Baldivis North Pty

Total Page:16

File Type:pdf, Size:1020Kb

Baldivis North Pty NNOORRTTHH BBAALLDDIIVVIISS LLOOCCAALL SSTTRRUUCCTTUURREE PPLLAANN Lot 30 & 31 Kerosene Lane and Lot 308 Fifty Road BALDIVIS March 2014 Prepared For: Baldivis North Pty. Ltd. Prepared By: Baldivis North Pty Ltd North Baldivis Local Structure Plan Page i Baldivis North Pty Ltd North Baldivis TABLE OF CONTENTS Local Structure Plan Page ii Baldivis North Pty Ltd North Baldivis PLANS PLAN 1: LOCATION PLAN PLAN 2: REGIONAL CONTEXT PLAN PLAN 3: SITE PLAN PLAN 4: BALDIVIS (NORTH) DISTRICT STRUCTURE PLAN PLAN 5: LOCAL STRUCTURE PLAN PLAN 6: PUBLIC OPEN SPACE PLAN PLAN 7: ULTIMATE NORTH-SOUTH DISTRIBUTOR ROAD NETWORK PLAN 8: PATH NETWORK PLAN PLAN 9: DRAINAGE CATCHMENT PLAN PLAN 10: STAGING PLAN APPENDICES APPENDIX 1: CERTIFICATES OF TITLE APPENDIX 2: SAND QUARRY CORRESPONDENCE APPENDIX 3: ENVIRONMENTAL ASSESSMENT REPORT APPENDIX 4: SIGNIFICANT TREE ASSESSMENT REPORT APPENDIX 5: DETAILED TREES SURVEY APPENDIX 6: SUBDIVISION PLAN (WAPC REF: 133489) APPENDIX 7: FIRE MANAGEMENT PLAN, LOT 9009, BALDIVIS APPENDIX 8: PROPOSED NAIRN ROAD / ABUTTING INTERFACE ELEVATION APPENDIX 9: PUBLIC OPEN SPACE PRELIMINARY LANDSCAPE SKETCH DESIGN APPENDIX 10: LANDOWNER AGREEMENT APPENDIX 11: CLAUSE 42 CERTIFICATE FOR LOT 308 APPENDIX 12: PROPOSED LOT LEVELS APPENDIX 13: NAIRN ROAD INTERFACE LOT LEVEL PLAN Local Structure Plan Page iii Baldivis North Pty Ltd North Baldivis 1.0 Introduction This Local Structure Plan (LSP) document for Lots 30 and 31 Kerosene Lane and Lot 308 Fifty Road, North Baldivis is presented to the Rockingham City Council and Western Australian Planning Commission for approval. The purpose of this Local Structure Plan document is to provide a general planning framework for guiding the future development of the subject land into an integrated residential estate. The outcome is a subdivisional and lot product approach, which conforms to good design principles including maximising solar access and energy efficiency standards for residential dwellings. Local Structure Plan Page 1 Baldivis North Pty Ltd North Baldivis 2.0 Existing Site the Baldivis area. The Rockingham/Kwinana District Hospital and the Rockingham Family 2.1 Ownership and Description Hospital are located 3.5 kilometres to the north west of the site and provide general health LOT NO. CERTIFICATE OF TITLE AREA (HA) care services to the area. Lot 30 1646/489 5.5826 The composite site is bound by Kerosene Lane Lot 31 1646/490 5.5826 to the north and Fifty Road to the south. The Baldivis Primary School is located immediately Lot 308 1693/675 21.1044 to the east of Lot 308 (refer Plan 3). All Certificates of Title areTOTAL attached 32.2696 at pendix 1. 2.3 Access As noted, the site abuts Kerosene Lane to the The subject land is wholly owned by Baldivis north and Fifty Road to the south. Both roads North Pty Ltd. Copies of the Certificates of Title intersect Mandurah and Baldivis Roads. are included in Appendix 1. Mandurah Road connects onto Gilmore The subject site was previously used for market Avenue and Dixon Road providing access to gardening purposes and as a poultry farm. The the Kwinana Town Centre and Rockingham poultry operation has since ceased, with all Regional Centre. Baldivis Road connects to associated equipment and sheds able to be Safety Bay Road to the south, which links to removed from the site at the time of Mandurah Town Centre via Ennis Avenue and development. There are existing homes on the Kwinana Freeway. Accordingly, the site is each of the lots (fronting Kerosene Lane) which highly accessible to the surrounding road are to be retained as part of the subdivision network and the Freeway. The Mundijong and development of the land. Road on and off ramps to the freeway are located only some 2 kilometres from the site. 2.2 Location 2.4 Topography The composite land holdings are located some 39 kilometres south