Performance Appraisal & District Economic Scenario

Total Page:16

File Type:pdf, Size:1020Kb

Performance Appraisal & District Economic Scenario DISTRICT ECONOMICSCENARIO DISTRICT PERFORMANCE APPRAISAL& PERFORMANCE Government of Andhra Pradesh ofAndhra Government 2017-18 Krishna 189121 Pe Visakhapatnam 178166 r Ca West Godavari 172006 pi ta SPSR Nellore 156106 In Andhra co 142054 Pradesh me Guntur 141098 at East 136007 Cu Godavari Chittoor 135008 rr en Prakasam 134014 t Pr YSR 125319 ic es-2017-1 Kurnool 119638 Anantapuramu 118451 Vizianagaram 105434 8 Srikakulam 99792 Government of Andhra Pradesh PERFORMANCE APPRAISAL & DISTRICT ECONOMIC SCENARIO 2017-18 Directorate of Economics & Statistics Planning Department Government of Andhra Pradesh Sri Nara Chandrababu Naidu Hon'ble Chief Minister Government of Andhra Pradesh FOREWORD The Government of Andhra Pradesh, converting the divergent challenges emerged since state bifurcation into opportunities, have developed a model to transform the State as a Happy, Inclusive and a Globally competitive society through accomplishing sustainable Double Digit Growth over a period of time. I would like to re-iterate the Vision 2029 statement which reads - “The people of Andhra Pradesh envision transforming their state into a happy, inclusive, responsible, globally competitive and innovation-driven society through structural transformation and by sustaining inclusive double-digit economic growth, to become one among the best states by 2022, the best state by 2029 and a leading investment destination by 2050”. In order to translate the vision of the state into reality, the government has taken up a mission approach focusing on the dynamics of the economy to accelerate the growth trajectory for which innovative initiatives under each sector have been taken up besides adopting best practices and these efforts have proved fruitful in targeting national / global benchmarks. The perspective plans prepared by each department in such a way to reap the low- hanging fruits first and then march towards attaining the ultimate set goals, have worked quite well through coordination among departments by optimum utilization of resources. The efforts of the Government reflect in its performance in achieving Double Digit Growth consecutively for last three years by registering the GSDP growth rates of 10.60%, 11.07% and 11.22% for the years 2015-16(TRE), 2016-17(FRE) and 2017-18 (AE) respectively for which I appreciate all the functionaries of various departments and earnestly hope similar hard work continues in future as well. I am very glad to note that this publication entitled ‘’Performance appraisal and District Economic scenario’’ now brought out by the Directorate of Economics and Statistics depicting the performance of different sectors of the State economy and districts during 2017-18 and action plan for 2018-19 will be very useful for different users. Nara Chandrababu Naidu Chief Minister of Andhra Pradesh Yanamala Ramakrishnudu Hon’ble Minister for Finance, Planning, Commercial Taxes & Legislative Affairs Government of Andhra Pradesh FOREWORD Immediately post state re-organisation in June 2014, the Government of Andhra Pradesh envisioned an innovative approach for the comprehensive development of the state by departing from the conventional development model to that of a more inclusive and balanced framework. This higher inclusive economic growth is expected to result in a quantum jump in human development in sync with the vision aspirations. Andhra Pradesh was a pioneer in compilation of district level estimates of domestic product since late nineties and now stands out as a role model in the country for its analytical presentation. It is noteworthy to mention that the GSDP and DDP estimates compiled by the Directorate of Economics and Statistics, have provided valuable