 864 100% 234 100% 397 100% 1,981 100%

Rio Vista 00000011 Balance of County 00000000 Napa County 0120503359 Outside Solano Co 24 2 10 14 132 19 33 234 Unincorp. Solano 01002003 0 0 Total 209 111 122 98 1,048 256 434 2,278

Values for FY19-20 Calculations2 WITHOUT 1) OUTSIDE COUNTY, 2) RIO VISTA, AND 3) UNINCORPORATED AREA Blue Line Green Express Yellow (Route 78) (Route 20/30/40) Red Line Combined Route 80 Route 85 (Route 90) Total 316 407 Weighted 1,250 234 391 2598 Ridership Percent Ridership Percent Ridership Percent Ridership Percent Ridership Percent Ridership Percent Ridership Percent Ridership Percent Benicia 128 45.0% 3 0.9% 2.7% 31 3.0% 2 1.0% 0 0.0% 164 7.4% Dixon 0 0.0% 22 6.7% 0.0% 0 0.0% 0 0.0% 6 1.6% 28 1.2% Fairfield 7 2.5% 141 42.9% 8.2% 30 2.9% 73 33.7% 234 65.0% 485 21.8% Suisun City 0 0.0% 22 6.7% 2.1% 8 0.7% 18 8.5% 74 20.4% 121 5.4% Vacaville 1 0.3% 137 41.7% 0.8% 5 0.5% 5 2.4% 45 12.6% 194 8.7% Vallejo 148 52.2% 4 1.2% 86.2% 965 92.9% 119 54.5% 1 0.3% 1237 55.5% Total 283 100.0% 329 100% 0 0% 0 100.0% 1,039 100% 218 100% 360 100% 2,229 100% 82.7% 17.3% Rio Vista 0 1 4 5 Balance of County Napa County 2 4 50 3 1 60 Outside Solano Co 29 70 154 13 26 293 Unincorp. Solano 1 2 8 0 10

Total 316 406 0 0 1,250 234 391 2,597 Balance/Rounding 01000001

1. 2014 Solano Express Intercity Ridership Study, June 25, 2014, Figure 43. City of Residence - Individual Intercity 2. Results of STA 2018 On-Board Transit Survey, Draft 2-13-19

C (2) Ridership92 SOLANO TRANSPORTATION AUTHORITY DRAFT FY 16-17 SOLANO EXPRESS COST SHARING RECONCILIATION 12-Apr-19 Attachment C Tab 3 Based on FY 2017-18 Planned vs Actual Cost1 Route 78 Route 20 Route 302 Route 40 Route 80 & 82 Route 85 Route 90 Total Cost & Subsidy Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Gross Cost 1,773,801 1,725,325 424,792 435,519 793,316 820,974 1,074,722 1,103,401 3,031,685 2,929,017 1,119,273 1,064,702 2,358,925 2,435,839 10,576,514 10,514,777 Fares 394,079 365,405 88,029 66,626 138,771 117,775 202,821 202,910 1,950,449 1,806,135 237,194 244,073 1,192,975 1,144,469 4,204,318 3,947,394 Sec 5311 100,000 - 100,000 0 Sec 5316 JARC 42,306 42,306 28,020 28,020 70,326 70,326 RM-2 731,700 731,700 30,867 433,100 433,100 608,000 608,000 201,741 201,741 636,600 636,600 2,611,141 2,642,008 STAF Lifeline - 150,000 150,000 0 STAF Revenue Based - - - - - 0 0 Other 98,897 100,000 163,972 53,378 0 416,247

Subtotal, Net Subsidy 648,022 529,323 294,457 326,587 526,525 544,312 438,801 467,391 473,236 350,910 530,338 565,511 529,350 654,770 3,440,729 3,438,803

County Subsidy Share 4.56% 29,844 24,392 13,561 15,049 24,249 25,082 20,209 21,538 21,795 16,170 24,425 26,059 24,379 30,172 158,462 158,462 County Cap @ $158,462 101.08% Balance to be Shared 101.13% 618,178 504,932 280,896 311,538 502,276 519,230 418,592 445,853 451,441 334,740 505,913 539,452 504,971 624,598 3,282,267 3,280,341 (Required Subsidy)

Population Shares at 20% of Required Subsidy 123,636 100,986 56,179 62,308 100,455 103,846 83,718 89,171 90,288 66,948 101,183 107,890 100,994 124,920 656,453 656,068

Benicia 6.82% 8,432 6,887 3,831 4,249 6,851 7,082 5,710 6,082 6,158 4,566 6,901 7,358 6,888 8,520 44,771 44,744 Dixon 4.72% 5,831 4,763 2,650 2,939 4,738 4,898 3,948 4,206 4,258 3,157 4,772 5,088 4,763 5,892 30,961 30,942 Fairfield 27.93% 34,535 28,209 15,693 17,405 28,060 29,008 23,385 24,908 25,220 18,701 28,264 30,137 28,211 34,894 183,369 183,261 Rio Vista 0.00% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Suisun City 7.21% 8,920 7,286 4,053 4,495 7,247 7,492 6,040 6,433 6,514 4,830 7,300 7,784 7,286 9,012 47,359 47,331 Vacaville 24.22% 29,946 24,460 13,607 15,091 24,331 25,152 20,277 21,598 21,869 16,215 24,507 26,132 24,462 30,257 158,998 158,905 Vallejo 29.10% 35,972 29,382 16,345 18,128 29,228 30,214 24,358 25,944 26,269 19,479 29,439 31,391 29,384 36,345 190,996 190,884 Balance of County 0.00% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Check Total 100.00% 123,636 100,986 56,179 62,308 100,455 103,846 83,718 89,171 90,288 66,948 101,183 107,890 100,994 124,920 656,453 656,068

Ridership by Residence at 80% of Required Subsidy 494,542 403,945 224,717 249,230 401,821 415,384 334,874 356,683 361,153 267,792 404,730 431,561 403,977 499,678 2,625,814 2,624,273

Benicia 43.2% 213,619 174,486 0.9% 2,100 2,329 0.0% 0 0 1.2% 3,987 4,246 2.7% 9,614 7,129 1.7% 6,918 7,377 0.0% 0 0 236,239 195,567 Dixon 0.5% 2,676 2,185 0.9% 2,100 2,329 23.6% 94,976 98,182 0.0% 0 0 0.0% 0 0 0.4% 1,730 1,844 1.0% 4,070 5,035 105,552 109,575 Fairfield 1.1% 5,351 4,371 34.6% 77,706 86,182 22.7% 91,323 94,405 46.4% 155,477 165,603 2.9% 10,450 7,749 21.8% 88,210 94,058 59.9% 242,183 299,555 670,700 751,923 Rio Vista 0.0% 0 0 0.0% 0 0 0.0% 0 0 0.0% 0 0 0.0% 0 0 0.0% 0 0 0.0% 0 0 0 0 Suisun City 0.0% 0 0 5.6% 12,601 13,976 6.4% 25,570 26,434 16.7% 55,812 59,447 0.6% 2,090 1,550 5.6% 22,485 23,976 22.4% 90,564 112,019 209,123 237,400 Vacaville 0.0% 0 0 54.2% 121,809 135,097 36.4% 146,117 151,049 35.7% 119,598 127,387 0.3% 1,254 930 3.4% 13,837 14,754 16.1% 65,125 80,553 467,739 509,769 Vallejo 55.2% 272,896 222,903 3.7% 8,401 9,317 10.9% 43,835 45,315 0.0% 0 0 93.5% 337,745 250,435 67.1% 271,550 289,552 0.5% 2,035 2,517 936,461 820,039 Balance of County 0.0% 0 0 0.0% 0 0 0.0% 0 0 0.0% 0 0 0.0% 0 0 0.0% 0 0 0.0% 0 0 0 0

Check Total 100.00% 494,542 403,945 100.00% 224,717 249,230 100.00% 401,821 415,384 100.00% 334,874 356,683 100.00% 361,153 267,792 100.00% 404,730 431,561 100.00% 403,977 499,678 2,625,814 2,624,273

Total Subsidy with County Share 648,022 529,323 294,457 326,587 526,525 544,312 438,801 467,391 473,236 350,910 530,338 565,511 529,350 654,770 3,440,729 3,438,803

Total Subsidy by Jurisdiction Benicia 222,051 181,373 5,932 6,579 6,851 7,082 9,696 10,328 15,772 11,695 13,819 14,735 6,888 8,520 281,009 240,311 Dixon 8,507 6,948 4,750 5,268 99,714 103,079 3,948 4,206 4,258 3,157 6,502 6,933 8,834 10,926 136,512 140,518 Fairfield 39,887 32,580 93,398 103,587 119,383 123,413 178,862 190,511 35,670 26,449 116,474 124,196 270,394 334,449 854,069 935,185 Rio Vista 0 0 00 00 0 0 0 0 0 0 0 0 0 0 Suisun City 8,920 7,286 16,654 18,471 32,818 33,925 61,852 65,880 8,604 6,380 29,785 31,759 97,850 121,031 256,482 284,731 Vacaville 29,946 24,460 135,416 150,188 170,448 176,201 139,875 148,984 23,123 17,145 38,344 40,886 89,586 110,809 626,737 668,674 Vallejo 308,868 252,285 24,746 27,445 73,063 75,529 24,358 25,944 364,014 269,914 300,989 320,943 31,420 38,863 1,127,457 1,010,923 County Share 29,844 24,392 13,561 15,049 24,249 25,082 20,209 21,538 21,795 16,170 24,425 26,059 24,379 30,172 158,462 158,462 Check Total 648,022 529,323 294,457 326,587 526,525 544,312 438,801 467,391 473,236 350,910 530,338 565,511 529,350 654,770 3,440,729 3,438,803

Notes: 1. SOURCES for Cost & Subsidy data: FY17-18 Planned values for Routes 78, 80, & 85: SOLTRANS - Cost Allocation Model - FY 17-18 Budget 4-17-17.xls FY17-18 Planned values for Routes 20, 30, 40, & 90: FF - Cost Allocation Model - FY 17-18 FINAL.xls FY17-18 Actual values for Routes 78, 80, & 85: SOLTRANS - Cost Allocation Model - FY 17-18 Actuals thru 6-30-18 FINAL.xls C (3) FY17‐18 Planned v Actual FY17-18 Actual values for Routes 20, 30, 40, & 90 : FF - Cost Allocation Model - RECONCILED FY17-18 Adjusted P&R 040519.xls 93 Attachment C Tab 4

SOLANO TRANSPORTATION AUTHORITY DRAFT SOLANO EXPRESS COST SHARING 12-Apr-19 RECONCILIATION OF FY 17-18 SUBSIDIES BY JURISDICTION SUMMARY Difference Amount Owed to FAST Amount Owed to SolTrans (Actual - for Rt 20 for Rt 30 for Rt 40 for Rt 90 TOTAL for Rt 78 for Rt 80 for Rt 85 TOTAL Budget)

Benicia 647 231 631 1,632 3,142 -40,678 -4,077 916 -43,839 -40,698 Dixon 518 3,366 257 2,093 6,234 -1,558 -1,101 431 -2,228 4,005 Fairfield 10,188 4,030 11,649 64,056 89,922 -7,307 -9,221 7,721 -8,807 81,116 Rio Vista 0000 0 000 00 Suisun City 1,817 1,108 4,028 23,181 30,133 -1,634 -2,224 1,975 -1,884 28,249 Vacaville 14,772 5,753 9,109 21,223 50,857 -5,486 -5,977 2,542 -8,921 41,936 Vallejo 2,699 2,466 1,586 7,443 14,195 -56,583 -94,101 19,954 -130,730 -116,535 County Share 1,488 833 1,329 5,793 9,443 -5,452 -5,625 1,634 -9,443 0

TOTAL 32,130 17,787 28,590 125,420 203,926 ‐118,699 ‐122,326 35,173 ‐205,852 ‐1,926

Notes: Negative amounts are credits to jurisdiction. Positive amounts are funds owed to Solano Express operators.

