Page 1 of 5 Review of Prioritized Projects Hon'ble CM Conducted
Total Page:16
File Type:pdf, Size:1020Kb
Review of Prioritized Projects Hon’ble CM conducted Review for Prioritized Projects RECORD OF DISCUSSION Date Monday, 15th October 2018 Time 10:30 AM to 01:30 PM Agenda Progress review on Prioritized projects by Hon’ble Chief Minister, A.P Venue Prajavedika (Grievance Hall), Near Hon’ble CM Residence. Shri. D. Uma Maheswara Rao, Hon’ble Minister, WRD . Shri G Sai Prasad. Principle secretary to Hon’ble CM. Shri. Shashi Bhushan Kumar, Secretary, WRD . Smt. Rekha Rani – Commissioner, R&R . Shri M. Venkateswara Rao, EnC, WRD Attendees . District collectors . Forest department . Ground water department, APSRAC and M/s Vassar Labs . Chief Engineers from Tirupathi, Ananthapuram, Kadapa, Ongole, Vijayawada & Visakhapatnam . Consultants to APWRD Page 1 of 5 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble CM and Minister of water resources reviewed status of prioritized projects. Overall status of 61 prioritized projects : Projects inaugurated: 15 nos. For 1 Overall status - Projects ready for inauguration: 4 nos. information Projects in progress: 42 nos. Hon’ble CM requested to provide timelines for all the prioritized projects. Hon’ble Minister, WRD reviewed the status of the projects/areas/ acres of lands affected by the Titli Cyclone in Srikakulam district. CE, Srikakulam informed around 325 Tanks and Canals are affected by the cyclone and rectification measures are taken up immediately. Around 83,550 acres of crop is affected by the Vamshadhara flow. Hon’ble Minister, WRD raised concern for the underutilization of 90TMC of flood water from Vamshadhara and also instructed to make a committee with Expert Team, Hydrology Team, M/s Vassar labs to study on Temporary and Permanents Titli Cyclone For 2 solutions for the Flood banks. - Damages information Hon’ble Minister, WRD raised concern for the Man-made mistake of construction of National Highway at the low level, which affected 3000 acres of agricultural land. Instructed CE, Srikakulam to set up a meeting immediately with NHAI, to understand the cause and conclude permanent solutions for the coming futures. Hon’ble Minister, WRD instructed Hydrology department and CE, Srikakulam to come up with the model to understand the crisis, which may happen in Srikakulam district during Kharif season. Page 2 of 5 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble Minister, WRD enquired about drinking water reserve capacity and water management plan until June’19 for the Visakhapatnam region. Raiwada (Visakhapatnam) CE, Visakhapatnam informed only Raiwada region has 800 MCFT of drinking water For 3 - Drinking water shortage and can be drawn from Yeleru reservoir. information Crisis Hon’ble Minister, WRD instructed EnC, WRD to make a plan for Drinking water deficit in concurrence with Municipal Commissioner and CE, Visakhapatnam. CE, TGP informed Adavipalli Lift (Peddamandyam Lift) works will finish by 21st Oct’18 and only 100m of pipe line laying works are balance. Kuppam Branch Canal works will finish by 15th Nov’18. Nellore Barrage: Proposed to connect Head Regulator to Survypalli canal by 15th Nov’18. Sangam Barrage: CE, TGP informed action has initiated to entrust the part of work to another agency. Projects under CE, For 4 - Tirupathi CE, TGP informed Mallemadugu Reservoir, Balaji Reservoir, Venugopal Sagar information Reservoir and Somasila Swarnamukhi Link Canal are under issues of Alienation of Forest Lands. However, works are progressing with the available fronts. CE,TGP informed formalities for the stage-1 forest clearance for Somasila Swarnamukhi Link Canal is uploaded. DFO has processed the proposal to Chennai office and may take 15days of time for approval. Hon’ble CM instructed Forest department to expedite the approvals by end of November 2018. Hon’ble CM instructed to show the three Projects as completed & ready for Projects under CE, For 5 inauguration in the overall 61 Projects list. - Anantapuram Information Page 3 of 5 Action to be # Project / Topic Gist of discussions Timeline taken by — Marala Reservoir — Cherlopally Reservoir — Madakasira Branch Canal Hon’ble CM reviewed the projects status of the following projects (Detailed Progress details attached in annexure): — Widening of HNSS Main Canal – to take up in next season — Mid Pennar South Canal – to take up in next season — Lifting of water from Jeedipalli Reservoir to Upper Pennar Project — Lifting of water from Jeedipalli Reservoir to Bhairavanithippa Project — Community Lift cum Drip irrigation – Phase wise work to drip distributed for 50,000 acres of land and targeted to complete by 31 Mar’18. Secretary, WRD informed Package VI and VII are transferred to CE, Kadapa from CE, Tirupathi. For 6 GNSS Phase II CE, Kadapa briefed about the status of the work for all the packages. - Information Hon’ble CM instructed expedite all package tenders and targeted to complete tenders by Nov’18. CE, Ongole