Headline Zooming in on Tods Mediatitle the Edge Financial
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Users' Perceptions on Parking Utilization Pattern at Park-And-Ride
USERS’ PERCEPTIONS ON PARKING UTILIZATION PATTERN AT PARK-AND-RIDE FACILITY IN PUTRAJAYA SENTRAL Sharifah Adibah Alyia Syed Adnan1 and Abdul Azeez Kadar Hamsa2 ABSTRACT The increasing number of private vehicles in Federal Territory of Kuala Lumpur and Putrajaya has created inadequate parking spaces and traffic congestion. The limited parking spaces for the public at Government complexes and its surroundings in Putrajaya had lead to the increasing number of illegal parking. As an initiative to encounter this problem, the concerned authority had provided the park-and-ride facilities at public transportation terminal in Putrajaya. The provision of park-and-ride scheme would obviously promote the use of rail transit, thus shifting the users from using motorcar to public transport. Putrajaya Sentral is the main public transportation hub of Putrajaya which provides multi-modal public transportation services such as Express Rail Link (ERL), intercity buses, intra-city buses namely as ‘Nadi Putra’, express buses and taxi services. However, the existing parking spaces at the park and ride facility in Putrajaya Sentral are not fully utilized. Thus, this paper highlights the user’s perceptions on parking utilization pattern at Putrajaya Sentral park and ride facility in order to examine the current parking demand at the parking facility. Parking inventory survey to determine existing physical conditions of the parking facility and questionnaire survey to evaluate the perceptions of the users on the parking usage pattern were administered. The findings showed that most of the users (78%) parked their vehicles for longer duration (more than eight hours). The multi-storey parking facility was found to have higher demand than surface parking due to minimal parking fees and longer operation hours. -
Media Release Final Tunnel Boring Machine Breakthrough for the Mrt Putrajaya Line
MEDIA RELEASE FINAL TUNNEL BORING MACHINE BREAKTHROUGH FOR THE MRT PUTRAJAYA LINE Kuala Lumpur, 17 July 2020: The MRT Putrajaya Line (previously known as the MRT Sungai Buloh-Serdang-Putrajaya Line) saw its final tunnel boring machine (TBM) breakthrough at the Ampang Park MRT Station site today, marking a major milestone for the project. The TBM, codenamed TBM 774, was launched in September 2019 from Conlay MRT Station site and excavated a section of the MRT tunnel beneath Jalan Stonor, Persiaran KLCC, Jalan Binjai and Jalan Ampang as well as the LRT Kelana Jaya Line tunnels to the Ampang Park MRT Station site, a distance of 917 metres. The breakthrough – where a TBM completes its excavation work and bores through the wall and breaks into a station box or shaft – was witnessed by Datuk Mohd Zarif Hashim, the newly appointed Chief Executive Officer of Mass Rapid Transit Corporation Sdn Bhd (MRT Corp). “We congratulate MMC Gamuda for the TBM breakthrough today. This is a major milestone for the project,” he said during the event. He added that today’s breakthrough also showed that the project was able to achieve good progress despite the Covid-19 pandemic. Also present at the breakthrough were MRT Corp’s Project Director MRT Putrajaya Line Dato’ Amiruddin Ma’aris, MMC Gamuda KVMRT (PDP SSP) Sdn Bhd Directors Dato’ Ir Paul Ha and Datuk Seri Che Khalib Mohd Noh as well as MMC Gamuda MRT Putrajaya Line Project Director Dato’ Wong Wai Ching. MMC Gamuda is the turnkey contractor for the construction of the MRT Putrajaya Line. -
Service Disruption on Mrt Kajang Line Due to Signalling Problems