insights in evaluating the performance of the economy under various sectors and these results facilitate formulation of spatial plans to narrow down regional imbalances on economic front and thereby achieving inclusive growth. This publication provides the growth rates coupled with contributions under each sector of all thirteen districts of the State. I hope that the present edition of “Performance Appraisal and District Economic Scenario” which contained District wise and sector wise performance for the year 2017-18 (AE) will certainly help the Government, District administration for chalking out better planning at micro level. I appreciate the efforts put in by the Directorate of Economics and Statistics and the Chief Planning Officers in bringing out of this publication in such a presentable and appealing form. Yanamala Ramakrishnudu Hon’ble Minister for Finance, Planning, Commercial Taxes & Legislative Affairs N. Yogeswara Sastry Director Directorate of Economics & Statistics Government of Andhra Pradesh PREFACE The Directorate of Economics & Statistics (DE&S), in tune with the Vision aspirations of the Government of Andhra Pradesh, has been bringing out various publications essentially focussing on providing various data sets for policy making and to formulate development plans. The department is using all its human development resources optimally in building up of various data sets through adopting scientific approach in collection and compilation of data. The DE&S as a nodal agency has been compiling the estimates of Gross State Domestic Product (GSDP) - one of the most important indicators to measure the economy of the State and arriving at Per Capita Income that reflects the standard of living of the citizens of the State. The standardized procedures and methodology adopted by the Central Statistical Office, MOSPI, Government of India are being adopted at state level for compilation of these economic aggregates. This publication contains the sector-wise estimates of GSDP, inter-state comparison and inter-district ranking which are useful for tracking the status and standings of districts in terms of their performance and thereby help government implement appropriate interventions by chalking out district-specific action plans. I am glad to note that the DDP estimates compiled at sub-state level for all sectors and incorporated in the publication of “Performance Appraisal and District Economic Scenario” would provide very vital inputs to bridge critical gaps and ensure inclusive growth and thereby help reduce spatial disparities. I express my gratitude to all the departments and agencies including CSO, MOSPI for extending their cooperation and for their valuable inputs in bringing out this publication. I appreciate the officers, staff of Directorate of Economics & Statistics involved and the Chief Planning Officers in bringing out this publication which will be useful to all the Administrators, Economists, Policy makers and Research scholars. N. Yogeswara Sastry Director CONTENTS 1 A.P AT A GLANCE 1-3 2 STATE ECONOMY 2017-18 4-25 3 ACTION PLAN FOR 2018-19 AND TARGETS 26-28 4 GROWTH ENGINES 29-30 5 INTER-STATE COMPARISON 31-35 6 GSDP Estimates Broad Sector Wise at a glance and 36-37 Sub Sector Wise comparing the All India Estimates 7 DISTRICT DOMESTIC PRODUCT - ANALYSIS 38-50 8 DISTRICT-WISE ESTIMATES a SRIKAKULAM 51-62 b VIZIANAGARAM 63-72 c VISAKHAPATNAM 73-84 d EAST GODAVARI 85-94 e WEST GODAVARI 95-106 f KRISHNA 107-116 g GUNTUR 117-128 h PRAKASAM 129-138 i SPS NELLORE 139-148 j CHITTOOR 149-158 k YSR 159-168 l ANANTHAPURAMU 169-178 m KURNOOL 179-188 xii 1 PERFORMANCE APPRAISAL AND DISTRICT ECONOMIC SCENARIO PERFORMANCE APPRAISAL AND DISTRICT ECONOMIC SCENARIO 2017-18 2017-18 xii 1 PERFORMANCE APPRAISAL AND DISTRICT ECONOMIC SCENARIO PERFORMANCE APPRAISAL AND DISTRICT ECONOMIC SCENARIO 