Welland River Eutrophication Study

Total Page:16

File Type:pdf, Size:1020Kb

Welland River Eutrophication Study Appendix A Terms of Reference Niagara River (Ontario) RAP Welland River Eutrophication Study Purpose: This Terms of Reference document outlines the purpose of the Welland River Eutrophication Study, the study goals, the Technical Working Group (TWG) membership, roles and responsibilities, meeting frequency, reporting requirements, timelines and reference documents. The purpose of the Welland River Eutrophication Study is to refine and implement the Recommendations for Monitoring and Assessment as laid out by the technical review committee in Appendix H of the Technical Review Report.1 The goals of the study include the following: - gather missing data about how the Welland River ecosystem is responding to nutrient inputs (e.g. with algal blooms or low oxygen levels), - set delisting criteria for key parameters in the river, and - set targets for tributary loads to meet the delisting criteria. Background: The Welland River watershed encompasses 81% of the Niagara River (Ontario) Area of Concern (AOC). With a total drainage area of 1023 km2, the Welland River watershed is the largest, most diverse and most stressed watershed within the jurisdictional area of the Niagara Peninsula Conservation Authority (NPCA). The river has its origins in the Town of Ancaster, and is characterized by a wide range of agricultural activities, rural residential and urban development patterns along its course. Although it drops significantly (78m) over the first 55 kilometers, it is a meandering, sluggish river from Port Davidson downstream to its physical outlet at the Niagara River. The entire flow of the Welland River is diverted at a point 6 kilometers west of its junction with the Niagara River into the Queenston-Chippawa Power Canal. The operation of the Power Canal and the Control Structure cause the section of the Welland River between Chippawa and the Queen Elizabeth Way (locally known as Chippawa Creek) to flow westward (upstream) as water is diverted from the Niagara River to the Power Canal. The regulated diversion of water in the lower Welland River creates a pattern of regular diurnal fluctuation in water levels that extends approximately 60 kilometers upstream of the diversion. The twice-daily vertical fluctuation of 30cm to 45cm has impacted on the river’s ability to transport its sediment to an appropriate outlet or to maintain floodplain wetlands for fish habitat and erosion control purposes. The current The 2007 Technical Review of Impairments and Delisting Criteria situation creates a dilemma in that the river can not drain effectively. Sediment that is deposited at a delta in other river systems is continually suspended within the Welland River. By almost any standard of measurement, water quality in the Welland River is poor and in need of improvement. Water quality monitoring results continue to confirm the following: - very high suspended sediment levels caused by excess topsoil erosion; - excess algae growth caused by high phosphorus loads; - stagnant flow and rotting algae combine to cause low dissolved oxygen levels in the river waters; - unacceptably high bacteria levels at many locations from both human and livestock sources - lack of forest cover through the entire drainage basin, and - low abundance and diversity of fish species. As it is the largest tributary to the Niagara River, consequently the Welland River is the focus of many of the Recommendations in the Niagara River Remedial Action Plan (RAP) reports. In order to delist the Niagara River AOC, it is imperative that the environmental problems within the Welland River watershed are addressed. The Niagara River RAP Stage 2 review: Between 2005 and 2007, a 10-year review of the framework for implementation of remedial actions was undertaken as part of the Niagara River (Ontario) Remedial Action Plan (RAP). This included review and, where applicable, revision of the status of Beneficial Use Impairments (BUIs), delisting criteria, monitoring and assessment priorities, and the implementation annex and RAP work plan. As part of the review of delisting criteria and BUIs, a number of recommendations were made for science-related activities (monitoring, assessment, and reporting) to be undertaken in the Niagara River (Ontario) Area of Concern (AOC). Appendix H of the 2007 Technical Review of Impairments and Delisting Criteria lays out proposed Recommendations for monitoring and assessment to address the BUI: Eutrophication and Undesirable Algae, and briefly listed below. Recommendations for Monitoring and Assessment: A working group of MOE, NPCA, and Environment Canada staff (referred to as the Technical Working Group or TWG) will be assembled to refine and implement the recommendations below over the next 2-3 years. The lead agency is the NPCA. Recommendations are as follows: 1. Characterize the biological response of the Welland River to high phosphorus inputs including the type, frequency, location, and timing of algal blooms, and whether oxygen depletion (anoxia) is occurring in relation to aquatic plant or algae overgrowth. A number of potential studies are suggested to implement this recommendation. This work is considered the highest priority for implementation. Details are provided in the Work Plan (dated January 30, 2008). 