C (4) Recon 17‐18 94 SOLANO TRANSPORTATION AUTHORITY Attachment C TabDRAFT 5 SOLANO EXPRESS COST SHARING 12-Apr-19 FY 2019-20 Forecast1 Route 78/Yellow Blue Line Route 80, 82, 85 / Red Red North Co Exp. Route 90 / GX Line Total Cost & Subsidy SolTrans FAST SolTrans SolTrans FAST Revenue Hours 12,552 24,748 28,466 4,400 10,902 Cost per Revenue Hour $ 141.00 141.00$ 141.00$ 130.00$ $ 141.00 Gross Cost 1,769,832 3,489,468 4,013,706 572,000 1,537,182 11,382,188 Fares 346,738 475,870 2,125,928 20% 114,400 950,579 4,013,515 Sec 5316 JARC 171,274 171,274 RM-2 762,567 523,967 809,741 576,600 2,672,875 RM-3 - STAF Lifeline - Solano College Fee2 55,000 55,000 Parking Revenue 105,308 163,704 269,012 STAF Reserve 457,600 457,600

Subtotal, Net Subsidy 555,219 2,318,357 859,333 - 10,003 3,742,912

County Subsidy Share 25,201 105,229 39,005 - 454 169,889 Balance to be Shared 530,018 2,213,128 820,328 - 9,549 3,573,023 (Required Subsidy)

Population Shares at 20% of Required Subsidy 106,004 442,626 164,066 - 1,910 714,605

Benicia 6.7% 7,093 29,617 10,978 - 128 47,816 Dixon 4.8% 5,132 21,428 7,943 - 92 34,595 Fairfield 28.3% 29,961 125,103 46,371 - 540 201,974 Suisun City 7.1% 7,530 31,440 11,654 - 136 50,760 Vacaville 24.1% 25,530 106,600 39,513 - 460 172,103 Vallejo 29.0% 30,759 128,437 47,607 - 554 207,357 Balance of County 0.0% -

Check Total 100.0% 106,004 442,626 164,066 - 1,910 - Ridership by Residence at 80% of Required Subsidy 424,014 1,770,503 656,263 - 7,639 2,858,419 weighted ave Benicia 45.0% 190,972 0.9% 15,320 2.7% 17,420 1.0% - 0.0% - 223,712 Dixon 0.0% - 6.7% 118,179 0.0% - 0.0% - 1.6% 125 118,304 Fairfield 2.5% 10,399 42.9% 759,412 8.2% 54,040 33.7% - 65.0% 4,965 828,818 Suisun City 0.0% - 6.7% 118,179 2.1% 13,571 8.5% - 20.4% 1,561 133,312 Vacaville 0.3% 1,418 41.7% 737,527 0.8% 5,300 2.4% - 12.6% 963 745,208 Vallejo 52.2% 221,225 1.2% 21,885 86.2% 565,931 54.5% - 0.3% 25 809,066 Balance of County ------

Check Total 0.0% 1.00 424,014 1.00 1,770,503 1.00 656,263 1.00 - 1.00 7,639 2,858,419 FY 19-20 Due Total Subsidy 555,219 2,318,357 859,333 - 10,003 3,742,912

Benicia 198,065 44,937 28,398 - 128 271,527 Dixon 5,132 139,608 7,943 - 217 152,899 Fairfield 40,360 884,515 100,412 - 5,505 1,030,791 Suisun City 7,530 149,620 25,225 - 1,697 184,071 Vacaville 26,948 844,127 44,813 - 1,423 917,311 Vallejo 251,984 150,322 613,538 - 579 1,016,423 Balance of County 25,201 105,229 39,005 - 454 169,889

Check Total 555,219 2,318,357 859,333 - 10,003 3,742,912

Reconcilation with FY 17-18 FY 19-20 Due Benicia (40,678) 198,065 1,510 44,937 (3,161) 28,398 - 1,632 128 230,829 Dixon (1,558) 5,132 4,141 139,608 (670) 7,943 - 2,093 217 156,905 Fairfield (7,307) 40,360 25,867 884,515 (1,500) 100,412 - 64,056 5,505 1,111,907 Suisun City (1,634) 7,530 6,953 149,620 (250) 25,225 - 23,181 1,697 212,321 Vacaville (5,486) 26,948 29,635 844,127 (3,435) 44,813 - 21,223 1,423 959,247 Vallejo (56,583) 251,984 6,752 150,322 (74,147) 613,538 - 7,443 579 899,888 County Share (5,452) 25,201 3,650 105,229 (3,991) 39,005 - 5,793 454 169,889 Check Total ------(0)

1. SOURCES for Cost & Subsidy data: FY18-19 Planned service hours and revenues for Routes Blue Line (20, 30, 40) & GX (90): FF - Cost Allocation Model - FY 18-19 1Q 2Q.xls, March 11, 2019 . FY18-19 Planned service hours and revenues for RoutesYellow Line (78) & Red Line (80, 82, 85): SolTrans CAM Q2 ending 12-31-18v2.xls, March 11, 2019 . Full Year estimate based on exending first 6 months actuals for full year. 2. Solano College Fee used to subsidize service by SolTrans; subsidy underC (5) FY19discussion95‐20 Forecast with FAST. Attachment C Tab 6

SOLANO TRANSPORTATION AUTHORITY DRAFT SOLANO EXPRESS COST SHARING 12-Apr-19 RECONCILIATION OF FY 17-18 SUBSIDIES BY JURISDICTION PLUS AMOUNT OWED FOR 19-20 SUMMARY

Amount Owed to FAST Amount Owed to SolTrans Blue Line Yellow Red Red Grand (20,30,40) GX (90) TOTAL (78) (80,82,85) Expansion TOTAL Total

Benicia 46,446 1,760 48,206 157,386 25,237 0 182,624 230,829 Dixon 143,749 2,310 146,058 3,573 7,273 0 10,846 156,905 Fairfield 910,381 69,561 979,942 33,053 98,912 0 131,965 1,111,907 Rio Vista 0 0 0 0000 0 Suisun City 156,572 24,877 181,450 5,896 24,975 0 30,871 212,321 Vacaville 873,762 22,646 896,408 21,462 41,377 0 62,839 959,247 Vallejo 157,074 8,022 165,096 195,401 539,391 0 734,792 899,888 County Share 108,879 6,247 115,126 19,749 35,014 0 54,762 169,889 0 TOTAL 2,396,864 135,423 2,532,287 436,520 772,180 0 1,208,700 3,740,986

C (6) Total Due in 19‐20 96 Attachment C Tab 7

SOLANO TRANSPORTATION AUTHORITY DRAFT SOLANO EXPRESS COST SHARING 12-Apr-19 COMPARISON OF NET SUBSIDIES PAID IN FY 2018-19 TO FY 2019-20 SUMMARY FY 18-19 FY 19-20 TDA TDA Matrix TDA Matrix Matrix Amount Amount Amount Amount Owed to Owed to Owed to Owed to Change in FAST SolTrans TOTAL FAST SolTrans TOTAL Total Benicia 25,085 224,196 249,281 48,206 182,624 230,829 -18,452 Dixon 117,629 17,155 134,784 146,058 10,846 156,905 22,121 Fairfield 528,559 178,720 707,279 979,942 131,965 1,111,907 404,628 Rio Vista 0 0 0 000 0 Suisun City 161,111 44,197 205,308 181,450 30,871 212,321 7,013 Vacaville 481,058 82,076 563,134 896,408 62,839 959,247 396,113 Vallejo 139,592 833,935 973,527 165,096 734,792 899,888 -73,639 County Share 82,131 81,436 163,567 115,126 54,762 169,889 6,322

TOTAL 1,535,165 1,461,715 2,996,880 2,532,287 1,208,700 3,740,986 744,106

Notes: FY 18-19 TDA Matrix: amounts each jurisdiction paid to Solano Express operators in FY 18-19 (combination of FY 16-17 reconciliation and FY 18-19 budget)

FY 19-20 TDA Matrix: amounts each jurisdiction will pay to Solano Express operators in FY 19-20 (combination of FY 17-18 reconciliation and FY 19-20 budget)

C (7) Compare97 FY19 to FY20 Attachment C Tab 0

FY 2019-20 TDA Matrix WORKING DRAFT Date Prepared 12-Apr-19 STA Board Action

Note Vallejo/Benicia Solano # Dixon Fairfield Rio Vista Suisun City Vacaville (SolTrans) County Total TDA Revenue Available FY19-20 TDA Revenue Estimate from MTC 1 $ 903,994 $ 5,277,659 $ 417,466 $ 1,326,366 $ 4,497,114 $ 6,667,772 $ 892,044 $ 19,982,415 Projected Carryover from MTC 1 $ 1,107,531 $ 3,939,482 $ 918,306 $ 97,090 $ 7,734,451 $ 3,447,905 $ 1,650,892 $ 18,895,657 Available for Allocation per MTC 1 $ 2,011,525 $ 9,217,141 $ 1,335,772 $ 1,423,456 $ 12,231,565 $ 10,115,677 $ 2,542,936 $ 38,878,072 FY18-19 Allocations / Returns after 1/31/19 1 $ (311,406) $ (12,633) $ (324,039) Total TDA Revenue Available for Allocation $ 2,011,525 $ 9,217,141 $ 1,024,366 $ 1,423,456 $ 12,231,565 $ 10,103,044 $ 2,542,936 $ 38,554,033

USES Paratransit Intercity Taxi Scrip 2 $ 10,000 $ 40,000 $ 5,000 $ 70,000 $ 85,000 $ 598,194 $ 808,194 Paratransit 3 $ - Local Taxi Scrip 3 $ - Subtotal Paratransit $ 10,000 $ 40,000 $ 5,000 -$ $ 70,000 $ 85,000 $ 598,194 $ 808,194

Local Transit Service 3 $ -

SolanoExpress Intercity Bus To FAST 4 $ 146,058 $ 979,942 -$ $ 181,450 $ 896,408 $ 213,302 $ 115,126 $ 2,532,287 To SolTrans 4 $ 10,846 $ 131,965 $ - $ 30,871 $ 62,839 $ 917,416 $ 54,762 $ 1,208,700 FAST to replace FTA 5311 5 $ - Subtotal SolanoExpress Intercity Bus $ 156,905 $ 1,111,907 $ - $ 212,321 $ 959,247 $ 1,130,718 $ 169,889 $ 3,740,986

Transit Capital Claimed by each agency 3 $ -

STA Planning Claimed by STA 6 $ 26,672 $ 157,779 $ 12,465 $ 40,489 $ 136,078 $ 201,755 $ 27,398 $ 602,636

C (0) TDA Matrix98 Revised Format Page 1 of 2 Attachment C Tab 0

FY 2019-20 TDA Matrix WORKING DRAFT Date Prepared 12-Apr-19 STA Board Action

Note Vallejo/Benicia Solano # Dixon Fairfield Rio Vista Suisun City Vacaville (SolTrans) County Total Swaps / Other LCTOP swap: Dixon to claim from SolTrans for 7 FY17-18 funding shares $ 26,469 $ 26,469 LCTOP swap: Rio Vista to claim from SolTrans 8 for FY17-18 funding shares $ 12,263 $ 12,263 State of Good Repair swap: Rio Vista to claim 8 from SolTrans for FY17-18 funding shares $ 370 $ 370 LCTOP swap: Vacaville to claim from SolTrans 9 for FY17-18 funding shares $ 134,230 $ 134,230 State of Good Repair swap: Vacaville to claim 9 from SolTrans for FY17-18 funding shares $ 4,419 $ 4,419 Intercity Bus Replacement Plan, Claimed by 10 FAST $ - Intercity Bus Replacement Plan, Claimed by 10 SolTrans $ 237,068 $ 237,068 Suisun City Train Station, claimed by STA 11 $ 50,000 $ 50,000 Faith in Action, claimed by STA 12 $ 40,000 $ 40,000 Subtotal Swaps $ - -$ -$ $ 50,000 $ 237,068 $ 177,751 $ 40,000 $ 504,819

Total To Be Claimed by All Agencies $ 193,577 $ 1,309,686 $ 17,465 $ 302,810 $ 1,402,393 $ 1,595,224 $ 835,481 $ 5,656,635

Balance $ 1,817,948 $ 7,907,455 $ 1,006,901 $ 1,120,646 $ 10,829,172 $ 8,507,820 $ 1,707,455 $ 32,897,398

Notes (1) MTC February 27, 2019 Fund Estimate; Reso 4220; columns I, H, J; FY18-19 Allocation to Rio Vista (including swap with SolTrans) not processed by MTC prior to 1/31/19 (2) STA will be claimant. Amounts subject to change. (3) From each agency's annual TDA claim. (4) Based on FY 2017-18 reconciliation and FY 2019-20 Intercity Transit Funding Agreement forecast (5) From STA letter to Fairfield dated April 23, 2018 (6) Claimed by STA from all agencies per formula; approved by STA Board March 13, 2019 (7) Dixon to claim from SolTrans per March 5, 2018 swap letter (8) Rio Vista to claim from SolTrans per February 9, 2018 swap letter (9) Vacaville to claim from SolTans per March 5, 2018 swap letter (10) From Intercity Bus Replacement Plan approved by STA Board on Feburary 13, 2019. Vacaville amount claimed by SolTrans for repayment of advance. (11) To be claimed by STA for Suisun Amtrak station maintenance (12) To be claimed by STA for Faith in Action

