This document shows the Matters Arising Changes proposed to the Deposit Eryri Local Development Plan following the Hearing Sessions (July 2018).

The Proposed Changes insertions are shown in purple – insertions and the Proposed Deletions are shown with a double strikethrough and in purple – deletions

The text highlighted in green and red are the revisions proposed at Deposit LDP stage, which was subject to consultation in Summer 2017, these are not the subject of the Matters Arising Changes consultation. The text highlighted in orange and blue are the revisions proposed at the Focussed Changes stage, which was subject to consultation in Spring 2018, these are not the subject of the Matters Arising Changes consultation.

When making representations on the Matters Arising Changes please use the Matters Arising Changes number shown in the left hand column.

MAC Page Policy / Paragraph Proposed Change Reason for Change Number Number Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

1 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

Hearing Session 1: Matters Arising Changes

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

1 12 1.8 The Local Development Plan does not repeat national planning policy and guidance although it does make some cross- To provide further reference. In addition to the policies contained in this plan, national planning policy and guidance will also be a material information about what consideration when making decisions. The Local Development Plan also refers to Supplementary Planning Guidance Place Plans are. which has already been prepared or will be produced by the Authority. A list of the proposed Supplementary Planning Guidance is included in Appendix 8. This list is not exhaustive. These guidance documents will be used by the Authority in decision making and are material considerations. The Planning () Act 2015 places a greater emphasis on engagement in planning decisions; Place Plans echo these ambitions. Place Plans should reflect the aspirations of the local community whilst also making synergies with the local planning authority’s aspirations in Local Development Plan and Wellbeing Plan and will be given weight in planning decisions by being adopted as supplementary planning documents where appropriate.

2 37 Strategic Strategic Policy C: Spatial Development Strategy (C) Removal of criteria from Policy C: policy as this information Spatial Spatial development within National Park will be based on the following hierarchy: is contained in the Development housing components Strategy table, in the housing Local Service Centres – and Bala chapter and in the i. Open market housing and affordable housing for local needs. monitoring framework which is considered to be ii. New housing development will be restricted to a range of between 23% and 35% 17% - 30% 22% and more appropriate. Minor 34% of the overall housing requirement and will be monitored during the Plan period. edits to correct terminology.

iii. To support existing or provide new employment opportunities to support the rural economy.

iv. Improve existing and provide new facilities to serve local residents to strengthen its role as a local service centre and to support its role as a visitor destination.

v. Retail development located in close proximity to the main retail areas.

Service Settlements vi. Small scale general open market and affordable housing for local needs.

1 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

vii. New housing development will be restricted to a range of between 10% and 16% 9% and 13% 10% and 14% of the overall housing requirement and will be monitored during the Plan period.

viii. Small scale employment development to support existing or provide new employment opportunities to support the rural economy in accordance with Development Policy 19

ix. Improve existing and provide new community facilities to serve local residents.

x. Strengthen its role as a service settlement serving the settlement and the immediate community.

xi. Support its role as a visitor destination.

xii. Retail development within the commercial areas of , , Betws y Coed.

Secondary Settlements xiii. Small scale general open market and affordable housing for local needs.

xiv. New housing development will be restricted to no more than 48% 47% 53% of the overall housing requirement and will be monitored during the Plan period.

xv. Small scale employment development to support existing or provide new employment opportunities to support the rural economy in accordance with Development Policy 19 .

xv.xvi. Improve existing and provide new community facilities to serve local residents and strengthen its role in providing services to the rural hinterland.

Smaller Settlements xvi.xvii. Single units of affordable housing for local needs.

2 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

xvii.xviii. New housing development will be restricted to no more than 9% 7 13% of the overall housing requirement and will be monitored during the Plan period.

xix. Improve existing and provide new community facilities to serve local residents where there are no suitable locations in settlements listed in the settlement hierarchy.

xviii.xx. Conversion of buildings to support economic uses.

xxi. In exceptional circumstances new small scale employment and training development in accordance with Development Policy 19

Open countryside xix.xxii. Conversion of rural buildings to support economic uses.

xx.xxiii. Conversions of rural buildings for affordable housing for local needs.

xxi.xxiv. New housing development through conversion will be restricted to no more than 8% 1612% of the overall housing requirement and will be monitored during the Plan period.

xxii.xxv. Replacement dwellings.

xxiii.xxvi. Housing relating to an essential need to live in the countryside in line with national planning policy.

xiv.xxvii. Other essential community facilities to serve local residents where there are no suitable locations in settlements listed in the settlement hierarchy.

xxviii. Agricultural developments which are sympathetically accommodated in the landscape.

3 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

xv.xxix. In exceptional circumstances new small scale employment and training development in accordance with Development Policy 19

xxvi.xxx. Economic development as part of the Snowdonia Enterprise Zone allocation in accordance with Development Policy 27.

3 135-139 Amend Promoting Healthy & Sustainable Communities chapter monitoring framework as outlined below : To reflect the changes to the housing numbers as Relevant Indicators Policy Targets Trigger Level presented through the deposit plan, focused LDP changes and MACs Policies

Promoting Healthy A Housing Land Supply Maintain a 5 year housing Housing land supply & Sustainable land supply falling below the 5 Communities Ng year requirement

1 Number of consents To meet the requirement Below the average 11 granted and new houses of 770 (average 51 units annual housing completed annually per annum) units over requirement target 12 the Plan period (2016 – over +/- 20% for Number of dwellings 2031) twohree consecutive 13 permitted and completed years i.e. below 102 annually 2017/18 44 units over two 14 2018//19 57 consecutive years. 2019/20 62 15 2020/21 72 16 2021/22 85 2022/23 56 17 2023/24 51 2024/25 51 H 2025/26 60 2026/27 52 18 2027/28 46 2028/29 46 2029/30 46 2030/31 45

4 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Total housing completions between 50-55units per annum

% of dwellings permitted Local Service Centres +/- 20% for three consents granted and new (25%) consecutive years housing completed annually in each settlement tier Service Settlements (25%) 21-29% Secondary Settlements (41%)

Smaller Settlements (8%) 11-13%

Conversions (13%)% of dwellings permitted by No more than 48% settlement tier to accord with the following distribution: No more than 9% Local Service Centres – at least 25% of total housing growth No more than 16%

Proportion of Service Settlements – at dwellings least 10% of total permitted: housing growth

a) falls below the Secondary Settlements – targets for Local no more that 45% of total Service Centres housing growth

5 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

and Service Settlements Smaller Settlements – no more than 10% housing growth b) exceeds the targets for Secondary Open Countryside - – no Settlements and more than 10% housing Open Countryside growth

for two consecutive years

Number of affordable To meet the affordable +/- 30% housing units granted housing target of 375 planning permission per (average 25 affordable annum housing units per Below 14 21 units annum) over the Plan completed granted period (2016 – 2031) planning 20 affordable housing units permission per to be granted planning annum for two permission per annum consecutive years

Number of affordable To meet the affordable +/- 30% housing units completed per housing target of 375 annum (average 25 affordable housing units per Below 21 units annum) over the Plan completed per period (2016 – 2031) annum for two 20 affordable housing units consecutive years to be completed per 14 units completed annum. per annum for 3 consecutive years

6 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Monitor progress on Monitor number of allocated housing sites. dwellings coming Monitor the number of forward on allocated market and affordable sites per annum and the dwellings permitted and mix of open market and completed on housing affordable dwellings on allocated sites per each site annum.

2017/18 0 2018//19 10 2019/20 26 2020/21 20 2021/22 28 2022/23 26 2023/24 10 2024/25 6 2025/26 10 2026/27 10 2027/28 5 2028/29 12 2029/30 11 2030/31 10

Number of market units 10 or more units per coming forward as a result annum granted of non-viability (i.e. units planning permission that are not viable and have for three consecutive therefore resulted in open years. market housing with a commuted sum).