MEDIA STATEMENT FOR IMMEDIATE RELEASE SERVICE DISRUPTION ON MRT KAJANG LINE DUE TO SIGNALLING PROBLEMS KUALA LUMPUR, 16 August 2021- MRT Kajang Line is experiencing a service disruption due to signalling problems that were detected at 9.15am today that caused all trains that were in operations along the MRT Kajang Line to be held at platforms along its entire alignment starting from MRT Sungai Buloh Station to MRT Kajang Station. “The signalling problems are believed due to a technical issue and Rapid KL’s Engineering Department, together with BT Alstom who is the system’s manufacturer and Mass Rapid Transit Corporation Sdn Bhd (MRT Corp), are working to resolve this so that MRT Kajang Line could operate normally as soon as possible,” said a statement issued by the rail operator today. When the signalling problems were detected, all trains that were in operations switched to manual mode and were driven by Transit Officers to the nearest station, at a speed of not more than 25km/hour. Passengers were advised to disembark and take alternative transport in order to continue with their journey. Then, MRT Kajang Line suspended its operations from 11.15am to 3.45pm to allow for diagnostic work and full system reboot to be performed. It has since resumed operations at 3.45pm in revised service mode. “We deeply regret the inconvenience and would like to apologise to our passengers for this service disruption. For the safety of all involved, MRT Kajang Line is currently operating on revised service mode where trains would be moving slower and dwelling at platforms longer,” it added. -
The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in the Klang Valley and Kuala Lumpur, Malaysia
JOURNAL OF SOCIAL TRANSFORMATION AND REGIONAL DEVELOPMENT VOL. 2 NO. 2 (2020) 1-10 © Universiti Tun Hussein Onn Malaysia Publisher’s Office Journal of Social Transformation JSTARD and Regional Journal homepage: http://publisher.uthm.edu.my/ojs/index.php/jstard Development e-ISSN : 2682-9142 The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in The Klang Valley and Kuala Lumpur, Malaysia Mohd Sahrul Syukri Yahya1*, Edie Ezwan Mohd Safian1, Burhaida Burhan1 1Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, 86400 Parit Raja, Batu Pahat, Johor, MALAYSIA *Corresponding Author DOI: https://doi.org/10.30880/jstard.2020.02.02.001 Received 20 July 2020; Accepted 30 October 2020; Available online 30 December 2020 Abstract: The development and distribution pattern of the railway network has significantly increased in urban public transport with the current situation to move fast towards the fourth industrial revolution (4IR). In Malaysia, the problem issues are related to traffic congestion and many user cars on the roadway in daily lives. One alternative mode of using a rail network is commuter, LRT, Monorail, MRT and ETS. Therefore, the Geographic Information System (GIS) technology is then used to map and produce the railway networks history and developments in urban public transportation (UPT). The goal of this research is to identify the heatmap trends of the Klang Valley railway stations which included Kuala Lumpur as urban public transport sectors. It was based on the OSM image layer from the year 1990 to 2019 and studied the growth of railway networks through a polyline pattern analysis. -
Construction Sector Remains Challenging As the Federal Government Is Reviewing Ongoing Infrastructure Projects to Reduce Costs by 20-33%
4 October 2018 Waiting for the other shoe to drop Sector Update The outlook for the Construction sector remains challenging as the federal government is reviewing ongoing infrastructure projects to reduce costs by 20-33%. Projects that could be affected include the Construction Klang Valley MRT Line 2 (MRT2) and LRT Line 3 (LRT3), Pan Borneo Highway (PBH) and Gemas-Johor Bahru Electrified Double Tracking (EDT). There are opportunities in state government projects in Penang and Sarawak. Maintain our NEUTRAL call. Top BUYs are IJM, Suncon Neutral (maintain) and HSS. Potential MRT2 cost cuts We gather that the MRT2 project could see a 25% reduction in cost to RM24bn from an initial estimate of RM32bn. The MMC Gamuda Joint Absolute Performance (%) Venture (JV) will be the most affected as it is the main contractor for the underground section and the Project Delivery Partner (PDP) for the above- 1M 3M 12M ground section of the MRT2. Other listed contractors that could be affected AQRS (6.4) (14.9) (37.9) due to ongoing work on above-ground packages secured include Ahmad Gamuda (10.0) 2.8 (37.1) HSS Eng 2.2 33.3 (9.5) Zaki, Gadang, George Kent, IJM Corp, MRCB, MTD ACPI, Mudajaya, IJM Corp (6.3) 1.7 (45.9) SunCon, TRC, TSR and WCT. Since the cost reductions will come from MRCB 0.7 15.8 (23.2) the reduction in the scope of works, we believe only the contract values will Suncon (0.4) (6.5) (37.4) be reduced while profit margins should be preserved. -
