ANNUAL LIST OF OBLIGATED PROJECTS FEDERAL FISCAL YEAR (FFY) 2020

12 Acme Road Suite 104 Brewer, 04412 207.941.3111 www.bactsmpo.org

1 Purpose of this Report

The Metropolitan Transportation Planning and Programming regulation requires that (per Title 23 §450.334):

“on an annual basis, no later than 90 calendar days following the end of the program year, the State, public transportation operator(s), and the MPO shall cooperatively develop a listing of projects (including investments in pedestrian walkways and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were obligated in the preceding program year.”

Listing Requirements

Title 23 §450.334 requires that the Bangor Area Comprehensive Transportation System (BACTS), as the Metropolitan Planning Organization (MPO), publish a listing of projects that obligated federal transportation funds in the previous federal fiscal year including investments for highway improvements, transit projects, bus facilities, bicycle and pedestrian facilities, signal and intersection improvements, etc. This listing is publicly posted on the BACTS website.

The listing must include all federally funded projects authorized (or revised to increase obligations) in the preceding program year, and at a minimum, must include:

 Sufficient description to identify each project;  Identification of the agencies responsible for carrying out each project;  Amount of Federal funds requested in the TIP for each project;  Federal funding that was obligated during the preceding year for each project;  Federal funding remaining and available for subsequent years for each project.

Report of FFY 2020 Obligated Projects

The obligation report has been developed using data from the Maine Department of Transportation (MaineDOT), Federal Transit Administration (FTA), and the City of Bangor.

This report is divided into two sections:

 Federal Highway Administration (FHWA) funded projects, which includes State and local highway projects; and  Federal Transit Administration (FTA) funded projects, which includes transit projects.

2 FEDERAL HIGHWAY ADMINISTRATION FUNDED PROJECTS FFY 2020 Obligated Funding OBLIGATED FUNDING FFY 2020 Sponsor Win PSN Title Scope Status Description Work Plan Description Federal State Local Other Total Beginning at Western Avenue and extending north 1.73 miles. BACTS 011577.00 21779HAMPDEN, ROUTE 1A RECONSTRUCTION ACTIVE $ 2,578,143.33 $ 571,092.35 $ 828,929.33 $ 479,520.00 $ 4,457,685.01 BACTS Sponsored Located at the intersection of Wilson Street and Dirigo Drive. BACTS 023575.00 73980 BREWER, WILSON STREET INTERSECTION IMPROVEMENTS W/ SIGNAL ACTIVE $ 16,000.00 $ 18,576.10 $ 18,576.10 $ - $ 53,152.20 BACTS Sponsored. Beginning at the Hampden town line and extending north 0.66 BACTS 2351973979BANGOR, MAIN STREET MILL AND FILL ACTIVE $ 20,000.00 $ 77,357.80 $ 77,357.80 $ - $ 174,715.60 of a mile to Dutton Street. BACTS Sponsored. CONSTRUCTION Beginning at Johnson Street and extending south 0.57 of a BACTS 020856.00 68247 BANGOR, MAINE AVENUE MILL AND FILL $ 299,792.86 $ 37,474.10 $ 37,474.10 $ - $ 374,741.06 COMPLETE mile to Venture Way. BACTS Sponsored. CONSTRUCTION Beginning at Venture Way and extending south 0.40 of a mile BACTS 020857.00 68278 BANGOR, MAINE AVENUE MILL AND FILL $ 283,313.21 $ 35,414.15 $ 35,414.15 $ - $ 354,141.51 COMPLETE to Hammond Street. BACTS Sponsored. Beginning 0.06 of a mile north of Elm Street and extending BACTS 022410.00 71280 BREWER, SOUTH MAIN STREET MILL AND FILL ACTIVE $ 74,456.13 $ 65,554.32 $ 76,754.32 $ - $ 216,764.77 north 1.08 miles to Abbott Street. BACTS Sponsored.