of the Perth CBD, 6 The site generally slopes from east to west with kilometres east of the Rockingham Regional elevations ranging from 18 -19 metres along the Centre, 5 kilometres north east of the future eastern boundary of Lot 31 to 13 – 17 metres Warnbro Railway Station, 3 kilometres north of AHD along the western boundary of Lot 30 the future Baldivis Town Centre and 2 kilometres Kerosene Lane. Lot 308 is slightly more elevated west of the Kwinana Freeway (refer Plans 1 and with a maximum elevation of 24 metres AHD in 2). the north eastern corner and a minimum elevation of 9 metres AHD along the western The developed nature of the ‘coastal strip’ in boundary. Rockingham to the west of the subject land provides a high level of service and amenity to Local Structure Plan Page 2 Baldivis North Pty Ltd North Baldivis 2.5 Soils years, contains a further 2-3 million tonnes of Regional mapping indicates two geological resource which is intended to be extracted units present on the site: over the next 10 to 20 years pursuant to demand. There is no current truck Sand (S7) – a pale yellowish brown sand access/egress from the quarry via Kerosene comprising medium to coarse grains of Lane and no intention for this to occur in the sub-angular to sub-rounded quartz with future. The City of Rockingham has recently traces of feldspar, derived from Tamala approved an Extractive Licence for the Limestone. operation which is valid until 2011 and was also in receipt of a Development Application for Limestone (LS1) –Tamala Limestone and extension of the quarry including further Safety Bay Sand in part. Pale, yellowish extraction from the existing buffer along fine to coarse grained, sub-angular to Kerosene Lane. well rounded quartz. In light of the Development Application lodged Both these soils units are compatible with by WA Limestone, Development Planning urbanisation with few geotechnical limitations. Strategies, on behalf of Baldivis North Pty Ltd, A typical soil profile identified during soil lodged a comprehensive submission expressing sampling comprised brown/grey fine to concern over the application at that time (refer medium grain sand overlying orange/brown Appendix 2). The proposal did not fine to medium grained sand. acknowledge the presence of existing residential dwellings along Kerosene Lane, nor 2.6 Groundwater the Urban and Development zoning of the land Regional mapping indicates that the average on the southern side of Kerosene Lane, nor the groundwater level is relatively uniform across approved Baldivis (North) Structure Plan which the site at approximately 2 metres AHD (7 – 20 prescribes urban development for this land. metres below ground level in the south western The EPA's Guidance Statement No. 3 - corner to the north eastern corner Separation Distances between Industrial and respectively). Sensitive Land Uses recommends a buffer The groundwater flows in a westerly direction distance of 300-500 metres for quarries to towards Lake Cooloongup. residential lots for noise and dust impacts. The current industry and government focus has 2.7 Surrounding Land Uses been on protecting basic raw materials which An existing limestone and sand quarry facilitate land supply. operated by WA Limestone is situated on land immediately opposite Lots 30 and 31 (on the In order to further investigate the interface of northern side of Kerosene Lane). The Quarry, the quarry operation and residential which has been operating for approximately 30 development proposed by the subject LSP and Local Structure Plan Page 3 Baldivis North Pty Ltd North Baldivis negotiate an appropriate outcome, a meeting EPA’s recommended buffer from market was chaired by the DPI on 12 September 2007 gardens to residential areas is 300 – 500 metres and attended by representatives of Council, depending on the size of the facility. The WA Limestone and Baldivis North Pty Ltd. It was Western