7 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Number of affordable 10 6 units per annum +/- 30% housing units granted planning permission per annum via windfalls. Below 5 7 units granted planning permission per annum for 2 3 consecutive years

Number of affordable 10 6 units per annum +/- 30% housing units completed per annum via windfalls. Below 5 7 units completed per annum for 3 2 consecutive years

Number of affordable 3 units per annum +/- 30% housing units granted planning permission per annum via conversions. Below 2 units granted planning permission per annum for 2 3 consecutive years

Number of affordable 3 units per annum +/- 30% housing units completed per annum via conversions. Below 2 units completed per annum for 2 3 consecutive years

8 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Monitor uptake of affordable 2 per settlement over the Take up of 2 units housing in smaller life of the Plan per settlement. settlements Take up of more than two units per settlement relating to need.

No take up after 4 years in any individual settlement.

Number of affordable 1 scheme completed every Less than 1 scheme housing units granted 4 years completed every 4 planning permission and years. completed per annum on exception sites. The exception sites are not included in the housing requirement figure.

Monitor the size of sites coming forward and the number of units proposed on each site.

Monitor take up of windfall sites (large and small sites)

Monitor the affordable housing targets and thresholds of sites coming forward

Complete the LHMA to Identify whether a Complete the assess whether Gypsy and permanent or transit assessment of the

9 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

traveller accommodation is traveller site is required need for a permanent required in the area. within the National Park. or transit site by (2012).

If need is identified through the GTNA within the Failure to meet an National Park consider Site Assessment, ongoing identified need. suitable sites resulting from monitoring and the Site Study. review.Continue to be part of the GTNA group

Monitor affordable housing need figure identified through the LHMA and other appropriate local

housing needs surveys

Monitor intermediate Ensure to continue to be Failure to deliver affordable housing needs part of the development of through Tai Teg Register. the register progress of Gwynedd Affordable Homes register. Register should be regularly updated and information to be disaggregated to National Park area and to Community Council areas to assist the monitoring process.

Revise Produce a practical By 20129 Failure to deliver note on affordable housing based on amending the existing SPG on Affordable Housing. Include information regarding viable

10 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

small scale and self build affordable dwellings.

The number of applications Substitution for a condition Less than 30% of all approved for the removal of restricting occupancy to approvals to remove an agricultural or holiday affordable housing agricultural or holiday accommodation occupancy accommodation condition conditions

Number of new or improved An increase in the number Failure to deliver community facilities in Local of new or improved Service Centres, Secondary community facilities Settlements and Smaller Settlements

Number of community No loss of viable facilities Failure to deliver facilities lost through change of use

Number of Community & No significant harm to the 1 harmful scheme for Linguistic Statements character and language 3 consecutive years submitted balance of a community or 3 harmful developments in 1 year Number of Community & Linguistic Impact Assessments submitted

Monitor the effectiveness of Number produced in the Community and compliance with policy. linguistic statement and the Assess effectiveness. Community & Linguistic Impact Assessments

11 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Encouraging Welsh or bi- An increase in Welsh or bi- lingual signage lingual signage

Encouraging the use of An increase in Welsh place Welsh place names for new names for new developments developments

Number of planning All large development Failure to secure obligations secured on obligations where larger development necessary on 2 or more sites in 3 years

4 72 5.5 To include an allowance for large windfall site in Amend Paragraph 5.5 as follows: the Eryri LDP housing provision. Further minor Sufficient land therefore needs to be allocated in the Local Development Plan to accommodate approximately 770 770 -– changes have been 830 dwellings houses over the Plan period. This figures includes , including the contribution of the existing land supply to necessary to text and this requirement and the potential contribution of small sites (less than 5 units) 1 , large sites (5 units or more) windfall tables in the housing sites within housing development boundaries 2 and an estimated contribution fromor conversions. to housing from other chapter to reflect the uses. To allow greater flexibility within the Plan a contingency of 11512540 units (155%) has been is included in the forecast increase in housing figure as indicated in the table below. The contingency is to allow for sites not coming forward and providesThis figure equates to approximately two years completions and provides sufficient flexibility in the Plan to enable the delivery of provision. affordable housing to meet targets. without compromising the environmental capacity of the National Park.

Amend table following Para 5.5 to include large windfall site allowance as follows:

Summary of Housing Supply Components – 01st April 2016

A Total Completions 01/04/2016 – 31/03/2031 (Small & large sites) 0

1 This information has been collated in a Settlement Capacity Study (Snowdonia National Park Authority 20117)

12 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

B Committed Sites / Land Bank 288

C Contribution from Housing Allocations 184

Ch Contribution Small Sites 338

D Contribution Large Sites 75

Dd Total Housing Provision 2016 – 2031 885 810

Amend table following Para 5.7 to include large windfall site allowance as follows:

Components of Housing Local Service Secondary Smaller Open Total Supply Service Settlement Settlement Settlement Countryside Centre

A Total completions (small and - - - - - 0 large)

01.04.16 – 31.03.17

A Units with planning 90 38 120 11 29 288 permission (at plan base date (2016) 31.03.17

B Strategy 80 40 64 - - 184 compliant candidate sites/Allocations (subject to further refinement)

C Small windfall sites (less than 2463 2430 136141 5465 10039 338 5) (-5) 14 years remaining

13 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Ch Large Sites (5 or more) 30 23 22 - - 75

D Approximate Total Housing 194233 102108 320325 6576 12168 810 provision 263 131 347 885

% Target in each settlement 29 13 40 9 8 tier 29.2% 14.8% 39.2% 8.6% 7.7%

Amend Paragraph 5.12 as follows

The Housing Background Paper provides other additional data sources and housing need estimates including estimates in connection with regional work on the Local Housing Market Assessment and housing register data. If the evidence is taken together the affordable housing needs figures indicate a much higher affordable housing need of 2130205 units. This is higher than the overall housing requirement for the Plan as a whole and is far beyond what is environmentally acceptable or practically deliverable when compared with past affordable housing completion rates of 19 units between 2012- 2016. These sources taken with the community level rural housing enabler surveys indicate a possible higher level of affordable housing need of 1,200 units over the whole plan period which would compromise the environmental capacity of the National Park and would be unacceptable. Other considerations include the anticipated future level of finance available to assist in building new affordable homes. Future funding is uncertain but not likely to remain at current levels due to government cutbacks. Housing sites in the National Park are also small; therefore the contribution of affordable homes has to come from a greater number of smaller sites. The viability of developing potential sites has been tested and shows a varying across the National Park and this is likely to impact on the overall capacity to deliver and achieve affordable housing developer contributions. Taking all the above factors into account, the overall affordable housing target has been realistically set at a range of between 375 350 400 – 450 dwellings. If towards the end of the Plan period the lower target range has been exceeded, the affordable housing policies in the Plan will continue to apply to reach or exceed the upper target figure although this is considered unlikely due to the rate of past completions.. The range of need will be kept under review through the Local Housing Market Assessment and the Rural Housing Enabler’s Local Housing Needs Surveys. as the Plan progresses and in any subsequent reviews.

Amend Paragraph 5.13 as follows

14 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Representations received when preparing the Local Development Plan have indicated that theThe affordability of local housing is one of the main issues that should be addressed. The Authority is committed to delivering affordable housing to meet local need, but recognises that land use planning is only one of the mechanisms that can be used to provide for affordable housing. The overall target has been set at 350.

