Phoenix Transportation 2050 Plan

Transit 2000 Phoenix Transportation 2050 .4% Dedicated to Public Transit .7% Dedicated to Transit & Transportation 65% Voter Approved - March 2000 55% Voter Approved - August 2015 Sunset in 2020 Sunset in 2050

How Will the Transportation 2050 Plan Build Phoenix’s Future? Service Light Rail & Bus • Increase bus frequency by 70% • 75 miles of new • Increased weekend bus service • 42 miles of new stations • New and extended routes • Addition of new rail stations • Service increase through 12 a.m. on week • New Transit Centers days and 2 a.m. on weekends for local bus • Wi-Fi on rail and Dial-A-Ride • Increased /K-9 unit • Enhanced ADA/ Dial-A-Ride service • $40 billion of economic return on light rail • Wi-Fi on investment (estimate) • More shaded bus stops • Reloadable cards

New and Improved Local and RAPID/Commuter Bus Service Plan Current light rail Expanded Light Rail and Tranvía ligero actual Plan de Servicio Nuevo y Mejorado de Autobús Local e Interurbano New light rail New Bus Rapid Transit Plan Nuevo tranvía ligero Improved bus service* P New bus rapid transit Plan de Expansión de Tranvía Ligero y Nuevo servicio de New bus service Downtown Circulator Nuevo Servicio de Transporte Rápido transporte rápido de Improved RAPID*/ N de Autobús autobús Commuter Circulador del centro New RAPID/Commuter N Creek Rd Happy Valley Rd New Park-n-Rides P P th St Happy Valley Rd 7 Ave Blvd Tatum Mejoras al servicio de autobús* th Nuevo servicio de autobús Deer Valley Rd 35

P Ave

Mejoras al servicio interurbano Deer Valley th

19 Bell Rd

Nuevo servicio interurbano Ave

th st

7 51 Ave P Nuevos Park-n-Rides Scottsdale Rd St

th ASU West Cactus Rd 56

Metrocenter Mall Dunlap Ave Paradise Valley Mall

Grand Canyon University Biltmore Maryvale Fashion Park 91st Ave Thomas Rd th Ave P P th 44 St 99 Arcadia Crossing Ave st th 91 79 Ave

75th Ave Park-n-Ride New 48th St Broadway Rd Station St Southern Ave Capitol th

*May include increased peak frequency, 24 Central Ave early morning and late night service, P P and/or route extensions. Dobbins Rd th St 40 Baseline Rd th st Ave Ave 59 Ave rd South Mountain *Podrá incluir servicio con mayor 67 43 frecuencia en horas pico, temprano en st Ave Laveen Park la mañana y tarde por la noche, y/o 59 prolongación de rutas. st Ave New bus rapid transit route Nueva ruta de transporte rápido de 51 on either 19th or 35th Ave autobús en la Avenida 19 ó la 35 Phoenix Transportation 2050 Plan

The How Will the Transportation 2050 Plan Next Build Phoenix’s Future? , Bicycle, and Pedestrian 5Years Improvements • 680 miles of new asphalt pavement on major

Light Rail Studies & Engineering • Northwest Extension Phase 2 • 1,080 miles of new bicycle • Phoenix Capitol/I-10 West Corridor • 135 miles of new sidewalks • South Central Corridor • 2,000 new street lights • Camelback Rd/Central Glendale Corriodor • $240 million set aside for major street • Northeast Corridor improvement projects • Focus on connecting people to transit Immediate Transit Improvements • Increase span of service: local bus & dial-a- Proposed Phoenix Major Street Improvement Plan Plan de Mejoras a Vías Principales de Phoenix ride hours of operation to match light rail New Pavement* • Weekend local bus service to 30 minute N New and Expanded New River Rd Streets* frequencies

Nueva pavimentación* 74 • Install over 300 shaded bus stops Ampliación y nuevas 303 Lone Mountain • Add 4 new/extended bus routes vías públicas

Dynamite Blvd St

th Bicycle & Street Improvements Happy Valley Rd 7 Pinnacle Pk Rd • 84 miles of major street pavement overlays • 20 miles of new/upgraded sidewalks Union Hills Dr Bell Rd • 100 miles of new bicycle lanes Greenway Rd Thunderbird Rd • Add 30 new bus bays Cactus Rd Shea Blvd • Improvements to 3 major roadways Dunlap Rd

Ave Glendale Ave th Ave 99 rd 83 Camelback Rd

McDowell Rd Ave st 91

Broadway Rd Ave th 107 Baseline Rd

St

th Ave th

*Planned improvements to streets may 75 40

include new pavement, bike lanes, Ave th Ave rd Elliot Rd

sidewalks, curb and gutter, streets lights 67 43 and/or landscaping. th Ave 59 Ray Rd st Ave *Mejoras a las vías públicas planeadas 51 Chandler Blvd podrán incluir nueva pavimentación, carriles para bici, aceras, bordes de aceras y cunetas, iluminación vial y/o Map does not include planned improvements to local residential streets. jardinería. El mapa no incluye mejoras planificadas a calles residenciales locales.