Mohd Hatta Kahar

Total Page:16

File Type:pdf, Size:1020Kb

Mohd Hatta Kahar MOHD HATTA KAHAR CONTACT NUMBER : +60-133-486-199 e-mail ADDRESS : [email protected] DATE OF BIRTH : 7th July 1967 IC No. : 670707-01-5883 NATIONALITY : Malaysian EDUCATION : Bachelor of Science Degree in Civil Engineering University of Hartford, May 1991 American Associate Diploma Institut Teknologi MARA – Midwest Universities Consortium Cooperative Program, Dec 1988 MEMBERSHIP OF : Graduate Member since 1992 Board of Engineers, MALAYSIA CAREER BLOGSITE : http://ibsrevolution.blogspot.com https://www.linkedin.com/in/mohd-hatta-3814a630/ SUMMARY OF EMPLOYERS AND POSITIONS • HSS Engineers Sdn Bhd, Project Manager • Dhaya Maju Infrastructure (ASIA) Sdn Bhd, • Project Manager • MRCB Builders Sdn. Bhd., Project Manager • HSSI – SNC Lavalin JV, MRT Infrastructures Manager • UEM Construction Sdn. Bhd., Project Manager • Bumihiway (M) Sdn. Bhd., Project Manager • Emrail Sdn. Bhd., Senior Project Engineer • Peremba Construction Sdn. Bhd. Construction Manager • Pengurusan LRT Sdn. Bhd., QA/QC Engineer • Pengurusan Lebuhraya Bhd., Assistant Engineer SKILLS & KNOWLEDGE • First Aid & Basic Life Support Course, September 2016 • Works Train Operation Course, August 2016 • ISO 9001:2008 (Quality Management System) • OSHAS 18001 (OSH Management System) • ISO 14001:2004 (Environmental Management System) 1 | 9 MOHD HATTA KAHAR EMPLOYMENT RECORD Aug 2020 – Present : HSS Engineers Sdn. Bhd., Project Manager a Project Manager role in Delivery Management Office on behalf of the Northern Corridor Implementation Authority for infrastructure development projects: • the Construction and Completion of Earthworks and Infrastructure Works for Cadangan Pembangunan Kawasan Perindustrian Lembah Chuping Phase 1, Package I in Perlis costing RM180mil • the Construction and Completion of Sewerage Treatment Plant for Cadangan Pembangunan Kawasan Perindustrian Lembah Chuping Phase 1, Package II in Perlis costing RM16mil PROPOSED KAWASAN PERINDUSTRIAN WORK PROGRESS IN KAWASAN PERINDUSTRIAN LEMBAH CHUPING PHASE 1 LAYOUT PLAN LEMBAH CHUPING PHASE 1 2 | 9 MOHD HATTA KAHAR Jul 2018 – Jul 2020 : Dhaya Maju Infrastructure (ASIA) Sdn Bhd, Project Manager responsible for the Construction and Completion of RM339mil West Coast Expressway Package S11 from Beruas Interchange to Taiping South Interchange Job description : • planned for ground works to start a construction project ie. Land Acquisition Plan, Pre-Comp Survey drawings, Right of Way, Preliminaries • commanded ground exploration and soil investigation of highway alignment by boring works and Mackintosh probe tests to collate existing ground conditions to identify area requiring ground treatments against the tender drawings • submitted applications to Local Authorities for Work Permits ie. Telekom, TNB and Lembaga Air Perak for Utilities Mapping, Detection and Relocation Works • defined project tasks, resource requirements, logical work activities, work duration, contractual parameters to generate a Construction Work Program • prepared procurement schedule based on the Construction Work Program for Award of Subcontracts ie. Pre-Qualification, Selection, Call for Tender, Tender Opening and Closing, Technical and Commercial Evaluation, Recommendation and Award of Subcontract • carried out construction activities ie. site clearing, environment and sediment control plan, ground treatment works, earthworks cut and embankment fill, drainage crossing culverts, line drains, piling works, bridge structures and vehicle box culverts ALIGNMENT LAYOUT OF WEST COAST WORK PROGRESS FOR SECTION 11 FROM BERUAS EXPRESSWAY FROM KLANG TO BANTING INTERCHANGE TO TAIPING INTERCHANGE 3 | 9 MOHD HATTA KAHAR Nov 2017 to Apr 2018 : MRCB Builders Sdn. Bhd., Project Manager responsible for the Construction and Completion of RM369 mil Damansara - Shah Alam Expressway Package CB2 Job description : • commanded a team of Engineers, Quantity Surveyor, Planner and Land Surveyor to start preliminary site ground works and initiate a construction project • submitted applications to Majlis Perbandaran Petaling Jaya for Work Permits • submitted applications to Services Providers for Existing Utilities Mapping, Detection and Relocation Works • defined project tasks, resource requirements and allocations to ensure works within