2. Characterize concentrations of plant-available phosphorus versus sediment-bound phosphorus along the length of the Welland River. (Dependent on results from implementing recommendation 1) 3. Develop delisting criteria for the Welland River upstream of the Old Welland Canal which identify the desired conditions in the river with regard to dissolved oxygen and abundance of algae/aquatic plants. This is the key purpose of the study. When the delisting criteria for nutrients have been developed then effective monitoring programs may be established for the Welland River. 4. Develop phosphorus loading targets for different subwatersheds of the Welland River upstream of the Old Welland Canal to meet delisting criteria. This approach, using the AGNPS model at the NPCA, is based on the development of loading targets for the Hamilton Harbour RAP. 5. Monitor success in meeting ambient targets for the Welland River through alterations to the existing AOC Tributary Monitoring Program. An existing program called the AOC Tributary Monitoring Program, designed for long-term monitoring of the state of AOC tributary water quality, is run by the NPCA. Necessary modifications would be determined at the time of developing delisting criteria. Membership: The Welland River Eutrophication Study TWG consists of partner agency representatives to implement the eutrophication study under the auspices of the RAP Science Committee. The following agency representatives* will comprise the TWG: • Martha Guy, Environment Canada (EC) • Véronique Hiriart-Baer, EC • Mary Ellen Scanlon, Ontario Ministry of the Environment (MOE) • Sarah Day, MOE • Tanya Labencki, MOE • Annie Michaud, Niagara Peninsula Conservation Authority (NPCA) • Josh Diamond, NPCA • Valerie Cromie, NPCA *Representatives from other agencies will be circulated information and/or solicited for input as the Study progresses. The RAP Team will continue to provide the main coordination and oversight function for the RAP, with the Welland River Eutrophication Study TWG receiving direction from, and providing information to, the RAP Science Committee. Roles and Responsibilities: The NPCA representatives will facilitate meetings and work with the TWG to organize and schedule meetings and/or teleconferences, as required during the study. They will also liaise with the RAP Science Committee for the purpose of reporting on the Welland River Eutrophication Study activities and priorities, and to receive directives and information from the RAP Science Committee on behalf of the TWG. As RAP Coordinator, the NPCA representatives will report on progress in the study to the RAP Team when requested. The NPCA representatives will organize meetings and/or teleconferences, and keep records of the study activities and results in cooperation with the TWG. Other members will attend related meetings and events, prepare and present information on their agency’s activities and priorities as applicable, and coordinate relevant information flow between the Welland River Eutrophication Study and scientific personnel within their agency. Meeting Frequency: The Welland River Eutrophication Study TWG will generally meet and/or teleconference twice annually, in the summer and winter, although additional meetings may be arranged as required by the study. The winter meeting will mainly be for the purpose of work planning for the coming monitoring season, and the summer meeting will be a review of progress and update on activities planned in the winter meeting. Additional meetings and events (such as workshops) may be planned as the need arises. Reporting requirements and timelines: A report on the status of Welland River eutrophication, established delisting criteria, and loading targets to meet delisting criteria is required for March 2011. Progress reports will be submitted quarterly for 2008 – 2010 to the Niagara River RAP Science Committee. Reference Documents: The following documents will guide the Welland River Eutrophication Study TWG’s work: • The 2007 RAP Monitoring Plan • The 2007 Technical Review of Impairments and Delisting Criteria • The 2007 RAP Work plan • The 1993 RAP Stage 1 and 1995 RAP Stage 2 reports • A map showing the boundaries and key features of the Niagara River (Ontario) AOC is found in Figure 1 in this document.