ATNICG/5-IP/1 31/05/10 MEETING BULLETIN 1. Schedule of Meeting 1.1 Opening Session of the Fifth Meeting of Aeronautical Telecomm
ATNICG/5-IP/1 31/05/10 International Civil Aviation Organization THE FIFTH MEETING OF AERONAUTICAL TELECOMMUNICATION NETWORK (ATN) IMPLEMENTATION CO-ORDINATION GROUP OF APANPIRG (ATNICG/5) Kuala Lumpur, Malaysia, 31 May – 4 June 2010 MEETING BULLETIN 1. Schedule of Meeting 1.1 Opening session of the Fifth Meeting of Aeronautical Telecommunication Network Implementation Co-ordination Group ATNICG/5 of APANPIRG will start at 0900 hrs. on 31 May 2010 at the Concorde Hotel, Kuala Lumpur, Malaysia. 1.2 The daily order of business will be announced on the first day of the Meeting. 2. Meeting Location 2.1 Concorde Hotel Kuala Lumpur is located in golden triangle of Kuala Lumpur, amidst the bustling commercial, shopping and entertainment hub. The golden triangle is a large area encompassed primarily by three main roads; Jalan Imbi, Jalan Sultan Ismail and Jalan Raja Chulan with many reputed international hotels of Kuala Lumpur located in this area. 2.2 Situated along Jalan Sultan Ismail, this Kuala Lumpur hotel is a 10-minutes drive from the Putra World Trade Centre (PWTC). Within walking distance is the Malaysia Tourism Centre (MTC), Suria KLCC Shopping Centre, Petronas Twin Towers, Kuala Lumpur Convention Centre, Kuala Lumpur Tower and Bukit Bintang. The meeting location address is as follows : Hotel Concorde Kuala Lumpur 2, Jalan Sultan Ismail 50250, Kuala Lumpur Tel : + 603 2144 2200 Fax : + 603 2144 1628 3. Registration of Participants 3.1 Participants should register at the Registration Desk in front of the Meeting Room from 0830 – 0900am on the first day of the Meeting and they are encouraged to wear the identification badge provided at the time of registration, while attending all the activities during the meeting. -
Section 3 Project Description Projek Mass Rapid Transit Laluan 2 : Sg
Section 3 Project Description Projek Mass Rapid Transit Laluan 2 : Sg. Buloh – Serdang - Putrajaya Detailed Environmental Impact Assessment SECTION 3 : PROJECT DESCRIPTION 3. SECTION 3 : PROJECT DESCRIPTION 3.1 INTRODUCTION The main objective of the Project is to facilitate future travel demand in the Klang Valley and to complement the connectivity to Kuala Lumpur by improving the current rail coverage and increasing accessibility of public transport network to areas not currently served or covered by public transport. The SSP Line will serve the existing residential areas, minimize overlapping with existing rail service and provide convenient access to Kuala Lumpur city centre. This section describes the Project in terms of the proposed alignment and stations, the planning and design basis, operation system and the construction methodology. 3.2 PLANNING AND DESIGN BASIS The over-arching principles in the development of the KVMRT is even network coverage, entry into the city centre, location of stations in densely populated areas and ability to sustain future expansion. The GKL/KV PTMP has identified key issues in the rail network such as capacity and quality of existing systems, integration between modes, gaps in network coverage and mismatch in land use planning. Considering the gap in the network, particularly in the northwest – southern corridor, the SSP Line is designed to serve the city centre to Sg Buloh, Kepong, Serdang and Putrajaya areas. The SSP Line will traverse through high density residential and commercial areas and has the capacity to move large volumes of people from the suburban areas to the employment and business centres. In terms of planning basis, the main objectives of the Project are as follows:- • To meet the increasing demand for rail based urban public transportation • To increase the railway network coverage and its capacity • To provide better integration between the new SSP Line and existing rail lines such as LRT, Monorail, SBK Line and KTM lines as well as the future High Spee Rail. -
Klang Valley Rail Transit Map April 2020