Australian Planning Commission confirmed that potential noise and dust Planning Bulletin No.63 – Policy for Dealing with impacts would be easily manageable as the Potential Conflicts Between Residential quarry excavation occurs below the level of Subdivisions and Market Gardens in East Kerosene Lane, and further minimised by Wanneroo outlines that for residential existing ‘earth bunds’ and vegetation, and subdivision on land that is zoned Urban or there being no direct truck access from Urban Deferred under the MRS and is in the Kerosene Lane. Consequently both WA vicinity of a market garden, the WAPC will Limestone and Arbitrage suggested approved the subdivision subject to the development within the buffer may be suitable following: however, that notification on titles may be Specially designed fencing for necessary. residential lots abutting the market An arrangement whereby the quarry operator garden as well as a protected and would concentrate on the removal of resource maintained vegetation buffer of one material within the southern portion of its site line of evergreen trees or bushes of a (i.e. along Kerosene Lane) over the two year minimum height of 1.5 metres; period commencing in 2007, was subsequently Suitable rural fencing of good standard reached. As a further safeguard, some on the boundary of the market garden memorials advising of possible noise/dust where it abuts roads or open space; impact from the quarry operation are to be placed on selective proposed lots on the Prospective purchasers within 300 residential land. metres of the boundary of the market garden being advised of the existence In light of the preceding information, the of the market gardens on the contract presence of the existing quarry north of the of sale; subject site is deemed to be manageable, and not restrict the approval of the proposed Memorials to be included on the titles of Structure Plan over this area. The agreements all residential lots within 300 metres of that have been reached are to be dealt with the boundary of the market garden at the time of subdivision, and will be advising of the location and potential dependant upon the circumstances at that impacts of the market garden on time.
Recommended publications
  • 2009-10 Budget Paper No 2 Volume 2
    2 0 0 9–10 BUDGET BUDGET STATEMENTS Budget Paper No. 2 Volume 2 PRESENTED TO THE LEGISLATIVE ASSEMBLY ON 14 MAY 2009 2009-10 Budget Statements (Budget Paper No. 2 Volume 2) © Government of Western Australia Excerpts from this publication may be reproduced, with appropriate acknowledgement, as permitted under the Copyright Act. For further information please contact: Department of Treasury and Finance 197 St George’s Terrace Perth WA 6000 Telephone: +61 8 9222 9222 Facsimile: +61 8 9222 9117 Website: http://ourstatebudget.wa.gov.au Published May 2009 John A. Strijk, Government Printer ISSN 1448–2630 BUDGET 2009-10 BUDGET STATEMENTS TABLE OF CONTENTS Volume Page Chapter 1: Consolidated Account Expenditure Estimates........................ 1 2 Chapter 2: Net Appropriation Determinations .......................................... 1 32 Chapter 3: Agency Information in Support of the Estimates ................... 1 43 PART 1 - PARLIAMENT Parliament ........................................................................................................ 1 47 Parliamentary Commissioner for Administrative Investigations ..................... 1 71 PART 2 - PREMIER; MINISTER FOR STATE DEVELOPMENT Premier and Cabinet......................................................................................... 1 83 Public Sector Commission ............................................................................... 1 97 Corruption and Crime Commission ................................................................. 1 108 Gold Corporation ............................................................................................