budget • involved in the Works Package Tender Exercises ie. Pre-Qualification, Selection, Opening and Closing, Technical Evaluation and Recommendation ALIGNMENT LAYOUT OF DAMANSARA – SHAH ALAM WORK PROGRESS FOR SECTION CB2 IN KOTA HIGHWAY DAMANSARA 4 | 9 MOHD HATTA KAHAR Sept 2012 – Jul 2017 : HSSI – SNC Lavalin, MRT Infrastructures Manager • HSSI - SNC Lavalin JV was appointed by Mass Rapid Transit Corporation as Independent Consultant Engineer (ICE) for the MRT1 Project in Kuala Lumpur, Malaysia. ICE verified monthly progress claims for completed works, monitored actual work progress against Key Access Dates, reported and highlighted observations from independent perspective. The assigned projects: • Package V1, V2, V3, V4 - Construction and Completion of Viaducts, Stations and Other Associated Works from Sg Buloh Station to Semantan Portan • Package DPT1 & 2 - Construction and Completion of Sungai Buloh Maintenance Depot, Administration Building, Rolling Stock and Other Associated Works in Sungai Buloh and Kajang • Package MSPR1 & 4 - Construction and Completion of Multi Storey Car Park Building, External Works and Other Associated Works at Sungai Buloh Station and Section 16, Petaling Jaya Job description: • attended and witnessed joint site valuation exercise with representatives from PDP, WPC and PQS for completed works every 25th of the month • attended and witnessed materials on-site/off-site valuation exercise for materials fabricated, manufactured, delivered off-site and ensured Joint Measurement Sheets were endorsed • checked the submission of draft Interim Payment Certificate by PDP in terms of completeness, sufficiency of back-up documents, authorized signatures, material approvals and conformances and checked the Bill of Quantities in the Main Contract, Provisional Sum, Prime Cost Sum, Variations and cross-checked with Main Certificate • discussed with Superior on findings and issued Review Sheets for further clarification from PDP and verified the final IPC upon closing of Review Sheets • monitored and reported to Superior the PDP/WPC’s actual work activities and analyzed the result against the Baseline Work Program • prepared weekly / monthly Observation Report and highlighted findings, deviations and projections of Viaducts and Stations progress against the Key Access Dates, Target Line Completion and Contractual Completion Dates 5 | 9 MOHD HATTA KAHAR Apr 2004 to Aug 2012 : UEM Construction Sdn. Bhd., Project Manager responsible for the Design, Construction and Completion of RM4mil UEMB Head Office in Section 51, Petaling Jaya, Selangor Job description: • commanded a team of Architects, Engineers, Quantity Surveyors to prepare proposals to transform abandoned industrial workshop into an office building for UEMB Head Office • secured Development Order and Building Plan approvals from Local Authority • commanded the Team in the pre-qualification, tender and award of contract exercises • commanded the Team from construction stage to completion • responsible for selection of IBS Building System for the Proposed Development of 4,000 Mass Housing in Kampung Mentiri, Brunei Darussalam for Brunei Economic Development Board responsible for the Design, Construction and Completion of 548 units of Government Apartments at Parcel 172RK2, Precinct 17, Putrajaya Holdings Bhd. using IBS System Job description: • commanded a team of Architects, Engineers, Quantity Surveyors, PMC for a Development Order submission and approval from Perbadanan Putrajaya • commanded in the preparation of tender documents in line with IBS guideline and pre-qualification, qualification, selection, recommendation and appointment of Contractors, NSCs, DSs, DCs • prepared and presented before the UEMB Management the cost plan, the contracting strategy for approval • commanded the construction, completion and delivery of the IBS Project responsible for the Construction and Completion of RM9mil Sub-structure Works for the Proposed 7 Blocks Condominium of 410 Units on Lot 35283, Jalan Desa Utama, Off Jalan Kelang Lama, Kuala Lumpur for Faber Union Sdn. Bhd. Job description: • was a Project Manager to manage a RM9mil. contract • commanded a team of Engineer, QS, Project Planner, Site Supervisors and Sub-contractor and completed the Foundation Project to Faber Union Sdn. Bhd. 6 | 9 MOHD HATTA KAHAR Jul 