Amend Paragraph 5.15 as follows:

The Local Development Plan affordable housing target is must be based upon a realistic assessment of what is likely to be achievable and what can be delivered within the environmental capacity of the National Park. The figure of 375 350 units represents 25 23 units per annum at the lower figure range and is slightly higher than past completion rates. Having undertaken a Settlement Capacity Study and considered all the environmental constraint of settlements of the maximum overall housing requirement of 830 dwellings approximately 50% of these will be It is anticipated that these units will be delivered as affordable intermediate or social rented housing for local people in need who cannot afford open market housing. This stock of dwellings will be retained in perpetuity to establish a range of dwellings for the social and economic benefit of the National Park at lower cost than open market housing.

Amend table following paragraph 5.16 as follows:

Estimated yield delivered

Committed supply 2072 units

Small sites and Small Wwindfall sites within 14266 units housing development boundaries

Large windfall sites within housing 25 units development boundaries

Mixed allocation (Bala, Harlech, , 3128 units Trefriw, Dyffryn ) (50% affordable)

100% affordable housing allocations 87121 units

Conversions (within and outside development 50 40 units boundaries)

Affordable housing in smaller settlements 54 units

Total 375350415

15 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

5 81-83 Strategic Split Strategic Policy G into two policies 1 Strategic Policy and 1 Affordable Housing Policy Splitting the Policy into Policy G: two ensures that the key Housing + Strategic Policy: Housing (G) elements are included proposed within appropriate policies Development The Eryri Local Development Plan has a plan requirement of 770 dwellings and makes provision for in a coherent manner. Policy 30: approximately 810 885 new dwellings up to 2031. The large windfall sites Affordable contribution has been Housing New housing within the National Park will be required to meet the need of local communities. Proposals must take included in the over all appropriate account of local housing needs in terms of size, type and tenure of dwellings. The house types should housing provision. The reflect the results of the Local Housing Market Assessment or appropriate local needs surveys. Residential affordable housing target developments should make the best use of land. The Authority will seek a density of 30 dwellings per hectare has been included in the for residential developments (unless there are local circumstances such as the character of the locality that Affordable housing policy suggests a lower density may be more appropriate). along with additional text to ensure that should a Housing allocations are listed below and are shown on the Proposals and Inset Maps. need be identified within a smaller settlement for Hierarchy Allocations Estimated more than 2 additional Units dwellings over the plan Local Land behind the Red Lion, Y Bala (80% open market, 20% affordable 55 period this can be Service housing to meet local need). Release of 30 units up to 2021 and, if built, the considered as included in Centre remaining 25 units from 2026 to 2031 the existing plan.

Local Land at Cysgod y Coleg, Y Bala (100% affordable housing to meet local 10 Service need) Centre

Local Land behind Wenallt, Dolgellau (100% affordable housing to meet local 15 Service need) Centre

Service Former Primary School, Aberdyfi (100% affordable housing for local need 6 Settlement

16 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Service Land adjacent Penyrhwylfa, Harlech (67% open market 33% affordable 24 Settlement housing for local need)

Service Land adjacent Bro Prysor, (100% affordable housing for local 10 Settlement need)

Secondary Land adjacent to Pentre Uchaf, (100% affordable housing 10 Settlement to meet local need)

Secondary Land adjacent to Capel Horeb, Dyffryn Ardudwy (50% open market, 50% 5 Settlement affordable housing to meet local need)

Secondary Land adjacent to Garreg Frech, (100% affordable housing to 6 Settlement meet local need)

Secondary Land adjacent to Maes y Pandy, (100% affordable housing to 7 Settlement meet local need)

Secondary Land adjacent to Lawnt y Plas, Dinas (100% affordable housing 6 Settlement for local need)

Secondary Land at Former Woolen Mill, Trefriw (50% open market, 50% affordable 5 Settlement housing to meet local need)

Secondary Land adjacent to Rathbone Terrace, Dolwyddelan (100% affordable 6 Settlement housing to meet local need)

Secondary Land at Y Rhos, Llanegryn (50% open market, 50% affordable housing to 8 Settlement meet local need)

Secondary Land adjacent to Bryn Deiliog, (100% affordable housing for local 6 Settlement need)

Secondary Land adjacent Maesteg, (100% affordable housing for local need) 5 Settlement

Total 184

17 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Development Policy 30: Affordable Housing (30)

Development opportunities have been identified within the Plan to provide a target of 375 new affordable homes to meet local needs

On all sites the following affordable housing contributions will be sought:

i) Within Local Service Centres 20% on sites of 5 dwellings or more dwellings

ii) Within Service Settlements 33% on sites of 3 dwellings or more

i)iii) Within Secondary Settlements 50% on sites of two 2 dwellings or more

ii)iv) On sites Within smaller settlements immediately adjacent a highlighted property as shown on the inset maps up to two new single dwellings for 100% affordable housing. Exceptionally more than two dwellings will be allowed where need is proven and the character and setting of the settlement is not impaired.

v) On sites being developed by Housing Associations, Trusts or similar subsidised bodies 100%

vi) On conversions anywhere, 50% or a commuted sum contribution for one dwelling. Alternatively the conversion can be a 100% affordable with local occupancy conditions The delivery of new housing will be provided through:

Allocated Sites

i. Allocating sites for 100% affordable housing to meet local need on publicly owned land and 50% affordable housing to meet local need on privately owned land within the housing development boundaries of settlements (identified on the inset maps).

ii. Phasing the site to the rear of the Red Lion in Bala by allowing the release of 30 units up to 2016 and, if built, the remaining 25 units from 2016 to 2022.

18 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Unallocated Sites

iii. Seeking 50% affordable housing to meet local need on unallocated sites in Dolgellau and Bala.

iv. Seeking 100% affordable housing to meet local need on all new build on unallocated sites within the housing development boundaries of Service Settlements and in Secondary Settlements for four or more dwellings 50% affordable housing to meet local need will be sought.

v. Supporting the development of up to two new single dwellings for 100% affordable housing to meet local need within Smaller Settlements (if the site is immediately adjacent to a property highlighted on the settlement inset map). Exceptionally more than two dwellings will be allowed where need is proven and the character and setting of the settlement is not impaired.

vi. Supporting small scale 100% affordable housing to meet local need on exception sites immediately adjoining housing development boundaries in line with Development Policy 11.

vii. Seeking 50% affordable housing to meet local need for all conversions.

Where adjacent and related residential proposals result in combined numbers or site size areas exceeding the above thresholds, the Authority will seek affordable housing based on the affordable housing target percentages set out above.

If it can clearly be demonstrated that the above indicative affordable housing targets cannot be met due to site viability, or could be exceeded in some cases, the Authority will negotiate an appropriate affordable housing contribution on individual sites, which could include an appropriate commuted payment. This however will not apply to exception sites or sites in smaller settlements where a 100% affordable housing contribution will always be sought.

19 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Planning permission for a new affordable dwelling will be subject to a legal agreement to ensure that it remains affordable in perpetuity for a local person in housing need as defined in paragraph 5.4126 and 5.2742.

New affordable housing units should be fully integrated and be as good, if not better than market housing units in terms of external design quality and materials.

The size of affordable housing units will be commensurate with the needs of the intended household.

Permitted development rights will be removed on all the affordable housing units in order to regulate the manner in which they can be extended in the future.

All new units and alterations should be of good quality sustainable design in accordance with Development Policy 6: Sustainable Design & Materials, and achieve the Welsh Government’s development standards which include the lifetime homes standard.