    [Show full text]
  • Public Transport Authority
    Annual Report 2013-14 Connecting our community 2 Annual Report 2013-14 Public Transport Authority To the Hon. Dean Nalder MLA Minister for Transport In accordance with Section 63 of the Financial Management Act 2006, I submit for your information and presentation to Parliament the Annual Report of the Public Transport Authority of Western Australia for the year ended 30 June 2014. The Annual Report has been prepared in accordance with the provisions of the Financial Management Act 2006. Reece Waldock Chief Executive Officer 3 Annual Report 2013-14 Public Transport Authority Measuring effectiveness and About this efficiency report To honour the Government’s vision for Western Australia, the In this report, the PTA fulfils its PTA has targeted two outcomes: reporting obligation by identifying the relevant strategic outcomes 1. An accessible, reliable and and its contribution to them in safe public transport system. 2013-14 through: 2. Protection of the long-term functionality of the rail corridor • operational reports which show the effectiveness and and railway infrastructure. efficiency of our transport Indicators of success in achieving services (22-75). the first of these outcomes are • compliance reports (76-86). based on patronage and service • audited key performance provision, accessibility, reliability, indicators report (87-115). customer satisfaction, safety and cost efficiency. • audited financial report (116- 171). For the second outcome, success results from quality The purpose of this report is management of the railway to provide our customers and corridor and residual issues of the community with information rail freight network, which was about our organisation, as well leased to private sector operators as operational and financial in 2000.
    [Show full text]
  • June 2015 the Distribution List Instructions and Information Are on Page 4
    Australian Timetable Association PO Box 21 Yea Vic 3717 Inc. No A0043673H Phone: 03 5797 2493 ABN 74 248 483 468 Email: [email protected] DISTRIBUTION LIST June 2015 The Distribution List instructions and information are on page 4. When ordering items that are available as both prints and computer files, please indicate clearly which version you require. The closing date for orders for Limited Stock items (*) is Friday 19 June 2015. Order Details Name ___________________________________________________________________________________________ Address _________________________________________________________________________________________ _______________________________________________________________________________________________________ Email address (or phone number) ____________________________________________________________________ Number of Distribution List Items ordered ______________ Total number of cost points for these items ______________ Total cost of Distribution List Items (1 point = $0.25. Minimum order = $1.25) $ ____________ Less: Costs you incurred in supplying items $ ____________ Your previous credit balance $ ____________ Members discount (5% off orders over $10) $ ____________ Payment due $ ____________ Payment by stamps cheque money order PayPal bank deposit $ ____________ Size - Points Status Item Details Date Pages Print File 1. TRAIN and TRAM TIMETABLES INTERSTATE G 1 ARTC CF C A4 6 Master Train Plan: Working Timetable for NSW, Vic, SA, WA Tabular 7 June 2015: v1.0 ~720 QUEENSLAND L 2 QueenslandRail
    [Show full text]
  • Annual Report 2011-12 Supporting Our Community
    Annual Report 2011-12 Supporting Our Community ii Contents Glossary of terms 2 PTA people 62 PTA year at a glance 3 Executive profiles 66 An introduction to your Annual Report 4 Compliance, audits and reporting 72 Organisational chart 7 Compliance statements 79 Cover Part of the PTA’s Overviews 8 Service and financial achievements 80 public art installation Chief Executive Officer 8 at Mount Lawley Managing Director 10 Electoral Act 1907 – Section 175ZE 88 Station. Transperth 12 Explanation of major capital expenditure variations 2011-12 90 Regional Town Bus Services 32 Independent audit opinion 92 School Bus Services 36 Audited Key Performance Indicators 94 Transwa 40 Financial statements 112 Network and Infrastructure 48 Certification of financial statements 113 Statement of comprehensive income 114 Major Projects Unit 52 Statement of financial position 115 Statement of changes in equity 116 Infrastructure Planning and Land Services 56 Statement of cash flows 117 Notes to the financial statements 118 Strategic Asset Management Development 60 To the Hon. Troy Buswell MLA Minister for Transport In accordance with Section 63 of the Financial Management Act 2006, I submit for your information and presentation to Parliament the Annual Report of the Public Transport Authority of Western Australia for the year ended 30 June 2012. The Annual Report has been prepared in accordance with the provisions of the Financial Management Act 2006. Reece Waldock Chief Executive Officer 1 Glossary of terms AM Asset Management OTR On-time running Category B Incident that may have the potential to cause a serious accident. AMP Asset Management Plan PCL Perth City Link Circle A high-frequency bus service ASL Acceptable Service Level PMP Prevention Maintenance Program Route connecting major shopping centres, CAT Central Area Transit PPTA Perth Public Transport Area universities, schools and colleges.
