Underground Space Use: Analysis of the Past and Lessons for the Future - Erdem & Solak (Eds) ©2005 Taylor & Francis Group, London, ISBN 04 1537452 9

Total Page:16

File Type:pdf, Size:1020Kb

Underground Space Use: Analysis of the Past and Lessons for the Future - Erdem & Solak (Eds) ©2005 Taylor & Francis Group, London, ISBN 04 1537452 9 Underground Space Use: Analysis of the Past and Lessons for the Future - Erdem & Solak (eds) ©2005 Taylor & Francis Group, London, ISBN 04 1537452 9 Table of Contents Preface xvii Sponsors xix Volume 1 Tunnels, environment and public Positive impact of El Azhar road tunnels on environment, safety and tourism in Fatimid Cairo 3 A. Abd El M. Khali! Why did the hydropower industry go underground? 9 E. Broch Workforce competence in the United Kingdom tunnelling industry 15 R. Ibell, PI Jewell & D. Allenby Microtunnelling or trench excavation: a comparison of the two alternatives 21 D. Peila & M. Bottero Tunnels related to Metro, Highway and Sewerage schemes in Istanbul 27 M.C. Gumusoglu Underground space use in Ancient Anatolia: the Cappadocia example 35 A. Erdem & Y. Erdem Explosion tests in drainage pipes of long tunnels 41 V. Wetzig A multi-level tunnel for Amsterdam Zuidas 45 L.I. Vdkar, Th. S. de Wilde & E.L. Megens Planning, research, development and design aspects on underground structures Design of pressure tunnels of Ermenek hydro power plant 53 M. Marence &A. Oberladstatter Three-dimensional rock mass documentation in conventional tunnelling using JointMetriX3D 59 A. Gaich, W.Schubert & M. Potsch Highway D5 Pilsen highway by-pass - the Valik Tunnel 65 J. Svoboda & M. Salac A risk based methodology for optimum runnel configuration 71 D.P Richards, M.A. Hudson & M. Whitaker Effect of ground water on tunnel face stability in the soft ground 77 S. Konishi, T. Ono, T. Kitagawa, H. Iida, A. Isogai & T. Matsunaga Development of Anchor sheet segment and Push Resin Joint 85 S. Okamoto, Y. Yamamoto & T. Kunifuji Observational method for tunnel construction in difficult conditions considering 93 environmental impact to groundwater H. Ohtsu, Y. Ohnishi, T. Nishioka, K. Takahashi & T. Yasuda Research plan and construction outline of the Mizunami Underground 101 Research Laboratory (MIU) in large depth for geoscience and geological disposal fundamental research M. Sakamaki, T. Sato, S.-I. Mikake, T. Kanata, K. Nakamura, M. Kubo, K. Akiyoshi, M. Noda, Y. Nishikawa & J. Nobutoh Water-tightening design and construction of tailbay tunnels at Kannagawa Power Plant 109 F. Kawashima, M. Yamasaki, H. Ozawa, S. Ishizaki, T. Otani & N. Igarashi Study on state and pattern analysis of Tunnel Portal Slope in Korea 117 Y Baek, O.I. Kwon, H.B. Koo & G.J. Bae Desilting chambers of Nathpa Jhakri hydroelectric project - case study of problems during 123 construction and remedial measures S.P.S. Chauhan & R. Jeyaseelan Oporto light train. Bolhao station design 129 R.S. Pistone & M.C Costa A design case study of the very wide 3-arch tunnel under the railroad station building 135 SB. Chang, S. Kwon, S.J Moon & S.D. Lee Rock mass characterization and primary support design for the Boztepe Tunnel, Turkey 141 E. Sopaci, H. Akgiin & M. Akinci Tunnel and portal stability assessment in weak rock 149 M.K Koqkar & H. Akgiin Three-dimensional regions in tunnels 157 H. Gercek Surface settlement prediction for Istanbul Metro tunnels via 3D FE and empirical methods 163 S.G. Ercelebi, H. Copur, N. Bilgin & C Feridunoglu Transportation demands in Istanbul and New York 171 A. Gursoy Experimental study for shear behavior of pseudo rock joint under constant normal stiffness 175 condition H.