CONSTRUCTION Beginning 0.18 of a mile north of Haskell Road and extending BACTS 023517.00 73978 BANGOR, HOGAN ROAD MILL AND FILL $ 491,080.46 $ 72,762.40 $ 72,762.40 $ - $ 636,605.26 COMPLETE 0.60 of a mile south to Mt. Hope Avenue.. BACTS Sponsored. Safety and infrastructure improvements that may include MaineDOT 018701.01 72218 DEWITT FIELD, OLD TOWN MUNICIP NEW CONSTRUCTION ACTIVE $ - $ 37,160.22 $ - $ - $ 37,160.22 construction of a 6 unit T-Hangar. MaineDOT 024623.00 78113 Bangor, SHIP REHABILITATION ACTIVE Replacement of public docks. Located off Front Street. $ - $ 165,661.00 $ - $ - $ 165,661.00 I-95 SB/ Emerson Mills Road Bridge (#1430) over B&A MaineDOT 021673.00 68896 HAMPDEN, I-95 SB BR #1430 BRIDGE REPLACEMENT ACTIVE Railroad and Emerson Mills Road. Located 0.12 of a mile south $ 2,594,416.91 $ 801,362.07 $ - $ - $ 3,395,778.98 of Old Emerson Mill Road. Lower Trestle Bridge (#3535) over Sunkhaze Stream/River MILFORD, LOWER TRESTLE CONSTRUCTION MaineDOT 019312.00 43304 BRIDGE REPLACEMENT Overflow. Located 1.25 miles south of French Settlement $ 2,253,022.19 $ 499,255.54 $ - $ 64,000.00 $ 2,816,277.73 BR#3535 COMPLETE Road. Ohio Street/ I-95 Bridge (#5790) over . Located MaineDOT 018722.00 65808 BANGOR OHIO ST / I 95 BR #5790 BRIDGE REPLACEMENT ACTIVE $ 5,505,826.69 $ 1,376,456.67 $ - $ 223,350.00 $ 7,105,633.36 0.02 of a mile southeast of Sixteenth Street. CONSTRUCTION Sunkhaze Bridge (#2825) over Sunkhaze Stream/River MaineDOT 020505.00 60695 MILFORD, SUNKHAZE BR #2825 BRIDGE REPLACEMENT $ 1,984,690.94 $ 505,447.87 $ - $ - $ 2,490,138.81 COMPLETE Overflow. Located 1.50 miles north of Grove Street. Stillwater #2 Bridge (#2806) over the North Channel Stillwater OLD TOWN, STILLWATER #2 MaineDOT 022511.00 62290 BRIDGE REPLACEMENT ACTIVE River. Located 0.13 of a mile north of Free Street. FHWA $ 208,380.41 $ 52,095.10 $ - $ - $ 260,475.51 BRIDGE INFRA Grant recipient. Wilson Street/I-395 Bridge (#1564) over Interstate 395. Brewer, Wilson Street/I-395 Bridge MaineDOT 018915.20 76938 BRIDGE REPLACEMENT ACTIVE Located 0.35 of a mile west of Dirigo Drive. FHWA INFRA $ 6,937,500.00 $ 6,937,500.00 $ - $ - $ 13,875,000.00 #1564 Grant recipient. I-95 NB/Emerson Mills Road Bridge (#5969) over Emerson MaineDOT 021673.10 72542 HAMPDEN, I95 NB BR #5969 BRIDGE REPLACEMENT ACTIVE $ 2,350,000.00 $ 776,245.48 $ - $ - $ 3,126,245.48 Mills Road. Located 0.29 of a mile west of Exit 180. I-95/ Broadway Bridge (#5789) over Route 15. Located 0.06 MaineDOT 022276.00 70979 BANGOR, I95/Broadway BR#5789 BRIDGE IMPROVEMENTS ACTIVE of a mile west of Interstate 95 northbound Exit 187. FHWA $ 261,500.00 $ 30,000.00 $ - $ - $ 291,500.00 INFRA Grant recipient. Bridge Joints I-95 Southbound, Old Various bridge joint improvements on Interstate 95 MaineDOT 023617.60 78910 BRIDGE JOINT REPLACEMENT ACTIVE $ - $ 51,083.00 $ - $ - $ 51,083.00 Town to Carmel southbound from Old Town to Carmel. Hampden, Cold Brook Road/I-95 Coldbrook Road/I-95 Bridge (#5970) over Interstate 95. MaineDOT 023224.00 76638 BRIDGE SUBSTRUCTURE REHABILITATION ACTIVE $ 562,757.22 $ 430,689.30 $ - $ - $ 993,446.52 Bridge (#5970) Located 0.24 of a mile south of the Odlin Road. Bridge Joints I-95 Northbound, Various bridge joint improvements on