Klang Valley Rail Transit Map April 2020 2 P Tanjung Malim 5 P Kuala Kubu Baru Gombak P 1 P Rasa Taman Melati P Batu Caves P Batang Kali Wangsa Maju P P P P Serendah Taman Wahyu P P Sri Rampai P 3 Sri Sri P Metro P Rawang Damansara Damansara Kepong Sri Prima Ampang P Sentral Timur Baru Jinjang Delima 4 3 Setiawangsa P P Kuang Sentul Cahaya Kampung P Jelatek P Sri Batu P Timur P Damansara Kepong Sentral P Barat P Kentonmen Dato’ Keramat Kepong Damansara Batu Kentomen Damai Cempaka P Sentul P Jalan Damai Ipoh *Sungai Sentul P P P Segambut Sentul Buloh Pandan Indah P Barat Hospital Raja Ampang *Kampung Titiwangsa Kuala Lumpur Uda Park Selamat *Rubber Research Institute 8 KLCC Pandan Jaya P *Kwasa Chow Kit P Damansara 9 12 Putra PWTC Medan Tuanku Kampung Baru Persiaran KLCC Kwasa P Sentral Sultan Ismail Dang Wangi Bukit Nanas Kota Conlay Damansara Raja Chulan Surian Bank Negara Bandaraya Tun Razak Mutiara Exchange (TRX) Damansara Bukit Bintang Cochrane Maluri P Bandar Bukit Bintang P Masjid Utama Jamek Imbi S01 P Miharja P Plaza Hang Rakyat Tuah Pudu S02 Taman Tun 11 Dr Ismail Taman Pertama Chan Phileo P Merdeka Sow Lin Damansara Taman Midah P S03 P Kuala Lumpur Cheras Taman Mutiara Bukit Kiara Bandar Malaysia P Muzium Negara Pasar Utara Seni Maharajalela Taman Connaught S04 Salak Selatan P KL Sentral P Bandar Malaysia Taman Suntex Selatan P P Tun Sambanthan Semantan KL Sentral 8 Pusat Bandar Sri Raya P S05 Damansara P Mid Valley Seputeh Salak Selatan Bandar Tun Bandar Tun Razak P Hussein Onn 10 Bangsar P P P P P S06 Batu 11 Cheras Skypark -
Our Commitment to Sustainability
Sustainability Statement OUR COMMITMENT TO SUSTAINABILITY Kwasa Sentral MRCB IS COMMITTED TO DISCLOSING THE PROGRESS OF OUR SUSTAINABILITY JOURNEY AND SETTING THE HIGHEST STANDARDS IN THE SOCIAL, ECONOMIC, SCOPE OF THIS STATEMENT AND ENVIRONMENTAL PERFORMANCES OF OUR SECTOR. WE ASPIRE TO RAISE The coverage of this statement includes all domestic operations of MRCB, consisting of OUR UNDERSTANDING OF SUSTAINABILITY ISSUES SO THAT WE MAY CONTINUE its subsidiaries, of which MRCB has direct TO GROW AND PERFORM BETTER AS A CORPORATE CITIZEN. control and holds a majority stake. REPORTING PERIOD We are currently in the process of reviewing and priorities through conducting stakeholder The reporting period covered is from our sustainability approach and intend to engagement and a materiality assessment, 1 January, 2017 to 31 December, 2017. explore various ways in which we can improve identifying sustainability indicators, referring to Where possible, historical information from our sustainability practices and performances global practices and standards in sustainability previous years were included to provide across our management and operations. reporting, and adopting the sustainability comparative data. guidelines provided by Bursa Malaysia. For this report, we began embarking on obtaining REPORTING CYCLE baseline data to measure and subsequently While we seek to maintain our compliance to monitor the impact of our projects and activities, national laws and regulations, we are becoming Annually which helped us determine our performance increasingly -
Connect with Lrt 3
Headline CONNECT WITH LRT 3 MediaTitle Property Insight Date 10 Jul 2015 Color Full Color Section NEWS Circulation 30,000 Page No 30TO32 Readership 90,000 Language English ArticleSize 1742 cm² Journalist Mak Kum Shi and Daniel Sim AdValue RM 17,464 Frequency Monthly PR Value RM 52,392 CONNECT WITH LRT 3 Connectivity, the catalyst of a developed country By: Mak Kum Shi and Daniel Sim Commencement of the 1 Batu Caves Development Rail Network I ^ Terminal Putra KTMHemtMr i*t» Im* Lm KLMtoon* Sentut^Timur * EftL ^ Sentul West — I *""NTitiwangsa || / /' ^CKg Ba7u Up^*dmg KTH KmiMII /"% , ,y , Ampang 1 LRTK >r \ f Tun Razak Pusat Bandar w, 1 UTT J to P.l liiyhu Damansara rTandan Jaya MRT S8XL<n»(MRT 11 M HoAorW E*» fPTvaw 11 i, Mid valley Miharj^"¥:! » Fw#w R*W U«* KofanHniaya^ >• * * URT Merttttoutfl ptiM* HRT Hn4>iou» (*Hn« »1 ^'•y ^ ^J0 MRTCjrtfcLm Happy Gard7 ■f I i Sunway ~"Tas'£ So,at®^«^V ^ • Scri Pctaling j " IRT 3 K<4MU Jjy*JUM0 1 Ptmim Mener* Hw| , 06 HHI M MeMtM £tt (PhM* 2| \Klang^ / \J KLMwtataJMttWtffebd1 Polabuhnn Klang Kajang V / Putrajaya Sentral Putrajaya Snurrft: LRT3 website Recently, the