-R. Rim, H.-J. Choi, B.-K. Son, C.-I. Lee & J.-J. Song The effect of spatial distribution in geotechnical design parameters on tunnel deformation 183 K.I. Song, G.C Cho, I.M. Lee & S.W. Lee Behaviour of a large cross-section tunnel in a large-scale model test 191 C.J. Lee, IS. Kim, N.Y Ryu, S.D. Lee, KH. Jeong&J.W. Yang GIS-based application and intelligent management of geotechnical information and 197 construction data in tunnelling C. Y. Kim, S. W. Hong, K Y Kim, S.H. Baek, G.J. Bae, B.H. Han & KS Jue A new approach to estimate plastic region near tunnel considering excavation induced 205 damage and in situ rock mass condition M. Sagong & J.S. Lee The influence of the round length on the stability of tunnel face and unsupported span 211 Y. Zoo, Lee, W. Schubert & C.-Y Kim Effect of tunnelling and groundwater interaction on ground and lining responses 217 C. Yoo, S.B. Kim, H.C. Shin & S.C. Baek Application of the multiple-layer supporting method to a tunnel in squeezing argillaceous rocks 225 S Kemmochi, E. Taketsu,A. Ogawa, T.Aoki, M. Koike, R. Morita, H. Shirahata, N. Koya & M. Matsubara On design analyses of NATM-tunnels 233 S.C. Moller & PA. Vermeer Case study of 3D fracture aperture density distribution technique on the assessment of 239 tunnel safety at new constructing road B.-J. Lee, J.-Y. Kim & Y.-S Kim A study on the reinforcement effect of Umbrella Arch Method and prediction of 245 tunnel crown and surface settlement S.-H. Kim, S.-H. Baek & H.-K Moon Numerical analysis of geotechnical parameters on subsidence due to underground mining 253 D.S. Cheon, S.O. Choi, YS. Jeon & C. Ryu Model testing of perpendicularly spaced tunnels 259 S.-H. Kim Design and construction of NATM underground station tunnel by using the forepoling 265 method in difficult conditions for Athens Metro P. Kontothanassis, N. Koronakis, A. Karinas & S. Massinas Design of water isolation grouting for reducing high water inflows in urban shallow tunnels 271 N. Koronakis, P. Kontothanassis, D. Katsahs & J. Bournazos Gotthard Base Tunnel - Sedrun section 277 Mastering squeezing rock zones H. Ehrbar Engineering geology and design of primary support of road tunnels. Cases 283 from the Egnatia roadway N. Kazilis & G Aggistalis Rock reinforcement design for unstable tunnels originally excavated in very poor rock mass 291 R. Osgoui & E. Unal Estimation of subsidence due to mining using artificial neural network - preliminary study 297 YB. Jung, D.S. Cheon & S.O. Choi Model tests on shotcrete to analyze early age behavior of tunnel support 303 T.B. Celestino & D.A. Ferreira Design aspects of the Bangkok Blue Line Extension 309 C Photayanuvat, N. Phien-wej & S. Suwansawal Teaching tunnels: knowledge management and on-line databases 315 R.-M. Faure, J.