2017-18 2017-18 ANDHRA PRADESH AT A GLANCE SL. No. Particulars Unit Number 1 Area ‘000 Sq. Kms. 162.97 2 Districts Number 13 3 Revenue Divisions " 51 4 Mandals " 670 5 Revenue Villages " 17,398 6 Gram Panchayats " 12,918 7 Habitations “ 47,861 8 Villages (As per Census, 2011) " 17,366 9 Towns (Statutory and Census) " 195 10 Municipal Corporations " 14 11 Municipalities/Nagar Panchayats " 96 12 Population (Census, 2011) Lakhs 495.77 a Male " 248.30 b Female " 247.47 c Rural Population " 349.67 d Rural Male " 175.38 e Rural Female " 174.29 f Urban Population " 146.10 g Urban Male " 72.92 h Urban Female " 73.18 i Households " 127.19 j Rural " 90.65 k Urban " 36.54 l Total Literacy Rate Percentage 67.35 m Male Literacy Rate " 74.77 n Female Literacy Rate " 59.96 o Percentage decadal growth rate of Population (2001-2011) " 9.21 13 a Members of Parliament - 1. Lok Sabha, Number 25 2. Rajya Sabha " 10 b Members of Legislative Assembly " 175 c Members of Legislative Council " 58 2 3 PERFORMANCE APPRAISAL AND DISTRICT ECONOMIC SCENARIO PERFORMANCE APPRAISAL AND DISTRICT ECONOMIC SCENARIO 2017-18 2017-18 SL. No. Particulars Unit Number 14 Agriculture(2016-17): Lakh a Gross Area Sown 74.18 Hectares b Net Area Sown " 60.77 c Total Foodgrains Production Lakh Tonnes 149.16 d Cropping Intensity 1.24 Lakh e Gross Area Irrigated 35.82 Hectares f Net Area Irrigated " 27.19 g Irrigation Intensity 1.29 15 Livestock (2016-17) Production a Milk (000 MTS) 12177.85 b Meat " 632.502 c Egg (Lakh in no.) 158274 16 Fishing (2016-17) Production a Marine fish (MTS) 471692 b Inland fish " 1617483 c Prawns " 251197 17 Forestry Area under Forest Hects. 3688461 % to total Geographical Area 22.63% 18 Rainfall Season wise (2016-17) A South - West Monsoon (June to Sept.) a Normal (In MM) 556.0 b 2016-17 " 533.8 c 2015-16 " 523.0 d 2016-17 % Dev. Over Normal " -4.0 B North - East Monsoon (October to December) a Normal (In MM) 296.0 b 2016-17 " 85.3 c 2015-16 " 287.2 d 2016-17 % Dev. Over Normal " -40.0 19 Industrial
Recommended publications
  • Page 1 of 5 Review of Prioritized Projects Hon'ble CM Conducted
    Review of Prioritized Projects Hon’ble CM conducted Review for Prioritized Projects RECORD OF DISCUSSION Date Monday, 15th October 2018 Time 10:30 AM to 01:30 PM Agenda Progress review on Prioritized projects by Hon’ble Chief Minister, A.P Venue Prajavedika (Grievance Hall), Near Hon’ble CM Residence. Shri. D. Uma Maheswara Rao, Hon’ble Minister, WRD . Shri G Sai Prasad. Principle secretary to Hon’ble CM. Shri. Shashi Bhushan Kumar, Secretary, WRD . Smt. Rekha Rani – Commissioner, R&R . Shri M. Venkateswara Rao, EnC, WRD Attendees . District collectors . Forest department . Ground water department, APSRAC and M/s Vassar Labs . Chief Engineers from Tirupathi, Ananthapuram, Kadapa, Ongole, Vijayawada & Visakhapatnam . Consultants to APWRD Page 1 of 5 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble CM and Minister of water resources reviewed status of prioritized projects. Overall status of 61 prioritized projects : Projects inaugurated: 15 nos. For 1 Overall status - Projects ready for inauguration: 4 nos. information Projects in progress: 42 nos. Hon’ble CM requested to provide timelines for all the prioritized projects. Hon’ble Minister, WRD reviewed the status of the projects/areas/ acres of lands affected by the Titli Cyclone in Srikakulam district. CE, Srikakulam informed around 325 Tanks and Canals are affected by the cyclone and rectification measures are taken up immediately. Around 83,550 acres of crop is affected by the Vamshadhara flow. Hon’ble Minister, WRD raised concern for the underutilization of 90TMC of flood water from Vamshadhara and also instructed to make a committee with Expert Team, Hydrology Team, M/s Vassar labs to study on Temporary and Permanents Titli Cyclone For 2 solutions for the Flood banks.