C (0) TDA Matrix99 Revised Format Page 2 of 2 Attachment D SOLANO TRANSPORTATION AUTHORITY SOLANO EXPRESS COST PER HOUR BUDGET vs. ACTUAL HISTORY 12‐Apr‐19 FAST: Rts 20, 30, 40 & 90 FY 2010‐11 FY 2011‐12 FY 2012‐13 FY 2013‐14 FY 2014‐15 FY 2015‐16 FY 2016‐17 FY 2017‐18 FY 2018‐19 FY 2019‐20 Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Total Service Hours 30,803 30,929 29,034 27,196 27,196 27,581 31,338 30,843 31,186 35,650 Gross Cost $ 3,895,727 $4,163,783 $4,161,405 $4,129,315 $4,206,110 $4,256,141 $4,641,753 $ 4,651,754 $ 4,974,501 $ 5,026,650 Gross Cost per Service Hour$ 126.47 $ 134.62 $ 143.33 $ 151.84 $ 154.66 $ 154.31 $ 148.12 $ 150.82 $ 159.51 $ 141.00 Annual Percent Change 6.4% 6.5% 5.9% 1.9% ‐0.2% ‐4.0% 1.8% 5.8% ‐11.6% Actual Actual Actual Actual Actual Actual Actual Actual Q2 Forecast Total Service Hours 30,803 27,868 27,256 27,621 27,581 28,987 31,006 30,748 35,652 Gross Cost $ 4,005,090 $3,886,209 $4,024,533 $4,061,514 $3,950,246 $3,989,633 $4,435,112 $ 4,795,733 $ 5,167,667 Gross Cost per Service Hour$ 130.02 $ 139.45 $ 147.66 $ 147.05 $ 143.22 $ 137.64 $ 143.04 $ 155.97 $ 144.95 Annual Percent Change 7.2% 5.9% ‐0.4% ‐2.6% ‐3.9% 3.9% 9.0% ‐7.1% Budget to Actual Variance 2.8% 3.6% 3.0% ‐3.2% ‐7.4% ‐10.8% ‐3.4% 3.4% ‐9.1%

SolTrans: Rts 78, 80, 82 & 85 FY 2010‐11 FY 2011‐12 FY 2012‐13 FY 2013‐14 FY 2014‐15 FY 2015‐16 FY 2016‐17 FY 2017‐18 FY 2018‐19 FY 2019‐20 Budget (Vallejo) Budget Budget Budget Budget Budget Budget Budget Budget Budget Total Service Hours 42,220 41,377 39,629 41,530 36,827 35,095 39,211 40,550 41,063 45,418 Gross Cost $ 5,281,139 $5,806,015 $4,248,235 $4,583,966 $4,582,149 $4,585,352 $5,321,850 $ 5,924,759 $ 6,125,287 $ 6,355,538 Gross Cost per Service Hour$ 125.09 $ 140.32 $ 107.20 $ 110.38 $ 124.42 $ 130.66 $ 135.72 $ 146.11 $ 149.17 $ 139.93 Annual Percent Change 12.2% ‐23.6% 3.0% 12.7% 5.0% 3.9% 7.7% 2.1% ‐6.2% Actual (Vallejo) Actual Actual Actual Actual Actual Actual Actual Q2 Forecast Total Service Hours 44,349 44,293 37,137 35,056 34,793 37,450 40,427 40,708 41,018 Gross Cost $ 6,324,609 $4,684,172 $3,948,105 $4,136,514 $4,076,346 $4,575,329 $5,215,425 $ 5,924,759 $ 5,925,522 Gross Cost per Service Hour$ 142.61 $ 105.75 $ 106.31 $ 118.00 $ 117.16 $ 122.17 $ 129.01 $ 145.54 $ 144.46 Annual Percent Change ‐25.8% 0.5% 11.0% ‐0.7% 4.3% 5.6% 12.8% ‐0.7% Budget to Actual Variance 14.0% ‐24.6% ‐0.8% 6.9% ‐5.8% ‐6.5% ‐4.9% ‐0.4% ‐3.2%

SOLANO EXPRESS FY 2010‐11 FY 2011‐12 FY 2012‐13 FY 2013‐14 FY 2014‐15 FY 2015‐16 FY 2016‐17 FY 2017‐18 FY 2018‐19 FY 2019‐20 Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Total Service Hours 73,023 72,306 68,663 68,726 64,023 62,676 70,549 71,393 72,249 81,068 Gross Cost $ 9,176,866 $9,969,798 $8,409,640 $8,713,281 $8,788,259 $8,841,493 $9,963,603 $10,576,513 $11,099,788 $11,382,188 Gross Cost per Service Hour$ 125.67 $ 137.88 $ 122.48 $ 126.78 $ 137.27 $ 141.07 $ 141.23 $ 148.14 $ 153.63 $ 140.40 Annual Percent Change 9.7% ‐11.2% 3.5% 8.3% 2.8% 0.1% 4.9% 3.7% ‐8.6% Actual (Vallejo) Actual Actual Actual Actual Actual Actual Actual Q2 Forecast Total Service Hours 75,152 72,161 64,393 62,677 62,374 66,437 71,433 71,456 76,670 Gross Cost $ 10,329,699 $8,570,381 $7,972,638 $8,198,028 $8,026,592 $8,564,962 $9,650,537 $10,720,492 $11,093,189 Gross Cost per Service Hour$ 137.45 $ 118.77 $ 123.81 $ 130.80 $ 128.68 $ 128.92 $ 135.10 $ 150.03 $ 144.69 Annual Percent Change ‐13.6% 4.2% 5.6% ‐1.6% 0.2% 4.8% 11.1% ‐3.6% Budget to Actual Variance 9.4% ‐13.9% 1.1% 3.2% ‐6.3% ‐8.6% ‐4.3% 1.3% ‐5.8% 100 Attachment E SOLANO TRANSPORTATION AUTHORITY SOLANO EXPRESS COST SHARING HISTORY Annual Actual or Budgeted Costs and Subsidies for FY 2009‐10 to FY 2019‐20 (before reconciliation of budget vs. actual plus future budget) 12‐Apr‐19

FY 2009‐10 FY 2010‐11 FY 2011‐12 FY 2012‐13 FY 2013‐14 FY 2014‐15 FY 2015‐16 FY 2016‐17 FY 2017 ‐18 FY 2018‐19 FY 2019‐20 Actual1 Actual2 Actual3 Actual4 Actual5 Actual6 Actual7 Actual8 Actual9 Budget10 Budget11 Cost & Subsidy Gross Cost 8,681,613 9,975,009 8,570,381 7,972,638 8,198,028 8,026,592 8,564,962 9,650,538 10,514,777 11,099,788 11,382,188 Fares 2,973,956 3,305,665 3,453,362 3,641,020 3,768,623 3,698,907 3,803,342 4,042,301 3,947,394 3,984,475 4,013,515 Sec 5307 PM 907,600 346,526 ‐ ‐ Sec 5311 284,786 298,590 186,065 307,300 163,474 140,000 140,000 100,000 ‐ ‐ ‐ ARRA PM 1,153,558 ‐ ‐ RM‐2 1,928,500 1,934,875 1,934,875 1,934,875 1,934,875 1,934,875 2,280,881 2,596,141 2,642,008 2,672,875 2,672,875 STAF/JARC Lifeline 125,000 195,891 185,000 363,537 ‐ 358,200 317,127 70,326 167,843 171,274 Other 155,000 35,446 ‐ 177,211 416,247 100,000 781,612

Subtotal, Net Subsidy 2,185,813 3,367,833 2,453,662 1,904,443 1,967,519 2,252,811 1,982,538 2,417,758 3,438,803 4,174,595 3,742,912

FY 2009‐10 FY 2010‐11 FY 2011‐12 FY 2012‐13 FY 2013‐14 FY 2014‐15 FY 2015‐16 FY 2016‐17 FY 2017‐18 FY 2018‐19 FY 2019‐20 Total Subsidy by Jurisdiction Benicia 118,946 277,063 213,680 142,076 101,006 122,229 166,164 186,069 240,311 329,837 271,527 Dixon 57,204 95,178 63,849 57,917 81,078 91,198 99,103 116,663 140,518 243,421 152,899 Fairfield 611,033 815,919 619,895 651,914 623,261 721,415 545,166 653,888 935,185 868,763 1,030,791 Rio Vista ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Suisun City 183,406 251,886 188,395 211,159 177,491 201,806 167,990 197,281 284,731 242,631 184,071 Vacaville 362,838 532,103 392,550 397,847 457,299 536,501 430,400 511,024 668,674 816,652 917,311 Vallejo 718,485 1,266,575 841,394 304,911 385,202 433,885 423,797 598,995 1,010,923 1,509,724 1,016,423 Balance of County 133,900 129,108 133,900 138,619 142,181 145,777 149,919 153,838 158,462 163,567 169,889 Total 2,185,813 3,367,833 2,453,662 1,904,443 1,967,519 2,252,811 1,982,538 2,417,758 3,438,803 4,174,595 3,742,912 Check Total 00000000000

Notes: 1. Source: FY 09‐10 Reconciliation with 11‐12 Cost Sharing 061011 (2)a.xls 2. Source: 6_FY 10‐11 Reconciliation and 12‐13 Cost Sharing DRAFT_20120511.xls 3. Source: FY 11‐12 Reconciliation and 13‐14 Cost Sharing DRAFT 050513 w TDA Matrix.xls 4. Source: FY 12‐13 Reconciliation and 14‐15 Cost Sharing DRAFT 050714.xls 5. Source: FY 13‐14 Reconciliation and 15‐16 Cost Sharing DRAFT 050715.xls 6. Source: FY 14‐15 Reconciliation and 16‐17 Cost Sharing DRAFT 042816.xls 7. Source: FY 15‐16 Reconciliation and 17‐18 Cost Sharing DRAFT 051717.xls 8. Source: FY 16‐17 Reconciliation and 18‐19 Cost Sharing DRAFT 052118.xls 9. Source: FY 17‐18 Reconciliation and 19‐20 Cost Sharing route ridership with red line expansion DRAFT 040919.xls 10. Source: FY 16‐17 Reconciliation and 18‐19 Cost Sharing DRAFT 052118.xls 11. Source: FY 17‐18 Reconciliation and 19‐20 Cost Sharing route ridership with red line expansion DRAFT 040919.xls

101 Attachment F

SOLANO TRANSPORTATION AUTHORITY SOLANO EXPRESS REVENUE SERVICE HOURS BY ROUTE 12‐Apr‐19 Change Solano Express FY 2013‐14 FY 2014‐15 FY 2015‐16 FY 2016‐17 FY 2017‐18 FY 2018‐19 FY 2019‐20 from FY19 Percent Actual Actual Actual Actual Actual Budget Budget to FY20 Change Rt 20 / Blue Line 3,657 3,645 3,721 3,722 3,694 2,783 Rt 30 / Blue Line 4,283 4,413 4,449 4,471 4,473 9,635 24,748 3,338 16% Rt 40 / Blue Line 5,040 5,115 6,011 7,212 7,069 8,992 Rt 78 / Yellow 7,175 7,449 10,101 11,757 11,930 11,979 12,552 573 5% Rt 80 & 82 18,675 18,147 17,987 19,201 19,477 19,773 28,466 (619) ‐2% Rt 85 9,206 9,197 9,362 9,470 9,301 9,312 Red Line Expansion 4,400 4,400 ‐‐ Rt 90 / GX 14,640 14,409 14,805 15,601 15,512 9,776 10,902 1,126 12% Subtotal FAST 27,621 27,581 28,987 31,006 30,748 31,186 35,650 4,464 14% Subtotal SolTrans 35,056 34,793 37,450 40,427 40,708 41,063 45,418 4,355 11% Total Service Hours 62,677 62,374 66,437 71,433 71,456 72,249 81,068 8,819 12% check ‐ ‐ ‐ ‐ ‐ ‐

102 Agenda Item 8.B April 23, 2019

DATE: April 14, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Daryl Halls, Executive Director Brandon Thomson, Transit Mobility Coordinator RE: Review of SolanoExpress Performance Measures – FY 2019-20 Cost per Hour

Background: In October of 2016, the STA Board adopted SolanoExpress Performance Benchmarks for the current service and planned updated SolanoExpress service. The Performance Benchmarks include 12 specific benchmarks covering the areas of service design, productivity, efficiency, and effectiveness. This staff report is to report on the specific performance benchmark of cost per hour that impacts the current SolanoExpress Service in anticipation of SolanoExpress service Phase 2 revisions that are to be implemented June 30, 2019.

Discussion: In developing the SolanoExpress Service Plan, STA needed to develop an estimate of the amount of service that could be implemented. The amount of service is based on available financial resources against the cost per unit of service. Therefore, the cost per hour of service (“cost per vehicle revenue hour”) becomes an important statistic.