6 81 5.24 Amend Para 5.24 as follows: To provide further clarification on The Authority aims to restrict the size of properties to be commensurate with the needs of the intended household, but also circumstances where the recognising the role of the property to meet future needs of the community for affordable housing. In respect of all new Authority will be seeking affordable housing for local needs, permitted development rights for extensions will be removed to make sure that an commuted sums. extension or alteration would not increase the value of the property beyond the value of an affordable house that meets local need. Given the Authority’s commitment to secure affordable housing it is preferred that affordable housing for local needs is provided on-site. In exceptional circumstances, affordable housing commuted payments may be acceptable. Commuted sums will be particularly relevant where a proposed development will generate the requirement for ‘partial’ affordable dwellings i.e. an affordable housing contribution which amounts to less than a whole unit. Where contributions would equate to less than one unit, commuted sums of the equivalent amount to the part contribution will be required. Commuted sums may be used to facilitate the provision of affordable housing directly by a

20 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

housing association or to bring back empty properties into use as affordable housing for local needs elsewhere within the National Park. Further details about the type of affordable housing models, information on local need requirements about what will need to be demonstrated by applicants, and additional information about commuted sums, and floorspace guidelines and other related issues will beareis set out in the Affordable Housing Supplementary Planning Guidance (4) Affordable Housing information about what will need to be demonstrated by applicants and additional information about commuted sums and floorspace guidelines will be set out in the Affordable Housing Supplementary Planning Guidance.

7 Include Eryri LDP housing land supply table 2016-2031 and trajectory graph and delivery evidence on housing allocations To provide clarity. as appendices in the Eryri Local Development Plan

See appendix 1 and 2 of this document

8 87-88 Development Insert after Para 5.33 the following; Policy and reasoned Policy 13: justification has been Gypsy and updated to ensure Travellers It is recognised that need for a Gypsy and Travellers site may arise outside of the findings of the Gypsy and conformity with the newly Sites Traveller Needs Assessments. Where this is the case the Authority will consider applications on a case by case published Welsh basis in line with the criterion set out in Development Policy 13. Evidence will be expected to show that there are Government circular – no suitable pitches available within existing sites within Gwynedd or Conwy Local Authority area. Planning for Gypsy, Traveller and Showpeople sites.

21 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Development Policy 13: Gypsy and Travellers Sites (13)

Within the National Park planning permission for gypsy sites will be granted provided that the following criteria are satisfied:

i. Evidence of need to locate or provide transitory arrangements in the area has been identified.

ii. There are no suitable pitches available within existing sites within the Gwynedd or Conwy Local Authority area.

iii. The use of the site will not cause significant harm to residential or public amenity.

iv. The site is in scale with the nearest settled community.

v. The site has adequate provision of essential services including an efficient waste and recycling collection service and mains services, and does not place any undue burden on local infrastructure. vi. The site has direct access onto a principal road, and is on a bus route accessing local services.

vii. The proposal does not cause significant visual intrusion, is sensitively sited in the landscape and satisfactory landscaping is provided.

9 124 Amend Appendix 1: Glossary; Following assessment of the revised Development Policy 13 through the SA/SEA to ensure it was Windfall Sites A site not specifically allocated for development in a development plan, but which unexpectedly becomes available during the lifetime of a plan. Sites within the sufficiently clear that Housing Development Boundaries which do not currently enjoy the benefit of a planning sites would be required permission but could be considered favourably for housing. to submit a community and linguistic statement the definition of windfall in Appendix 1 Glossary has been updated.

22 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

23 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

Hearing Session 2: Matters Arising Changes

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

10 96 Strategic Amend Strategic Policy H as following: Added wording of ‘Bala, Dolgellau and Policy H: A Harlech’ to provide further clarity regarding Strategic Policy H: A Sustainable Rural Economy (H) Sustainable which sites are safeguarded and where. Rural Economy In order to create and retain a sustainable rural economy the National Park Authority will:

i. Safeguard existing key employment sites at Bala, Dolgellau and Harlech.

ii. Support new employment and business development and the retention of existing employment in the local service centres, service settlements and secondary settlements. The nature and scale of the development must be commensurate with the settlement’s size and function.

iii. Promote the re-use of underused or redundant land or buildings for economic or employment purposes.

iv. Support the agricultural sector and opportunities for rural diversification that do not negatively impact on the ‘Special Qualities’ of the National Park.

v. Support tourism and recreation activity which maximise local economic benefits, minimise environmental impact and safeguard the ‘Special Qualities’ of the National Park.

vi. Encourage proposals which would provide appropriate supportive infrastructures to sustain and promote the local economy.

vii. Support live-work units and home working.

In order to safeguard employment and business premises pPProposals for the re-use of existing employment land or buildings (other than key employment sites) for other purposes will only be permitted where:

24 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

viii. The new use would result in a significant improvement to the environment which outweighs the loss of employment land, or

ix. The retention of the employment or business facility is no longer viable and it cannot be re- used for similar or alternative employment purposes and the employment potential has been advertised on the market for at least one year. x.

ix.xi. In the case of allocated land, land of equal or better quality is made available elsewhere, even if this is not within the National Park boundary.

11 Amend proposals maps to show the existing key employment sites. To provide clarity to where the key employment sites are within the Snowdonia See Appendices 3-5 National Park.

12 100-101 Development Development Policy 27 Snowdonia Enterprise Zone As part of addressing the actions points Policy 27: arising from the Hearing Sessions Snowdonia A detailed landscape led outline Masterplan will need to be produced for both Llanbedr and Development Policy 27 was revisited and in Enterprise Trawsfynydd sites and agreed with the Authority. The Masterplan which will contain a order to provide clarity and to ensure that Zone development brief, a design statement, and a schedule identifying the of development and the National Purposes were given sufficient associated infrastructure improvements required for each stage, before any development consideration additional text has been commences. included to provide further information about

what the Authority will require to ensure the The outline masterplan will need to be supported by a landscape and visual impact assessment and demonstrate how the siting, scale, design and character of the development will minimise landscape is protected. These changes adverse effects upon the landscape character, visual amenity, natural environment and cultural have been proposed to ensure that they heritage of the National Park. support the criterion detailed in MAC 13.

Minor changes have been proposed to the Welsh version to ensure conformity with the A. Proposals for development in line with Parts B and C of this policy will be supported within English version. This has included the the Snowdonia Enterprise Zone provided the following criteria are met: deletion of a criterion that was not deleted.

25 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

i. There is a design is coherent and of high standard of design, responds positively to the sensitive landscape and visual setting which reflects the outstanding landscape setting and Special Qualities of the National Park

ii. The siting, height, form and scale materials and use of colour within of the development assists its landscape integration and minimises significant adverse effects upon the landscape character and visual amenity is appropriate to the site on which it is located

iii. Development proposals have been considered in view of the requirements of the Habitats Regulations and found to be compliant.

iv. The landscape lead master plan has demonstrated that the development does not result in an adverse effect on the landscape character or have an inappropriate visual impact

v. Development on either site is in line with an agreed outline masterplan for that site.

vi. The employment development maximises the use of the existing local workforce

vii. Development on either site does not have and unacceptable impact on the dark skies reserve

26 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

13 101 Wording of Part B of Development Policy 27 B. Llanbedr revised to include ‘indicative focus area’ for Llanbedr and provide additional criterion for Within the wider Enterprise Zone area as identified on the proposals maps development determining applications within the associated with the uses below will be considered on a case by case basis. Enterprise Zone designation at Llanbedr. Within the Enterprise Zone Designation allocation at Llanbedr identified on the proposals maps the following uses will be accepted: This will also be reflected on the proposal o operations and uses associated with the aviation and aerospace industry, including those maps for clarity. associated with airfield infrastructure and services and airspace management; o new uses including employment use (B1, B2, B8) and other uses associated with research and development (related to including aviation and aerospace industries), o employment-related training and education purposes; o other uses ancillary to the uses identified above including accommodation, catering and leisure.