Recommended publications
  • The Welland River Eutrophication Study in the Niagara River Area of Concern in Support of the Beneficial Use Impairment: Eutrophication and Undesirable Algae
    The Welland River Eutrophication Study in the Niagara River Area of Concern in Support of the Beneficial Use Impairment: Eutrophication and Undesirable Algae March 2011 Niagara River RAP Welland River Eutrophication Study Technical Working Group The Welland River Eutrophication Study in the Niagara River Area of Concern in Support of the Beneficial Use Impairment: Eutrophication and Undesirable Algae March 2011 Written by: Joshua Diamond Niagara Peninsula Conservation Authority On behalf of: Welland River Eutrophication Technical Working Group The Welland River Eutrophication Study in the Niagara River Area of Concern in Support of the Beneficial Use Impairment: Eutrophication and Undesirable Algae Written By: Joshua Diamond Niagara Peninsula Conservation Authority On Behalf: Welland River Eutrophication Technical Working Group Niagara River Remedial Action Plan For more information contact: Niagara Peninsula Conservation Authority Valerie Cromie, Coordinator Niagara River Remedial Action Plan Niagara Peninsula Conservation Authority 905-788-3135 [email protected] The Welland River Eutrophication Study in the Niagara River Area of Concern Welland River Eutrophication Study Technical Working Group Ilze Andzans Region Municipality of Niagara Valerie Cromie Niagara Peninsula Conservation Authority Sarah Day Ontario Ministry of the Environment Joshua Diamond Niagara Peninsula Conservation Authority Martha Guy Environment Canada Veronique Hiriart-Baer Environment Canada Tanya Labencki Ontario Ministry of the Environment Dan McDonell Environment
    [Show full text]
  • NIAGARA ROCKS, BUILDING STONE, HISTORY and WINE
    NIAGARA ROCKS, BUILDING STONE, HISTORY and WINE Gerard V. Middleton, Nick Eyles, Nina Chapple, and Robert Watson American Geophysical Union and Geological Association of Canada Field Trip A3: Guidebook May 23, 2009 Cover: The Battle of Queenston Heights, 13 October, 1812 (Library and Archives Canada, C-000276). The cover engraving made in 1836, is based on a sketch by James Dennis (1796-1855) who was the senior British officer of the small force at Queenston when the Americans first landed. The war of 1812 between Great Britain and the United States offers several examples of the effects of geology and landscape on military strategy in Southern Ontario. In short, Canada’s survival hinged on keeping high ground in the face of invading American forces. The mouth of the Niagara Gorge was of strategic value during the war to both the British and Americans as it was the start of overland portages from the Niagara River southwards around Niagara Falls to Lake Erie. Whoever controlled this part of the Niagara River could dictate events along the entire Niagara Peninsula. With Britain distracted by the war against Napoleon in Europe, the Americans thought they could take Canada by a series of cross-border strikes aimed at Montreal, Kingston and the Niagara River. At Queenston Heights, the Niagara Escarpment is about 100 m high and looks north over the flat floor of glacial Lake Iroquois. To the east it commands a fine view over the Niagara Gorge and river. Queenston is a small community perched just below the crest of the escarpment on a small bench created by the outcrop of the Whirlpool Sandstone.