The adopted benchmark of $135 per hour was set in 2016 and STA staff is reviewing this projection based on input provided by the two SolanoExpress service providers, Fairfield and Suisun Transit (FAST) and Solano County Transit (SolTrans). The adoption of the 2016 performance benchmarks included a 2% annual adjustment for inflation. Therefore, the benchmark cost per hour benchmark for FY 2019-20 is $141 per revenue vehicle hour.

The full list of benchmarks is included with this report (Attachment A). The benchmark for cost per revenue vehicle hour will impact the total number of service hours that can be provided within the framework of current operating revenues. This provides the ability to set budgets within available financial resources. Thus, using $141.00 per hour allows planning for approximately 73,000 hours of service within existing identified resources for SolanoExpress. Increases in cost per hour reduces the number of service hours available to SolanoExpress and with the passage of Regional Measure 3 (RM3), STA would like to add additional hours of service rather than simply maintaining the existing service level at a cost per hour higher than the STA Board approval performance benchmarks. This is also the intent of the RM3 operating funds.

Fiscal Impact: There is no immediate financial impact to STA. The performance benchmarks create a framework for projecting SolanoExpress service levels. The STA does program STAF population based funds to SolanoExpress capital, markeing and operating. The adjustment in cost per revenue vehicle hour will impact the total number of service hours that can be provided

103 within the framework of current operating revenues and the potential operating subsidy to be provided by each transit operator.

Recommendation: Informational.

Attachments: A. FY 2019-20 SolanoExpress Performance Benchmarks

104 Attachment A

FY 2019-20 SolanoExpress Performance Benchmarks Time Period 2016 FY 2019-20 Description Benchmarks -Adopted Benchmarks - Proposed Service Design Speed - MPH 35 35 Productivity Passengers per vehicle revenue hour 25.0 25.0 Passengers per trip 15.0 15.0 Passengers per vehicle revenue mile 1.0 0.4 Peak corridor demand 85.0% 85.0% Capacity Utilization 35.0% 35.0% Efficiency Cost per revenue vehicle hour $ 135.00 $ 141.00 Cost/RVM $ 5.00 $ 3.87 Cost/Rev Seat Mile $ 0.100 $ 0.079 Effectiveness Subsidy per trip $ 3.50 $ 3.71 Revenue per revenue seat mile $ 0.040 $ 0.040 Farebox recovery ratio 50% 50%

105 This page intentionally left blank.

106 2017 STA Regional Transportation Plan Priority Project Submittal

Project Title Requested Regional Funds Committed Total Cost In Current RTP (MTC calculated Year of Funds (Thousands of Expenditure) (Thousands of dollars) (Thousands of dollars) dollars) I-80/I-680/SR-12 Interchange, Construction Package 1 0 578,000 578,000 Yes (under construction) Express Lane System Conversion/Expansion Regionally funded -- -- Yes

I-80/I-680/SR-12 Interchange, Construction Package 2- 375,620 220,000 595,620 No and Studies Projects Major 7 Westbound Truck Scales 210,000 0 210,000 No Jepson Parkway 85,000 144,000 229,000 Yes Fairgrounds Access Improvements, including Redwood 3,000 93,000 96,000 Yes Drive MLIP Implementation 183,000 No I-80 Auxiliary Lanes in Fairfield 57,000 0 57,000 Yes Fairfield/Vacaville Intermodal Station (AHSC grant 12,100 0 12,100 Yes application facilities) Vallejo Station Parking Structure Phase B 30,000 0 30,000 Yes SR 37 Sea Level Rise and Congestion Mitigation Pilot 1,500 800,000 810,000 *** No Program Expand Bicycle and Pedestrian Facilities 6,000 0 * 6,000 ** Yes Enhance and Rehabilitate Bicycle and Pedestrian 2,000 0 * 2,000 ** Yes Facilities Lifeline Transit Services 75,000 0 * 75,000 ** Yes Categories Programmatic Senior and Persons with Disabilities Transit (non- 38,000 0 * 38,000 ** Yes Lifeline) Parkway Blvd Overcrossing 10,000 0 * 10,000 ** No Maintain State Highways in Solano County 29,000 0 * 29,000 ** Yes Implement Safety Projects on State Highways 2,000 0 * 2,000 ** Yes Enhance State Highways (soundwalls, landscaping, 1,000 0 * 1,000 ** Yes SOHIP)

Rehabilitate Local Bridges 1,000 0 * 1,000 ** Yes Implement local climate change programs/projects 4,000 0 * 4,000 ** Yes Implement local rideshare and vanpool measures 19,000 0 * 19,000 ** Yes Implement Solano SR2S 15,000 0 * 15,000 ** Yes

107 Project Title Requested Regional Funds Committed Total Cost In Current RTP (MTC calculated Year of Funds (Thousands of Expenditure) (Thousands of dollars) (Thousands of dollars) dollars) Local and CMA Planning, including PDA and PCA 12,900 500 13,400 Yes Planning Implement SR 12 Corridor Study 58,000 0 900,000 No Implement SR 113 Corridor Study 58,000 0 325,000 No Widen Railroad Avenue, SR 37 to G Street Locally funded -- 5,000 Yes Local Projects American Canyon Road Overcrossing Locally funded -- 12,000 Yes Improve I-505/Vaca Valley Parkway Locally funded -- 2,000 Yes Widen and Improve Peterson Road Locally funded -- 2,000 Yes

Lagoon Valley Road Interchange Locally funded -- 10,000 Yes Local Streets and Roads O&M 576,000 1,165,000 ** Yes Mare Island Straight Dredging No TOTAL 1,864,120 1,846,500 3,309,120

* Does not include current program operations; only those from 2017 through 2040. Project or program may be eligible for OBAG or other fund sources that have not yet been committed.

** Project costs based upon current Plan Bay Area Final Project List.

*** Four CMAs will contribute a total of $10 million for initial project design funds.

108 Agenda Item 8.C April 23, 2019

DATE: April 12, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Brandon Thomson, Transit Mobility Coordinator RE: SolanoExpress Intercity Fiscal Year (FY) 2019-20 Mid-Year Report

Background: Prior to 2005, the funding for Solano County’s intercity routes, collectively called Solano Express, was shared among local jurisdictions through various verbal understandings and informal and year to year funding agreements. In Fiscal Year (FY) 2005-06, at the request of Vallejo Transit and Fairfield and Suisun Transit (FAST), the STA developed with the transit operators a countywide cost-sharing method that would provide funding stability for the operators of the intercity services and an equitable and predictable cost sharing formula for the funding partners. A working group was formed, the Intercity Transit Funding Working Group (ITFWG), and was comprised of representatives from STA, Solano County, and each participating city in Solano County. The first countywide Intercity Transit Funding Agreement was established for FY 2006-07. Key components of the agreement are the Intercity Cost Sharing Formula, primarily based upon two factors: ridership by residence and population. This shared funding is for the cost of these routes after farebox and other non-local revenue are taken into account. Another key element of the agreement is that these routes be regularly monitored so that all the funding partners are aware of these routes’ performances. This data helps guide future funding, service planning and marketing decisions. In the Intercity Funding Agreement, it states that transit operators shall report at least quarterly to the ITFWG the following information by intercity route: • Budget vs. actual cost for the quarter • Budget vs. actual fares for the quarter • Ridership • Service hours Discussion: Solano County Transit (SolTrans) and FAST have submitted their FY 2018-19 2nd Quarter Reports for the working group's review (Attachment A). The report shows where the SolanoExpress Intercity routes are compared to the estimated numbers in the Cost Allocation Model (CAM). Fifty percent (50%) would indicate that the estimate is meeting the actual projections. A summary of the 1st and 2nd Quarter report is presented below.

1st and 2nd SolTrans FAST Quarter Cost 50.7% 44.8% Fares 50.2% 45.4% Ridership 56.6% 53.3% Service hours 49.9% 56.6%

109 Recommendation: Informational.

Attachment: A. SolTrans and FAST Intercity Quarterly Report

110 SOLANOEXPRESS INTERCITY TRANSIT SERVICE QUARTERLY MONITORING REPORT

FY 2018-19 Budget vs Estimated or Actual Cost

First Quarter Ending Second Quarter Ending Dec. FY 18-19 Sept. 30 31 TOTAL Annual SolanoExpress Budget Estimate or % of Route Expenses Actual % of Budget Estimate % of Budget Actual Budget FAST Blue $ 3,178,364 $ 763,972 24.0% $ 770,913 24.3% $ 1,534,886 48.3% FAST GreenExpress $ 1,805,619 $ 345,865 19.2% $ 350,169 19.4% $ 696,034 38.5% Subtotal, FAST $ 4,983,983 $ 1,109,837 22.3% $ 1,121,082 22.5% $ 2,230,920 44.8%

SolTrans Yellow $ 1,832,105 $ 475,236 25.9% $ 464,761 25.4% $ 939,997 51.3% SolTrans Rt 80 $ 3,044,718 $ 735,711 24.2% $ 723,146 23.8% $ 1,458,857 47.9% SolTrans Rt 82 $ 104,885 $ 13,206 12.6% $ 14,183 13.5% $ 27,389 26.1% SolTrans Rt 85 $ 1,143,579 $ 343,009 30.0% $ 334,675 29.3% $ 677,684 59.3% Subtotal, SolTrans $ 6,125,287 $ 1,567,162 25.6% $ 1,536,765 25.1% $ 3,103,927 50.7% Total $ 11,109,270

Report Completed By: Brandon Thomson .

111 SOLANOEXPRESS INTERCITY TRANSIT SERVICE QUARTERLY MONITORING REPORT

FY 2018-19 Budget vs Estimated or Actual Cost

First Quarter Ending Second Quarter Ending FY 18-19 Sept. 30 Dec. 31 TOTAL Annual Budget % of Estimate or % of Intercity Route Fares Actual Budget Estimate % of Budget Actual Budget FAST Blue $ 418,791 $ 117,782 28.1% 120,110 29% $ 237,892 56.8% FAST GreenExpress $ 1,152,259 $ 253,175 22.0% 222,093 19% $ 475,268 41.2% Subtotal, FAST $ 1,571,050 $ 370,957 23.6% $ 342,203 21.8% $ 713,160 45.4%

SolTrans Yellow $ 435,760 $ 113,934 26.1% $ 112,141 25.7% $ 226,075 51.9% SolTrans Rt 80 $ 1,991,983 $ 519,574 26.1% $ 502,364 25.2% $ 1,021,938 51.3% SolTrans Rt 82 $ 29,126 $ 4,212 14.5% $ 2,995 10.3% $ 7,207 24.7% SolTrans Rt 85 $ 231,557 $ 69,853 30.2% $ 73,266 31.6% $ 143,119 61.8% Subtotal, SolTrans $ 2,688,426 $ 707,573 26.3% $ 690,766 25.7% $ 1,398,339 52.0%

. .

112 SOLANOEXPRESS INTERCITY TRANSIT SERVICE QUARTERLY MONITORING REPORT

FY 2018-19 Budget vs Estimated or Actual Cost

First Quarter Ending Second Quarter Ending FY 18-19 Sept. 30 Dec. 31 TOTAL Annual Budget % of % of Estimate or % of Intercity Route Ridership Actual Budget Estimate Budget Actual Budget FAST Blue 118,920 35,632 30.0% 36,432 30.6% 72,064 60.6% FAST GreenExpress 217,216 56,277 25.9% 50,900 23.4% 107,177 49.3% Subtotal, FAST 336,136 91,909 27.3% 87,332 26.0% 179,241 53.3%

SolTransYellow 95,729 28,360 29.6% 28,756 30.0% 57,116 59.7% SolTrans Rt 80 488,600 132,726 27.2% 133,463 27.3% 266,189 54.5% SolTrans Rt 82 4,413 1,102 25.0% 1,045 23.7% 2,147 48.7% SolTrans Rt 85 69,491 22,167 31.9% 25,168 36.2% 47,335 68.1% Subtotal, SolTrans 658,233 184,355 28.0% 188,432 28.6% 372,787 56.6%

Report Completed By: Diane Feinstein

113 SOLANOEXPRESS INTERCITY TRANSIT SERVICE QUARTERLY MONITORING REPORT

FY 2018-19 Budget vs Estimated or Actual Cost

First Quarter Ending Second Quarter Ending FY 18-19 Sept. 30 Dec. 31 TOTAL Budget Revenue % of Estimate or % of Intercity Route Hours Actual Budget Estimate % of Budget Actual Budget FAST Blue 21,567 6,126 28.4% 6,249 29.0% 12,375 57.4% FAST GreenExpress 9,855 2,690 27.3% 2,761 28.0% 5,451 55.3% Subtotal, FAST 31,422 8,816 28.1% 9,010 28.7% 17,826 56.7%

SolTrans Yellow 11,979 3,171 26.5% 3,105 25.9% 6,276 52.4% SolTrans Rt 80 18,941 4,739 25.0% 4,626 24.4% 9,365 49.4% SolTrans Rt 82 832 138 16.6% 137 16.5% 275 33.1% SolTrans Rt 85 9,312 2,312 24.8% 2,281 24.5% 4,593 49.3% Subtotal, SolTrans 41,064 10,360 25.2% 10,149 24.7% 20,509 49.9%

.