Development proposals should be directed towards the indicative focus area. Where development is proposed outside this area, the following criteria should be met: o detailed proposals will need to demonstrate that the proposed development incorporates appropriate and acceptable flood risk mitigation measures agreed with NRW o there are no unacceptable significant effects on the landscape or visual amenity o sufficient evidence has been provided that the site demonstrates the least impact upon the landscape, visual amenity, environmental and cultural heritage o the development is not located in an area which will prevent the use of the main runway o the development should not adversely affect the integrity of European designated sites o sufficient evidence has been provided to justify why the development cannot be located in the indicative focus area

27 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Part of the wider enterprise zone area as identified on the proposals map is within an area of flood risk. Detailed proposals will need to demonstrate that the proposed development incorporates appropriate and acceptable flood risk mitigation measures agreed with NRW.

Amend proposals map to include the words ‘indicative focus area’ and ‘Welsh Government Designation’.

See Appendix 7

14 99 6.19 The Authority will expect requires an outline masterplan to be in place before any significant new Text amended to support the changes development commences on either the sites. Having a clear strategic framework for the development of proposed to Development Policy 27. the sites will be important in order to prevent inappropriate, piecemeal development and ensure that any new development is coherent in terms of design and layout and respects its location within the National Minor changes have been proposed to the Park. It should also allow greater certainty to any developer, and allow a quicker determination of Welsh version to ensure conformity with the planning applications as and when they are received. The Authority will work with support and advise English version. the site owners and promoters to help develop the outline masterplans following the adoption of the ELDP. The Masterplan would be prepared by the site owners and promoters with support from the Authority. The Masterplan will need to be agreed by the Authority Given the sensitive location of the Enterprise Zone within the National Park it is considered vital that any masterplan should be landscape led and supported by a landscape and visual impact assessment ensuring that full consideration is given to the potential impacts of any proposed development on the landscape.

15 99 6.20 The Authority will expect any new buildings to exhibit a coherent design of a high standard. The Text amended to support the changes scale and nature of any new development should not detrimentally affect the character of the area. proposed to Development Policy 27.

16 99 6.21 Due to its the open nature of the local landscape, the scale of any new buildings on the Llanbedr Text amended to support the changes site should generally be restricted to be no higher than relate and be proportionate to the existing proposed to Development Policy 27. buildings, to ameliorate their visual impact, unless there are exceptional or operational circumstances, in which case a clear evidenced justification will be required. The detailed consideration of design, height, scale and siting of development would be guided by the masterplan for the site and be informed by robust technical assessment in respect of landscape and visual impact. Consideration and assessment of siting options within Llanbedr Enterprise Zone will be required should development be proposed outside of the indicative focus area. The preferred site option

28 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

will need to demonstrate least impact upon landscape, visual amenity, environmental and cultural heritage

17 99 6.23 The Welsh Government designation This is a 793 hectares (1960 acres)50 hectare (123 acre) Text amended to support the changes site around the former Trawsfynydd nuclear power station, including Llyn Trawsfynydd. The extent of proposed to the proposals map to show the the site is shown in on the proposals map Appendix 9. The site benefits from the legacy of its Welsh Government Designation for former use in that there is a source of cooling water from Wales’ largest man-made lake and a Trawsfynydd. national grid substation that delivers a large and reliable electricity supply. The Authority recognises that the development of the site will be entirely dependent on progress with the site’s decommissioning programme. The LDP allocation corresponds with the The Welsh Government SEZ designation as this recognises the importance of the lake as an integral part of the opportunity presented at the site, particularly for energy generation. However, tThe Authority does not anticipate that the lake will come forward for development and a broad development area has been defined which provides flexibility and scope for innovative development proposals to come forward which do not have a detrimental impact on the character of the area. Development is anticipated to be focused on the area identified in the plan allocation, which extends to approximately 58 hectares (143 acres) 135 hectares (334 acres). in line with Development Policy 27 (also identified on the Proposals Map).

18 100 6.26 The Welsh Government designation at Llanbedr Airfield extends to 227.8 hectare (562 acre). Now Text amended to provide conformity with the re-branded as the Snowdonia Aerospace Centre, the site was a former Ministry of Defence owned wording of the Welsh Government site The airfield has three runways of 2.3km, 1.4km and 1.3km providing access to 7,100km² of Designation at Trawsfynydd. segregated airspace over Cardigan Bay. The simultaneous access by both civil and military systems to this significant area of segregated airspace is unique to any airfield in the UK and is the first of its kind in Europe.

19 100 6.266.27 For clarity and consistency, the LDP allocation for Llanbedr shows an indicative focus area Text amended to reflect the changes to where development should be directed, the area is approximately 12.7 hectares (31 acres) and Development Policy 27 and the addition of this area falls outside the area identified as flood risk. the area where the focus of development indicative focus area. will be. A larger area has also been identified on the maps which corresponds with the Welsh Government SEZ designation, here development associated within the uses proposed for the site will be considered on a case by case basis in line with the requirements of the policy. The Authority is aware that the site’s owners have undertaken some initial work to prepare a masterplan for the site. An area of approximately 12.7 35 hectares (31 86 acres) has been identified as the focus of new development, . this area falls outside of the area identified as flood risk. The Authority recognises that there will be a need for small scale new development within the wider site for operational and safety reasons, but development should first be directed towards the indicative focus area any

29 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

significant new development and uses will be focussed within the Enterprise Zone Allocation as shown on the proposals map. North-eastern area of the site. The National Park Authority expects to work closely with the site owners to develop an outline masterplan to guide new development on the site, before any significant development commences on the site.. New development proposals will be subject to the criteria provided in Development Policy 27. Delivery of new uses on the site is anticipated during the first 10 years of the plan period – this will be monitored as part of the regular plan review process.

20 139-141 Monitoring Framework Following a Review of the Monitoring Framework it is proposed to amend the LDP Strategic Relevant Indicators Policy Targets Trigger Level Monitoring Framework to ensure that Objectives employment developments that are granted LDP permission are monitored to provide a more Policies correct reflection of what the Authority are delivering through planning permissions Supporting a A New employment floor Increase in new Failure to deliver Sustainable space built granted employment floor Rural Economy I permission in the Local space Service Centres 1

19 Total new employment Increase in new Failure to deliver 20 floor space granted employment floor permission built in space L National Park (including conversions) 21

22

23

30 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

21 139-141 Amendments to the monitoring framework to ensure that developments coming forward LDP Strategic Relevant Indicators Policy Targets Trigger Level at both Trawsfynydd and Llanbedr are Objectives monitored. LDP

Policies

Supporting a A Monitor take up of land All development Sustainable within the Snowdonia proposals Rural Economy I Enterprise Zone

1 Monitor the types of employment 19 development coming

forward within the 20 Snowdonia Enterprise L Zone

21 Developments coming All Development forward within the proposals 22 Snowdonia Enterprise

23 Zone Indicative focus area – Llanbedr

Developments coming All Development forward within the proposals wider Snowdonia Enterprise Zone Designation – Llanbedr

31 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Developments coming All Development forward within the proposals Snowdonia Enterprise Zone allocation Trawsfynydd

Developments coming All Development forward immediately proposals adjacent to the Snowdonia Enterprise Zone Allocation –

Trawsfynydd

Amend Para 1.57 as follows Amend paragraph to reflect the changes to As the Plan will be reviewed in 2020, any new suggested proposals brought forward seeking to propose the monitoring framework. alternative uses to create new employment and leisure opportunities will be considered as part of the review process. Annual monitoring of Employment levels on the site and the pace of decommissioning Trawsfynydd power station and its consequent impacts will be monitored as part of the Annual Monitoring Report also inform the review process

22 32-33 Insert additional text into para 2.5 as follows: To provide clarity about the kinds of development the Authority considers to be The relationship between the scale of development and its location is important when considering the major development and clarification in the impact that buildings and structure have on the landscape of an area. Given the sensitive environment LDP on when a development will be within the Park and the scale of local communities, it is inevitable that certain types of large development considered a Development of National will have significant effects on both the character of the landscape and the integrity of the Park Significance. environment. Legislation and national planning policy are quite clear that major development should not take place in National Parks other than in exceptional circumstances. ‘Major development’ is not precisely defined in national planning policy. It is therefore defined in this plan as meaning development which is more national1 than local in character and in addition will have significant and long term impact on either the landscape, wildlife, cultural heritage or opportunities for understanding and enjoying the ‘Special Qualities’ of the area. Examples of development which will be classed as major include large scale development associated with: mineral working, quarries, large industrial development, large power generating schemes, high voltage electricity transmission, large scale renewable energy and low

1 ‘National’ in this context means .