-F Thimus, G. Hemond, N. Faure & B. Lecomte The 9 km long Kallidromo Tunnel of the New Highspeed Railway Line Athens-Thessaloniki, 321 Greece, Tunnel sections in squeezing ground W. Wittke, B. Wittke-Schmitt & D. Schmitt New high-speed railway lines Stuttgart 21 and Wendlingen-Ulm - approximately 100 km of tunnels 327 W. Wittke & C Erichsen Status of Japanese underground research laboratory design and construction of 335 1000 m-deep shafts and research tunnels T. Sato, M. Imazu, S. Mikake, T. Tamai, M. Yamamoto & M. Sakamaki Tunnel portal problems in landslide areas - Black Sea Highway Project, Turkey 343 M. Vardar, B. Kogak & H. Karaoglan Jet-Grout application at Saraykoy Tunnel interval portals 347 M. Vardar, H. Karaoglan, K. Kaya & R. Mucukgil Case study - deformations and remedial measures for Nefise Akcelik and Asarkayasi 353 tunnels on Black Sea Costal Road Project M. Vardar, H. Karaoglan, Z. Etkesen & E. Akis Metsovitikos river north alignment of Egnatia Motorway. The concept and the tunnel designs 357 N. Kazilis, Ch. Georganopoulos & G Aggistalis New developments in excavation and construction technology for rock and soft ground tunnelling New tunnel construction technique of pipe-roof method in saturated soft soil 365 J.k. Ge Tunnelling in difficult ground and groundwater conditions 371 H. Quick & S. Meissner Visualizing excavated soil flow in the cutter chamber of a large earth pressure balanced shield 377 H. Dobashi, Y. Sakurai, Y Konishi, S. Ouchi, K. Matsubara, A. Kitayama & H. Takahashi Planning and construction of Keelung River Yuanshantzu Flood-Diversion Tunnel Project 385 H. Shimizu, H. Hamada, T. Yasunaga, K. Taira & M. Kuniya Application of the tunnel face reinforcement and fore-piling 391 T. Yamamoto, K. Murakami, S. Shirasagi, K Negishi, K. Nishioka & T. Kobayashi Tunnel excavation penetrating active landslide area - second-TOMEI Expressway Inasa 397 No. 2 Tunnel S. Tayama, K. Kanzawa, H. Hirano & S. Isoda A deep open-cut excavation with three types of continuous retaining walls 405 H. Tsunoda, Y. Endo, I. Kamegaya, H. Kawakami, K. Fukumoto & A. Ueda Application of the multiple-layer supporting method to a tunnel in squeezing argillaceous rocks 413 S. Kemmochi, E. Taketsu, A. Ogawa, T. Aoki, M. Koike, R. Morita, H. Shirahata, N. Koya & M. Matsubara Support structure for tunneling in squeezing ground and secondary lining design 421 1 Yorita, M. Hanita, H. Takahara, K. Kawahara, H. Takahashi & M. Mitarashi Ground reinforcement by the Pre-Supporting System Arch (PSS-Arch) method 427 K. Miyashita, H. Takahashi, M. Teranishi, S. Iwanaga, M. Inada, T Matsuo&A. Nakakita From research to practice "Development of Rapid Excavation Technologies" 435 S. Eskikaya, N. Bilgin, C. Balci & H. Tuncdemir Jacked box tunnelling, a non-intrusive technique for constructing underbridges 443 J. W.T Ropkins & D. Allenby Ground borne vibration on the East Side Access Project Manhattan segment: issues and impacts 449 A. Benslimane, D.A. Anderson, N. Munfakh & S. Zlatanic An experimental study on the development of high performance shotcrete for permanent runnel support 455 S.P Lee, D.H. Kim, l.H. Ryu, 1Y Yu, S.D. Lee, S.H Han, M.S. Choi & C. Park Successful application of the observational design method to difficult tunnel 463 conditions - Driskos tunnel P. Grasso, G. Scotti, G. Blasini, M. Pescara, V. Floria & N. Kazilis Ground freezing improvement for TBM maintenance in Singapore 471 I Itoh, Y.-S. Lee, S.-W. Yoo & S.-D. Lee High pressure jet grouting in tunnels - a case study 477 A. Da Via, M. Marotta & G Peach Gotthard Base Tunnel: special aspects and state of the works 485 M.