    [Show full text]
  • A Guide to Celebrate Niagara Peninsula's Native Plants
    A GUIDE TO CELEBRATE NIAGARA PENINSULA’S NATIVE PLANTS 250 Thorold Road West, 3rd Floor Welland, ON L3C 3W2 Phone: 905.788.3135 Fax: 905.788.1121 www.npca.ca Like us on Facebook www.facebook.com/NiagaraPeninsulaConservationAuthority Follow us on Twitter @NPCA_Ontario © 2014 Sixth Edition – Niagara Peninsula Conservation Authority The Niagara Peninsula Conservation Authority has made every attempt to ensure the accuracy of the information contained within this publication and is not responsible for any errors or omissions. The Niagara Peninsula Conservation Authority warns consumers that it is not advisable to eat any of the fruits or plants described in this publication. TABLE OF CONTENTS Introduction ............................................................................................................2 to 5 Flowering Times and Bloom Colour ............................................................................6 to 7 Native Plant List .................................................................................................... 8 to 15 Dry Conditions - Sunny - Wildflowers ..................................................................... 16 to 22 Dry Conditions - Sunny - Grasses ....................................................................................23 Dry Conditions - Sunny - Trees ........................................................................................24 Moist to Wet Conditions - Sunny - Wildflowers ........................................................ 25 to 28 Moist to Wet Conditions
    [Show full text]
  • Methodology and Application of a Statistical Approach to the Universal Soil Loss Equation (Usle): Welland River Case Study
    Middle States Geographer, 1996, 29:105-113 METHODOLOGY AND APPLICATION OF A STATISTICAL APPROACH TO THE UNIVERSAL SOIL LOSS EQUATION (USLE): WELLAND RIVER CASE STUDY Shannon L. Vickers1 , Kim N. Irvine2, and Ian G. Droppo3 1. Department of Geography, McMaster University, Hamilton, Ontario, Canada, L8S 4K1. 2. Department of Geography and Planning, State University College, Buffalo, NY 14222. 3. National Water Research Institute, Burlington, Ontario, Canada, L7R 4A6. ABSTRACI': The WeI/and River watershed drains an area of 880 km2 and is part of the Niagara River Area of Concem. As one step towards remediation, the Universal Soil Loss Equation (USLE) was used to estimate soil erosion inputs to the river from each of the 34 sub-basins in the watershed. An innovative approach using risk and uncertainty analysis was incorporated into the conventional USLE estimates in order to address concems about uncertainty due to the variability of the USLE parameters across the WeI/and River watershed. This paper describes the methodology for the statistical approach to the USLE and those sub-basins with high potential soil loss were identified. INTRODUCflON (USLE) was used to estimate soil erosion rates for each of the 34 sub-basins in the watershed. A risk and uncertainty analysis (including probability The Welland River watershed is part of the distribution fitting and simulations using Latin Niagara River Area of Concern. Areas of Concern Hypercube sampling) was incorporated into the around the Great Lakes have been designated by conventional USLE estimates and was performed the International Joint Commission (DC) as using BESTFIT and @RISK, which are EXCEL exhibiting various environmental impairments.
    [Show full text]
  • Bookletchart™ Buffalo Harbor NOAA Chart 14833
    BookletChart™ Buffalo Harbor NOAA Chart 14833 A reduced-scale NOAA nautical chart for small boaters When possible, use the full-size NOAA chart for navigation. Included Area Published by the The International boundary between the United States and Canada follows a general middle of the river course in the upper Niagara River National Oceanic and Atmospheric Administration from the head of the river downstream to the head of Grand Island National Ocean Service where the river forks around the island. The boundary then follows Office of Coast Survey Chippawa Channel and is generally less than 1,000 feet off the west shore of Grand Island until Chippawa Channel and Niagara River Channel www.NauticalCharts.NOAA.gov join at the northwest end of Grand Island. The boundary again follows a 888-990-NOAA general middle of the river course around the south side of Goat Island and over Niagara Falls. What are Nautical Charts? Chart Datum, Upper Niagara River.–Depths and vertical clearances under overhead cables and bridges in the Niagara River from its Nautical charts are a fundamental tool of marine navigation. They show confluence with Lake Erie to the head of navigation, the turning basin at water depths, obstructions, buoys, other aids to navigation, and much Niagara Falls, NY, is as follows: from Lake Erie to the Black Rock Canal more. The information is shown in a way that promotes safe and Lock is the Low Water Datum of Lake Erie, 569.2 feet (173.5 meters); efficient navigation. Chart carriage is mandatory on the commercial from just below the Black Rock Canal Lock to the south end of Grand ships that carry America’s commerce.