2003 to Mar 2004 : Bumihiway (M) Sdn. Bhd., Project Manager responsible for the Construction and Completion of RM43mil Jalan Temerloh - Mentakab for Jabatan Kerja Raya Malaysia. Upgrading works involved site clearance, existing utilities detection and relocation, ground treatment, earthworks, drainage, bridges and road works. Job description: • was a Project Manager to manage a local road up-grading project of RM42m in Pahang State Jun 2002 to Jun 2003 : Emrail Sdn. Bhd., Senior Project Engineer responsible for the Design Coordination, Production, Planning and Installation of Concrete Cable Troughs and Chambers for Signal & Communication Works for Rawang - Ipoh Electrified Double Railway Tracks Job description: • was assigned as a Senior Project Engineer to coordinate the design of reinforced concrete cable troughs / chambers and secure approval from Keretapi Tanah Melayu Bhd. • managed the production of 150,000 nos. concrete cable troughs in ACPI Factory
Recommended publications
  • The Perak Development Experience: the Way Forward
    International Journal of Academic Research in Business and Social Sciences December 2013, Vol. 3, No. 12 ISSN: 2222-6990 The Perak Development Experience: The Way Forward Azham Md. Ali Department of Accounting and Finance, Faculty of Management and Economics Universiti Pendidikan Sultan Idris DOI: 10.6007/IJARBSS/v3-i12/437 URL: http://dx.doi.org/10.6007/IJARBSS/v3-i12/437 Speech for the Menteri Besar of Perak the Right Honourable Dato’ Seri DiRaja Dr Zambry bin Abd Kadir to be delivered on the occasion of Pangkor International Development Dialogue (PIDD) 2012 I9-21 November 2012 at Impiana Hotel, Ipoh Perak Darul Ridzuan Brothers and Sisters, Allow me to briefly mention to you some of the more important stuff that we have implemented in the last couple of years before we move on to others areas including the one on “The Way Forward” which I think that you are most interested to hear about. Under the so called Perak Amanjaya Development Plan, some of the things that we have tried to do are the same things that I believe many others here are concerned about: first, balanced development and economic distribution between the urban and rural areas by focusing on developing small towns; second, poverty eradication regardless of race or religion so that no one remains on the fringes of society or is left behind economically; and, third, youth empowerment. Under the first one, the state identifies viable small- and medium-size companies which can operate from small towns. These companies are to be working closely with the state government to boost the economy of the respective areas.
    [Show full text]
  • Service Disruption on Mrt Kajang Line Due to Signalling Problems
    MEDIA STATEMENT FOR IMMEDIATE RELEASE SERVICE DISRUPTION ON MRT KAJANG LINE DUE TO SIGNALLING PROBLEMS KUALA LUMPUR, 16 August 2021- MRT Kajang Line is experiencing a service disruption due to signalling problems that were detected at 9.15am today that caused all trains that were in operations along the MRT Kajang Line to be held at platforms along its entire alignment starting from MRT Sungai Buloh Station to MRT Kajang Station. “The signalling problems are believed due to a technical issue and Rapid KL’s Engineering Department, together with BT Alstom who is the system’s manufacturer and Mass Rapid Transit Corporation Sdn Bhd (MRT Corp), are working to resolve this so that MRT Kajang Line could operate normally as soon as possible,” said a statement issued by the rail operator today. When the signalling problems were detected, all trains that were in operations switched to manual mode and were driven by Transit Officers to the nearest station, at a speed of not more than 25km/hour. Passengers were advised to disembark and take alternative transport in order to continue with their journey. Then, MRT Kajang Line suspended its operations from 11.15am to 3.45pm to allow for diagnostic work and full system reboot to be performed. It has since resumed operations at 3.45pm in revised service mode. “We deeply regret the inconvenience and would like to apologise to our passengers for this service disruption. For the safety of all involved, MRT Kajang Line is currently operating on revised service mode where trains would be moving slower and dwelling at platforms longer,” it added.