Recommended publications
  • OZEL EK 2019 Ingilizce 4.Pdf
    "[NBTSBGM ÎPLTFÎFOFLMJ .FSDFEFT#FO[&VSP LBNZPOBJMFTJ Mercedes-#FO[&VSPBSBmMBS EÜLCBLÎNNBMJZFUJZMFDFCJOJ[JZPSNB[ EBIBV[VOCBLÎNBSBMÎLMBSÎZMBJÜUFOBMÎLPZNB[ TEKBOR “Hayat Taşır” Telefon: +90(412) 456 6052 • Mail: [email protected] • Fax: +90(412) 456 6085 Adres: Bismil Diyarbakr Yolu 8.Km Bismil/DùYARBAKIR www.tekbor.com.tr Bu bir güç gösterisi. Yeni X-Class V6. 258 BG ve 550 Nm torka sahip V6 turbo motoruyla şimdi yollarda. BaķWan Sona (WNLle\LFL: ZF’den KomponenWler ve 6LVWHmler 2WREÕV \ROFXODUĊ PDNVLPXP JÕYHQOLN YH NRQIRU EHNOHUOHU =) QLQ ķDQ]ĊPDQODUĊ YH DNVODUĊ EX EHNOHQWLOHULQ NDUķĊODQPDVĊQD\DUGĊPFĊROPDNWDGĊU µUÕQOHULPL] \ROFXODUĊQ DUDFD KĊ]OĊ YH JÕYHQOL ELU ķHNLOGH LQLS ELQPHOHULQL JÕYHQOL YH NH\LƮL ELU \ROFXOXN \DSPDODUĊQĊVDøODU=)ÕUÕQOHULELUELUOHULQHWDPRODUDNX\XPOXGXUYHHQÕVWGÕ]H\WHNQRORML\OHJHOLķWLULOGLNOHUL LÀLQGLQDPLNKĊ]ODQPDYHD\QĊ]DPDQGDVHVVL]ÀDOĊķPDÏ]HOOLNOHULQHVDKLSWLU =)NRPSRQHQWOHULLOHDUDFĊQĊ]ĊQKHPNXOODQĊPÏPUÕPDOL\HWOHULQLKHPGHDUDÀYHÀHYUHÕ]HULQGHNLROXPVX] HWNLOHULQLD]DOWDELOLUVLQL] ]IFRPEXVHs BU GURUR TABLOSUNA BU GURUR BELGESİ YERLİ MALI Yerli üretim Ford Trucks, yerli malı belgesine sahip ilk ağır ticari markası olmanın gururunu yaşıyor. Bugün de yüksek yerlilik oranıyla üretimine devam ediyor, Türkiye kazanıyor. Ford Trucks Her yükte birlikte 444 36 73 / 444 FORD www.fordtrucks.com.tr TRUCKS • ,TRSZQ2&#,3+ #0-$+','120'#1510#"3!#","2&##!-,-+7512)#,-4#0 7-,# &,"5'2&2&#1202-$2&#,#50#1'"#,2'*%-4#0,+#,21712#+',30)#7T,2&'1!-,2#62Q 0#1307","#01#!0#20'2Q,"#','1207-$$',,!#5#0#+#0%#"',2-1',%*#+','1207TTT The Turkish economy was affected by the US- The tension experienced in Turkey-US relations China trade war, Brexit developments, the Fed’s was reflected adversely to the markets due to the case decisions to raise interest rates, geopolitical risks, and of Pastor Andrew Brunson, and the speculative attacks also by some speculative exchange rate attacks.
    [Show full text]
  • Railway Heritage of Istanbul and the Marmaray Project
    International Journal of Architectural Heritage Conservation, Analysis, and Restoration ISSN: 1558-3058 (Print) 1558-3066 (Online) Journal homepage: https://www.tandfonline.com/loi/uarc20 Railway Heritage of Istanbul and the Marmaray Project Yonca Kösebay Erkan To cite this article: Yonca Kösebay Erkan (2012) Railway Heritage of Istanbul and the Marmaray Project, International Journal of Architectural Heritage, 6:1, 86-99, DOI: 10.1080/15583058.2010.506622 To link to this article: https://doi.org/10.1080/15583058.2010.506622 Published online: 03 Oct 2011. Submit your article to this journal Article views: 439 View related articles Citing articles: 3 View citing articles Full Terms & Conditions of access and use can be found at https://www.tandfonline.com/action/journalInformation?journalCode=uarc20 International Journal of Architectural Heritage, 6: 86–99, 2012 Copyright © Taylor & Francis Group, LLC ISSN: 1558-3058 print / 1558-3066 online DOI: 10.1080/15583058.2010.506622 RAILWAY HERITAGE OF ISTANBUL AND THE MARMARAY PROJECT Yonca Kösebay Erkan Kadir Has University, Istanbul, Turkey This study explores the significance of Istanbul’s railway heritage and discusses the criteria for evaluating the historical importance, architectural value, and social issues surrounding the city’s rail system, leading into an examination of the consequences of the Marmaray Project. The Marmaray Project is a commuter rail system designed to unify Istanbul’s two independent rail transportation systems, and it will connect Halkalı on the European side with Gebze on the Asian side of the city. With the beginnings of rail construction in the 1870s, the waters of the Bosphorus separated the Oriental Railway on the European side from the Anatolian and the Baghdad Railway, preventing a direct connection between Europe and Asia.
