ENERGY MEETS REALITY

MAIN REFERENCES – ONSHORE & REVAMPING PROJECTS REVAMP PROGRAM PROJECTS AT MPN FIELD Client Procurement, Onshore MOBIL PRODUCING NIGERIA Fabrication, Offshore LOCATIONS UNLIMITED Demolition/Installation and Pre- commissioning. Location Scope of work - mostly like-for- Work in progress Idoho Field, approx 50 km South like structural and piping of Nigerian Coast replacement - covers the main Main contractor deck, cellar deck and spider deck ROSETTI PIVOT LTD Technical Data Contract Piping Fixed Term EPC 70 ton approx. Outline Agreement

Award Structures February 2016 260 ton approx

Ready for offshore mobilization Mechanical October 2018 Pig Receiver, Sump Tank

Scope of work E&I Project Management, HSEQ MOV’s, Line Instruments Management, Interface and Transmitters Management, Construction and Installation Engineering, 160 POB [at peak] BAHR ESSALAM PHASE II TOPSIDE REVAMPING

Completed

Client Scope of work Mellitah Oil & Gas B.V. Construction Engineering, Procurement of bulk material, Location onshore fabrication, offshore Sabratha Platform – Block NC41 construction activities & Floatel

Main contractor Technical Data FMC No. 1 ALQ Jacket (N.4 legs; H=59mt) Contract Total weight: 754 t Lump sum No. 4 ALQ Piles Award (D=1,524 mt – thk = 38‐ April 2017 50mm; L= 163,7mt) Total weight: 1,302 t Ready for start up February 2018 110kV GIS MAIN SUBSTATION 52-SU-3301

Completed

Client Project GE Grid Solutions Future Growth Project, Wellhead Pressure Management Project Final client (FGP/WPMP) TENGIZCHEVROIL Scope of work Location Construction Engineering, Structure and Architectural Main contractor Procurement and Fabrication, SPA Load out activities of a 10kV GIS Substation Contract EPC/Lump Sum Technical Data BUILDING DIMENSION [m] Award GIS MODULE October 2016 56,3 x 14,60 x 8,644 (h) UTILITY MODULE Ready for sail away 24,8 x 14,60 x 8,644 (h) August 2018 BUILDING TOT WEIGHT [ton] 1300 MODULAR SUBSTATION 51-SU-33004

Completed

Client Project GE Grid Solutions Future Growth Project, Wellhead Pressure Management Project Final client (FGP/WPMP) TENGIZCHEVROIL Scope of work Location Detail design, Construction KAZAKHSTAN Engineering, Procurement, Main contractor Fabrication, Commissioning Rosetti Marino SPA Technical Data Contract BUILDING DIMENSION [m] 24,5 (l) EPC/Lump Sum x 14.14 (w) x 7,9 (h) BUILDING WEIGHT [ton] 414 Award The proposed Substation is January 2016 supplied as subdivided in N.14 modules of indicative dimensions Ready for sail away (m) 3,5 (W) x14,2 (L) x 3,9 (H) May 2017 BALANCE OF PLANT FOR 2 NEW STEAM GENERATORS

Completed

Client Scope of work VERSALIS Detail design, Procurement, Construction and Commissioning Location of Balance of Plant for 2 new PORTO MARGHERA - steam generators, involving civil Main contractor works, mechanical, Rosetti Marino SPA electrical/instrumentation, painting and insulation activities Contract EPC Technical Data Piping: 560 Tons. Award N. 220 Tie-ins May 2016 Steel Structures: 200 Tons. N. 3 Pumps Ready for commissioning N. 2 Tanks modifications November 2017 Painting: 7,600 Sqm. Insulation: 8,600 Sqm. Cables E&I: 55,000 Mt. Concrete: 2,000 Cum. FUEL OIL TREATMENT PLANTS & EFFLUENT WATER TREATMENT

PLANTS Client conditioning and treatment of GE ENERGY Heavy Fuel Oil (HFO) to make it suitable to feed gas turbines Location Assiut - Egypt Technical Data (each plant) Treated HFO: 145 t/h Contract Treated Effluent Water: 15 m3/h Lump Sum – Turn Key

Award Plant Main Features January 2015 Two-Stage Electrostatic Separation System Duration Process Module (Heating and 1 Year Water Pumping System, Sampling System & Others) Scope of work Waste Water Recovery Pit System Design, Engineering, Sludge Recovery Pit System Procurement, Construction, HFO Transfer Pump System Commissioning and Start-up. System Control building Oil/Oil Economizer System Description Steam/Oil Heat Exchanger N. 2 modularised plants for System LER SUBSTATIONS - Future Growth Project, Wellhead Pressure Management Project (FGP/WPMP)

Completed

Client Ready for sail away SKEMA SpA December 2016

Final Client Scope of work TENGIZCHEVROIL Construction Engineering, Procurement, Fabrication, Location Transportation, Commissioning KAZAKHSTAN and Start-up Assistance.

Main contractor Rosetti Marino SPA Technical Data 110 kV Main substation Contract Weight: 500 Tons EPC/Lump sum 110 kV Core substation Weight: 310 Tons Award October 2014 TELECOM SYSTEM INTEGRATION PIPELINE GK1-GK2

Client Procurement, Construction, TRC Commissioning and Start-up.

Location Plant Main Features Hassi R’mel – Skikda, Algeria Integration of OTN (Open Transport Network) system along Contract GK1/GK2 pipelines from Hassi Lump Sum – Turn Key R’mel to Skikda (570 Km.) Award October 2014 Laying of fibre optical cable 24 brins Duration 2 Years Refurbishment of 60 telecommunication station Scope of work Design, Engineering, Installation of 41 solar panels with batteries DP4 – FPSO INTERFACE WORKS Completed Client development & Risks STX Offshore & assessment), Procurement & Inspection Fabrication, Offshore Finale Client installation and Hook up, MELLITAH OIL & GAS B.V. Dismantling, installation and Hook up, Location recommissioning & ‐ Offshore Commissioning activities.

