MOHD HATTA KAHAR

CONTACT NUMBER : +60-133-486-199 e-mail ADDRESS : [email protected] DATE OF BIRTH : 7th July 1967 IC No. : 670707-01-5883 NATIONALITY : Malaysian EDUCATION : Bachelor of Science Degree in Civil Engineering University of Hartford, May 1991 American Associate Diploma Institut Teknologi MARA – Midwest Universities Consortium Cooperative Program, Dec 1988 MEMBERSHIP OF : Graduate Member since 1992 Board of Engineers, CAREER BLOGSITE : http://ibsrevolution.blogspot.com https://www.linkedin.com/in/mohd-hatta-3814a630/

SUMMARY OF EMPLOYERS AND POSITIONS • HSS Engineers Sdn Bhd, Project Manager • Dhaya Maju Infrastructure (ASIA) Sdn Bhd, • Project Manager • MRCB Builders Sdn. Bhd., Project Manager • HSSI – SNC Lavalin JV, MRT Infrastructures Manager • UEM Construction Sdn. Bhd., Project Manager • Bumihiway (M) Sdn. Bhd., Project Manager • Emrail Sdn. Bhd., Senior Project Engineer • Peremba Construction Sdn. Bhd. Construction Manager • Pengurusan LRT Sdn. Bhd., QA/QC Engineer • Pengurusan Lebuhraya Bhd., Assistant Engineer

SKILLS & KNOWLEDGE • First Aid & Basic Life Support Course, September 2016 • Works Train Operation Course, August 2016 • ISO 9001:2008 (Quality Management System) • OSHAS 18001 (OSH Management System) • ISO 14001:2004 (Environmental Management System)

1 | 9

MOHD HATTA KAHAR

EMPLOYMENT RECORD

Aug 2020 – Present : HSS Engineers Sdn. Bhd., Project Manager a Project Manager role in Delivery Management Office on behalf of the Northern Corridor Implementation Authority for infrastructure development projects: • the Construction and Completion of Earthworks and Infrastructure Works for Cadangan Pembangunan Kawasan Perindustrian Lembah Chuping Phase 1, Package I in Perlis costing RM180mil • the Construction and Completion of Sewerage Treatment Plant for Cadangan Pembangunan Kawasan Perindustrian Lembah Chuping Phase 1, Package II in Perlis costing RM16mil

PROPOSED KAWASAN PERINDUSTRIAN WORK PROGRESS IN KAWASAN PERINDUSTRIAN LEMBAH CHUPING PHASE 1 LAYOUT PLAN LEMBAH CHUPING PHASE 1

2 | 9

MOHD HATTA KAHAR

Jul 2018 – Jul 2020 : Dhaya Maju Infrastructure (ASIA) Sdn Bhd, Project Manager responsible for the Construction and Completion of RM339mil Package S11 from Interchange to Taiping South Interchange Job description : • planned for ground works to start a construction project ie. Land Acquisition Plan, Pre-Comp Survey drawings, Right of Way, Preliminaries • commanded ground exploration and soil investigation of highway alignment by boring works and Mackintosh probe tests to collate existing ground conditions to identify area requiring ground treatments against the tender drawings • submitted applications to Local Authorities for Work Permits ie. Telekom, TNB and Lembaga Air for Utilities Mapping, Detection and Relocation Works • defined project tasks, resource requirements, logical work activities, work duration, contractual parameters to generate a Construction Work Program • prepared procurement schedule based on the Construction Work Program for Award of Subcontracts ie. Pre-Qualification, Selection, Call for Tender, Tender Opening and Closing, Technical and Commercial Evaluation, Recommendation and Award of Subcontract • carried out construction activities ie. site clearing, environment and sediment control plan, ground treatment works, earthworks cut and embankment fill, drainage crossing culverts, line drains, piling works, bridge structures and vehicle box culverts

ALIGNMENT LAYOUT OF WEST COAST WORK PROGRESS FOR SECTION 11 FROM BERUAS EXPRESSWAY FROM TO INTERCHANGE TO TAIPING INTERCHANGE