    [Show full text]
  • Electoral Boundaries WA
    15th April 2011 Mr Warwick Gately AM Electoral Commissioner GPO Box F316 PERTH WA 6841 Dear Mr Gately Re: Western Australian Electoral Commission Boundary Redistribution 2011 The Nationals WA are pleased to offer the accompanying submission for your consideration during your deliberations on new boundaries in accordance with section 16F of the Electoral Act 1907 which was amended in 2005 by the Electoral Amendment and Repeal Bill 2005. The Nationals’ submission focuses on the minimalist approach as suggested in the preliminary observations by the Commissioners. We seek to retain the current regional boundaries and the number of districts within each region as they are at present. In accordance with the legislation, The Nationals have given due consideration to the following parameters: Maintaining a community of interest within each electorate. Land use patterns. Means of communication and distance from the capital. Physical features within each electorate. Existing boundaries of regions and districts. A key focus of The Nationals WA submission is to group Local Government Authorities with clearly demonstrable social and economic links together. In effect this has led to the creation of electorates that are compact and designed to enable constituent’s greater access to their local Member of Parliament. Consideration was also given to major commercial and population centres in each electorate to ensure residents maintained a connection with those centres they traditionally gravitate to for services, recreation and access to Government Departments. In addition to the comprehensive research undertaken to form the submission, The Nationals WA carried out a consultation process that included advice and input from Nationals’ Members of Parliament, Executive members and members of the party organisation.
    [Show full text]
  • Australia South West Corridor Railway
    Australia South West Corridor Railway This report was compiled by the University of Melbourne, Melbourne, Australia. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. 2 CONTENTS A INTRODUCTION Type of project Project name Description of mode type Technical specification Principal transport nodes Major associated developments Parent projects Country/location Current status B PROJECT BACKGROUND Principal project objectives Key enabling mechanisms Description of key enabling mechanisms Key enabling mechanisms timeline Main organisations involved Planning and environmental regime Outline of planning legislation Environmental statements Overview of public consultation Ecological mitigation Regeneration Appraisal methods Complaints procedures Land acquisition C PRINCIPAL PROJECT CHARACTERISTICS Detailed description of route Detailed description of main and intermediate travel nodes Introduction Planning context
    [Show full text]
  • Pdf Download
    26273 AnnualRpt_PTA 23/9/05 12:57 PM Page a 26273 AnnualRpt_PTA 23/9/05 12:57 PM Page b Fulfilling the Government’s Vision The Organisation for Western Australia The Public Transport Authority (PTA) is required to The Public Transport Authority is responsible for the demonstrate in its annual report that it contributes following transport services in Western Australia: to the State Government achieving its vision for • rail, bus and ferry services in the metropolitan Western Australia.The vision is set out in the 2003 area under the brand Transperth; document Better Planning: Better Services which • public transport services in regional centres; establishes strategic outcome goals under the five • road coach and rail passenger services to headings: regional areas under the brand Transwa; and 1. People and Communities • school buses. 2. The Economy In addition to these transport services, it is 3. The Environment responsible for designing and building transport 4. The Regions infrastructure, principally through its entity New 5. Governance MetroRail which is extending the Perth In this report, the PTA has fulfilled this reporting metropolitan rail network, and for protecting the obligation by identifying the strategic outcomes long-term functionality of Western Australia’s freight applicable to itself and the contribution it has made rail corridor and infrastructure. to them in 2004/05 through: The PTA was formed by the Public Transport • Operational reports which show the Authority Act 2003 and began operating on 1 July effectiveness and efficiency of the PTA’s 2003. transport services - see pages 5-30 • A Better Planning: Better Services report - see pages 31-38 Purpose • Audited and unaudited performance indicator reports - see pages 46-62 To increase the use of public transport through the • Audited financial report - see pages 64-89 provision of customer-focused, safe and cost- effective passenger transport services.