Main contractor Description Rosetti Marino SPA New FPSO will be installed near the platform . Modification and Contract interface works on the platform EPIC contract on Turn Key Lump to be done for new risers Sum basis connection (HV electrical power cable and 16’’ inc. process piping) Award October 2014 Technical Data Main new equipment: Ready for sail away Transformer, UTA, Switchboard, February 2016 fiber optic, Control & Safety system extension, ESDV. Scope of work E&I, mechanical, structural and Project Management, piping works to perform. Engineering (Basic Design review, detailed engineering DRILLING RIG CONVERSION TO WHP PLATFORM Completed

Client Ready for sail away LOTOS PETROBALTIC November 2015

Location Scope of work Poland Conversion of drilling rig from MODU to production center. Main contractor Engineering, Procurement Rosetti Marino SPA services, management and HUC works. Contract EPMS Technical Data Weight: Approx. 3.000 tons Award new modules and removal August 2013 and reconversion of drilling rig Hull and legs DP3/DP4 MODIFICATION & REVAMPING PROJECT

Completed

Client Commissioning & assistance to MELLITAH OIL & GAS B.V. the Company during Start‐up

Location Description Bouri Field – Offshore Libya Decommissioning and dismantling of Gas Sweetening Unit, Main contractor Procurement of bulk material Rosetti Marino SPA (structures, piping, E&I), construction of 3 chemical transfer Contract pump skids & 4 chemical injection EPIC contract on Turn Key Lump skids. Sum basis Offshore revamping works onboard two platforms, Update of Award the DCS/ESD/PSD system October 2012 Technical Data Provisional Acceptance Dismantling of Unit 22 for a total November 2013 weight of 240 tons (Columns, Piping and Structures) Scope of work Cables: 3000m Piping: 60t Engineering, Procurement, Scaffolding more than: 3500 m3 Fabrication, Transportation & Offshore works: 70.000 mhrs Delivery, Off‐shore installation, (SIMOPS) Testing, Precommissioning, ASHTART REVAMPING PROJECT

Completed

Client Completion date SEREPT December 2013

Location Scope of work Ashtart Field – Offshore Tunisia Construction engineering, procurement, fabrication, Main contractor dismantling , load-out and Rosetti Marino SPA offshore revamping works.

Fabrication site Technical Data Sfax-Tunisia/Ashtart Field Prefabricated structures: 1.350 Offshore Tunisia tons Piping spools & supports: 195 Contract tons Procurement and Fabrication Electrical & instrumentation Contract at Unit/Time rates cables: 25 km Offshore works: approx. Award 1.200.000 mhrs September 2010 NEW FRACTIONATION PLANT Completed

Client Scope of work MAIRE TECNIMONT Engineering, Procurement, Fabrication, Transportation, Owner Assembly and erection POLIMERI EUROPA at site

Location Technical Data , Italy LIGHTEST FRACTIONATION TOWERS (C-2310) Main contractor Vessel assembly: vertical Rosetti Marino SPA Diameter: 2500/5.90 mm Length: TT 80300 – Tot. 84300 mm Contract Shell thickness: 18 to 76 mm EPC Weight: 289 metric tons Award May 2010 HEAVIEST FRACTIONATION TOWERS (C-2320) Completion at site Vessel Assembly: vertical February 2013 Diameter: 3300 / 6910 mm Length: TT 81600 – Tot. 87900 mm Shell thickness: 20 to 50 mm Weight: 276 metric tons HOOK UP WORKS – ISLAND D, Completed

Owner/Operator Award KCO NV May 2009

Location Completion North , Kazakhstan June 2011 Sector Scope of work Main contractor Fabrication, Testing, Hook up and AKER SOLUTIONS Carry Over works

Subcontractor Work location Rosetti Kazakhstan LLP Island D (Hub 1) – Kashagan Field

Contract Frame agreement for hook up Works TEG REGENERATION PLANT

Completed

Client Year STOGIT, Group 2006

Location Scope of work Minerbio Gas Plant, Italy Nr.3 Glycol regeneration units Main contractor Civil works Rosetti Marino SPA Dismantling of the existing DEG plant Contract Interconnecting pipeworks EPC LSTK + commissioning + start-up assistance STABILIZATION UNIT FOR EL GAMIL PLANT

Completed

Client Plant Main Features PETROBEL 1.890 m3/day Stabilized condensate: 11 psia Location RVP Egypt Fire heaters duty: 4,25 MW

Contract Main items EPC - Contract nr. 1 stabilizer column nr. 1 fire heater Award nr. 1 reboiler circulation pumps September 2004 skid nr. 1 condensate pre-heater skid Completion nr. 2 fuel system inter-piping April 2005 skids

Scope of work Process design, Engineering, Procurement, Construction, Assistance to commissioning and start-up. HYDROGEN PRODUCTION PLANT Completed

Location Technical Data Refinery of Milazzo PLANT MAIN FEATURES Capacity: 100 Nm3/h Main contractor Hydrogen 99.99% Rosetti Marino SPA Feedstock: Multifuel (methane, nafta) Contract Oxydation agent: Air/Oxygen EPC MAIN PLANT UNITS Award Feedgas compression April 2004 (Air/Methan) Gas desulphurization Completion Feed preheating September 2005 Reaction & syngascooling CO shift conversion Scope of work Hydrogen purification (PSA) Engineering, Procurement, Offsites Construction, Assistance to Commissioning and Start-up