    [Show full text]
  • Tunnel Systems . Design & Supply
    Business Location Zweibrücken Sales Office Vienna, Austria Business Location Chengdu, China (Joint Venture) Headquarters Power, Mining, Tunnel and Chengdu KK&K Power Fan Co., Ltd. Power, Mining and Tunnel Fans, Industrial Fans Sales, Service, Engineering, Manufacture Service Sales, Service No. 15 Wukexisilu, Wuhou Disctrict, Gleiwitzstrasse 7 Karl-Waldbrunner-Platz 1 Chengdu 61 0045 66482 Zweibrücken/Germany 121 0 Vienna /Austria Sichuan Province/P.R. China Phone: +49 6332 808-0 Phone: +43 1713 403010 Phone: +86 28 85003500 Business Location Bad Hersfeld Rep. Office Moscow, Russia Business Location Akron, OH USA Manufacture and Logistics, Power, Mining, Tunnel and TLT-Turbo Inc. Industrial Fans, Service Industrial Fans Power, Mining, Tunnel and Wippershainer Strasse 51 ul. Novoslabodskaya 31,d.4 Industrial Fans 36251 Bad Hersfeld/Germany 127055 Moscow/Russia Sales, Service, Manufacture Phone: +49 6621 7962-0 Phone: +7 459 6611780 2693 Wingate Avenue Akron, OH 44314/USA Business Location Frankenthal Sales Office Beijing, China Phone: +1 844-858-3267 (844-TLT-Fans) Service, Power Fans TLT-Turbo GmbH Hessheimer Strasse 2 Beijing Representative Office Business Location TLT ACTOM (Pty) Ltd, South Africa 67227 Frankenthal/Germany Sales Industrial Fans (Joint Venture) Phone: +49 6233 77081-0 22 D Building E Sales, Service, Manufacture Majestic Garden No. 6 Magnet House Business Location Oberhausen North Sichuan Medium Road 4 Branch Road Service, Power Fans Chaoyang District Driehoek Havensteinstrasse 46 100029 Beijing /P.R. China Germiston, 1401 46045 Oberhausen/Germany Phone: +86 10 82842683/84 Phone: +27 11 878-3050 Phone: +49 208 8592-0 www.tlt-actom.co.za Sweden Russia Canada Germany Benelux Poland Mongolia Ukraine Slovakia Spain Italy Czech Republic USA Turkey Korea China Israel Egypt Taiwan Indonesia Columbia Venezuela Peru Brazil Australia Chile Mexico South Africa Guatemala Honduras Nicaragua TLT-Turbo GmbH representatives Tunnel Systems .
    [Show full text]
  • Marmaray Project - Turkey
    MARMARAY PROJECT - TURKEY Istanbul is a city where historical and cultural values must be preserved and at the same time modern railway facilities have to be installed to decrease the environmental impact of public transportation and increase the capacity, reliability and comfort of the railway systems. The Project provides an upgrading of the commuter rail system in Istanbul, connecting Halkalı on the European side to the Asian side with an uninterrupted, modern, high-capacity commuter rail system. Railway tracks in both sides of Istanbul Strait will be connected to each other through a railway tunnel connection under the Istanbul Strait. The line goes underground at Yedikule, continues through the Yenikapı and Sirkeci new underground stations, passes under the Istanbul Strait, connects to the Üsküdar new underground station and emerges at Sögütlüçesme. The entire upgraded and new railway system will be approximately 76 km long. The main structures and systems; include the immersed tube tunnel, bored tunnels, cut-and-cover tunnels, at - grade structures, three new underground stations, 37 surface stations (renovation and upgrading), operations control centre, yards, workshops, maintenance facilities, upgrading of existing tracks including a new third track on ground, completely new electrical and mechanical systems and procurement of modern railway vehicles. The idea of a railway tunnel under the Istanbul Strait was first raised in 1860. However, where the tunnel under the Istanbul Strait crosses the deepest parts of the Strait, the old-fashioned techniques would not allow the tunnel to be on or under the seabed, and therefore the design indicated a "floating" type of tunnel placed on pillars constructed on the seabed.
    [Show full text]
  • DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website
    EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor.