114 Cost Fares Ridership Revenue Hours Farebox % of Estimate or Estimate or % of Estimate % of Recovery Intercity Route Estimate or Actual Budget Actual % of Budget Actual Budget or Actual Budget Ratio

FAST Blue $ 1,534,886 48.3% $ 237,892 15.5% 72,064 60.6% 12,375 57.4% 15% FAST Green $ 696,034 38.5% $ 475,268 68.3% 107,177 49.3% 5,451 55.3% 68% $ - $ - 0 0 Subtotal, FAST $ 2,230,920 $ 713,160 179,241 17,826 32% $ - $ - 0 0 $ - $ - 0 0 SolTrans Yellow $ 939,997 $ 226,075 57,116 6,276 24% SolTrans Rt 80 $ 1,458,857 $ 1,021,938 266,189 9,365 70% SolTrans RT 82 $ 27,389 $ 7,207 2,147 275 26% SolTrans Rt 85 $ 677,684 $ 143,119 47,335 4,593 21% Subtotal, SolTrans $ 3,103,927 $ 1,398,339 372,787 20,509 45% Total SolanoExpress $ 5,334,847 $ 2,111,499 552,028 38,335 40%

115 This page intentionally left blank.

116 Agenda Item 8.D April 23, 2019

DATE: April 10, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Lloyd Nadal, Program Services Division Manager RE: Solano Community College (SCC) Student Transportation Fee Update

Background: During the Fall 2016 Semester, Solano Community College (SCC) students elected a measure by a simple majority to pay a transportation fee each semester for the purpose of providing reduced transit fares for students for the semesters from Spring 2017 through Fall 2019. The fee structure works as follows:

Full Time Students: taking 12+ units pay $10 per semester = $20.00 per year PT Students: taking 6.5 - 11.5 units pay $8.00 per semester = $16.00 per year PT Students: taking 3.5 - 6 units pay $4.00 per semester = $8.00 per year PT Students: taking 0.5 - 3 units pay $1.50 per semester = $3.00 per year

The Solano Community College Student Transportation Fee 2-Year Pilot Program launched in Spring 2017 offering a 50% reduced fee on usage among the individual Transit Operators. Despite the reduced fare cost, the 2017 Spring and Fall Semester had low usage amongst students. Based on these concerns, STA met with SCC and the three participating Transit Operators (FAST, SolTrans and Vacaville City Coach) to explore alternative methods to increase ridership among SCC students. In 2018, the Transit Operators agreed to provide unlimited rides at no additional cost to SCC student users who pay the transportation fee in their registration. Students would just need to show their current semester ID card (with updated sticker) upon boarding the bus. In return, and based on a separate agreement, STA and the Transit Operators would receive the calculated share of the transportation fee generated by the SCC fee. Based on initial feedback, this new student fee program has been a huge success among the SCC administration, Board of Trustees and students. With the SCC Transportation Fee set to expire at the end of the 2019 fall semester, SCC administration reached out to STA in hopes of continuing the program pending the SCC students vote to retain the SCC Student Transportation Fee.

Discussion: According to the agreement between STA and SCC, the terms are ongoing and may be extended upon written approval from SCC continuing the following year and beyond. As mentioned, the SCC Student Transportation Fee is expiring at the end of 2019 and STA Staff is currently working with the SCC Student Council to amend the agreement and continue an extension of the student fee program (i.e. students who pay the fee, ride for free). Also in meeting with SCC and the students, some recommended changes were discussed which could include the following: 1) Simplifying the fee structure to $1/per unit each semester; 2) Increasing from a 2-year to a 10-year agreement (with an option to opt-out at any time if the program is not successful).

117 Ultimately, SCC will decide on the final language which will be included on the ballot (along with other voting items) the week of May 6-10, 2019.

If successful, STA and the three transit operators will continue to receive the SCC fee revenue to provide SolanoExpress and local transit service to the three SCC campuses and to promote the student fee program to encourage more students to take transit.

Fiscal Impact: In 2018, STA received $160,105 in student transportation fee revenue from SCC which was distributed to the three Transit Operators based on an agreed upon percentage: FAST received 43%, SolTrans received 43% and Vacaville City Coach received 15%. STA’s disbursement to FAST = $53,378; SolTrans = $53,378 and Vacaville (City Coach) = $24,016.

In March 2019, STA also received SCC fee revenues of $21,676 and $65,673 for a total of $87,349 which was distributed to the Transit Operators using the same formula. SCC Administration indicated that there may be another check for SCC student fee revenue before the end of the semester and estimates approximately $100,000/per year moving forward.

Recommendation: Informational.

118 Agenda Item 8.E April 23, 2019

DATE: April 15, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Katelyn Costa, Program Coordinator RE: Employer Program Update

Background: Since 1990, Solano Mobility has worked to support the transportion needs and services of all Solano County residents, employers, older adults, and people with disabilities. The Solano Mobility Employer Program of the Solano Tranportation Authority serves to connect commuters to existing benefits by way of their company. Solano Mobility administers all commuter benefits programs directly to employees in the county. Staff connects with businesses as platforms to advertise these commuter benefits. Businesses also work with staff to implement transit and active transportation events in order to increase awareness of available transportation options in the county.

In recent years, local transit ridership has been gradually falling while regional transit ridership is on the rise. Carpool and vanpool rates have also been decreasing as more people opt to use app based on-demand rideshare. The Solano Mobility’s approach is moving to accommodate changes in commuter trends and continue to find Solano residents and employees the right ride for them.

Starting in FY 2018-19, Solano Mobility has reorganized its implementation strategy to expand collaboration, efficiency, accessibility, and ease into commuting, especially via non-drive alone modes. This will be accomplished by running full-package promotions to encourage transit use and to get Solano residents to take advantage of options other than solo driving. Staff is strengthening existing commuter programs to enhance simplicity and tailor offerings to company and jurisdiction need through employer consultations. The ultimate goal is to continue to expand transit and active transportation options.

Solano County has consistently led the Bay Area and Northern California mega region in carpool and vanpool use. Yet, when alternative modes are looked at in the aggregate, Solano County ranks 9th in the Bay Area for use of non-drive alone modes. A long term goal for the program is to expand the regional public transportation use average on ferry, rail and express bus, in addition to carpool and vanpool.

Discussion: Employer Program Improvements - Collaborative Focus STA’s Solano Mobility Program meets employers and employees where they are at in their commuting experiences, whether it be considering switching from single occupancy vehicles to carpooling or buses to bikes, and helping them facilitate that transition. The Program is in the process of developing an online Employer Toolkit, packed with information and resources to help employers consider, create, and carry out their own commuter 119 benefits programs with Solano Mobility partnership. By embedding these programs into the offerings of companies, Solano Mobility staff intends to expand awareness of the various alternative modes into the fabric of the business community in Solano County.

Over the past 5 months, Solano Mobility Program staff completed 51 unique engagements on the Commuterinfo.net site, contacted 52 different businesses, set-up 13 meetings and met with the following 13 employers: • Altec • Back 2 Work • Benicia Public Library • Cal Maritime • Downtown Vacaville • Kaiser (Vallejo, VV, and FF) • Mar- Bay Garden • Paradise Valley Estates • Savage and Cooke • Touro University • Travis AFB • Travis Credit Union • Wiseman (8 Solano County buildings)

Also during this time period, the Solano Mobility Program had 7 employees sign up for Emergency Ride Home (ERH) with 4 trips taken this year; 10 people receive Bucks for Bikes (B4B) incentives and 3 new Vanpools were formed.

Ride Amigos Online Platform One of the goals of the Solano Mobility Employer Program is to make the Program more efficient, accessible and easier to use for Solano County commuters, employers and employees. In July 2018, STA contracted with Ride Amigos, an online platform which will have all of the STA’s various programs (i.e. Emergency Ride Home, Bucks for Bikes, Vanpools, etc) in one place where an employer can choose from a menu of options with a simple sign-up interface. On January 7th, 2019 Ride Amigos took over the Commuter Info URL and was discoverable on the internet. The platform was announced to previous users on January 31st, 2019. From the 511 database, over 3,282 users were migrated and there are 51 current users of Ride Amigos. The Solano Mobility Program staff plan to do a larger marketing effort to grow the offerings of the platform and enhance user accessibility.

Solano Commute Challenge With the integration and transition to the new Ride Amigos platform, staff anticipated seeing a drop off migrating users from 511. There are currently 28 participants and 6 companies. Through the new Ride Amigos platform, staff is in the process of creating a more robust award system which we plan to launch in May 2019. The goal is to engage at least 100 commuters and their companies in participating in the yearly challenge.

First/Last Mile Program Solano Mobility recently launched 80% subsidized First and Last Mile Lyft rides to and from 12 Transit Centers (Amtrak stations and SolanoExpress fixed stops) across the County with the goal of connecting riders first of last mile to take public transit. The intent is also not to compete with local transit service so STA staff is working with SolTrans and the other transit agencies to ensure that the connections are integrated and not competing. Currently, 44 participants have used the discounted codes which has doubled in the last 6 months. 120 Amtrak + Lyft Pilot The first full-package promotion Solano Mobility has developed is a subsidized Amtrak and free Lyft rideshare. For $20 a person, up to 50 participants will be given a 10 ride Amtrak pass, plus 10 free First Last Mile Lyft rides to connect the train station and worksite. The goal is to use this pilot as a case study and analyze motives for increasing participation. Participants will be requested to complete surveys with the potential of renewing this pilot. By incentivizing people to try transit in the short term, there is a greater likelihood they pick up using alternative modes on their own in the long term. The first round of participants began on March 1st and currently have 13 signed up for the promotion.

Budget: The Solano Mobility Employer Program is funded using Congestion Mitigation and Air Quality (CMAQ) program funds, Transportation Fund for Clean Air (TFCA) funds through the Bay Area Air Quality Management District (BAAQMD) and Clean Air Funds through the Yolo Solano Air Quality Management District (YSAQMD).

Recommendation: Informational.

121 This page intentionally left blank.

122 Agenda Item 8.F April 23, 2019

DATE : April 15, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Amy Antunano, Program Coordinator II RE: Solano Mobility Program Update

Background: The Solano Mobility Program of the Solano Transportation Authority (STA) began as part of a statewide network of rideshare programs funded primarily by Caltrans for the purpose of managing countywide and regional rideshare programs in Solano county and providing air quality improvements through trip reduction. The main focus of the program is to encourage the use of non-drive alone travel modes to maximize roadway efficiencies, improve air quality, present mobility options and help address climate change goals.

In February 2014, the STA expanded their services to include the Solano Mobility Call Center. This was one of four Solano Mobility priorities identified in the Solano Transportation Study for Seniors and People with Disabilities completed in 2011. In addition to providing commuters and Solano county employers with information on a variety of transit services and incentive programs, the Mobility Call Center provides seniors and people with disabilities with a range of various mobility information.

Discussion: Mobility Programs Since 2014, STA has developed several strategies to further develop the travel training program. In addition to one-on-one travel training, STA added group training and Solano Mobility public presentations to the contracts with Independent Living Resources and Connections for Life. STA is actively marketing the program with advertisement ads, brochures, Facebook posts, providing a table of information at events, and making presentations. For the Fiscal Year (FY) 2018-19 as of March 2019, there have been 75 travel training referrals, 32 completed trainings, and 5 field trips.

On September 14, 2017, STA contracted with Nelson Nygaard Consulting Associates, Inc. to complete an in-depth analysis of the effectiveness of the American with Disabilities Act (ADA) current eligibility program. In February 2018, STA staff received their evaluation of the program. The analysis reported positive aspects of the program as well as areas for improvement. Between July 1st and December 31st 2018, CARE Evaluators scheduled 804 evaluations. Out of the 804 scheduled, 533 evaluations were completed, 150 applicants cancelled and 121 were no-shows. The cancellations and no-shows present a 34% incompletion rate.

Employer Program In an effort to package all of STA’s mobility programs and services, the new Employer Program was rolled out in October 2017. The goal is to re-connect with the employers and ensure that they are aware of all of the programs and services available to them and their employees. Currently, the Solano

123

Mobility Program Coordinators have consulted with 40 employers. Additionally, 28 employers have registered for the program. The goal is to have 50 registered employers by the end of 2019.