    [Show full text]
  • Page 1 of 6 Review of Prioritized Projects Hon'ble CM Conducted
    Review of Prioritized Projects Hon’ble CM conducted Review for Prioritized Projects RECORD OF DISCUSSION Date Monday, 12th November 2018 Time 08:20 PM to 09:00 PM Agenda Progress review on Prioritized projects by Hon’ble Chief Minister, A.P Venue Conference room, AP Secretariat, Velagapudi. Shri. D. Uma Maheswara Rao, Hon’ble Minister, WRD . Smt. Rekha Rani, Commissioner R&R . District collectors Attendees . Forest department . Ground water department . Chief Engineers from Tirupathi, Anantapuram, Kadapa, Ongole, Vijayawada & Visakhapatnam . Consultants to APWRD Page 1 of 6 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble CM reviewed status of prioritized projects. Overall status of 62 prioritized projects : Projects inaugurated: 16 nos. For 1 Overall status - Projects ready for inauguration: 6 nos. information Projects in progress: 40 nos. Hon’ble CM requested to provide timelines for all the prioritized projects. Hon’ble CM and Hon’ble Minister reviewed the water flow/release of HNSS. CE, Anantapuram informed the water shall reach as per the below plan: th — Lepakshi – 20 Nov’18 For 2 Release of Water - — Madaksira – 15th Nov’18 information — Cherlopally – 15th Nov’18 — Water will reach Chittor border via PBR by 20th Dec’18. Hon’ble CM instructed to ensure that water reaches Kuppam region by 15th Jan’19. Hon’ble CM reviewed the status of following projects (Detailed progress of projects attached in annexure): — Adavipalli Reservoir – CE, TGP informed reservoir works are completed and requested for extension of time for Peddamandyam lift till 20th Feb’18 — Kuppam Branch Canal (HNSS Phase II) – CE, TGP informed only 100m of LA is pending and expediting the works.
    [Show full text]
  • Irrigation Profile Anathapuram
    10/31/2018 District Irrigation Profiles IRRIGATION PROFILE OF ANANTAPURAMU DISTRICT *Click here for Ayacut Map INTRODUCTION Ananthapuramu District is situated in Rayalseema region of Andhra Pradesh state and lies between 13°-40'N to 15°-15'N Latitude and 76°-50'E to 78°-30'E Longitude with a population of 40,83,315 (2011 census). One of the famous spiritual center in this district is Puttaparthi and it is 80Km. away from Ananthapuramu. The District falls partly in Krishna basin and partly in Pennar basin. The District is surrounded by Bellary, Kurnool Districts on the North, Kadapa and Kolar Districts of Karnataka on South East and North respectively. The district is principally a hot country and temperatures vary from 17°C-40°C. The important rivers flowing in the District are (1) Pennar (2) Jayamangali (3) Chitravathi (4) Vedavathi (also called Hagari), (5) Papagni, (6) Maddileru. The district head quarter is connected by S.C. Railways broad gauge railway line from Secunderabad, Guntakal, Bangalore and Bellary (Via) Guntakal to Pakala. Most of the area in this District is covered under Minor Irrigation Sources only in addition to one completed Major Irrigation Project viz., Tungabhadra Project High level canal (TBP HLC) system stage-I (A joint venture of Karnataka and Andhra Pradesh States). The Right Bank High level canal (R.B.H.L.C.) takes off from right bank of T.B. Dam and runs in Karnataka and enters in Andhra Pradesh at Km. 105.437 and contemplated to irrigate an ayacut of 2.849 Lakh acres out of this 1,45,236 acres in Ananthapuramu district and remaining is Kurnool and Kadapa District.