    [Show full text]
  • Niagara River
    Niagara River Area of Concern Canadian Section Status of Beneficial Use Impairments September 2010 The Niagara River is a 58-km waterway connecting Lake Erie and Lake Ontario. The Canadian section of the Niagara River Area of Concern extends along the entire length of the Canadian side of the Niagara River, and includes the Canadian side of Niagara Falls and the Welland River watershed. The Niagara River drains extensive farmland on the Canadian side and passes through heavily industrialized, residential and parkland areas on the United States side. More than one half of the flow of the river is diverted for electrical power generation on both sides of the river. The river supports one of the largest and most diverse concentrations of gulls in the world, and its gorge and cliffs below the falls are habitat for some of the highest concentrations of rare plant species in Ontario. Environmental concerns on the Canadian side of the Niagara River Area of Concern have focused on the loss and degradation of wetlands and fish habitat, and the resulting impacts on fish and wildlife populations that depend on this habitat. Most of these impacts are associated with non-point sources of pollution from rural areas of the Niagara–Welland River basin, particularly runoff of pesticides and nutrients. (By contrast, most of the environmental concerns in the United States section are associated with toxic contamination from past industrial management practices, particularly the seepage of toxic wastes from chemical dumps, and the discharge of municipal wastes.) PARTNERSHIPS IN ENVIRONMENTAL PROTECTION The Niagara River was designated an Area of Concern in 1987 under the Canada–United States Great Lakes Water Quality Agreement.
    [Show full text]
  • Great Lakes St. Lawrence Seaway Study
    GREAT LAKES ST. LAWRENCE SEAWAY STUDY Final Report Fall 2007 GREAT LAKES ST. LAWRENCE SEAWAY STUDY By: Transport Canada U.S. Army Corps of Engineers U.S. Department of Transportation The St. Lawrence Seaway Management Corporation Saint Lawrence Seaway Development Corporation Environment Canada U.S. Fish and Wildlife Service Publication This publication is also available in French under the title: Étude des Grands Lacs et de la Voie maritime du Saint-Laurent. Rapport final, automne 2007. Permission is granted by the Department of Transport, Canada, and the U.S. Department of Transportation, to copy and/or reproduce the contents of this publication in whole or in part provided that full acknowledgement is given to the Department of Transport, Canada, and the U.S. Department of Transportation, and that the material be accurately reproduced. While the use of this material has been authorized, the Department of Transport, Canada, and the U.S. Department of Transportation, shall not be responsible for the manner in which the information is presented, nor for any interpretation thereof. The information in this publication is to be considered solely as a guide and should not be quoted as or considered to be a legal authority. It may become obsolete in whole or in part at any time without notice. Publication design and layout by ACR Communications Inc. ii Great Lakes St. Lawrence Seaway Study FOREWORD AND ACKNOWLEDGEMENTS We are pleased to present the binational report on the Great Lakes St. Lawrence Seaway Study, the result of collaborative research and analysis by seven federal departments and agencies from Canada and the United States.
    [Show full text]
  • Niagara Region Fallsview Boulevard & Clifton Hill
    Points of Interest Wego Routes Compliments of Niagara Falls Tourism 1 800 56 FALLS Attractions Wineries Parking Lundy’s Lane Niagara Parks niagarafallstourism.com & Hornblower Cruises Niagara 905 356 6061 Restaurants Others Hospital Fallsview / Clifton Hill NOTL Shuttle QEW Toronto 4 24 32 Niagara Region 77 y 7 87 w 68 43 k P a r 6 a g SHOW US HOW YOU 12 20 13 ia 57 42 N East West Line 8 25 #EXPLORENIAGARA Lake Ontario 87 58 Stanley Ave Stanley Virgil Ave Stanley QEW Niagara River 4 O’Neil St ) 15 Lakeshore Rd " 19 Townline Rd Townline Townline Rd Townline 5 3 Huggins St & 16 Port Niagara-on- y 22 y 34 Garner Rd Garner Dalhousie the-Lake Rd Garner St