Shah Alam Expressway
Top View
- Toll Concessionaires Raked in RM23.66B Malaysiakini.Com March 21, 2007
- A Legal Analysis of Successful and Problematic Build Operate and Transfer (Bot) Projects in Malaysia
- Mohd Hatta Kahar
- Guan Eng : Study on Impact of Taking Over Other Tolls Ready in 2-3 Months
- Department of Building Surveying Faculty of Architecture, Planning and Surveying Universititeknologi Mara
- Smart Highway Smart City
- West Coast Expressway (WCE) Interchanges 1 — Perak Section • Total Estimated Cost Proposed Alignment (As at 2017): 11 1
- Malaysian Expressway System
- Boundaries Solutions