    [Show full text]
  • Hizli Rayli Sistemlerin Yolcu Taşima Kapasite Hesaplamalari Ve Türkiyedeki Benzer Sistemlerin Birbirleriyle Karşilaştirilmasi
    HIZLI RAYLI SİSTEMLERİN YOLCU TAŞIMA KAPASİTE HESAPLAMALARI VE TÜRKİYEDEKİ BENZER SİSTEMLERİN BİRBİRLERİYLE KARŞILAŞTIRILMASI Ilgaz CANDEMİR_ , Serhan TANYEL_ SUMMARY Rail transit systems are found to be the most trusted transit systems all over the world. They have become one of the main parts of daily urban life as they provide, fast, safe and comfortable journey for passengers. If they are planned precisely, capacities up to10000-40000 passengers/hour can be achieved. They are also used as an important tool for to maintain well developed cities and provide dynamic city centers. In this study, some of the most important rail transit systems in Turkey are introduced. Their capacities tried to be determined by using different capacity calculation methods and the results are tired to be compared. ÖZET Dünyada halen en güvenilir ulaşõm modu, raylõ sistemlerdir. Gelişen teknolojinin yansõmasõ ile birlikte hõz, sinyalizasyon ve konfor problemlerini çözen kentsel raylõ sistemler büyük şehirler için vazgeçilmez olmuşlardõr. Planlama ,dizayn,araç ve ekipman seçimi, inşaat ve sonrasõnda çok titiz bir işletim isteyen metro hatlarõ ortalama 10000-40000 yolcu/saat kapasiteleri olan güçlü toplu taşõmacõlõk sistemlerdir. Raylõ sistemler ayrõca kentin homojen olarak gelişmesinin sağlanmasõnda önemli bir araç olarak görülmekte ve dinamik kent merkezlerinin oluşturulmasõnda etken olmaktadõrlar. Bu bildiride Türkiye’deki raylõ sistemleri hakkõnda kõsaca bilgi verildikten sonra, Türkiye’deki bazõ önemli raylõ ulaşõm sistemlerinin kapasiteleri farklõ yöntemlerle hesaplanarak, birbirleriyle karşõlaştõrõlmaya çalõşõlmõştõr. 1.GİRİŞ Dünyada 179 farklõ şehrin benimsendiği Metro ,hafif raylõ ve tramvay gibi kentiçi raylõ ulaşõm sistemleri, son yõllarda geç kalõnmasõna rağmen belediyelerimizin de rağbet ettiği ve ulaşõm politikalarõnõn baş hedefi haline gelen pahalõ inşaat yatõrõmlarõdõr.
    [Show full text]
  • TERRATEC Epbms Gear up for New Istanbul Metro Line
    PRESS RELEASE 1 MARCH 2020 For Immediate Release Release Number: 13169 TERRATEC EPBMs gear up for new Istanbul Metro line Gulermak, Nurol & Makyol JV is currently completing TBM testing on-site for the new Ümraniye-Ataşehir-Göztepe line, the latest addition to Istanbul’s metro expansion. TERRATEC is pleased to announce that it now has a total of nine machines working concurrently on Istanbul’s Metro system, in Turkey. The on-site assembly of two 6.56m diameter Earth Pressure Balance Tunnel Boring Machines (EPBMs) is currently underway for the Ümraniye-Ataşehir-Göztepe (UAG) Metro line, which is being constructed by the by the Gulermak, Nurol & Makyol JV. These EPBMs, along with another pair of sister machines that have already been assembled for this project, are all due to be launched and mining by mid-May. The 13km-long Ümraniye-Ataşehir-Göztepe (UAG) line, along with its 11 new stations and NATM-built connections, will form a second north to south rail corridor under the densely-populated Anatolian side of Istanbul and will be located entirely underground at an average depth of about 30m. The robust TERRATEC TBMs have versatile mixed-face dome-style cutterheads with an opening ratio of about 35% that have proven to work extremely effectively in Istanbul’s 171 Davey Street, Hobart, Tasmania 7000, AUSTRALIA | Tel +61 362233282 11F Wharf T&T Centre, 7 Canton Road, Kowloon, HONG KONG | Tel +852 31693660 Page | 1 PRESS RELEASE 1 MARCH 2020 mixed geology – which includes low-strength sandstones, siltstones, limestones and shales – as well as other state-of-the-art features such as VFD electric cutterhead drives, tungsten carbide soft ground cutting tools that are interchangeable with 17’’ roller disc cutters, high torque screw conveyors and active articulation systems.