prime minister mobility. IT'S ALL ABOUT INFRASTRUCTURES of Malaysia, Datuk Sen Najib Infrastructure such as the tollfree To achieve this goal, the government, Tun Razak, tabled the 11th Pan Borneo Highway over in East through Prasarana and MRT Corp, has Malaysia Plan (20152020) in Malaysia and the 325kmlong tollfree kickstarted a number of rail projects. parliament. This plan is dubbed as the federal route that will replace the Gua The ridership will increase when 'final leap', for Malaysia as a country, Musang and KarakTampin highways the Klang Valley Mass Rapid Transit to achieve a developednation status in will be upgraded. -
Asia Infrastructure Snapshot
COLLIERS INSIGHTS VALUATION & ADVISORY SERVICES | ASIA | DECEMBER 2019 ASIA INFRASTRUCTURE SNAPSHOT An Overview of Infrastructure Projects across Asia P.4-9 CHINA 37 4 143 FOREWORD AIRPORTS RAIL LINES METRO LINES 57.7M+ 65 2,100 1,754 2,800 additional passenger capacity stations km+ stations km+ During the next decade Asia will see massive investment in transportation infrastructure as cities become more connected and districts within cities P.10-15 become more accessible. The major investment will be in China and India, supported by their large populations, but many of the ASEAN countries are INDIA also investing in their transportation infrastructure. 18 1 18 AIRPORTS RAIL LINE METRO LINES Many of the airports built in Asia in the past 20 years have now reached or exceeded their design capacities leading to a programme of expansion 336M+ 12 508 884 1,130 in many of the leading cites, while the smaller cities are seeing the additional passenger capacity stations km stations km development of new airports either to replaced outdated facilities or to improve their connectivity with the major population centres. P.16-17 High speed rail has proven to be a viable substitute for air travel in China and other markets in the region are now expanding their rail development INDONESIA programmes, but it is mass transit systems in cities that are making the 3 1 5 AIRPORTS RAIL LINE METRO LINES greatest difference to urban travel to both reduce road congestion in city centres, and to open up suburban and fringe areas for new development. 40M 4 142 65 100 stations km+ The common thread across all the projects is real estate. -
SERVICED Apartments
SERVICED APARTMENTs floor plans Artist’s Impression – Overall view of SqWhere One Place Different Personalities Welcome to SqWhere – a vibrant development consisting of Serviced Apartments, SOVOs and Retail Offices, with artistic yet calming landscapes on different levels to provide you a series of life experiences. 1 2 LEGEND MRT Sungai Buloh-Serdang-Putrajaya Line Elevated Route MRT Sungai Boluh-Kajang Line Elevated Route Underground Route Interchange Station Ampang Park INTERCHANGE Kampung KL-Singapore High Speed Rail Batu Tun Razak Titiwangsa Exchange KL Monorail Line Cochrane Bukit Bintang Taman Ampang LRT Line Jalan Ipoh Taman Jinjang Taman Suntex Midah Sri Raya Mutiara KTM Komuter and Intercity Merdeka Chan Maluri Sow Taman Bandar Tun Hussein Onn Kelana Jaya LRT Line Pasar Seni Lin Pertama Taman Connaught Batu Sebelas Cheras Kepong Sentral KLIA Ekspress Line Bukit Dukung Bandar Malaysia Sungai Jernih KLIA Transit Line Muzium South Semantan Stadium Kajang Negara HSR Sri Damansara (West) Pusat Bandar Damansara Sungai Besi Kajang Phileo Serdang Raya (South) Sungai Buloh Damansara Bandar Serdang Raya Utama To (North) Mutiara Singapore UPM Kampung Damansara Taman Tun Selamat Dr Ismail Kwasa Damansara Exchange Surian Equine Park Kwasa Sentral Kota Damansara Putrajaya Sentral CyberJaya (North) CyberJaya (South) Strategically located in the next development hotspot in the Klang Valley, the Serviced Apartments at SqWhere offers an unparalleled connectivity with its direct link to Kampung Selamat MRT Station, and easy access to 6 major highways – PLUS, NKVE, LDP, MRR2, SPRINT and Guthrie Corridor. Every conceivable convenience surrounds you, starting with F&B and retail amenities below and nearby. The best higher educational institutions and international schools, medical centres, and retail landmarks such as Sunway Giza, One Utama, IPC IKEA, The Curve, are approximately 10km away.