    [Show full text]
  • White Paper on Natural Resources Management
    White Paper on Natural Resources Management 1. Important achievements since 2014: 1.1 After analyzing the deficiencies in Jalayagnam projects, Government adopted 3 pronged strategy - Water conservation, River Linkage including Completion of pending projects and Water Management including micro irrigation to achieve the vision of making the state drought proof and to provide water security to all its Citizens. To overcome spreading out of expenditure thinly over large number of projects taken up under Jalayagnam, Government prioritized certain projects which will realize maximum benefits with the available funds to complete them in a time bound manner. 1.2 An Expenditure of Rs.63,657.52 Crore is incurred in Water Resources Sector and irrigation facilities are provided to an extent of 32.02 Lakh acres including stabilization. 1.3 Polavaram Project: Government have given highest importance for the completion of the project, which is the lifeline of the state. Total Expenditure incurred is Rs. 15,363.79 Crores, out of which Rs. 10,227.92 Crores is incurred after 1.4.2014. Government of India reimbursed only Rs. 6,727.264 Cr. and Rs. 3500.66 Cr. is yet to be reimbursed. Works are in full swing and it is scheduled to supply water by gravity in next Khariff season. It is programmed to complete the project by 2019. 1.4 To realize early benefits of Polavaram Project, Government completed Patiseema lift Scheme and linked two major rivers Godavari and Krishna. During the last 4 crop seasons, 263 TMC of Godavari Water is diverted to Krishna. This facilitated commencement of khariff crop in Krishna delta in June itself, so that crop is completed by November, avoiding damages due to cyclones.
    [Show full text]
  • Clean Energy Finance Investment Program - Tranche 1
    Environment Due Diligence Report Project Number: 46268-002 December 2017 Part B: Annexures IND: Clean Energy Finance Investment Program - Tranche 1 Subproject: 100.8MW Wind Power Project at Beluguppa, Anantapur District, Andhra Pradesh Submitted by Indian Renewable Energy Development Agency, New Delhi This environment due diligence report has been prepared by the Indian Renewable Energy Development Agency, New Delhi for the Asian Development Bank and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This environment due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. TABLE OF CONTENTS 1 INTRODUCTION 1 1.1 BASIS OF THE REPORT 1 1.2 APPLICABLE REFERENCE FRAMEWORK 1 1.3 ORANGE RENEWABLE POWER PVT. LTD. 2 1.4 OVERVIEW OF THE PROJECT 2 1.5 PURPOSE OF THIS REPORT 7 1.6 OBJECTIVES OF THE STUDY 7 1.7 SCOPE OF THE STUDY 7 1.8 APPROACH AND METHODOLOGY 8 1.8.1 Preliminary Discussions with Project Proponent 9 1.8.2 Scoping Study 9 1.8.3 Document Review 9 1.8.4 Site Survey and Preliminary Consultations 9 1.8.5 Environmental
    [Show full text]
  • Form 1 & Terms of Reference
    ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED Master Plan& EIA Study for Industrial Park at Gudipalli Ananthapur, District, Andhra Pradesh Form 1 & Terms of Reference January 2018 L&T Infrastructure Engineering Ltd. Client: Andhra Pradesh Industrial Infrastructure Corporation Limited(APIIC) Project: Master Plan& EIA Study for Industrial Project No.: Park at Gudipalli C1172905 Title: Document No.: Rev.: Terms of Reference RP002 0 This document is the property of L&T Infrastructure Engineering Ltd. and File path: must not be passed on to any person or body not authorised by us to receive it l:\roads\2017\c1172905 - mp & eia for ip gudipalli\working\reports\002-form nor be copied or otherwise made use of either in full or in part by such person or 1and tor\rp002-sap-r0-tor.doc body without our prior permission in writing. Notes: 1. Revision Details: MRU SAP TKS 0 05.01.2018 First Submission SNV BRT CVS Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved Table of contents Master Plan& EIA Study for Industrial Park at Gudipalli C1172905 Terms of Reference RP002 rev. 0 TABLE OF CONTENTS 1 Proposed Terms of Reference for EIA Study ............................................................................. 