    [Show full text]
  • Inside Pages
    Old meets new: existing urban railcar (left) and new railcar at the Nowergup railcar depot. To the Hon.Alannah MacTiernan MLA Minister for Planning and Infrastructure In accordance with Section 66 of the Financial Administration and Audit Act 1985, I submit, for your information and presentation to Parliament, the Annual Report of the Public Transport Authority of Western Australia for the year ended 30 June 2004.The report has been prepared in accordance with the provisions of the Financial Administration and Audit Act 1985. Hon.Alannah MacTiernan MLA Minister for Planning and Infrastructure Reece Waldock Acting Chief Executive Officer1 1 Mr Waldock was appointed Chief Executive Officer on 18 August 2004. PUBLIC TRANSPORT AUTHORITY ANNUAL REPORT 2004 1 Our Purpose To increase the use of public transport through the provision of customer-focused, safe and cost- effective passenger transport services. Our Aim To create the best passenger transport service for Western Australians. Our Values We value and respect our customers, suppliers and each other. We are committed to safety. We encourage each other to reach our full potential. We are honest and exhibit high levels of integrity, openness and ethical behaviour. We recognise and reward achievement, initiative and innovation. We strive for continuous improvement in everything we do. We are environmentally responsible. 2 PUBLIC TRANSPORT AUTHORITY ANNUAL REPORT 2004 The new Prospector in Kalgoorlie. Contents Chief Executive Officer’s overview ...............................................................................................................................................4
    [Show full text]
  • 2. Operational Report
    2. Operational Report Public Transport Authority Annual Report 2014-15 23 2. Operational Report 2.1 Customers and community Transperth The Transperth PSM, which has been An independent market research organisation is commissioned running for 24 years, surveyed more than to undertake annual Passenger Satisfaction Monitors (PSMs) to 4300 passengers, covering all modes, all the assess the level of passenger satisfaction with various aspects of bus contract areas and all the rail lines. Transperth and Transwa services. The survey conducts detailed face-to-face interviews with regular public transport users, Transperth: Level of overall customer covering all the main demographics. satisfaction (per cent) 100 88.4 84.4 85.5 82.3 85.4 80 60 Overall Transperth 40 88.4% customer satisfaction 20 0 2011 2012 2013 2014 2015 Overall customer satisfaction with Transperth services system-wide (calculated as the weighted average across all modes) recorded a marked improvement in 2015, increasing 3.5 per cent to 88.4 per cent of users from 85.4 per cent in 2014. 24 Transperth trains The Transperth train component of the 2015 PSM interviewed 1008 train passengers. The sample consisted of adults aged 18 years and older, residing within the Perth metropolitan area who were current users of Transperth train services and travelled on train services at least once per fortnight. School students were excluded. The results showed that the proportion of train passengers who were satisfied with Transperth train services overall increased for the second successive year with 92 per cent of users expressing satisfaction Transperth trains: Level of overall Among peak passengers, 91 per cent in 2015.
    [Show full text]
  • Parliamentary Debates (HANSARD)
    Parliamentary Debates (HANSARD) THIRTY-NINTH PARLIAMENT FIRST SESSION 2013 LEGISLATIVE ASSEMBLY Thursday, 18 April 2013 Legislative Assembly Thursday, 18 April 2013 THE SPEAKER (Mr M.W. Sutherland) took the chair at 9.00 am, and read prayers. SALTER POINT — DEVELOPMENT APPROVALS Petition MR J.E. McGRATH (South Perth — Parliamentary Secretary) [9.01 am]: I have a petition signed by 46 residents from my electorate of South Perth that is couched in the following terms — To the Honourable the Speaker and Members of the Legislative Assembly of the Parliament of Western Australia in Parliament assembled. We, the undersigned, say that several developments have been approved recently in the Salter Point area that residents believe do not meet streetscape character or significant view provisions in the current Town Planning Scheme. The undersigned request that the City of South Perth be asked to engage with the Salter Point foreshore community to develop policies that address community concerns about changing streetscapes and loss of significant views and amenity in the area. Now we ask the Legislative Assembly to instruct the Department of Planning to suspend all development approvals in the area bounded by the Canning River, Sulman Avenue and Hope Avenue until the intent of the development regulations as originally established in the scheme 3 subdivision plan, the special nature of the district and the respect and reasonable wishes of all residents are taken into account. The petition has been certified as complying with standing orders. [See petition 2.] PAPERS TABLED Papers were tabled and ordered to lie upon the table of the house.