Interstate 95 MaineDOT 023617.50 78909 BRIDGE JOINT REPLACEMENT ACTIVE $ - $ 50,116.00 $ - $ - $ 50,116.00 Carmel to Bangor northbound from Carmel to Bangor. BANGOR, VETERANS REM BR Veterans Remembrance Bridge (#1558) over the Penobscot MaineDOT 022278.00 72080 BRIDGE REHABILITATION ACTIVE $ 137,250.00 $ 15,500.00 $ - $ - $ 152,750.00 #1558 River. Located at the Bangor-Brewer town line. Highway Reconstruction: 1)Beginning at Ridge Road east 10.81 miles to Hinkley Road; 2)Beginning Billings Road MaineDOT 012787.01 35730 NEWPORT, ROUTE 2 RECONSTRUCTION CLOSED STATE PROJECT extending east 1.53 miles to Bog Road; 3)Beginning 0.16 of a $ - $ 99,496.72 $ - $ - $ 99,496.72 mile east of Cold brook Road extending east 2.28 miles to Bangor TL HIGHWAY CYCLICAL PAVEMENT CONSTRUCTION Beginning 0.18 of a mile west of Chapman Road and MaineDOT 023326.00 73708 NEWBURGH- HAMPDEN, ROUTE 9 $ - $ 1,270,268.65 $ - $ - $ 1,270,268.65 RESURFACING COMPLETE extending east 7.50 miles. HERMON-HAMPDEN, COLDBROOK HIGHWAY CYCLICAL PAVEMENT CONSTRUCTION Beginning 0.04 of a mile southeast of Autocar Lane and MaineDOT 023318.00 73657 $ - $ 701,058.10 $ 16,245.00 $ - $ 717,303.10 ROAD RESURFACING COMPLETE extending southeast 2.53 miles ending at Route 202. Beginning 2.67 miles east of the Etna town line and extending MaineDOT 024119.00 76880 Carmel -Bangor, Interstate 95 NB ULTRA-THIN BONDED WEARING COURSE ACTIVE $ 25,200.00 $ 509,867.30 $ - $ - $ 535,067.30 north 17.05 miles. Includes 13.01 miles within project limits. Beginning 0.79 of a mile north of the Orono town line and MaineDOT 024173.00 69242 Old Town - Carmel, Interstate 95 SB ULTRA-THIN BONDED WEARING COURSE ACTIVE extending south 23.65 miles. Includes 19.81 miles within $ 27,000.00 $ 561,036.00 $ - $ - $ 588,036.00 project limits. Union Street/I-95 Bridge (# 5797) over Interstate 95. Located MaineDOT 016681.00 41833 BANGOR, UNION ST/I-95 BR #5797 BRIDGE REPLACEMENT FINALED FHWA CLOSED $ 9,407,498.09 $ 1,048,140.04 $ 112,566.94 $ 11,448.00 $ 10,579,653.07 0.03 of a mile northwest of Fifteenth Street. CONSTRUCTION MaineDOT 018873.00 65212 HAMPDEN, ROUTE 202 INTERSECTION IMPROVEMENTS W/ SIGNAL Located at the intersection of Route 1A/9 and Route 202. $ 49,224.06 $ 12,305.96 $ - $ - $ 61,530.02 COMPLETE CLOSED ACCEPTANCE Beginning 0.02 of a mile south of Godfrey Drive and extending MaineDOT 018643.00 65290 ORONO, STILLWATER AVENUE MILL AND FILL $ 131,808.02 $ 16,475.99 $ 24,492.18 $ - $ 172,776.19 RECEIVED north 0.20 of a mile. BACTS Sponsored. I-95/Kenduskeag Stream Bridge (#5791) over Kenduskeag MaineDOT 018723.00 66086 BANGOR, I-95/KENDUSKEAG (#5791 BRIDGE REHABILITATION FINALED FHWA CLOSED Stream and Valley Avenue. Located 0.25 of a mile north of $ 161,920.07 $ 40,480.05 $ - $ - $ 202,400.12 Ohio Street. MaineDOT 020411.00 58567 ORONO, I-95/STILLWATER AVE SAFETY IMPROVEMENTS FINALED FHWA CLOSED Located at Interstate 95 Northbound Exit 193. $ 706,416.90 $ 176,604.23 $ - $ - $ 883,021.13 Realign the northbound On-Ramp at Interstate 95 Exit 184 and MaineDOT 019256.00 51362 MaineDOT RAMP IMPROVEMENTS FINALED FHWA CLOSED increase the length of the acceleration lane. Close Ohio Street $ 827,990.53 $ 98,642.20 $ - $ - $ 926,632.73 connection from northbound On-Ramp.