briefed about progess of Poola Subbiah Veligonda Project and issues of Refurbishment of TBM and replacement of deteriorated length of conveyor belt. CE, Ongole informed TBM works started and progressed a meter of work. However, faced issue with Belt. Hon’ble Minister, WRD raised concern for the continuous issues with the conveyor Project under CE, For 7 belt and instructed to expedite works. - Ongole Information Hon’ble CM instructed to complete Tunnel 1 works by 15th Jan’18. CE, Ongole informed 340 Acres of LA is under Court Case for Yerram Chinnapoli Reddy Korisapadu L.I Scheme and waiting for the Hearing. Hon’ble CM instructed to request the authority to expedite the hearing process. Uttarandhra Sujala 8 EnC, WRD informed there are two parts in the project. Part 1 is formation of For Sravanthi Project - Pedapudi reservoir & gravity canal works and Part 2 is Excavation of leading Information Phase-I works Page 4 of 5 Action to be # Project / Topic Gist of discussions Timeline taken by channel and two stage lifting. Also informed Canal designs are finalized and machinery is mobilized & reservoir designs are submitted for approval. Hon’ble CM reviewed the projects status of the following projects (Detailed Progress details attached in annexure): — B.R.R.Vamsadahra project Phase-II of Stage-II (Package 87-89) — Interlinking of Rivers Vamsadhara and Nagavali – Hon’ble CM instructed to Project under CE, For 9 complete works by Dec’18. - NC, Visakhapatnam Information — Offshore Reservoir on Mahendratanaya River — Taraka Rama Thirtha Sagaram Reservoir Project – Hon’ble CM and Hon’ble Minister, WRD raised concerns for the delay in the works and instructed to complete works by May’19. Hon’ble CM appreciated Joint Collector, Kadapa for the RR works of 1065 PDF’s For 10 LA&RR - in the region information Grounding of New Hon’ble CM instructed to complete the tender process of all the new projects For 11 - Projects expect Gundrevula Reservoir by Nov’18 and Agency to ground works. information Hon’ble CM briefed the issue & challenges faced due to Titli Cyclone on Food, Water and Power and instructed come with better solutions to with stand the future cyclone situations. Ridge to Valley For 12 - Development information Since there is 20.5% rainfall deficit, Hon’ble CM instructed to form a committee and study the Ridge to Valley Development concept. Encl.: Annexure 1 (Brief status of 61 prioritized projects as on15th Oct’18) Page 5 of 5 ANNEXURE I Status of prioritized projects as on 15 October 2018 Target Date of project Sl no. Project Major Issue / Current status completion Inaugurated projects - 15 nos. 1 Purushotha Patnam LIS Inaugurated on 15th Aug 2017 - Construction of Anicut across Sarada 2 Inaugurated on 6th Sept 2017 - River 3 Mutchumarri LIS Inaugurated on 8th Sept 2017 - 4 Kandaleru Left Canal – Lift Scheme Inaugurated on 12th Nov 2017 - 5 Gandikota – CBR Lifts Inaugurated on 3rd Jan 2018 - 6 Siddapuram Lift Irrigation Scheme Inaugurated on 7th Jan 2018 - 7 Modernisation of Yerracalva Inaugurated on 8th Jan 2018 - Formation of Pogonda Reservoir in 8 Inaugurated on 19th Feb 2018 - West Godavari 9 SH-31 Road Work (GNSS Phase I) Inaugurated on 6th June 2018 - Pulakurthy LI Scheme 10 Inaugurated on 23rd Aug 2018 - (Guru Raghavendra Project) 11 Chinasana LI Scheme on VLMC Inaugurated on 15th Sep 2018 - 12 Kondaveeti Vagu Pumping Scheme Inaugurated on 16th Sep 2018 - Gorakallu Balancing Reservoir (Sri 13 Inaugurated on 22nd Sep 2018 - Narasimharaya Sagar) 14 Owk Tunnel (GNSS Phase I) Inaugurated on 22nd Sep 2018 - 15 Pulikanuma LIS Inaugurated on 22nd Sep 2018 - Projects ready for Inauguration - 4 nos. Pedapalem LI Scheme on Krishna 16 Ready for inauguration - River 17 K.L. Rao Sagar Pulichinthala Project Ready for inauguration - 18 Gandikota Reservoir (GNSS Phase I) Ready for inauguration - Kandula Obul Reddy Gundlakamma 19 Ready for inauguration - Reservoir Project Projects in progress under purview of CE, Tirupathi Reservoir : Project works completed Adavipalli Reservoir (HNSS Phase-II) & Reservoir Completed. 20 Adavipalli Lift (Peddamandyam lift on Lift scheme :7 no of Towers are dismantled and being relocated due to railway Main canal) and power transmission line issue.Requested for extension of time up to 21 Lift scheme : 21-Oct-18 Oct 2018. Work in progress at 4.698 Km. Out of 24 structures remaining, 21 nos. in 21 Kuppam Branch Canal (HNSS Phase II) progress. Balance 3 nos. of structures to be taken up. Expected date of 15/Nov/18 completion:15 Nov 2018. Proposed to connect Head Regulator to Survypalli canal by 15-11-2018.85.60 22 Nellore Barrage 31/Dec/18 % of work completed.Requested extension up to 31 Dec 2018. Overall project completion 64.85% Rafts, 41 nos. completed out of 42 nos. 23 Sangam Barrage 31/Dec/18 Piers, 74 nos. completed out of 86 Nos. Requested extension up to 31 Dec 2018 Water Supply to Mulapalli and other 4 Tenders finalized. Action is being taken for concluding Agreement with M/S 24 31/Dec/18 tanks.