    [Show full text]
  • Travelling Across the Caucasus by Train Azerbaijan, Georgia And
    Travelling across the Caucasus by train from Baku to Batumi (by way of Yerevan) Azerbaijan, Georgia and Armenia 1st to 25th July 2019 This journey seeks to connect the three very distinct countries which together form the Caucasus. What links them culturally? They were vibrant places during the later Russian Tzarist period. They have been places of seismic change: oil in Baku, Stalin was born in Georgia and the first Christain state was born in Armenia. They lie between hospitable Asia and the descendents of Byzantium. They also sit between Russia and Iran. They are places which have been influenced by their overbearing neighbours: invaded by Russia, Iran and the Ottoman Turks. Their geography varies from some of the highest mountains in Europe to deserts, from the Mediterranean climate of the Black Sea to the perpetually snowy peaks of the Greater Caucasus. The area may rightly claim to be the birthplace of the grapevine and very early mastery of goldsmithing. Nowadays a train line links these three fascinating countries. The party will be restricted to 11 of us in total. Travelling across the Caucasus by train The itinerary Day 3: After breakfast we’ll start the imposing mansions of the oil our Baku city tour. Visit Martyrs’ barons, built during the oil boom of Day 1: Flights from London and Alley, enjoy the panoramic view 1870-1914. After lunch we’ll drive to Edinburgh into Istanbul. Transfer by of Baku bay. Then we’ll visit the see the Gobustan rock paintings, 65 metro to Sultanahmet, the heart of Icheri Shekher (Inner town) with km from Baku, and then return to ancient Constantinople/Istanbul to its historical buildings and narrow the city by way of the Bibi Heybat our comfortable three star hotel for lanes.
    [Show full text]
  • Powerpoint Sunusu
    TURKISH STATE RAILWAYS (TCDD) Infrastructure Development & Regulations in Railway Sector NAZIM BÜKÜLMEZ Deputy Head of RP&C Department1 CONTENTS Vision and Mission Historical Development The State of the Art Key Projects Vision 2023 Rail systems in Urban Transportation The Law on Liberalization of Turkish Rail Transportation CONTENTS Vision and Mission Historical Development Current Situation Key Projects Vision 2023 Rail systems in Urban Transportation The Law on Liberalization of Turkish Rail Transportation VISION and MISSION of TCDD Vision: Mission: To make railways the preferred To have the existing network mode of transport and to be and vehicles ready for service, the locomotive power for to construct new lines and development of the country links if necessary, to keep connections with other transport systems, and to provide economical, safe, comfortable and environmentally friendly transport services CONTENTS Vision and Mission Historical Development Current Situation Key Projects Vision 2023 Rail systems in Urban Transportation The Law on Liberalization of Turkish Rail Transportation HISTORICAL DEVELOPMENT OF RAILWAYS EDİRNE ZONGULDAK SAMSUN İSTANBUL KARS ERZURUM BANDIRMA ANKARA BURSA ESKİŞEHİR SİVAS ERZİNCAN POLATLI AFYON ELAZIĞ TATVAN VAN İZMİR KAYSERİ MALATYA KONYA DİYARBAKIR ADANA GAZİANTEP MERSİN 2012 : 12,008 km ( Conventional+ High Speed) Rail Network before the REPUBLIC 4,136 km Mainline The First Years of the REPUBLIC (1923-1950) 3,764 km Mainline (avg. 134 km per annum) From 1951 to 2002 945 km Mainline (avg. 18 km per annum) From 2005 to end of 2012 1,094 km Mainline (avg. 137km per annum) Lines under construction 3,400 km Mainline TCDD is a 157-year old enterprise 10 million passengers were transported.