3 | 9

MOHD HATTA KAHAR

Nov 2017 to Apr 2018 : MRCB Builders Sdn. Bhd., Project Manager responsible for the Construction and Completion of RM369 mil Damansara - Expressway Package CB2 Job description : • commanded a team of Engineers, Quantity Surveyor, Planner and Land Surveyor to start preliminary site ground works and initiate a construction project • submitted applications to Majlis Perbandaran for Work Permits • submitted applications to Services Providers for Existing Utilities Mapping, Detection and Relocation Works • defined project tasks, resource requirements and allocations to ensure works within budget • involved in the Works Package Tender Exercises ie. Pre-Qualification, Selection, Opening and Closing, Technical Evaluation and Recommendation

ALIGNMENT LAYOUT OF DAMANSARA – SHAH ALAM WORK PROGRESS FOR SECTION CB2 IN KOTA HIGHWAY DAMANSARA

4 | 9

MOHD HATTA KAHAR

Sept 2012 – Jul 2017 : HSSI – SNC Lavalin, MRT Infrastructures Manager • HSSI - SNC Lavalin JV was appointed by Mass Corporation as Independent Consultant Engineer (ICE) for the MRT1 Project in , Malaysia. ICE verified monthly progress claims for completed works, monitored actual work progress against Key Access Dates, reported and highlighted observations from independent perspective.

The assigned projects: • Package V1, V2, V3, V4 - Construction and Completion of Viaducts, Stations and Other Associated Works from Sg Buloh Station to Semantan Portan • Package DPT1 & 2 - Construction and Completion of Maintenance Depot, Administration Building, Rolling Stock and Other Associated Works in Sungai Buloh and • Package MSPR1 & 4 - Construction and Completion of Multi Storey Car Park Building, External Works and Other Associated Works at and Section 16, Petaling Jaya

Job description: • attended and witnessed joint site valuation exercise with representatives from PDP, WPC and PQS for completed works every 25th of the month • attended and witnessed materials on-site/off-site valuation exercise for materials fabricated, manufactured, delivered off-site and ensured Joint Measurement Sheets were endorsed • checked the submission of draft Interim Payment Certificate by PDP in terms of completeness, sufficiency of back-up documents, authorized signatures, material approvals and conformances and checked the Bill of Quantities in the Main Contract, Provisional Sum, Prime Cost Sum, Variations and cross-checked with Main Certificate • discussed with Superior on findings and issued Review Sheets for further clarification from PDP and verified the final IPC upon closing of Review Sheets • monitored and reported to Superior the PDP/WPC’s actual work activities and analyzed the result against the Baseline Work Program • prepared weekly / monthly Observation Report and highlighted findings, deviations and projections of Viaducts and Stations progress against the Key Access Dates, Target Line Completion and Contractual Completion Dates

5 | 9

MOHD HATTA KAHAR

Apr 2004 to Aug 2012 : UEM Construction Sdn. Bhd., Project Manager responsible for the Design, Construction and Completion of RM4mil UEMB Head Office in Section 51, Petaling Jaya, Job description: • commanded a team of Architects, Engineers, Quantity Surveyors to prepare proposals to transform abandoned industrial workshop into an office building for UEMB Head Office • secured Development Order and Building Plan approvals from Local Authority • commanded the Team in the pre-qualification, tender and award of contract exercises • commanded the Team from construction stage to completion • responsible for selection of IBS Building System for the Proposed Development of 4,000 Mass Housing in Kampung Mentiri, Brunei Darussalam for Brunei Economic Development Board responsible for the Design, Construction and Completion of 548 units of Government Apartments at Parcel 172RK2, Precinct 17, Holdings Bhd. using IBS System Job description: • commanded a team of Architects, Engineers, Quantity Surveyors, PMC for a Development Order submission and approval from Perbadanan Putrajaya • commanded in the preparation of tender documents in line with IBS guideline and pre-qualification, qualification, selection, recommendation and appointment of Contractors, NSCs, DSs, DCs • prepared and presented before the UEMB Management the cost plan, the contracting strategy for approval • commanded the construction, completion and delivery of the IBS Project responsible for the Construction and Completion of RM9mil Sub-structure Works for the Proposed 7 Blocks Condominium of 410 Units on Lot 35283, Jalan Desa Utama, Off Jalan Kelang Lama, Kuala Lumpur for Faber Union Sdn. Bhd. Job description: • was a Project Manager to manage a RM9mil. contract • commanded a team of Engineer, QS, Project Planner, Site Supervisors and Sub-contractor and completed the Foundation Project to Faber Union Sdn. Bhd.