    [Show full text]
  • Lot 309 Kerosene Lane and Lot 302 Mandurah Road
    Proposed Subdivision Lot 302 Mandurah Road & Lot 309 Kerosene Lane TRANSPORT IMPACT ASSESSMENT FINAL REPORT – V1 Prepared for: Masterplan. Prepared by: Move Consultants Move consultants Moving People Moving Commerce P.O. BOX 525 APPLECROSS WA AUSTRALIA 6953 P: +61 434 189 788 Abn 14 102 899 517 e-mail: [email protected] www.moveconsultants.com.au April 2018 Client Name: Masterplan April 2018 Project Name: Lot 302 Mandurah Road & Lot 309 Kerosene Lane DOCUMENT ISSUE AUTHORISATION Issue Rev Date Description Checked Approved 1 0 09/04/18 FINAL HH HH The information contained in this document is solely for the use of the client identified for the purpose for which it has been prepared. It is not to be used by any third party and no responsibility is undertaken to any third party. All photographs remain the copyright of Move Consultants and are included for illustration only. MC_Lot 302 MR Lot 309 Kerosene Lane_TIA_V1_090418.docx i Move Consultants Client Name: Masterplan April 2018 Project Name: Lot 302 Mandurah Road & Lot 309 Kerosene Lane TABLE OF CONTENTS PAGE 1. SUMMARY ............................................................................................................................................. 1 2. INTRODUCTION AND BACKGROUND ................................................................................................. 3 2.1. OBJECTIVE .............................................................................................................................................................. 3 2.2.
    [Show full text]
  • 1. BACKGROUND All Bus, Train and Ferry Public Transport Services in The
    Review of ihp ri9nspor1Putlitmlv Ar,t2013 June 200c, REPORT TO PARL6AMENT REVIEW OF THE PUBLIC TRANSPORT AUTHORITY ACT2003 (PTA ACT) REQUIRED UNDER SECTION 70 OF THE ACT INTRODUCTION AND EXECUTIVE SUMMARY 1. BACKGROUND The Public Transport Authority of Western Australia (PTA)was formed on 1 July 2003 by the Public Transport Authority Act 2003 (PTA Act). The PTA isresponsible for the operation of all bus, train and ferry public transport services in thegreater metropolitan area under the Transperth brand. It also operates public transport services in regionalcentres, operates road coach and rail passenger services to regionalareas under the Transwa brand, and administersand manages schoolbusservices.The PTAisalsoresponsiblefor administration of, and draws powers from, the Government RailwaysAct 1904 (GR Act) and the Rail Freight System Act 2000. The PTA also exercisespowers under the Public Works Act 1902. In addition to these transport services, the PTA is responsiblefor designing, building and maintaining public transport infrastructure, and for protectingthe long-term viability of Western Australia's freight rail corridor and infrastructure. The PTA is a statutory authority established under Section 5 of thePTA Act, 'an Act to establish a State agency responsible for providing publicpassenger transport services anywhere in the State and performing functions under otherActs, to amend or repeal certain Acts, and to provide for related matters'. Section 5 establishes thePTA as a body corporate with perpetual succession. Section 6 of the PTA Act establishes the PTAas an agent of the State with the status, immunities, and privileges of the State. The PTA isan SES organisation under the Public Sector Management Act 1994 (Section 8).
    [Show full text]