Solano Mobility Call Center For the FY 2018-19, as of March 2019, the Solano Mobility program staff assisted 8,611 customers. This is a 70% increase from last fiscal year. The Solano Mobility staff processed 108 Regional Transit Connection (RTC) applications, and processed 142 Clipper cards. In October 2018 the Solano Mobility Call Center implemented phase II of the intercity taxi card program. Vallejo and Benicia were the first cities to adopt the program followed by Dixon and Rio Vista in January 2019. In April 2019, the program will roll out to the Fairfield-Suisun area (Attachment B).

Fiscal Impact. None

Recommendation: Informational.

Attachment: A. FY 2018-19 Solano Mobility Program Summary

124

ATTACHMENT A

July 2016- July 2017- July 2018- Category March 2017 March 2018 March 2019 Employer program Commuter incentives calls 85 83 93 Emergency Ride Home sign ups 8 8 7 Bucks for Bikes Incentives 14 20 10 Vanpool Sign ups 0 4 2 Businesses contacted 24 10 40 Amtrak/Lyft Pilot program 0 0 10 First/ Last Mile sign ups 13 27 44 Call Center General transit calls 418 418 1451 Trip Planning 259 271 1807 Clipper Card sales 99 187 142 Regional Transit Discount Card 108 111 109 (RTC) Bikelink cards sold 0 5 8 Taxi Scrip Local calls 113 106 273 Website hits 8148 12650 15716 Total Walk ins 3578 4082 3011 Pex Card transactions 0 0 151 Mobility programs Taxi Scrip Intercity calls 374 138 402 Travel Training Referral 21 74 75 Travel Trainings completed 14 19 33 Travel Training field trips 7 13 15 ADA Questions 400 453 964 ADA Completed 1227* 1244* 533

* Numbers for Fiscal year July-June Activities

Mobility Call Center Activities

125 This page intentionally left blank.

126 Agenda Item 8.G April 23, 2019

DATE: April 15, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Ron Grassi, Director of Programs RE: Metropolitan Transportation Commission (MTC) Plan Bay Area 2050 – Transit Needs Assessment

Background: Metropolitan Transportation Commission (MTC) is in the process of updating the regions long range plan, Plan Bay Area 2050. The Plan Bay Area 2050 will outline how the Bay Area can meet its transportation needs through 2050 while preserving the character of its diverse communities and adapting to future population growth.

Plan Bay Area 2050 is a state-mandated, integrated long-range transportation and land use plan. As required by Senate Bill 375, all metropolitan regions in California must complete a Sustainable Communities Strategy (SCS) as part of a Regional Transportation Plan. In the Bay Area, MTC and ABAG are jointly responsible for developing and adopting a SCS that integrates transportation, land use and housing to meet greenhouse gas reduction targets set by the California Air Resources Board. The region adopted its previous plan, Plan Bay Area 2040 in July 2017. Plan Bay Area 2040 updated the planning assumptions and incorporate key economic, demographic, and financial trends from the original Plan Bay Area (adopted in 2013).

The Plan Bay Area 2050 document will include planning for the long term transit needs for the region. MTC is asking transit operators to project service levels, operating costs and revenues for use in establishing transit operating needs for the Plan Bay Area 2050.

Discussion: On March 28, 2019 MTC released the Plan Bay Area 2050 Transit Operating Needs Assessment workbook (Attachment A) to begin the Transit Needs Assessment process. The goal is to have the data collected from the transit operators by June 14, 2019 for analysis during the summer with the full assessment completed by September 2019.

MTC’s Transit Needs Assessment process will focus on transit operating costs, revenues, and maintenance levels. MTC will estimate the funding required to operate and maintain existing transit services over the 31 year plan period based on input received from transit operators as part of the needs assessment process. On the cost side, the analysis has two components: operating and maintenance costs, and capital replacement and rehabilitation costs. The estimate of needs includes the cost to maintain transit capital assets at their current levels as well as maintain existing service levels for public transit. On the revenue side, the analysis includes revenues that are committed to transit operating or capital costs by law or MTC or transit agency policy, and discretionary funds that are allocated to transit operating or capital needs by MTC or Congestion Management Agencies (CMAs), now called County Transportation Agencies (CTA). William Bacon from MTC has been invited to summarize the assessment at the Consortium meeting.

127 Fiscal Impact: No immediate fiscal impact at this time; however, it may impact future funding.

Recommendation: Informational.

Attachment: A. Transit Operating and Maintenance Needs Assessment for Plan Bay Area 2050

128 METROPOLITAN TRANSPORTATION COMMISSION

TRANSIT OPERATING AND MAINTENANCE NEEDS ASSESSMENT FOR PLAN BAY AREA 2050

Purpose MTC is asking transit operators to project service levels, operating costs and revenues for use in establishing transit operating needs for the Plan Bay Area 2050.

General Notes 1. Attached for your use in developing the projections are the following worksheets: Service Levels, Costs-Existing, Costs-Planned, Revenues, and Summary. The first four worksheets require your input. The Summary worksheet is for information purposes only.

2. Projections are needed for the period covering FY 2019-20 through FY 2049-50. Please ensure that the projections are consistent with board approved policies, adopted budget forecasts and/or most recent Short-Range Transit Plans (SRTP).

3. Projections should be provided in year-of-expenditure dollars. The formulae provided for each year refer to inflation factors that are consistent for a given period. If you need to override the formulae, please note that you have done so.

4. Please direct questions on the spreadsheet and the transmittal to William Bacon at 415.778.6628 or [email protected]. 5. Due date: Friday, June 14, 2019. Please submit completed Needs Assessments to [email protected]. 6. Please feel free to add rows as needed, but do not delete any unnecessary rows in the worksheets.

Notes and Instructions for Service Levels Worksheet 1. The worksheet is divided into two sections: existing service levels and planned changes (additions and/or subtractions) in service levels. All data should be entered in revenue vehicle hours. In the Planned section, include only projects that are under construction or are fully funded and have a certified environmental document (EIR/EIS). 2. Planned changes are categorized first by mode and then by project. Enter a descriptive name for each project. If a project affects more than one mode, list the project under all of the affected modes and enter data as appropriate for each mode. Example: for a new light rail expansion that will add light rail service and reduce bus service, list the project under the Light Rail category with positive revenue vehicle hours and again under the Motor Bus category with negative revenue vehicle hours.

Notes and Instructions for Costs-Existing Worksheet 1. Use this worksheet to provide detailed operating and non-operating costs for existing service levels only. 2. The worksheet is divided into two sections: operating expenses by mode and system-wide non-operating expenses. In the Operating Expenses section, under each mode, provide detailed costs either by functional class, or by object class, or by other similar categories. Other costs should include, but not be limited to, those funded with excess operating revenue, contributions to reserves, etc.

3. For the Plan Bay Area 2050 financial projections MTC is tentatively assuming an annual inflation rate of 3.0% per year. Inflation assumptions for service costs may differ from the 3.0% and may be entered for each cost category, and for the period from FY 2021-30 and the period from FY 2031-50. The spreadsheet will automatically calculate the projections upon input of data for a particular start year and inflation assumptions. If you wish to use different inflation factors within a given period, please explain your assumptions in the Notes section of the spreadsheet.

Notes and Instructions for Costs-Planned Worksheet 1. Use this worksheet to provide the requested detail on operating costs by mode and by project for planned changes to existing service levels only. Please do not include any costs associated with service expansions to address crowding. Service expansions beyond those associated with committed projects should be submitted through the concurrent Plan Bay Area 2050 | Request For Regionally-Significant Projects. 2. Provide detailed costs either by functional class or by other similar categories. Other costs should include, but not be limited to, those funded with excess operating revenue, contributions to reserves, etc. 3. For the Plan Bay Area 2050 financial projections MTC is tentatively assuming an annual inflation rate of 3.0% per year. Inflation assumptions for service costs may differ from the 3.0% and may be entered for each cost category, and for the period from FY 2021-30 and the period from FY 2031-50. The spreadsheet will automatically calculate the projections upon input of data for a particular start year and inflation assumptions. If you wish to use different inflation factors within a given period, please explain your assumptions in the Notes section of the spreadsheet.

4. For agencies currently submitting documents as part of the federal Section 5309 Fixed-Guideway Capital Investment Grant program (e.g. CIG or New Starts/Small Starts/Core Capacity) costs should be consistent with most recent submittal to the Federal Transit Administration.

Notes and Instructions for Revenues Worksheet 1. The worksheet is divided into two major sections: revenues for existing service levels, and the other for planned changes associated with committed projects. 2. Include all revenue sources as reflected in your agency budget for FY 2018, FY 2019, and FY 2020.

For the period of FY 2021-2050 please reflect all locally-controlled fund sources consistent with your agency's assumptions/financial plans.

For fund sources reflected in MTC's Short Range Transit Plan Revenue Forecast (https://mtc.ca.gov/sites/default/files/SRTP_Revenue_Forecast.pdf) please use the SRTP forecast amount for FY 2020-21 (year 3) and apply a 3.0% inflation rate for the period from FY 2021-30 and FY 2031-50. This 3.0% inflation rate will be updated for each fund source as detailed revenue forecasts for Plan Bay Area 2050 are developed later in 2019.

Funding from Regional Measure 3 should not be included due to pending litigation.

3. Fare revenue should be provided by mode, and all other revenues should be provided on a system-wide basis under the Existing Service Level section and on a per project-basis under the Planned Changes section. Non-Fare Revenue includes funds from schools for the provision of service exclusively to carry students to and from school, freight charges on passenger runs, and income derived from operations associated with transit (including station and vehicle concessions from vendors, on-board and in-station advertising and automotive vehicle ferriage). Other revenue includes revenue from charter service, city or county general funds, subsidies from other sectors of operation, and other federal, state, and local non-operator sources, and other operator sources. List each item separately for Non-Fare and Other Revenue categories.

4. For the Plan Bay Area 2050 financial projections MTC is tentatively assuming an annual inflation rate of 3.0% per year. Inflation assumptions for revenues may differ from the 3.0% and may be entered for each cost category, and for the period from FY 2021-30 and the period from FY 2031-50. The spreadsheet will automatically calculate the projections upon input of data for a particular start year and inflation assumptions. If you wish to use different inflation factors within a given period, please explain your assumptions in the Notes section of the spreadsheet.

Inflation assumptions for MTC managed and programmed fund sources as reflected in the Short Range Transit Plan Revenue Forecast will be updated later in 2019 as described above in #2.

T:\==STA COMMITTEES\Staff Based Advisory Committees\==Consortium Packet\2019\04 - Apr. 23, 2019\02 - Staff Reports\[PBA 2050_Transit Operating Needs Assessment Workbook.xlsx]Instructions

129 This page intentionally left blank.

130 Agenda Item 8.H April 23, 2019

DATE: April 12, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Vincent Ma, Marketing and Legislative Program Manager RE: STA Legislative Update

Background: Each year, STA staff monitors state and federal legislation that pertains to transportation and related issues. On February 13, 2019, the STA Board approved its 2019 Legislative Platform to provide policy guidance on transportation legislation and the STA’s legislative activities during 2019.

Monthly legislative updates are provided by STA’s State and Federal lobbyists and are attached for your information (Attachments A and B). An updated Legislative Bill Matrix listing state bills of interest is available at: https://sta.ca.gov/operations/legislative-program/current/

Discussion: The State Legislature is currently on recess and will reconvene on April 22nd. Policy committees will continue to hold hearings to amend legislation and decide whether or not to pass them to the floor. The following bills that staff is monitoring have passed their first committee and are scheduled to be heard by the second committees before being passed to the Floor. These bills include:

• Senate Bill (SB) 4 Housing – Passed Senate Committee on Housing; currently in Senate Committee on Governance and Finance • SB 5 Affordable Housing and Community Development Investment Program- Passed Senate Committee on Housing; currently in Senate Committee on Appropriations • SB 50 Planning and zoning: housing development: incentives - Passed Senate Committee on Housing; currently in Senate Committee on Governance and Finance • Assembly Bill (AB) 847 Transportation finance: priorities: housing – Passed Assembly Committee on Rule; currently in Assembly Committee on Housing and Community Development • AB 1487 Land use: housing element – Passed Assembly Committee on Housing and Community Development; currently in the House Committee on Local Government

The following bills are still in their first committee:

• AB 148 Regional transportation plans: sustainable communities strategies– Currently in Assembly Committee of Transportation • AB 185 California Transportation Commission: transportation policies: joint meetings - Currently in Assembly Committee of Transportation

131 The Metropolitan Transportation Commission (MTC) has sponsored SB(SB) 152 Active Transportation Program Reform Act. This bill is authored by Senator Jim Beall (D-San Jose), and would transfer the responsibility of administering bicycle and pedestrian safety improvements from the California Transportation Commission (CTC) to Metropolitan Planning Organizations (MPO). The bill would also modify the funding formula to increase the regional share from 40% to 75%, increase dedicated funding for rural and small areas from 10% to 15% (these areas would still be eligible to apply for the competitive statewide share), and reduce the statewide share from 50% to 10%. On April 10, the STA Board voted to Support SB 152 as it aligns with. 2019 STA Legislative Platform VI Funding #7: “Seek/sponsor legislation in support of initiatives that increase the overall funding levels for transportation priorities in Solano County.” And Legislative Platform VI Funding #9 “Support legislation to secure adequate budget appropriations for highway, bus, rail, air quality and mobility programs in Solano County.”