    [Show full text]
  • The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in the Klang Valley and Kuala Lumpur, Malaysia
    JOURNAL OF SOCIAL TRANSFORMATION AND REGIONAL DEVELOPMENT VOL. 2 NO. 2 (2020) 1-10 © Universiti Tun Hussein Onn Malaysia Publisher’s Office Journal of Social Transformation JSTARD and Regional Journal homepage: http://publisher.uthm.edu.my/ojs/index.php/jstard Development e-ISSN : 2682-9142 The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in The Klang Valley and Kuala Lumpur, Malaysia Mohd Sahrul Syukri Yahya1*, Edie Ezwan Mohd Safian1, Burhaida Burhan1 1Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, 86400 Parit Raja, Batu Pahat, Johor, MALAYSIA *Corresponding Author DOI: https://doi.org/10.30880/jstard.2020.02.02.001 Received 20 July 2020; Accepted 30 October 2020; Available online 30 December 2020 Abstract: The development and distribution pattern of the railway network has significantly increased in urban public transport with the current situation to move fast towards the fourth industrial revolution (4IR). In Malaysia, the problem issues are related to traffic congestion and many user cars on the roadway in daily lives. One alternative mode of using a rail network is commuter, LRT, Monorail, MRT and ETS. Therefore, the Geographic Information System (GIS) technology is then used to map and produce the railway networks history and developments in urban public transportation (UPT). The goal of this research is to identify the heatmap trends of the Klang Valley railway stations which included Kuala Lumpur as urban public transport sectors. It was based on the OSM image layer from the year 1990 to 2019 and studied the growth of railway networks through a polyline pattern analysis.
    [Show full text]
  • Sendayan Techvalley
    BANDAR SRI SENDAYAN a first-class township where home is for you and your loved ones. Located within the Greater Klang Valley Conurbation in Seremban on 5,233 acres of freehold land, Bandar Sri Sendayan is planned and designed with one thing in mind; comfortable living & business friendly. A premier integrated development made complete with ample facilities and amenities, BANDAR SRI SENDAYAN is without a doubt a sanctuary of tranquil tropical living, wholesome values and most importantly, a sense of community. Families find it an oasis of fulfillment; businesses see it as a world of promising opportunities. Being Part of the Greater Klang Valley Conurbation, along the west coast of Peninsular Malaysia, where it is merely a 20-minute drive to THE MASTER PLAN OF BANDAR SRI SENDAYAN Kuala Lumpur International Airport (KLIA) and a 35-minute journey to Kuala Lumpur (KL). Located within very close proximity to existing and progressing town centres such as Cyberjaya and Putrajaya, the North-South and the proposed Senawang-KLIA Expressways offer from smoother and faster alternatives to major destinations. KUALA LUMPUR / PUTRAJAYA New Seremban Toll ( Approved New Alignment ) DESTINATION 1 KUALA LUMPUR 70 KM MALACCA 75 KM KLIA 22 KM GEORGETOWN, PENANG 369 KM PUTRAJAYA / CYBERJAYA 60 KM ISKANDAR M’SIA, JOHOR 261 KM PORT KLANG 95 KM WOODLANDS, SINGAPORE 270 KM PORT DICKSON 20 KM 21km 22km 23km SEREMBAN North South Hig 2 from NILAI KPJ LANG VALLEY Specialist Hospital hway UALA LUMPUR Seremban Toll CONURBATION & BANDAR SRI SENDAYAN Taman S2 Heights
    [Show full text]
  • P R O Je C T Op T Io N S
    04 PROJECT OPTIONS Section 4 PROJECT OPTIONS SECTION 4 : PROJECT OPTIONS 4.1 INTRODUCTION Various alignment options were identified and evaluated in the process of selecting the preferred, optimum alignment for the Project. The options varied according to the physical characteristic, socio-economic constraints and transport network design requirements of each alignment options. In addition to the alignment options, two options for railway gauge were also considered, namely standard gauge and meter gauge. 4.2 PLANNING & DESIGN BASIS During the Feasibility Study for the ECRL Phase 2, a set of planning guidelines were used to develop the design concept for the ECRL Phase 2 corridor and the alignment (Table 4-1). Table 4-1 : Planning Guidelines for ECRL Phase 2 Aspect Description Strategic position Enhancing existing railway stations close to town centers to provide connectivity for freight transport Future development To avoid encroaching on areas committed for future development Connectivity Provide connectivity to: Major urban centers Industrial clusters Sea ports and internal container depot Tourism zones Integrated transport terminals Environment Minimize encroaching to Environmentally Sensitive Areas (ESAs) such as swamp forest, river corridors, forest reserves, ecological linkages and wildlife habitats wherever possible Additionally, a set of criteria will also be used to evaluate alignment options and to determine the preferred alignment ( Table 4-2). Section 5 Project Description 4-1 Table 4-2 : Alignment Criteria for ECRL