32 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

carbon energy schemes, large military development, large transport schemes, large tourism or leisure developments (this list is not exhaustive). More suitable sites for this scale of development should be sought outside the Park, in closer proximity to centres of population and industry, in locations where their impact on the landscape would not be as significant and would not jeopardise those aspects of the local economy which depend upon the high quality landscape.

Footnote to state: The Planning (Wales) Act 2015 introduced a new category of planning permission for Developments of National Significance (DNS). DNS include electricity-generating projects (other than wind) of between 10 and 50 MW and wind projects above 10 MW, and are decided by the Welsh Ministers. Projects under 10 MW are decided by local planning authorities.

23 Amend the proposals map to show the Welsh Government’s Enterprise Zone designation at Welsh Government’s Snowdonia Enterprise Trawsfynydd in its totality. Zone designation to be shown in its totality for the Trawsfynydd site on the Proposal See Appendix 6 Map to ensure consistency with the National designation.

24 104-105 Development Amend Development Policy 21 as follows Wording amended i.e. (‘the provision of’ Policy 21 : deleted) in order to provide clarity. Tourism and Development Policy 21 : Tourism and Recreation (21) Recreation (21) Within the National Park the provision of existing tourist attractions facilities will be protected and enhanced through adopting the principles of sustainable or eco tourism. New tourism tourist attractions development and the enhancement of current attractions facilities will be supported where:

i. It can be accessed by various modes of transport, specifically sustainable modes of transport such as, walking, cycling and public transport.

ii. It is located close to the main road network and does not cause an unacceptable increase in traffic in the vicinity.

iii. The development would not have an adverse impact on the ‘Special Qualities’ of the National Park.

33 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

iv. It promotes opportunities for the understanding and enjoyment of the ‘Special Qualities’ of the National Park, while not detracting from the quiet enjoyment, experience of visitors and the quality of life of the local residents.

v. The facility is designed or modified to improve accessibility for all, in particular disabled people.

vi. It does not have an adverse impact on the views to and from the National Park and does not generate an significant increase in noise or light pollution which could adversely affect the integrity of the Snowdonia Dark Skies Reserve.

vii. Current facilities will be improved or conversion of a vacant or underused building is proposed alongside efforts to improve its energy efficiency and/or provide a proportion of its energy requirements from appropriate renewable energy sources.

viii. There is sufficient land attached to the development or access to land through appropriate means for the proposed tourist facility.

ix. It would not affect the National Park’s biodiversity resources including designated sites from an international through to a local level, as well as wider biodiversity resources e.g. habitats and species outside designated sites

The change of use of serviced accommodation to the non-serviced sector, or its conversion to other non-tourist uses which would prevent its subsequent re-conversion back to serviced tourist accommodation, will not be permitted within the National Park unless to meet a recognised need for affordable housing.

25 109 6.55 Developments e.g. supermarkets should be located within the two larger settlements of Y Bala and Wording amended in par 6.55 to remove Dolgellau as they are the most suitable and sustainable locations and accessible by most means of ‘buffer zone’ and replace it with ‘radius’ in transport. Any development will need to be situated within the defined retail area or within reasonable order to provide clarity walking distance of the retail area (300m), with good access for pedestrians and all modes of transport. A radius buffer zone of 300m presents an opportunity for developers within these settlements.

34 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

35 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

Hearing Session 3: Matters Arising Changes

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

26 133-134 Insert the following to the Monitoring Framework: Addition to monitoring framework to monitor applications coming forward Indicators Policy Targets Trigger Level within the Dark Skies core areas and Monitor planning No unacceptable within the Dyfi Biosphere Reserve. applications coming impact on the forward within the designations Dark Skies core areas and within the Dyfi Biosphere Reserve

27 50 3.32 Amend paragraph 3.32 as follows; Add table shown in Appendix 1 of the Energy Background Paper on the Whilst large-scale energy power generation projects are generally considered incompatible with National theoretical renewable energy capacity Park status, an assessment of renewable energy in Snowdonia considered that scope might exist to contribute available in Snowdonia to para 3.32. to reduce demand for electricity derived from fossil fuels through efficiency savings and through This has been done to provide microgeneration and small-scale renewable energy developments to meet domestic or community needs. additional information and to provide These included may include small-scale hydro, domestic wind turbines, photovoltaics, biomass and landfill clarity. gas. Schemes up to 5MW may also offer some potential in Snowdonia and will be considered favourably, provided they do not cause harm to landscape, amenity and nature conservation and heritage interests.

The table below sets out the findings of the revised Renewable Energy Assessment for the National Park. It provides an estimation of the theoretical renewable energy capacity available within Snowdonia. It does not provide a target for renewable energy developments.

Potential Potential Potential Generation Potential Capacity Capacity (GWh) Generation Category Sub-Category (MWe) (MWt) (GWh) [Electricity] [Electricity] [Heat] [Heat]

Micro-wind 18.4 - 16.1 -

Managed Biomass 4 8 31.55 63.11 Woodland

36 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

Energy Crops 5.66 11.33 44.65 89.31

Animal Manure 0.18 0.28 1.42 1.2

Anaerobic Poultry Litter 0.048 0.072 0.37 0.32 Digestion Sewage Sludge1 0.07 0.10 0.52 0.43

Landfill Gas 2.13 - 11.2 - Gas engine

Low head 1.9 - 6.1 - Hydropower High head 2.0 6.5

Solar 17.3 17.3 15.15 15.15 Microgeneration Heat Pumps - 55 - -

Total 51.7 92.1 133.56 169.52

28 52 3.41 Insert addition text following para 3.41 as follows: Additional text to show the justification for not safeguarding Category 2 Mineral Given that new permissions for minerals working in the National Park must demonstrate an overriding Resources in the reasoned justification national (UK) interest the Proposals Map shows only the extent of Category One resources These are at para 3.41. high specification aggregates (HSA), e.g. high purity limestone, and hard igneous rock suitable for road surfacing, that are considered to be economically important and therefore are of national importance in Wales (and in some cases in the UK). HSA minerals have a limited geographical occurrence and therefore particularly susceptible to sterilisation. It is not considered necessary to safeguard the very extensive Category 2 Aggregates found in the National Park as they are in effect safeguarded by other policies in the LDP. Category 2 aggregates are:

1 It is intended that a substantial amount of sewage sludge from Snowdonia will be transported to the Advanced Digester at Treborth Waste Water Treatment Plant

37 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

 In areas covered by European nature conservation designations which are protected from inappropriate development by Policies within the LDP.  They are not ‘scarce’ in a local context and it is inconceivable that any form of development could sterilise anything other than an infinitesimally small part of the total.  It is unlikely that should any mineral workings be proposed in the future that large scale working of low grade aggregates would satisfy the ‘exceptional’ circumstances’ test set out in national and local policy.  By not safeguarding category 2 resources the Authority removes a burden on developers within the National Park demonstrating that working the resource is not economically viable, which would be required often given how extensive they are.  Much of the land is mountain and moorland and remote from main roads, accessing the resource in many areas would be very difficult without creating substantial adverse visual landscape impacts.