Catharines w 51 Carlton St 27 k 18 P Niagara Stone Rd 100 a r a 83 a g g a a i Montrose Rd Montrose Niagara River Rd Montrose 54 N 9 45 11 90 Thorold Stone Rd Queenston 79 75 QEW 5 14 10 81 81 46 50 2 York Rd 60 7 66 405 73 1 14 Portage Rd 52 3 406 55 Glendale Ave 81 23 13 67 89 4 QEW Fairview Bridge St Whirlpool Cemetery 6 Bridge Kalar Rd Rd Kalar Kalar 17 Thorold 70 Stanley Ave Stanley 100 Ave Stanley Victoria Ave Victoria 50 Ave Victoria Queen St 21 42 61 3 Thorold Stone Rd Drummond Rd Rd Drummond Drummond 69 Decew Rd Morrison St y Woodbine St w Portage Rd k Oakes P Short Hills a Park r Dorchester Rd Dorchester Provincial Park 420 a Rd Dorchester g ia 70 ane N U.S.A 78 dy’s L Lu n Niagara y Niagara River a Niagara Pkwy W 20 QEW Falls y B lle Niagara River ea Va 50 ver da m 5 s R d 2 Falls Ave 420 Walnut St Hiram St 72 Fallsview Boulevard & Clifton Hill Fallsview Boulevard & Clifton Hill
    [Show full text]
  • Development of the Large Lake Statistical Water Balance Model for Constructing a New Historical Record of the Great Lakes Water Balance
    Summary Report Development of the Large Lake Statistical Water Balance Model for Constructing a New Historical Record of the Great Lakes Water Balance Submitted to: The International Watersheds Initiative of the International Joint Commission Submitted by: NOAA Great Lakes Environmental Research Laboratory and University of Michigan Cooperative Institute for Great Lakes Research Lead authors: Joeseph Smith (CIGLR) Andrew Gronewold (NOAA-GLERL) SEPTEMBER 2018 Contact: [email protected] or [email protected] Contents Executive Summary ........................................................................................................................ 3 1 – Introduction ............................................................................................................................... 4 2 – Water balance model................................................................................................................. 5 2.1 – Channel flows and diversions .......................................................................................................... 8 3 – Data and the Bayesian network................................................................................................. 9 3.1 – Data .................................................................................................................................................. 9 3.2 – Bayesian network ........................................................................................................................... 10 3.2.1 – Prior distributions
    [Show full text]
  • Looking Back... with Alun Hughes
    Looking back... with Alun Hughes SURVEYING MERRITT’S DITCH The present Welland Canal, opened in 1932, is the The War ended in a stalemate, and led to lingering fourth in a series dating back to the early 19th century. uncertainty along the border; in particular, a need for a This essay is concerned with the original canal, with secure lake-to-lake connection became urgent. This special emphasis on the first canal-related survey in was heightened with the start of work on the Erie 1818 and the beginnings of construction in 1823. Canal in 1817, which threatened to divert Upper Lakes trade from Montreal to New York. Background to the Canal The principal force behind the Welland Canal was The First Canal was built in two stages, completed William Hamilton Merritt of St. Catharines. Beginning in 1829 and 1833. The initial portion, built between in 1815 Merritt had established a small industrial 1824 and 1829, ran from Port Dalhousie to Port complex on Twelve Mile Creek, with grist and saw Robinson, and then followed the Welland River to mills, a distillery and salt works. His mills suffered Chippawa. The main obstacles in construction were from chronic water supply problems, either too much the 150-foot-high Niagara Escarpment (crossed by or too little. Early on Merritt had the idea of cutting a locks), and a ridge of higher land in southern Thorold supply channel through the ridge in southern Thorold between Port Robinson and Allanburg (crossed by an to divert some Welland River water into the Twelve open channel called the Deep Cut).