State Legislative Update (Shaw/Yoder/Antwih, Inc.): Bills that were introduced before the February 22 deadline are currently making their way through committees, including the CASA related bills. The deadline for the Legislature to hear bills in policy committees is the end of April. The Legislature will be in Spring Recess between April 11 and April 22.

Updates on the following are detailed in Attachment A: • Bills of Interest

Federal Legislative Update (Akin Gump): STA’s federal legislative advocate (Susan Lent of Akin Gump) continues to work with STA staff to craft STA’s strategic objectives to align with those of available federal transportation funds. . Updates on the following are detailed in Attachment B:

• FY 2020 Budget - Released on March 11, the proposed budget includes: o $1 billion for the Better Utilizing Investments to Leverage Development (BUILD) program o $1.035 billion for Infrastructure for Rebuilding America (INFRA) grants o $1 billion from the Highway Trust Fund, authorized in the Fixing America’s Surface Transportation (FAST) Act. o $46.4 billion from the Highway Trust Fund for Federal-aid highways; o $300 million for Federal-aid highways o $500 million for transit infrastructure grants o $1.5 billion for the Capital Investment Grant program, including $500 million for new projects • Infrastructure Outlook – Both the House and Senate will continue to hold hearings to address reauthorization of the FAST Act, which is currently set to expire on September 30,2020. • Infrastructure Reimbursement Legislation – Senate Minority Leader Chuck Schumer (D- NY) set to introduce legislation that would require the Department of Transportation(DOT) to reimburse local governments that fund and begin work on “nationally significant” infrastructure projects, without the need for Presidential approval • Transit Low-No Emissions Grants – On March 18, the Federal Transit Administration (FTA) is soliciting grant applications and expects to award $85 million to assist with the purchase or lease of low or no emission vehicle and related equipment/facilities • NEPA Guidance – New directive from Office of Management and Budget, and the Council on Environmental Quality to NEPA delegation States (California is a NEPA delegate) to

132 complete environmental review and authorize decisions on major infrastructure projects within an average of two years.

Fiscal Impact: None.

Recommendation: Informational.

Attachments: A. State Legislative Update B. Federal Legislative Update

133 This page intentionally left blank.

134

March 28, 2019

TO: Board of Directors, Solano Transportation Authority

FM: Joshua W. Shaw, Partner Matt Robinson, Legislative Advocate

RE: STATE LEGISLATIVE UPDATE – April 2019

Legislative Update Policy committees are in full swing, with hundreds of bills heard over the last few weeks. Additionally, budget committees have begun hearing department requests related to the Governor’s budget proposal. Many of the bills related to the CASA Compact will be heard in policy committees in the coming weeks. The Legislature has until the end of April to hear bills in policy committees. The Legislature will break for Spring Recess on April 11, returning April 22. We are tracking a number of bills for STA, some of which are identified under Bills of Interest below.

Governor Newsom Releases Housing Proposal As we previously discussed, the Governor’s January 10 Proposed Budget, the Budget set the stage for a discussion on tying transportation funds to housing production. The Budget states:

“Going forward, the state will strongly encourage jurisdictions to contribute to their fair share of the state’s housing supply by linking housing production to certain transportation funds and other applicable sources, if any. The Administration will convene discussions with stakeholders, including local governments, to assess the most equitable path forward in linking transportation funding and other potential local government economic development tools to make progress toward required production goals.”

On March 11, the Governor released budget trailer bill language that encapsulates the statement made in his budget. The proposal sets higher short-term housing production goals for cities & counties, and provides $750 million in support and incentives from the General Fund, to help these jurisdictions plan and zone for these higher, ambitious housing targets. The proposal would also update and modernize the process of developing and allocating to regions the state’s long-term housing goals, known as Regional Housing Needs Allocations (RHNA). The RHNA is the state-mandated process to identify the total number of housing units (by affordability level) that each jurisdiction must accommodate in its Housing Element. As part of this process, the California Department of Housing and Community Development (HCD) identifies the total housing need for each region, for an eight-year period (in the current cycle, from 2015 to 2023). Regions must then develop a methodology to distribute this need to local governments in a manner that is consistent with the development pattern included in the Sustainable Communities Strategy (SCS). Once a local government has received its final RHNA, it must revise its Housing Element to show how it plans to accommodate its portion of the region's housing need.

135 Under the Governor’s proposal, HCD, in collaboration with the Governor’s Office of Planning and Research and stakeholders, must also propose an improved RHNA process and methodology that promotes and streamlines housing development.

As noted above, the proposal provides additional clarity regarding linking the new RHNA process and housing production to the provision of transportation funds, like those made available by SB 1. The proposal requires HCD, in coordination with the California State Transportation Agency and the Governor’s Office of Planning and Research, to engage stakeholders to develop and propose policies for linking transportation and other non-housing funds – including, very specifically, local streets and road funds from SB 1 – with housing goals by the end of 2022.

The proposal authorizes the state to withhold SB 1’s local streets and roads funds from any jurisdiction that does not have a compliant Housing Element and has not zoned and entitled for its updated annual housing goals, beginning July 1, 2023.

Bills of Interest SB 4 (McGuire and Beall) Planning and Zoning for Housing* This bill would a neighborhood multifamily project or eligible TOD project to submit an application for a ministerial approval process. The bill would define a “neighborhood multifamily project” to mean a project to construct a multifamily unit of up to 2 residential dwelling units in a nonurban community, as defined, or up to 4 residential dwelling units in an urban community, as defined, that meets local height, setback, and lot coverage zoning requirements as they existed on July 1, 2019. The bill would define an “eligible TOD project” as a project located in an urban community, as defined, that meets specified height requirements, is located within 1/2 mile of an existing or planned transit station parcel or entrance, and meets other floor area ratio, density, parking, and zoning requirements. The bill also requires an eligible TOD project development proponent to develop a plan that ensures transit accessibility to the residents of the development in coordination with the applicable local transit agency. The bill would require specified TOD projects to comply with specified affordability, prevailing wage, and skilled and trained workforce requirements. The bill would also define “eligible parcel” to mean a parcel located within a city or county that has unmet regional housing needs and has produced fewer housing units than jobs over a specified period; is zoned to allow residential use and qualifies as an infill site; is not located within a historic district, coastal zone, very high fire hazard severity zone, or a flood plain; the development would not require the demolition of specified types of affordable housing; the parcel is not eligible for development under existing specified transit-oriented development authorizations; and the parcel in question has been fully reassessed on or after January 1, 2021, to reflect its full cash value.

SB 5 (Beall) Local-State Sustainable Investment Incentive Program* This bill would establish the Local-State Sustainable Investment Incentive Program, which would be administered by the Sustainable Investment Incentive Committee. The bill would authorize a city, county, city and county, joint powers agency, enhanced infrastructure financing district, affordable housing authority, community revitalization and investment authority or transit village development district to apply to the Committee to participate in the program and would authorize the Committee to approve or deny applications for projects meeting specific criteria. Upon approval of a project application, the bill would require the Committee to issue an order directing the county auditor to reduce the total amount of ad valorem property tax revenue otherwise required to be contributed to the county’s ERAF from the applicant by the annual reduction amount approved. The bill would require a county auditor, if the applicant is an enhanced infrastructure financing district, affordable housing authority, transit village development district, or community revitalization investment authority, to transfer to the district or authority an amount of property tax revenue equal to the reduction amount approved by the Committee.

136 SB 50 (Wiener) Planning and Zoning: Housing Development: Equitable Communities Incentives* This bill would require a city, county, or city and county to grant upon request an equitable communities incentive when a development proponent seeks and agrees to construct a residential development, as defined, that satisfies specified criteria, including, among other things, that the residential development is either a job-rich housing project or a transit-rich housing project, as those terms are defined; the site does not contain, or has not contained, housing occupied by tenants or accommodations withdrawn from rent or lease in accordance with specified law within specified time periods; and the residential development complies with specified additional requirements under existing law. The bill would require that a residential development eligible for an equitable communities incentive receive waivers from maximum controls on density and automobile parking requirements greater than 0.5 parking spots per unit, up to 3 additional incentives or concessions under the Density Bonus Law, and specified additional waivers if the residential development is located within a 1/2-mile or 1/4-mile radius of a major transit stop, as defined. The bill would authorize a local government to modify or expand the terms of an equitable communities incentive, provided that the equitable communities incentive is consistent with these provisions.

SB 128 (Beall) Enhanced Infrastructure Financing Districts Existing law authorizes the public financing authority to issue bonds for these purposes upon approval by 55% of the voters voting on a proposal to issue the bonds. This bill would instead authorize the public financing authority to issue bonds for these purposes without submitting a proposal to the voters. The bill would require the resolution to issue bonds to contain specified information related to the issuance of the bonds. We recommend STA SUPPORT this measure.

SB 137 (Dodd) Federal Transportation Funds: State Exchange Programs Existing federal law apportions transportation funds to the states under various programs, including the Surface Transportation Program and the Highway Safety Improvement Program, subject to certain conditions on the use of those funds. Existing law provides for the allocation of certain of those funds to local entities. Existing law provides for the exchange of federal and state transportation funds between local entities and the state under certain circumstances. This bill would authorize the Department of Transportation to allow the above-described federal transportation funds that are allocated as local assistance to be exchanged for Road Maintenance and Rehabilitation Program funds appropriated to the department. STA SUPPORTS this bill (February 13 Meeting).

SB 152 (Beall) Active Program Funding This bill would increase the share of active transportation (ATP) funds dedicated to regional agencies to 75 percent, distributed by population. Currently, regional agencies receive 40 percent of the funding in the ATP funds for distribution. This bill would give MTC additional resources to program for ATP projects. We recommend STA SUPPORT this measure.

AB 11 (Chiu) Community Redevelopment Law of 2019* This bill, the Community Redevelopment Law of 2019, would authorize cities and counties to create agencies that would use tax increment financing to fund affordable housing and infrastructure projects. This bill takes a similar approach to the tax increment financing structure used by the former redevelopment agencies.

AB 185 (Grayson) HCD at CTC Meetings Existing law requires the CTC and the State Air Resources Board to hold at least two joint meetings per calendar year to coordinate their implementation of transportation policies. This bill would require the Department of Housing and Community Development to participate in those joint meetings.

137 AB 252 (Daly) Caltrans NEPA Delegation Existing law, until January 1, 2020, provides that the State of California consents to the jurisdiction of the federal courts regarding the compliance, discharge, or enforcement of the responsibilities it assumed as a participant in the program. This bill would extend the operation of these provisions indefinitely. STA SUPPORTS this bill (March 13 Meeting).

AB 847 (Grayson) Transportation Funding to Incentivize Housing This bill would require HCD to review each production report submitted by a city or county in to determine if that city or county has met the applicable minimum housing production goal for the reporting period. The bill would redirect transportation revenues currently used for debt-service (e.g. vehicle weight fees) to be apportioned by the Controller to cities and counties if they have been certified by HCD to have met their very low-income housing goals or low-income housing goals.

AB 1413 (Gloria) Local Sales Tax Measures Existing law authorizes, upon approval of two-thirds of the voters, to impose a retail transaction and use tax for specified transportation purposes. This bill would authorize a local agency to impose a tax applicable to only a portion of its county if two-thirds of the voters voting on the measure within the portion of the county to which the tax would apply. We recommend STA SUPPORT this measure.

AB 1568 (McCarty) Loss of Transportation Funding for Failure to Meet Housing Production Targets This bill would require HCD to review each production report submitted by a city or county in to determine if that city or county has met the applicable minimum housing production goal for the reporting period. If a local agency fails to meet their production targets, the bill would require the Controller to withhold Road Maintenance and Rehabilitation Account funding for that jurisdiction and deposit those funds in a separate escrow account for each city or county that is not in compliance. The bill would require the Controller to distribute the funds to the local agency when they are found to comply. We recommend STA OPPOSE this measure.

ACA 1 (Aguiar-Curry) Local Government Financing: Affordable Housing and Public Infrastructure: Voter Approval. This constitutional amendment would lower the necessary voter threshold from a two-thirds supermajority to 55 percent to approve local general obligation bonds and special taxes for affordable housing and public infrastructure projects. STA SUPPORTS this measure (January 9 Meeting).