1 1.1 Introduction to Project .............................................................................................................. 1 1.2 Project Description ................................................................................................................... 1 1.3 Methodology
    [Show full text]
  • Visit Arranged to Enable Understanding of Cultivation Practices of Andhra Pradesh Farmers
    Published: December 12, 2011 00:00 IST | Updated: December 12, 2011 04:17 IST 17 scientists from TNAU to go on exposure visit Special Correspondent Seventeen scientists from Tamil Nadu Agriculture University, Tamil Nadu Rice Research Institute at Aduthurai and other research stations of the TNAU will attend an exposure visit to rice fallow black gram fields at Vijayawada and Guntur in Andhra Pradesh from December 21 to 23, according to a press release issued by Dhanuka Agritech Ltd here on Sunday. The company, as part of its public-private partnership activities, is arranging the visit. In delta districts, pulses are cultivated after harvesting of paddy in an area of 3 lakh acres with very low crop yields per acre as compared to the same crop raised in Krishna delta districts of Andhra Pradesh. In a bid to understand the Andhra Pradesh pulses cultivation methods, the exposure visit has been arranged. Scientists from Thanjavur district to take part in visit are T.Jayaraj, Director, Tamil Nadu Rice Research Institute (TRRI), Aduthurai, V.Ravi, Professor, Agronomy, TRRI, R.Panneerselvam, Professor, Agronomy, TRRI, K.Cholan, Professor, Agronomy, (Entomology), TRRI, Assistant Professors T.Ramesh and S.Vallakannan, TRRI, and T.Senguttuvan of Krishi Vigyan Kendra, Needamangalam. Other scientists are from Tamil Nadu Agriculture University, Coimbatore, and other Krishi Vigyan Kendras and Agriculture Research Stations affiliated to TNAU. The public-private partnership activities are carried out with Krishi Vigyan Kendras, Agriculture departments, Agriculture Universities, and Agriculture Research Stations for Transfer of New Crop Improvement Technologies to ensure food security and sustainability in the future.
    [Show full text]
  • Annual Report 2018-19
    Empowering farmers towards agro-ecology drought mitigation and sustainable livelihoods in Ananthapuramu Photo credit Salil Sakhalkar Empowering farmers towards agro-ecology drought mitigation and sustainable livelihoods in Ananthapuramu Annual Report 2018–19 Acronyms AF Accion Fraterna AGEEWA Achieving Gender Equality through Empowerment of Women in Agriculture APDMP Andhra Pradesh Drought Mitigation Project APGB Andhra Pragathi Grameena Bank APWALTA Andhra Pradesh Water Land and Trees Act ANGRAU Acharya N. G. Ranga Agricultural University ADATS Agricultural Development and Training Society APMAS Andhra Pradesh Mahila Abhivruddhi Society AP-MARKFED Andhra Pradesh Marketing Federation ASMS Apex Sasya Mitra Samakhya BC Backward Classes CDM Clean Development Mechanism CBO Community Based Organisation CMSS Community Managed Seed System CRZBNF Climate Resilient Zero Budget Natural Farming DPMU District Project Management Units FAs Facilitating Agencies FPO Farmer Producer Organisations GIZ Deutsche Gesellschaft für Internationale Zusammenarbeit- German Society for International Cooperation GSMS Grama Sasya Mitra Samakhya HEIDA High External Input Destructive Agriculture HMV Heavy Motor Vehicle HNSS Handri Neeva Sujala Sravanthi HRP Human Resource Policy IFAD International Fund for Agriculture Development IWMP Integrated Watershed Management Programme ICRISAT International Crops Research Institute for the Semi-Arid Tropics IGP Income Generation Programme JLG Joint Liability Groups KVK Krishi Vignan Kendre KfW Kreditanstalt für Wiederaufbau -