As outlined in the reasons above, Category 2 Aggregates are to a very great extent, already protected from sterilisation by other National and Local policies.

29 134-135 Include the following to the Monitoring Framework: Addition to monitoring framework to monitor applications coming forward in Indicators Policy Targets Trigger Level World Heritage Sites (or their essential Monitor planning No unacceptable settings) and Candidate World Heritage applications coming impact on the Sites. forward within the designations and World Heritage Site candidate or essential setting designations and Candidate World Heritage Site

30 66-67 Development Development Policy 9: Conversion and change of use of rural buildings (9) Change of wording due to previous Policy 9: editing error. Conversion and change The conversion or change of use of redundant rural buildings outside any housing development boundary of use of will be permitted for affordable housing to meet local need an employment use, short term self catering rural holiday accommodation as part of a rural enterprise diversification scheme, or an open market dwelling buildings with the payment of a commuted sum or for affordable housing to meet local needs provided that the following criteria are met:

38 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

i. The building is of permanent and substantial construction, of traditional form and character and has an architectural value worthy of preservation.

ii. The building is capable of conversion without the need for significant rebuilding or extension which would harm its existing character.

iii. All external works including finishes and property boundaries are sympathetic to the character of the building, local building style and materials and do not harm the character of any surrounding building group.

iv. The proposal or any new ancillary structures do not harm the character of the landscape in which they are located.

v. The proposal does not lead to the creation of new vehicular access or parking areas that would adversely affect the character or appearance of the building or that of the wider landscape.

Where the proposal involves a listed building or a building of traditional form or design, the proposal conforms with Development Policy 7: Listed and Traditional Buildings.

Proposals for new affordable dwellings will only be granted where the requirements of Strategic Policy G: Housing are met including the possibility of commuted sums.

An independent structural survey will be required where there is any doubt over the structural stability of the building or it is considered that the proposed works would result in major or substantial reconstruction.

Applicants must demonstrate that the proposed residential use would not displace an existing use which requires the construction of an alternative building to enable it to continue.

39 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

MAC Page Policy / Proposed Change Reason for Change Number Number Paragraph

31 48 Development Insertion of additional wording in Policy 2: Development Policy 2 following Development Policy 2: Development and the Landscape (2) Development comments from NRW at Hearing

and the Session 3. The additional criterion Landscape The scale and design of new development, including its setting and , landscaping and integration should provide greater clarity and certainty that respect and conserve the character, qualities and views of the landscape. Unacceptable impacts on the all landscape considerations are given landscape will be resisted and particular regard will be had to the protection of: sufficient weight when making decisions. i. The Snowdonia Dark Skies Reserve, in particular Core Areas

ii. The Dyfi Biosphere Reserve

iii. Section 3 areas of natural beauty2.

iv. Undeveloped coast.

v. Panoramas visible from significant viewpoints.

vi. Sensitive Landscape Character Areas Landscape character areas based on LANDMAP and as defined in the Supplementary Planning Guidance documents the Landscapes of Eryri Supplementary Planning Guidance and the Landscape Sensitivity and Capacity Assessment.

2 As defined under section 3 of the Wildlife and Countryside Amendment Act 1985.

40 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018 Appendix 1 Eryri LDP housing land supply 2016-2031

Plan Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A Year 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 Remaining Years @ Year B end 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 C LDP Housing Requirements 770 770 770 770 770 770 770 770 770 770 770 770 770 770 770 D Plan Annual Requirement 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 Actual Completions LDP E Sites During Year 1 Actual Completions Other F Large Sites During year 6 Actual Completions Small G Sites During Year 13 H Land Bank Sites 0 31 31 20 34 36 12 23 22 27 19 18 5 5 5 I Allocated 0 0 10 26 20 28 26 10 6 10 10 5 12 11 10 J Windfalls 13 16 16 18 18 18 18 23 23 23 23 29 30 30 K Actual Completions E+F+G 20

L Anticipated Completions H+I+J 44 57 62 72 82 56 51 51 60 52 46 46 46 45 Total Cumulative M Completions @ Year End 44 101 163 235 317 373 424 475 535 587 633 679 725 770 Residual Housing N Requirement @ Year End C -M 770 726 669 607 535 453 397 346 295 235 183 137 91 45 0 O Five Year Requirement (N/B)*5 257 259 257 253 243 227 221 216 211 196 183 188 194 199 205 Annual Building P Requirement O/551 52 51 51 49 45 44 43 42 39 37 38 39 40 41 Q Total Land Available 317 329 323 312 300 270 260 255 250 235 183 191 199 207 216 R Land Supply (Years) Q/P 6 6 6 6 6 6 6 6 6 6 5 5 5 5 5

41 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

Eryri LDP Housing development trajectory 2016-2031 100

90

80

70

60

50

40

30

20

10

0 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31

Land Bank Sites Allocated Windfalls Actual Completions Plan Annual Requirement

42 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

Appendix 2

No of No Current Phasing as How will the Number % Land Constraints to Infrastructure Key Funding Allocation affordable open development outlined in the site be of units AH ownership development requirement and cost timings streams units market status trajectory developed? Red Lion 55 11 44 20 Private Pre-application No major No major infrastructure Landowner 10 units 2018/19 Sell the site to a Developer Bala owner discussions constraints requirements or costs. foresees first 10 units 2019/20 developer funding underway identified Estimated distance from phase 10 units 2020/21 streams key infrastructure: coming 10 units 2025/26 Electricity: 8m forward for 10 units 2026/27 Gas: 25m development 5 units 2027/28 Water: 25m within next 5 Sewerage: 0.7m years. Telecommunications:4m

Cysgod y 10 10 0 100 Cartrefi Pre- application Public footpath No major infrastructure CCG To be developed in CCG Housing Housing Coleg Bala Cymunedol discussions runs through the requirements or costs. foresee the one phase. Association to association Gwynedd underway site, which can be Estimated distance from site coming 10 units 2019/20 develop the site funding in owned site diverted. No major key infrastructure: forward for themselves to place. Will be constraint Electricity: 20m development meet the putting a bid Gas: 20m during housing need for Social Water:20m 2019/20 identified locally. Housing Grant Sewerage:20m Telecommunication:20m

Pentre 10 10 0 100 Cartrefi Pre-application No major No major infrastructure CCG To be developed in CCG Housing Housing Uchaf Cymunedol discussions constraints requirements or costs. foresee the one phase. Association to association Dyffryn Gwynedd underway identified Estimated distance from site coming 10 units 2020/21 develop the site funding in Ardudwy owned site key infrastructure: forward for themselves to place. Scheme Electricity: 15m development meet the already on Gas: No Gas available during housing need Gwynedd Water:15m 2020/21 identified locally. Councils Sewerage:20m Social Telecommunication:15m Housing Grant reserve list.