6 | 9

MOHD HATTA KAHAR

Jul 2003 to Mar 2004 : Bumihiway (M) Sdn. Bhd., Project Manager responsible for the Construction and Completion of RM43mil Jalan Temerloh - Mentakab for Jabatan Kerja Raya Malaysia. Upgrading works involved site clearance, existing utilities detection and relocation, ground treatment, earthworks, drainage, bridges and road works. Job description: • was a Project Manager to manage a local road up-grading project of RM42m in Pahang State

Jun 2002 to Jun 2003 : Emrail Sdn. Bhd., Senior Project Engineer responsible for the Design Coordination, Production, Planning and Installation of Concrete Cable Troughs and Chambers for Signal & Communication Works for Rawang - Electrified Double Railway Tracks Job description: • was assigned as a Senior Project Engineer to coordinate the design of reinforced concrete cable troughs / chambers and secure approval from Bhd. • managed the production of 150,000 nos. concrete cable troughs in ACPI Factory • planned delivery and installation of cable troughs throughout the 180km

7 | 9

MOHD HATTA KAHAR

Jun 1995 to May 2002 : Peremba Construction Sdn. Bhd., Construction Manager • Design, Construction and Completion of RM180mil, 268 units Residential Houses and Infrastructures in Precinct 10, PJH • Construction and Completion of RM39mil the Official Residence of the Deputy Prime Minister in Precinct 2, Putrajaya for PJH • Construction and Completion of RM52mil Jambatan Sri Perdana for PJH • Construction and Completion of RM115mil Custom, Immigration and Quarantine Complex in Gelang Patah for LINKEDUA Job description: • was assigned as a Construction Manager to lead a team of Engineers, QS, Supervisors and Sub-Contractors • planned and prioritized sequence of construction works and highlighted to the Project Manager • carried out scheduled / un-scheduled inspection, testing of materials in the presence of Resident Engineer / Asst. Resident Engineer for specification conformances • a member of Safety, Health and Environment (SHE) Committee to ensure SHE aspects were in place during construction

8 | 9

MOHD HATTA KAHAR

Nov 1994 to May 1995 : Pengurusan LRT Sdn. Bhd., QA/QC Engineer responsible for the development of Quality Management System and Project Quality Plan i.e. organisation’s policies, procedures and guidelines in accordance to ISO Standard for the PUTRA LRT Project Job description: • was assigned as a Quality Assurance and Quality Control Engineer to assist the QA/QC Manager in formulating, establishing the QA/QC Manual for the PUTRA LRT Project

Oct 1991 to Oct 1994 : Pengurusan Lebuhraya Bhd., Assistant Engineer • assisted the Construction Manager in managing the Construction and Completion of RM52mil Sungai Dua - Butterworth Interchange in Seberang Jaya,Butterworth for PLUS • assisted the Construction Manager in collating the Project Information, issuance of IFC Drawings and monitoring the construction activities. • assisted the Construction Manager in verification of Contractor’s Monthly Claim, Request for Variations, Extension of Time Claim.

REFERENCES

Name Position Contact Details

Ragavan Kannan Infrastructures Director 03 - 9171 3154 SSP MRT Dept. HSS Engineering Sdn. Bhd.

Dr. Andrew Yap Assistant Director [email protected] SSP MRT Interfacing Dept. 03 – 9171 3154 HSS Engineering Sdn. Bhd.