    [Show full text]
  • Grand Niagara Secondary Plan
    GRAND NIAGARA SECONDARY PLAN PUBLIC OPEN HOUSE #3 WELLAND RIVER GRASSY BROOK ROAD CROWLAND ROAD CROWLAND MONTROSE ROAD QUEEN ELIZABETH WAY BIGGAR ROAD (Source: Google Maps 2015) Date: January 17, 2017 Time: 4:30 pm to 6:30 pm (presentation at 5:00pm) Place: Grand Niagara Golf Club Clubhouse 8547 Grassy Brook Road SITE CONTEXT Regional Municipality of Niagara Niagara Falls QUEEN ELIZABETH WAY Secondary Secondary Plan Area Plan Area Lyons Creek Road Biggar Road Road Montrose Secondary Plan Area Context 6 5 WELLAND RIVER 8 7 3 GRASSY BROOK ROAD Secondary Plan Area CROWLAND ROAD CROWLAND 1 4 MONTROSE ROAD QUEEN ELIZABETH WAY CN RAIL LINE AND HYDRO CORRIDOR 2 (Source: Google Maps 2015) Existing Grand Niagara Golf Course with Resort 1 BIGGARResidential ROAD Land Use Permissions 5 7KXQGHULQJ:DWHUV6HFRQGDU\3ODQ$UHD RQJRLQJ 2 Future Regional Hospital Site 6 *DUQHU6RXWK6HFRQGDU\3ODQ$UHD FRPSOHWH 3 (6)R[/WG2I¿FHV 7 5HJLRQRI1LDJDUD%LR6ROLGV)DFLOLW\ 4 Existing Employment Uses 8 &\WHF,QGXVWULHV,QF SCOPE OF STUDY 000*URXS/LPLWHGLQFRQMXQFWLRQZLWK7KH3ODQQLQJ3DUWQHUVKLSLVZRUNLQJZLWKWKH&LW\RI1LDJDUD )DOOV1LDJDUD5HJLRQWKH1LDJDUD3HQLQVXOD&RQVHUYDWLRQ$XWKRULW\DQGYDULRXVSXEOLFDJHQFLHVWR SUHSDUHD6HFRQGDU\3ODQIRU*UDQG1LDJDUD 7KH*UDQG1LDJDUD6HFRQGDU\3ODQZLOOHVWDEOLVKDIUDPHZRUNIRUWKHIXWXUHODQGGHYHORSPHQWRIWKH DUHDZRUNLQJZLWKLQWKHFRQWH[WRIWKHVLWH¶VSK\VLFDOFKDUDFWHULVWLFVQDWXUDOKHULWDJHIHDWXUHVDQG VWRUPZDWHUPDQDJHPHQWDQGVHUYLFLQJFDSDELOLWLHV7KH6HFRQGDU\3ODQZLOOEHFRQVLVWHQWZLWKWKH &LW\¶V*URZWK6WUDWHJ\DQGSURMHFWHGKRXVLQJQHHGVWKH3URYLQFLDO3ROLF\6WDWHPHQWDQG*URZWK Plan
    [Show full text]
  • WATER QUALITY ASSESSMENT Buckhorn Creek & the Welland
    WATER QUALITY ASSESSMENT Buckhorn Creek & the Welland River In the Vicinity of the Glanbrook Landfill 2006 For: Fabiano Gondim, P. Eng. Supervisor of Landfills Waste Management Division Public Works Department City of Hamilton 120 King Street West Suite 1170 Hamilton, Ontario L8P 4V2 By: The Niagara Peninsula Conservation Authority March 2007 1.0 INTRODUCTION 1.1 Background The Glanbrook Landfill study site is located in the former Township of Glanbrook in the southeast portion of the City of Hamilton, Ontario. The landfill is currently the only open and operating landfill in the City of Hamilton, and has been in operation since 1980. The Glanbrook Landfill is designed to receive domestic, commercial, and non-hazardous solid industrial waste. Leachate is collected via a leachate collector system and is transported off-site to the City of Hamilton’s Waste Water Treatment Plant. Stormwater drainage is managed using a combination of open ditches and retention ponds. The site is currently operated by Waste Management of Canada Corporation (formerly named Canadian Waste Services Incorporated) on behalf of the City of Hamilton. The City of Hamilton currently has ten surface water quality monitoring stations on the Welland River and Buckhorn Creek, and select surface water samples are taken monthly for condensed parameters and four times a year for more comprehensive testing to determine water quality impacts. Both waterways meander through the landfill property and converge east of the site (Figures 1a, 1b). Annual monitoring reports have stated that there is no chemical evidence of landfill leachate impact on water quality in Buckhorn Creek and the Welland River (Golder Associates Ltd., 2002).
    [Show full text]