    [Show full text]
  • CADP 2.0) Infrastructure for Connectivity and Innovation
    The Comprehensive Asia Development Plan 2.0 (CADP 2.0) Infrastructure for Connectivity and Innovation November 2015 Economic Research Institute for ASEAN and East Asia The findings, interpretations, and conclusions expressed herein do not necessarily reflect the views and policies of the Economic Research Institute for ASEAN and East Asia, its Governing Board, Academic Advisory Council, or the institutions and governments they represent. All rights reserved. Material in this publication may be freely quoted or reprinted with proper acknowledgement. Cover Art by Artmosphere ERIA Research Project Report 2014, No.4 National Library of Indonesia Cataloguing in Publication Data ISBN: 978-602-8660-88-4 Contents Acknowledgement iv List of Tables vi List of Figures and Graphics viii Executive Summary x Chapter 1 Development Strategies and CADP 2.0 1 Chapter 2 Infrastructure for Connectivity and Innovation: The 7 Conceptual Framework Chapter 3 The Quality of Infrastructure and Infrastructure 31 Projects Chapter 4 The Assessment of Industrialisation and Urbanisation 41 Chapter 5 Assessment of Soft and Hard Infrastructure 67 Development Chapter 6 Three Tiers of Soft and Hard Infrastructure 83 Development Chapter 7 Quantitative Assessment on Hard/Soft Infrastructure 117 Development: The Geographical Simulation Analysis for CADP 2.0 Appendix 1 List of Prospective Projects 151 Appendix 2 Non-Tariff Barriers in IDE/ERIA-GSM 183 References 185 iii Acknowledgements The original version of the Comprehensive Asia Development Plan (CADP) presents a grand spatial design of economic infrastructure and industrial placement in ASEAN and East Asia. Since the submission of such first version of the CADP to the East Asia Summit in 2010, ASEAN and East Asia have made significant achievements in developing hard infrastructure, enhancing connectivity, and participating in international production networks.
    [Show full text]
  • Integrated Management of Malaysian Road Network Operations Through ITS Initiatives: Issues, Potentials and Challenges
    Integrated management of Malaysian road network operations through ITS Initiatives: issues, potentials and challenges Moazzem Hossain Malaysia University of Science and Technology (MUST) GL33, Kelana Square, Kelana Jaya, PJ 47301, Selangor, Malaysia [email protected] Abstract During the last twenty five years, rapid urbanization and industrialization have resulted considerable growth of Malaysian highway network. Apart from few specialized industrial zones, most of the industrial zones are established in close proximity of the urban areas in order to ensure the smooth supply of manpower especially for the dominating manufacturing sectors. This phenomenon resulted in a number of large regional units of transport demand base involving high private motorized trips and truck dependent freight trips. The growth of car and truck trips especially in the regions including sea ports is putting tremendous pressure on the capacity of these regions’s road network which cannot be subdued by only physical extension of the network which often proved to be costly also. As a result, a number of such regions e.g. Klang Valley, Penang and Johor Baru are experiencing the problems of congestion, accidents and air pollution on their highway network. In many developed countries integrated intelligent transport system (ITS) initiatives applied to these sorts of regional bases have been claimed to be successful in alleviating those problems in a cost-effective manner. This paper will investigate the issues related to such integrated application of ITS initiatives in Malaysia on a regional basis with particular focus on Klang Valley region. Starting from the basic ITS functionality, the paper will identify the potential focus areas such as data gathering, data communication among and across jurisdictions, System flexibility, smart use of alternative routes, public-private collaboration and integration of public-private agencies in terms of regional ITS operational needs.