    [Show full text]
  • Marmaray - Connecting
    Smart City – Good Practice Transport and mobility Marmaray - Connecting Istanbul's Asian and Ca European side by railway Istanbul, Turkey Marmaray- Connecting Istanbul's Asian and European side by railway The Marmaray railway public transportation system was opened in 2013 in Istanbul [1]. Transportation has been a major problem for Istanbul for many years, especially transportation between the two sides of the city - Asia and Europe - has been a real challenge. Before Marmaray has been implemented the two sides have been connected only by highways (2 Bosporus bridges) and sea transit ferries. The high-tech construction methods used for the Marmaray project helped creating smart solutions for specific challenges in cities. The project was planned already back in 1860, however only today’s technology made it possible to construct and operate it. In the further steps of the project, Marmaray will be connected to the existing railway system of the city [2]. It enables to pass the Bosporus in 4 minutes and to transport 75,000 passengers per hour (Yenikapi station) [3]. Country/ City Profile Country City Population (2014) 78 million [4] Population (2014) 14 million (metropolitan) [4] Land area (km²) 783,562 Land area (km²) 5,461 [6] GDP per capita 10,830 [5] GDP per capita 14,591(metropolitan) [7] (2014, US$, at (2008, US$, at purchasing power parity) purchasing power parity) Region Europe, Asia Region Coastal City’s physical Location Located in the north west of Turkey, Marmara Region geography The city extends over two continents; Europe and Asia, divided by the Bosporus Climate Mild wet winters, dry hot summers; average temperature : 13.5oC Initiating context Istanbul is the mega city of Turkey with a population of 14 million people.
    [Show full text]
  • Chapter 3 Road Network and Traffic Volume
    The Study on Integrated Urban Transportation Master Plan for Istanbul Metropolitan Area in the Republic of Turkey Final Report Chapter 3 Chapter 3 Road Network and Traffic Volume 3.1 Road Network 3.1.1 Inter-regional Road Network 1) Existing Road Turkey is situated at the transit corridor between South-east Europe and the Middle East. Since “The Declaration for The Construction of International Arteries” (AGR) prepared by the United Nations Economic Commission for Europe (UN/ECE) in 1950 in Geneva, Turkey has developed international corridors connecting it to Southern Europe, because the international road network of AGR included an extension to Turkey. According to the provisions of AGR, two arteries should reach Turkey as E-Road. These are E-80 entering from the Bulgarian border (Kapikule) and E-90 entering from the Greek border (Ipsala). These two main routes link the International Road Network of Europe with the Middle East and Asia at southern and eastern borders of Turkey via Anatolia. Source: KGM, Ministry of Transportation Figure 3.1.1 International Road Network through Turkey, 2007 In addition to the E-Roads, the Trans-European Motorway (TEM) project is ongoing and it covers the whole country as an expressway network. The TEM highway network in Turkey starts from Edirne at the Bulgarian border and passes through Istanbul via the Fatih Sultan Mehmet Bridge and parts into two branches in Ankara going eastward and southward. Its eastern branch again parts into two branches in Askale. One of them reaches Trabzon in the Black Sea Region, and the other ends in Gurbulak at the Iranian border.
    [Show full text]
  • Trend Analysis of Long Tunnels Worldwide
    Trend Analysis of Long Tunnels Worldwide MTI Report WP 12-09 MINETA TRANSPORTATION INSTITUTE The Mineta Transportation Institute (MTI) was established by Congress in 1991 as part of the Intermodal Surface Transportation Equity Act (ISTEA) and was reauthorized under the Transportation Equity Act for the 21st century (TEA-21). MTI then successfully competed to be named a Tier 1 Center in 2002 and 2006 in the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). Most recently, MTI successfully competed in the Surface Transportation Extension Act of 2011 to be named a Tier 1 Transit-Focused University Transportation Center. The Institute is funded by Congress through the United States Department of Transportation’s Office of the Assistant Secretary for Research and Technology (OST-R), University Transportation Centers Program, the California Department of Transportation (Caltrans), and by private grants and donations. The Institute receives oversight from an internationally respected Board of Trustees whose members represent all major surface transportation modes. MTI’s focus on policy and management resulted from a Board assessment of the industry’s unmet needs and led directly to the choice of the San José State University College of Business as the Institute’s home. The Board provides policy direction, assists with needs assessment, and connects the Institute and its programs with the international transportation community. MTI’s transportation policy work is centered on three primary responsibilities: Research MTI works to provide policy-oriented research for all levels of Department of Transportation, MTI delivers its classes over government and the private sector to foster the development a state-of-the-art videoconference network throughout of optimum surface transportation systems.
    [Show full text]