Page 1 12/1/2020 12:14 PM3 FEDERAL HIGHWAY ADMINISTRATION FUNDED PROJECTS FFY 2020 Obligated Funding OBLIGATED FUNDING FFY 2020 Sponsor Win PSN Title Scope Status Description Work Plan Description Federal State Local Other Total

Bangor Area Comprehensive Transportation System (BACTS) Unified Planning Work Program: Federally mandated program MaineDOT 002163.20 69939 BACTS PLANNING 2020/2021 MPO PROGRAM MANAGEMENT ACTIVE $ - $ 117,062.10 $ 39,020.70 $ - $ 156,082.80 associated with Maine's U.S. Census-defined metropolitan planning area in the Greater Bangor region. Years 2020-2021. Penobscot/Piscataquis Regional Planning Organization MaineDOT 014853.20 69973 PENOBSCOT COUNTY 2020 STATEWIDE PROGRAM DEVELOPMENT ACTIVE $ 7,995.50 $ 1,998.87 $ - $ - $ 9,994.37 support. PENOBSCOT COUNTY 2019 Penobscot/Piscataquis Regional Planning Organization MaineDOT 014853.19 64688 includes Penobscot & Piscataquis STATEWIDE PROGRAM DEVELOPMENT FINAL VOUCHER WORKUP $ 28,640.85 $ 7,160.21 $ - $ - $ 35,801.06 support. Counties MaineDOT 024893.00 78942 Bangor Odlin Rd. P&R 103 MULTIMODAL IMPROVEMENTS ACTIVE Located 0.05 of a mile north of Interstate 395. $ - $ 50,000.00 $ - $ - $ 50,000.00 Beginning 0.02 of a mile north of Haskell Road and extending south 0.51 of a mile. Then beginning 0.01 of a mile east of MaineDOT 024313.00 74008 BANGOR, HOGAN ROAD SIDEWALK MULTIMODAL IMPROVEMENTS ACTIVE $ 12,400.00 $ - $ 69,172.00 $ - $ 81,572.00 Hogan Road and extending 0.20 of a mile southwest on Mt. Hope Avenue. CONSTRUCTION Beginning at Front Street and extending east 0.14 of a mile. A MaineDOT 021767.00 69096 BANGOR, RIVER WALK NEW CONSTRUCTION $ 317,868.77 $ - $ 79,467.24 $ - $ 397,336.01 COMPLETE new sidewalk along Front Street for 0.03 of a mile. Beginning at Pebble Creek Drive and extending north 0.82 of a MaineDOT 018884.00 65726 ORRINGTON, SIDEWALKS RTE 15 MULTIMODAL IMPROVEMENTS CLOSED STATE PROJECT $ - $ - $ 88,849.78 $ - $ 88,849.78 mile to Harrison Avenue. Design and construction of Phase 3 of the Brewer Riverwalk. MaineDOT 024773.00 78349 Brewer, Riverwalk Phase 3 NEW CONSTRUCTION ACTIVE Beginning at Hardy Street and extending north 900 feet along $ - $ - $ 14,752.00 $ - $ 14,752.00 the east side of the . Bangor, Riverfront Trail Enhancements to the Bangor Riverfront trail system to include MaineDOT 024771.00 78348 NEW CONSTRUCTION ACTIVE $ - $ - $ 13,000.00 $ - $ 13,000.00 Enhancements lighting, restroom, and a new trail spur. CONSTRUCTION MaineDOT 021661.00 65050 BANGOR, FINSON ROAD NEW CONSTRUCTION Beginning at Davis Road and extending south 0.38 of a mile. $ 79,201.54 $ - $ 30,265.05 $ - $ 109,466.59 COMPLETE CONSTRUCTION MaineDOT 018769.20 76871 Statewide, Interstate Striping STRIPING Polyurea striping for the interstate. $ 1,215,000.00 $ 1,099.52 $ - $ - $ 1,216,099.52 COMPLETE MaineDOT 024213.00 76943 Statewide, ITS - RWIS INTELLIGENT TRANSPORTATION SYSTEMS ACTIVE RWIS upgrade on I-295, I-95 and Soucy Hill (Route 11). $ 398,756.37 $ 44,881.63 $ - $ - $ 443,638.00