    [Show full text]
  • Klang Valley Rail Transit Map April 2020
    Klang Valley Rail Transit Map April 2020 2 P Tanjung Malim 5 P Kuala Kubu Baru Gombak P 1 P Rasa Taman Melati P Batu Caves P Batang Kali Wangsa Maju P P P P Serendah Taman Wahyu P P Sri Rampai P 3 Sri Sri P Metro P Rawang Damansara Damansara Kepong Sri Prima Ampang P Sentral Timur Baru Jinjang Delima 4 3 Setiawangsa P P Kuang Sentul Cahaya Kampung P Jelatek P Sri Batu P Timur P Damansara Kepong Sentral P Barat P Kentonmen Dato’ Keramat Kepong Damansara Batu Kentomen Damai Cempaka P Sentul P Jalan Damai Ipoh *Sungai Sentul P P P Segambut Sentul Buloh Pandan Indah P Barat Hospital Raja Ampang *Kampung Titiwangsa Kuala Lumpur Uda Park Selamat *Rubber Research Institute 8 KLCC Pandan Jaya P *Kwasa Chow Kit P Damansara 9 12 Putra PWTC Medan Tuanku Kampung Baru Persiaran KLCC Kwasa P Sentral Sultan Ismail Dang Wangi Bukit Nanas Kota Conlay Damansara Raja Chulan Surian Bank Negara Bandaraya Tun Razak Mutiara Exchange (TRX) Damansara Bukit Bintang Cochrane Maluri P Bandar Bukit Bintang P Masjid Utama Jamek Imbi S01 P Miharja P Plaza Hang Rakyat Tuah Pudu S02 Taman Tun 11 Dr Ismail Taman Pertama Chan Phileo P Merdeka Sow Lin Damansara Taman Midah P S03 P Kuala Lumpur Cheras Taman Mutiara Bukit Kiara Bandar Malaysia P Muzium Negara Pasar Utara Seni Maharajalela Taman Connaught S04 Salak Selatan P KL Sentral P Bandar Malaysia Taman Suntex Selatan P P Tun Sambanthan Semantan KL Sentral 8 Pusat Bandar Sri Raya P S05 Damansara P Mid Valley Seputeh Salak Selatan Bandar Tun Bandar Tun Razak P Hussein Onn 10 Bangsar P P P P P S06 Batu 11 Cheras Skypark
    [Show full text]
  • For Promoting Private Sector Investment in Infrastructure
    ADB DEVELOPING BEST PRACTICES FOR PROMOTING PRIVATE SECTOR INVESTMENT IN INFRASTRUCTURE ROADS Asian Development Bank The views, conclusions, and recommendations presented here are those of the study consultants, and should not be considered to represent the official views of the Asian Development Bank or its member governments. © Asian Development Bank 2000 ISBN No. 971-561-280-6 Stock No. 010300 Published by the Asian Development Bank P.O. Box 789, 0980 Manila, Philippines For more information on ADB, visit http:\\www.adb.org FOREWORD This report is one of a series of five commissioned by the Asian Development Bank (ADB) to identify and recommend best practices to be followed and specific steps to be taken, by ADB’s developing member countries in order to encourage both private sector investment and competition in infrastructure development. The study was financed through a $600,000 regional technical assistance grant - RETA 5753: Developing Best Practices for Promoting Private Sector Investment in Infrastructure. This report focuses on the road sector; the other reports cover the power, water supply, airport and air traffic control, and port sectors. Transport is central to achieving prosperity and the quality of life, to which all countries aspire. Transport policy has pervasive impacts: on economic performance; on the shape and structure of human settlements through its impact upon physical development and economic structures; on the distribution of income; and on the environment. This report develops best practices for promoting private sector investment in the road sector. It defines the objectives of private sector participation, reviews experiences of private sector participation in Asia and elsewhere, examines the degree of success that has been achieved to date, and identifies the key issues that provide the basis for determining best practices.