    [Show full text]
  • 1 HNSS Lift Irrigation
    WELCOME HNSS IRRIGATION PROJECT PHASE-I CHIEF ENGINEER (PROJECTS) WATER RESOURCES DEPARTMENT ANANTAPURAMU ALIGNMENT & AYACUT MAP OF HNSS PROJECT LINE DIAGRAM HNSS PHASE-I AVR HNSS PROJECT PHASE-I - MALYALA TO JEEDIPALLI RESERVOIR LINE DIAGRAM OF AVR HNSS MAIN CANAL FROM KM.(-)3.722 TO KM.216.000 Sushee Infra Pvt Ltd, Sri Avanthika - G. Venkata Reddy & Com, EPI Limited, (1) IVRCL-JL-JV(Stage-I) // Back Bone Projects Ltd, Hyderabad // Prasad & Saivenkata (JV), Nellore ALS-KVR (JV), Hyderabad Sushee Infra Pvt Ltd, Hyderabad // Hyderabad // Prasad & RM Mohite & Bhuatham Engineering Projects (I) RMN-GVR (JV), Back Bone Projects Ltd, Engineering Projects (I) Reddy Veeranna Con RMN-GVR (JV), NAME OF THE AGENCY OM-RAY(JV) IVRCL-KBL-MEIL (2) IVRCL-KBL-JV(Stage-II) Ahmedabad Company Private Ltd, // Prasad & Company // M/S RK infra corp Deepika Infra Pvt Ltd, Hyderabad Company Private Const. Ltd, Hyderabad. Hyderabad. Ahmedabad Ltd, Hyderabad. Pvt Ltd, Bangalore. Hyderabad. Hyderabad Private Ltd,Hyderabad Ltd,Hyderabad Pkg-1 Civil PACKAGE Mech Pkg Stage - I & II 23 24 & 24A 25 & 25A 26 & 26A 27 & 27A 28 & 28A 29 30 31 32 33 34 35 36 Pkg-2 Mech km.64.000 to Additional PS and Link Channel & km.(-)3.722 to km.20.000 to km.42.000 to km.77.000 to km.100.000 to km.114.000 to km.134.000 to km.155.000 to km.176.000 to km.192.000 to km.210.000 to Jedipalli REACH km.77.000 & Krishnagiri Pattikonda Reservoir Approach Channel PS1 to PS8 on Main km.19.994/ 20.000 km.40.645/ 42.000 km.64.954/ 64.000 km.99.625/100.000 km.113.696/ 114.000 km.134.000 km.155.000
    [Show full text]
  • SOCIO ECONOMIC SURVEY 2017-18 I
    SOCIO ECONOMIC SURVEY 2017-18 i SOCIO ECONOMIC SURVEY 2017-18 PLANNING DEPARTMENT GOVERNMENT OF ANDHRA PRADESH ii SOCIO ECONOMIC SURVEY 2017-18 SOCIO ECONOMIC SURVEY 2017-18 iii PREFACE At the national level, the Ministry of Finance, Government of India presents the Economic Survey in both houses of the Parliament every year, just before the Union Budget. It is the ministry’s view on the annual economic development of the country. Annual document of the Ministry of Finance, Government of India, Economic Survey, reviews the developments in the Indian economy over the previous 12 months, summarizes the performance on major development programs, and highlights the policy initiatives of the government and the prospects of the economy in the short to medium term. It contains certain prescriptions that may find a place in the Union Budget which is presented a day or two later. The Government of Andhra Pradesh publishes ‘Socio-Economic Survey’ report every year and places it in both Houses of the State Legislature along with the budget documents. The report is a unique volume that captures the socio-economic changes took place in the state since the beginning of the financial year. The report essentially attempts to present the growth performance of the state economy by capturing the progress under key macro-economic aggregates and physical outcomes because of implementation of various programmes / schemes during the year 2017-18. The Socio Economic Survey 2017-18 is an outcome of the collective effort of all the stakeholders including the government departments, consultations made with experts from research bodies and interested readers who have offered their valuable advice.