Capel 5 3 2 50 Private No progress to There is a small No major infrastructure Developer 5 units within the Combination of Private funds Horeb, owner date brook running requirements or costs. foresees the next 5 years landowner available to Dyffryn along top of the Estimated distance from site coming 5 units 2021/22. selling develop the Ardudwy site. Public rights key infrastructure: forward completed site. of way across part Electricity: on site within 5 dwellings and of the site. Gas: None years. selling individual Water: on site plots. Sewerage: on site Telecommunications: on site

43 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

No of No Current Phasing as How will the Number % Land Constraints to Infrastructure Key Funding Allocation affordable open development outlined in the site be of units AH ownership development requirement and cost timings streams units market status trajectory developed? Primary 6 6 0 100 Gwynedd Advanced pre No Constraints to No major infrastructure CCG To be developed in CCG Housing Housing School Council applications development. requirements or costs. foresee the one phase. Association to association Aberdyfi have agreed discussions Estimated distance from site coming 6 units 2019/20 develop the site funding in to selling the key infrastructure: forward for themselves to place. Will be the land to Electricity: 10m development meet the putting a bid Cartrefi Gas: 10m during housing need for Social Cymunedol Water:10m 2019/20 identified locally. Housing Grant Gwynedd Sewerage: 10m (CCG) Telecommunication:10m .CCG have agreed to purchase once full planning is achieved. . Llanfrothen 6 6 0 100 Cartrefi No progress to No constraints to No major infrastructure CCG To be o be CCG Housing Housing Cymunedol date development requirements or costs. foresee the developed in one Association to association Gwynedd Estimated distance from site coming phase. develop the site funding in owned site key infrastructure: forward for 6 units 2022/23 themselves to place. Will be Electricity: 15m development meet the putting a bid Gas: No Gas during for Social housing need Water:25m 2022/23 Housing Grant Sewerage:25m identified locally. Telecommunication:15m Dolgellau 15 15 0 100 Cartrefi No progress to Water course 60m No major infrastructure CCG To be developed in CCG Housing Housing Cymunedol date to the east of the requirements or costs. foresee the one phase. Cartrefi Association to association Gwynedd site - no major Estimated distances site coming Cymunedol develop the site funding in owned site issues foreseen. from key infrastructure: forward for Gwynedd anticipate themselves to place. Will be Large protected Electricity: 15m development that more units can meet the putting a bid oak tree on site Gas: 15m during be developed on site housing need for Social which will be Water:15m 2022/23 in the future. identified locally. Housing Grant deigned to be part Sewerage:15m 15 units 2022/23 of the scheme. Telecommunication:15m Public footpath on part of the site. Llanuwchllyn 7 7 0 100 Grwp No progress to No constraints to All nearest utility Within the To be developed in Grwp Cynefin Housing Cynefin date developm connection is on site. next 15 one phase. Housing association owned site ent years 7 units 2029/30 Association to funding in develop the site place. Will be themselves putting a bid for Social Housing Grant Dinas 6 6 0 100 Cartrefi No progress to No constraints to No major infrastructure CCG To be developed in CCG Housing Housing Mawddwy Cymunedol date developm requirements or costs. foresee the one phase. Association to association ent Estimated distances site coming 6 units 2024/25 develop the site funding in

44 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

No of No Current Phasing as How will the Number % Land Constraints to Infrastructure Key Funding Allocation affordable open development outlined in the site be of units AH ownership development requirement and cost timings streams units market status trajectory developed? Gwynedd from key infrastructure: forward for themselves to place. Will be owned site Electricity: 30m development meet the putting a bid Gas: No gas during housing need for Social Water:50m 2024/25 identified locally. Housing Grant Sewerage:50m Telecommunication:30m Trefriw5 3 2 50Private Pre-application No constraints to No major infrastructure 5 units To be developed in Sell Site to No funding owner discussions development but requirements or costs. 2022/23 one phase. developer streams. underway the development Estimated distances 5 units 2022/23 of the site would from key infrastructure: lead to the Electricity: 200m removal of trees Gas: None and/or hedgerows. Water: 200m Sewerage:200m Telecommunications: Not known Dolwyddelan 6 6 0 100 Natural No progress to No major No major infrastructure 6 units To be developed in Natural Housing Resource date constraints requirements or costs. 2030/31 one phase. Resource Wales association Wales identified Estimated distance from 6 units 2030/31 own the site and funding in owned site key infrastructure: are keen to sell place. Will be Electricity: Nearby the land to a putting a bid Water: Nearby housing for Social Sewerage: Nearby association as Housing Grant Telecommunication: an affordable Nearby housing scheme similar to the scheme already completed on neighbouring site. Grwp Cynefin are keen to purchase the land and develop the site. Harlech 24 8 16 33 Private No progress to No constraints to 12 units by To be developed in Develop the site No funding Coleg date development 2022 two phase in conjunction stream Harlech 12 units by 12 units 2021/22 with a Housing identified to owned site 2029 12 units 2028/29 Association date. Llanegryn 8 4 4 50 Private Early There are no No major infrastructure 8 units 2029 To be developed in Private Housing discussions constraints to requirements or costs. - 31 two phase. landowner is association between the site development. Estimated distance from 4 units 2029/30 looking at the funding in owner and the key infrastructure: 4 units 2030/31 options of either place. Will be Rural Housing Electricity: 4m selling the land putting a bid Enabler. Gas: as individual for Social Water: 5m plots or Grwp Housing Grant

45 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

No of No Current Phasing as How will the Number % Land Constraints to Infrastructure Key Funding Allocation affordable open development outlined in the site be of units AH ownership development requirement and cost timings streams units market status trajectory developed? Sewerage: 5m Cynefin housing Telecommunications:5m association have shown an interest to purchase the land and develop the site. Llanbedr 6 6 0 100 Cartrefi No progress to No constraints to No major infrastructure CCG To be developed in CCG Housing Housing Cymunedol date development requirements or costs. foresee the one phase. Association to association Gwynedd Estimated distance from site coming 6 units 2021/22 develop the site funding in owned site key infrastructure: forward for themselves to place. Will be Electricity: 30m development meet the putting a bid Gas: No gas available during housing need for Social Water:20m 2021/22 identified locally. Housing Grant Sewarage:20m Telecommunication:30m Trawsfynydd 10 10 0 100 Cartrefi No progress to No constraints to No major infrastructure CCG To be developed in CCG Housing Housing Cymunedol date development requirements or costs. foresee the one phase. Association to association Gwynedd Estimated distance from site coming 10 units 2023/24 develop the site funding in owned site key infrastructure: forward for themselves to place. Will be Electricity: 10m development meet the putting a bid Gas: No gas available during housing need for Social Water:10m 2023/24 identified locally. Housing Grant Sewerage:40m Telecommunication:10m Pennal 5 5 0 100 Cartrefi No progress to No constraints to No major infrastructure CCG To be developed in CCG Housing Housing Cymunedol date development requirements or costs. foresee the one phase. Association to association Gwynedd Estimated distance from site coming 5 units 2021/22 develop the site funding in owned site key infrastructure: forward for themselves to place. Will be Electricity: 10m development meet the putting a bid Gas: Non gas available during housing need for Social Water:10m 2021/22 identified locally. Housing Grant Sewerage:10m Telecommunication:10m

46 Appendix 3 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

Area: 10.89ha

47 Appendix 4 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

Area: 2.91ha

48 Appendix 5 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

Area: 0.67ha

49 Appendix 6 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018

Welsh Government Designation - Snowdonia Enterprise Zone: Trawsfynydd

270000

· · ······ ···· · · ··

Llyn Trawsfynydd (Reservoir)"

270000

Graddfa / Scale: 1:29,000 Dyddiad / Date: 20/7/2018 Creawdwr I Creator: Elen Hughes

© Hawlfraint y Goron a hawliau cronfa ddata 2018 OS 100022403 Awdurdod Pare Cenedlaethol Eryri � Snowdonia National Park Authority © Crown copyright and database rights 2018 OS Swyddfa'r Pare Cenedlaethol � National Park Office 100022403 Hawlfraint Awdurdod Pare Cenedlaethol Eryri. Gwynedd Copyright Snowdonia National Park. 'if 01766 770274 LL 48 6LF

50 Appendix 7 Eryri Local Development Plan 2016-2031 Matters Arising Changes Consultation - September 2018