    [Show full text]
  • Malaysian Highway Authority
    IMPROVING MALAYSIAN TOLLED HIGHWAYS OPERATIONS USING INTELLIGENT TRANSPORT SYSTEMS (ITS) Abu Bakar Bin Hashim MalaysianMalaysian HighwayHighway AuthorityAuthority (MHA)(MHA) Background Of MHA StatutoryStatutory BodyBody UnderUnder MinistryMinistry OfOf PUBLIC WORKS WorksWorks DEPARTMENT SetupSetup inin 19801980 HIGHWAY PLANNING UNIT ROADS MALAYSIAN HIGHWAY MALAYSIAN HIGHWAY AUTHORITY AUTHORITY BUILDINGS MINISTRYMINISTRY OF OF WORKS WORKS CONSTRUCTION INDUSTRY MALAYSIAMALAYSIA DEVELOPMENT BOARD WATER SUPPLIES BOARD OF ENGINEER S STATE PWD’s BOARD OF ARCHITECTS BOARD OF SURVEYORS MHA Responsible for all toll highways and expressways in Malaysia MINISTRY OF WORKS MALAYSIA PUBLIC WORKS MALAYSIAN HIGHWAY DEPARTMENT AUTHORITY 1. Government Agency 1. A Statutory Body Established under an Act of 2. Responsible for the provision Parliament ( Act 231,1980 ) of infrastructures and public utilities specifically roads, 2. Responsible for all toll water supplies, buildings, highways and expressways airports, ports and jetties in in Malaysia the country. A Few Facts On Malaysia ¾ Total Land Area - 329,727 sq. km ¾ Population in Q3-2005 - 26.26 million* ¾ Registered Vehicles - 13.12 million** ¾ LengthLength ofof RoadsRoads Toll Highways - 1,492.3 km Other Federal Roads + State Roads - 75,732.7 km Total 77,225.0 km * Department of Statistics, Malaysia ** Department of Road Transport, Malaysia Registered No. Of Motor Vehicles In Malaysia 14 (Average traffic growth ~ 7%) 13.12 12.19 11.39 12 10.7 9.39 10.02 10 8.8 8.41 7.57 8 6.81 6.18 6 4 NO. OF MOTOR
    [Show full text]
  • Chapter 5 Malaysia Country Report
    Chapter 5 Malaysia Country Report Saadiah Mohammad Universiti Teknologi MARA, Malaysia November 2014 This chapter should be cited as Mohammad, S. (2014), ‘Malaysia Country Report’, in Zen, F. and M. Regan (eds.), Financing ASEAN Connectivity, ERIA Research Project Report FY2013, No.15.Jakarta: ERIA, pp.167-218. CHAPTER 5 Malaysia Country Report Saadiah Mohammad Universiti Teknologi MARA, Malaysia Introduction As a country, Malaysia represents one of the success stories in the ASEAN in terms of its top-down political commitment to the five-year economic plans. For one, a sizeable government budget is allocated every year for its infrastructure activities. Malaysia is now an upper middle-income country served in most parts by good quality roads and expressways and a system of communication comparable to that of any developed, high-income country in the world. Many of its indicators on infrastructure have reached world-class standards, although there are still disparities in terms of total coverage and quality of infrastructure especially between West Peninsular Malaysia and its eastern counterpart states of Sabah and Sarawak. For years, Malaysia had not relied much on external sources of infrastructure financing since the government for many years had always managed to source funds internally. However, this also meant that government expenditure has increased tremendously over the years as population, urbanisation, and economic growth continue to put increasing demands on infrastructure. Since the 1980s, the government has considered the privatisation option—i.e., inviting the private sector as its partner in public-private partnership (PPP) projects—in its attempt to reduce government's burden in sourcing.
    [Show full text]
  • Public-Private Partnership (Ppp) Projects for Malaysian Tolled Highways – an Insight Using a Political Economy Approach
    Journal of Accounting Perspectives, Vol 5, December 2012, 59-74 ISSN 1985-7136 PUBLIC-PRIVATE PARTNERSHIP (PPP) PROJECTS FOR MALAYSIAN TOLLED HIGHWAYS – AN INSIGHT USING A POLITICAL ECONOMY APPROACH 1 Ervina Alfan Abstract Tolled highways in Malaysia are built under the public-private approach in which the government provides the opportunities for the involvement of the private sector in the construction of these infrastructures. Using a political economy approach, this paper seeks to identify the main concession holders of the Malaysian tolled highways and ascertain in what way the tolled highways influence the political and economic arenas. This paper finds that the tolled highways in Malaysia play a significant role in achieving the country’s economic objectives. Keywords: political economy approach, tolled highways 1. Introduction In many countries worldwide, the provision of a public infrastructure and related services are undertaken using a Public-Private Partnership (PPP) approach (Olson, Guthrie et al. 1998, English and Guthrie 2003, Newberry and Pallot 2003). Previous studies on PPP focus on issues, such as ex ante decision-making (Utusan Malaysia 24 October 2003, Yaacob and Naidu 1997), the value for money in adopting this approach (Heald 2003), risk transfer (Broadbent and Laughlin 2003), varying interests that developed into tension between the government and the standard setting body (Broadbent and Laughlin 2005), and how PPP serves as the means to achieving the government’s political agenda (Broadbent and Laughlin 2005). Broadbent and Laughlin (2003) raise concern that PPP is a growing issue that is not geographically confined only to the UK but also to many countries internationally.
    [Show full text]