    [Show full text]
  • Beluguppa, Anantapur District, Andhra Pradesh, India
    Resettlement Planning Document Project Number: 46268-002 February 2018 IND: Clean Energy Finance Investment Program - Tranche 1 Subproject: 100.8MW Wind Power Project at Beluguppa, Anantapur District, Andhra Pradesh Submitted by Indian Renewable Energy Development Agency, New Delhi This social safeguards due diligence report has been prepared by the Indian Renewable Energy Development Agency, New Delhi for the Asian Development Bank and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This social safeguards due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. DUE DILIGENCE REPORT ON SOCIAL SAFEGUARDS (LOAN 3186 IND: CLEAN ENERGY INVESTMENT PROGRAM) Subproject: 100.8MW Wind Power Project at Beluguppa, Anantapur District, Andhra Pradesh Subproject Developer: Orange Uravakonda Wind Power Pvt Ltd (Subsidiary of Orange Renewable Power Private Limited) M K MOHANTY, ADB TA, Prepared by Social Safeguard Specialist RUCHIKA DRALL, Review by Environmental & Social Officer, ESSU, IREDA KHEKIHO YEPTHO, Head Approved by ESSU
    [Show full text]
  • from Water Resources Department, Anantapurarnu. Vijayawada. Lr.No
    GOVERNMINT OF ANDHRA PRADESH WATER RESOURCES DEPARTMENT . From To Sri B.Sudhakara Babu, M.Tech., The Engineer-In-Chief(Irrigation), Chief Engineer (Projects), Water Resources Department, Water Resources Department, Irrigation compound, Anantapurarnu. GovernerPet, Vijayawada. ENe Lr.No.CE(P) /HNSS /P-I/ATP/Dw lM-16 IDEE4lAEEs/ 18" Sir, Sub: Single Desk Policy - Filling of Common Application with the Nodal Agency of the state level single window clearance committee - forwarding of application of M/s Andhra Pradesh Aerospace & Defence Electronics Park Private Limited, Palaasamudram Village, Gorantla Mandal, Ananthaptramu District - Permission for drawl of 3500 KLD (I.4306 Cusces)water from Gollapalli Reservoir - Report Submitted - Regarding. Ref: 1) Govt. of A.P,Industries & Commerce(INF) Dept., G. O.Ms.N o.2O2; Dated: 06 . 12.2O 14. 2) Govt.memo.no. 277 2,dt:-30.09.20 1 5. 3) Govt. of A.P,Industries & Commerce(P&! Dept., G.O.Ms.No.56; Dated:-26.O4.2OI7 . 4) Engineer-In-Chief(Irr),Vij ayawada, Lr.no.ENC(I) / DCE(GDS) / DEE2 I AEEI2 I CE(P) Antpr/ Misc, dt:-9.0 1.20 1 8. 5) Engineer-In- Chief(Irr),Vij ayawada, Lr.No.ENC(I)/EE/DEEI IAEE2/ IWS(AP Aerospace & Defence Ltd); Dt: 10.07.2OL8 communicated to the Superintending Engineer, HNSS C-II, Ananthapuramu vide t.o. Endt..No.CE(P)/ATP/HNSS P-II/ F.M- 16 / 468 ATP,DT;- L9.O7 .2OI8. 6) Superintending Engineer, HNSS circle No-II, Ananthapur€unu, Lr.No.SE/HNSS C2 / ATP IDBlTo/JTo2 lF.P.s3 (A)/363 CE, Dt:27.O7.2OI8.
    [Show full text]