TOTAL $ 39,955,051.05 $ 17,363,381.04 $ 1,635,099.09 $ 778,318.00 $ 59,731,849.18

Page 2 12/1/2020 12:14 PM4 FEDERAL TRANSIT ADMINISTRATION FUNDED PROJECTS FFY 2020 Funding Requested in TIP FFY 2020 Obligated Funding OBLIGATED FUNDING FFY 2020

Federal Responsible WIN FAIN Title Scope Status Description Federal State Local Total Federal State Local Total Funding Agency Remaining

Operating assistance, Prevenative §5307 COVID-19 ER Response Active Maintenance for Fleet, and ADA City of Bangor NA ME-2020-018-00 Transit Operating Assistance NA$ 900,000 $ 900,000 $ 3,103,112 Urbanized Area Formula Grants (Executed) Paratransit service provided during the period of 4.1.20 - 6.30.20

Active City of Bangor 02323.00 ME-2020-003-01 §5307 Planning Study Capital Equipment Purchase Short-Range Transit Study $ 73,425 $ 18,356 $ 91,781 $ 73,425 $ 18,357 $ 91,782 (Executed)

Active Acquisition of Bus Support City of Bangor 024655.00 ME-2020-029-00 §5307 Urban Transit Capital Capital Equipment Purchase $ 14,951 $ 3,738 $ 18,689 $ 14,951 $ 3,738 $ 18,689 (Executed) Equip/Facilities

Active Fixed Route Operating Assistance City of Bangor 022761.20 ME-2020-029-00 §5307 Urban Transit Operating Transit Service Operating Assistance $ 657,315 $ 101,109 $ 556,206 $ 1,314,630 $ 657,315 $ 101,109 $ 571,816 $ 1,330,240 (Executed) during the period of 7.1.19 - 3.30.20

ADA Complementary Paratransit ADA Complementary Paratransit Active City of Bangor 020720.20 ME-2020-029-00 §5307 Urban Transit Operating Service provided during the period $ 172,581 $ 43,145 $ 215,726 $ 172,581 $ 43,145 $ 215,726 Service Operating Assistance (Executed) of 7.1.19 - 3.30.20

Preventative Maintenance for vehicle Transit Service Capital-Eligible Active City of Bangor 022757.20 ME-2020-029-00 §5307 Urban Transit Capital fleet during the period of 7.19.19 - $ 352,743 $ 88,186 $ 440,929 $ 352,743 $ 88,186 $ 440,929 $ 878,264 Maintenance (Executed) 3.30.20 TOTAL $ 1,271,015 $ 101,109 $ 709,631 $ 2,081,755 $ 2,171,015 $ 101,109 $ 725,242 $ 2,997,366 $ 3,981,376

5