Bills marked with an * are being tracked by MTC as implementing elements of the CASA Compact. These bills are not sponsored by MTC. The above list does not include all bills MTC has identified as others are included in the attached matrix.

138

MEMORANDUM

March 25, 2019

To: Solano Transportation Authority From: Akin Gump Strauss Hauer & Feld LLP Re: March Report

During the month of March we monitored developments in Washington and brought them to the attention of STA staff. We also made STA staff and Soltrans aware of grant opportunities.

FY 2020 Budget

President Trump released his Administration’s budget request for fiscal year (FY) 2020 last week. The budget funds the highway and transit programs funded with contract authority at the levels authorized in the FAST Act. Of note, it includes:

- $1 billion for the Better Utilizing Investments to Leverage Development (BUILD) program, a $100 million increase from FY 2019 enacted levels;

- $1.035 billion from the general fund for Infrastructure For Rebuilding America (INFRA) grants, in addition to $1 billion from the Highway Trust Fund as authorized in the Fixing America's Surface Transportation (FAST Act). Congress did not appropriate additional amounts from the general fund for the INFRA program in FY 2019 or 2018;

- $46.4 billion from the Highway Trust Fund for Federal-aid highways;

- $300 million from the general fund for Federal-aid highways (a $2.95 billion decrease);

- $500 million for transit infrastructure grants (a $200 million decrease); and

- $1.5 billion for the Capital Investment Grant program (a $1 billion decrease), including $500 million for new projects.

House Transportation and Infrastructure Committee Chairman Peter DeFazio (D-OR) has criticized Trump’s budget proposal as not being robust enough. Although presidential budget requests reflect Administration priorities, they are largely symbolic. Given that Democrats now control the House, the majority of Trump’s budget proposal will not make it into the eventual FY 2020 appropriations bills.

139

Solano Transportation Authority March 25, 2019 Page 2

House Appropriations Chairwoman Nita Lowey (D-NY) said that her committee will start holding markups of FY 2020 appropriations measures in April and May with an eye toward passing them by June. House Democratic leadership is also considering advancing appropriations bills in small packages rather than individually or in one large omnibus. Even if the Appropriations Committee were to advance the bills according to Lowey’s ambitious timeline, it is highly unlikely that the full House will pass them before the August recess.

Chairwoman Lowey circulated a letter to House Democrats this month stating that there is not enough bipartisan support in both chambers to revive earmarks in FY 2020 funding bills. She stated her own support for earmarks and pledged to continue discussing the possibility of reviving earmarks in the future. Prior to Chairwoman Lowey’s announcement, Transportation Chairman DeFazio told the American Association of State Highway and Transportation Officials (AASHTO) that he intends to include earmarks in the forthcoming infrastructure bill. Transportation and Infrastructure Committee Ranking Member Sam Graves (R-MO) also has expressed support for reviving earmarks for transportation spending this week.

Infrastructure Outlook

Both chambers of Congress have begun fervent work on developing infrastructure legislation as evidenced by a flurry of hearings in recent weeks. The Transportation and Infrastructure Committee held hearings on February 26 to discuss “How Federal Infrastructure Policy Could Help Mitigate and Adapt to Climate Change” and on March 13 on “Aligning Federal Surface Transportation Policy to Meet 21st Century Needs.” The House Ways and Means Committee held a hearing on “Our Nation’s Crumbling Infrastructure And The Need For Immediate Action” on March 6.

The Senate Commerce, Science, and Transportation Committee held a hearing on February 26 on “Connecting America: Examining Intermodal Connections Across Our Surface Transportation Network.” The Senate Environment and Public Works Committee held a hearing on March 6 regarding the “Economic Benefits of Highway Infrastructure Investment and Accelerated Project Delivery.” We provided summaries of the hearings in separate memoranda.

Senate Environment and Public Works Committee Chairman John Barrasso (R-WY) has said that the Environment and Public Works Committee will develop an infrastructure bill that distributes federal funds by formula, balances the needs of urban and rural communities; and streamlines the project permitting process. Senator Barrasso and Ranking Member Tom Carper (D-DE) have asked Committee members to submit priorities for the bill by late February or early March. He said that Committee leadership then will solicit priorities from Senators not on the Committee.

140

Solano Transportation Authority March 25, 2019 Page 3

It is not clear whether Congress can secure funding and agreement on broad infrastructure or should focus on securing the necessary funding to reauthorize the highway and transit legislation (the FAST Act), which expires on September 30, 2020. Nevertheless, House Ways and Means Committee member Earl Blumenauer (D-OR) has said that House leadership has reserved time to consider an infrastructure bill on the chamber floor in late spring. A growing number of members of Congress are expressing support for a gas tax increase or a vehicle miles traveled fee although there will need to be bipartisan agreement and support from the White House to advance infrastructure legislation.

Regardless of whether there is broad infrastructure legislation this year, the House and Senate transportation committees will continue to hold hearings that address the reauthorization of the FAST Act.

Infrastructure Reimbursement Legislation

Senate Minority Leader Chuck Schumer (D-NY) has said he will introduce legislation that would require the Department of Transportation (DOT) to reimburse local partners who fund infrastructure reconstruction projects in the absence of immediate federal funding. Under the proposal, local entities that begin work on infrastructure projects that are “nationally significant” will be guaranteed reimbursement by DOT without the need for presidential approval. The purpose of the legislation is to advance the Gateway project in New York and New Jersey despite a lack of federal approval and presidential support; however, the bill could benefit other infrastructure projects that are of national significance or that compete for limited federal infrastructure dollars. Schumer has said he will attempt to add the bill to “must-pass” legislation such as an appropriations bill or surface transportation reauthorization bill.

Transit Low-No Emissions Grants

On March 18, The Federal Transit Administration (FTA) began soliciting applications for the Low or No Emission (Low-No) grant program. The FTA expects to award $85 million to 45 projects to assist with the purchase or lease of low or no emission vehicles as well as related equipment or facilities. Applications are due by May 14.

NEPA Guidance

On February 26, the Trump Administration released guidance to states intended to streamline the environmental review process under the under the National Environmental Policy Act (NEPA) for large infrastructure projects. A memo from the Office of Management and Budget and the Council on Environmental Quality directs states assuming NEPA delegation (like California) to

141

Solano Transportation Authority March 25, 2019 Page 4 complete environmental reviews and authorization decisions for major infrastructure projects within two years on average, echoing a similar requirement placed on federal agencies in a Trump Administration Executive Order from August 2017.

142 Agenda Item 8.I April 23, 2019

DATE: April 11, 2019 TO: SolanoExpress Intercity Transit Consortium FROM: Triana Crighton, Planning Assistant RE: Summary of Funding Opportunities

Discussion: Below is a list of funding opportunities that will be available to STA member agencies during the next few months, broken up by Federal, State, and Local. Attachment A provides further details for each program.

AMOUNT APPLICATION FUND SOURCE AVAILABLE DEADLINE Federal First deadline is Up to $300 million; Federal Highway Administration (FHWA) – Nationally December 18, 2018, 1. projects of at least $25 Significant Federal Lands and Tribal Projects (NSFLTP) applications accepted on million a Quarterly Rolling Basis. Regional Carl Moyer Off-Road Equipment Replacement Program (for Approximately $10 Due On First-Come, 1. Sacramento Metropolitan Area) million First-Served Basis Due On First-Come, Air Resources Board (ARB) Clean Vehicle Rebate Project Up to $7,000 rebate 2. First-Served Basis (CVRP) per light-duty vehicle (Waitlist) Approximately $5,000 Bay Area Air Quality Management District (BAAQMD) Hybrid Due On First-Come, 3. to $45,000 per Electric Vehicle Purchase Vouchers (HVIP) (for fleets) First-Served Basis qualified request

Pays to install 7,500 Due On First-Come, 4. PG&E Charge Program chargers in PG&E area First-Served Basis

Awarded First-come, 5. BAAQMD Charge! Program $5 million First serve. Closes June 30, 2019.

6. Transportation Development Act Article 3 (TDA-3) $350,000 Open Now

State

Fiscal Impact: None.

Recommendation: Informational.

Attachment: A. Detailed Funding Opportunities Summary

143 This page intentionally left blank.

144 ATTACHMENT A The following funding opportunities will be available to the STA member agencies during the next few months. Please distribute this information to the appropriate departments in your jurisdiction. Yellow highlighted grants have deadlines approaching soon!

Fund Source Application Project Amount Program Description Call For STA Staff Potential Projects Contact** Types/Eligibility Available Projects Contact

Federal Grants Nationally Jeffrey Mann, Tribal and/or $300 million; Federal funding to projects of national Ongoing. Triana Crighton Projects involving Significant NSFLTP Federally Significant construction significance for construction, Application Due (707) 399-3230 Travis AFB Federal Lands Program Land (on, adjacent to, cost of at least reconstruction, or rehabilitation of On First-Come, [email protected]. and Tribal Manager or providing access $25 million, transportation facilities within, adjacent to, First-Served Basis gov Projects (202) 366-9494 to) projects with or providing access to Federal or Tribal (NSFLTP) Jeffrey.mann@ $50+ million lands. dot.gov will be prioritized. Regional Grants Carl Moyer Off- Gary A. Bailey Replace high- Approx. The Off-Road Equipment Replacement Ongoing. Cory Peterson Road Equipment Sacramento polluting off-road $10 million, Program (ERP), an extension of the Carl Application Due (707) 399-3214 Replacement Metropolitan Air equipment maximum per Moyer Program, provides grant funds to On First-Come, [email protected] Program (for Quality project is $4.5 replace Tier 0, high-polluting off-road First-Served Basis .gov Sacramento Management million equipment with the cleanest available Metropolitan District emission level equipment. Area) (916) 874-4893 gbailey@airqu ality.org

Air Resources Graciela Garcia Low/No Carbon Up to $7,000 The Zero-Emission and Plug-In Hybrid Application Due Cory Peterson Board (ARB) ARB Vehicles rebate per Light-Duty Vehicle (Clean Vehicle) On First-Come, (707) 399-3214 Clean Vehicle (916) 323-2781 light-duty Rebate Project is intended to encourage First-Served Basis [email protected] Rebate Project [email protected] vehicle and accelerate zero-emission vehicle (Currently .gov (CVRP)* a.gov deployment and technology applicants are put innovation. Rebates for clean vehicles on waitlist) are now available through the Clean Vehicle Rebate Project (CVRP) funded by the Air Resources Board (ARB) and implemented statewide by the California Center for Sustainable Energy (CCSE). Bay Area Air To learn more Low/No Carbon Approx. $5,000 The California Air Resources Board Application Due Brandon - FAST Renewable Quality about how to Engines to $45,000 per (ARB) created the HVIP to speed the On First-Come, Thomson Diesel Bus Purchase Management request a qualified market introduction of low-emitting hybrid First-Served Basis (707) 399-3234 District voucher, request trucks and buses. It does this by reducing [email protected] (BAAQMD) contact: the cost of these vehicles for truck and .gov Hybrid Electric 888-457-HVIP bus fleets that purchase and operate the Vehicle Purchase info@california vehicles in the State of California. The Vouchers (HVIP)* hvip.org HVIP voucher is intended to reduce about half the incremental costs of purchasing hybrid heavy-duty trucks and buses.

145 Fund Source Application Project Amount Program Description Call For STA Staff Potential Projects Contact** Types/Eligibility Available Projects Contact

PG&E EV Charge 1-877-704-8723 EV Infrastructure Funds PG&E plans to install 7,500 charging January 2018 – Triana Crighton EV Charging Network EVChargeNetw infrastructure stations across their service area. Most of 2020, or funds (707) 399-3230 Infrastructure [email protected] to support these will be at employers or multi-unit exhausted [email protected]. 7,500 dwellings. This could be a potential gov chargers in avenue for funding and coordination to PG&E service bring more EV infrastructure to Solano area County.

Charge! (from 415-749-4994 EV Infrastructure $5 million The Air District’s Charge! Program offers Awarded First- Triana Crighton EV Charging BAAQMD) climatetech@ba grant funding to offset the cost of Come, First Serve. (707) 399-3230 Infrastructure aqmd.gov purchasing and installing new publicly available electric vehicle charging Closes June 30, stations within the Bay Area. 2019

Transportation Cheryl Chi, TDA Bike & Ped Projects $350,000 Transportation Development Act Article 3, Open now Cory Peterson Bicycle and pedestrian Development Act Program annually or TDA 3, provides funding annually for (707) 399-3214 safety improvement Article 3 (TDA-3) Manager, bicycle and pedestrian projects. [email protected] projects at cchi@bayare .gov ametro.gov (415) 778-5339

Statewide Grants

**STA staff, Triana Crighton, can be contacted directly at (707) 399-3230 or [email protected] for assistance with finding more information about any of the funding opportunities listed in this report

146