1 HNSS Lift Irrigation

Total Page:16

File Type:pdf, Size:1020Kb

1 HNSS Lift Irrigation WELCOME HNSS IRRIGATION PROJECT PHASE-I CHIEF ENGINEER (PROJECTS) WATER RESOURCES DEPARTMENT ANANTAPURAMU ALIGNMENT & AYACUT MAP OF HNSS PROJECT LINE DIAGRAM HNSS PHASE-I AVR HNSS PROJECT PHASE-I - MALYALA TO JEEDIPALLI RESERVOIR LINE DIAGRAM OF AVR HNSS MAIN CANAL FROM KM.(-)3.722 TO KM.216.000 Sushee Infra Pvt Ltd, Sri Avanthika - G. Venkata Reddy & Com, EPI Limited, (1) IVRCL-JL-JV(Stage-I) // Back Bone Projects Ltd, Hyderabad // Prasad & Saivenkata (JV), Nellore ALS-KVR (JV), Hyderabad Sushee Infra Pvt Ltd, Hyderabad // Hyderabad // Prasad & RM Mohite & Bhuatham Engineering Projects (I) RMN-GVR (JV), Back Bone Projects Ltd, Engineering Projects (I) Reddy Veeranna Con RMN-GVR (JV), NAME OF THE AGENCY OM-RAY(JV) IVRCL-KBL-MEIL (2) IVRCL-KBL-JV(Stage-II) Ahmedabad Company Private Ltd, // Prasad & Company // M/S RK infra corp Deepika Infra Pvt Ltd, Hyderabad Company Private Const. Ltd, Hyderabad. Hyderabad. Ahmedabad Ltd, Hyderabad. Pvt Ltd, Bangalore. Hyderabad. Hyderabad Private Ltd,Hyderabad Ltd,Hyderabad Pkg-1 Civil PACKAGE Mech Pkg Stage - I & II 23 24 & 24A 25 & 25A 26 & 26A 27 & 27A 28 & 28A 29 30 31 32 33 34 35 36 Pkg-2 Mech km.64.000 to Additional PS and Link Channel & km.(-)3.722 to km.20.000 to km.42.000 to km.77.000 to km.100.000 to km.114.000 to km.134.000 to km.155.000 to km.176.000 to km.192.000 to km.210.000 to Jedipalli REACH km.77.000 & Krishnagiri Pattikonda Reservoir Approach Channel PS1 to PS8 on Main km.19.994/ 20.000 km.40.645/ 42.000 km.64.954/ 64.000 km.99.625/100.000 km.113.696/ 114.000 km.134.000 km.155.000 km.176.000 km.192.000 km.210.000 km.216.000 Reservoir Canal & 3 Lifts on Reservoir Peruru Branch Canal LENGTH (km) 23.716 20.645 22.954 13.000 21.825 14.000 Pattikonda Reservoir 20.000 21.000 21.000 16.000 18.000 6.000 MUT TCH UM LBC RBC ARR I 0.153 TMC LIFT PS-0 KC Canal KC KRIS HNAG IRI RESE RVOI R KM.7 0.650 MALYALA LIFT 2 3 4 5 6 7 8 APPROACH 1 - - - - - - - - PS PS PS PS PS PS PS CHANNEL PS LOCATION (km) Approach Channel Phase - II )1.622 )1.743 9.217 - - 14.100 28.229 42.238 42.345 64.298 74.739 56.950 66.132 78.785 88.890 95.735 ( 106.100 ###### JEDIPALLI ( 1.126 TMC PAT RESERVOIR TIK 1.694 TMC OND A RES ERV OIR 52 - PUMPING STATIONS & MAJOR STRUCTURES Guntur SH Guntur ALONG HNSS MAIN Bridge 7 18 Bridge 18 - 1 Malyala 1 - - - 3 Mallepalli 3 Aqueduct - CANAL Krishnagiri 4 8 Ragulapadu 8 NH - - 7 Gundlakonda 7 5 Kambalapadu 5 PS NH Canal Canal Syphon Canal Syphon 6 Lakkasagaram 6 - - - PS 2 Brahmanakotkur 2 PS PS Railyway Crossing - PS PS PS Kurnool PS LBC RBC 9 km.1.375 - PS OBSTACLES (TANDOOS & Ramps @ km. 42.200, Partial Ramps @ km. Ramps @ km. 78.550, 86.400, 87.700, 10 km.3.770 RAMPS TO BE - - - - 54.950, 55.690, 50.787, - 110.250, 100.750, 101.450, - - - - - - PERURU CANALBRANCH 88.300, 88.600, 88.750, 89.100, 95.700 - REMOVED) 53.072 . 102.550, 103.800, 104.450. PS CM & CD WORKS (Total/ Completed) - 27/25 28/28 21/21 16/16 21/16 17/16 0 18/18 27/26 18/13 14/10 27/25 11/11 AYACUT (acres) - 4200 2300 1900 5100 5100 29200 32200 0 0 0 20900 17300 0 PHASE - I Package No. Package Wise Bottle Necks Index 1Length of Main Canal - 216.000 km 23 Distributary system to be completed. Completed 2Total Ayacut - 118200 acres 24 & 24A Dupadu distributory & all field channels to be tackled. Progress Kurnool - 80000 acres 25 & 25A Ramps & Tandoos to be removed. To be Tackled Anantapur - 38200 acres 26 & 26A - 3Drinking Water 9 Lakhs Population 27 & 27A Field channels to be tackled. Ramps to be removed. 4Lifts 28 & 28A Investigation for Distributaory system yet to be tackled. Main Canal - 8 29 Work stopped by the Agency due to non finalization of addl amount of RBC. Additional - 1 Mech Stage-I Tandoo removal on U/s of all pump houses - Branch Canal 3 Mech Stage-II 4 5 6 7 8 9 PUMPING STATION NO.1 Pumping station No.1 is constructed at K.M. (-) 1.742 of HNSS main canal near Malyala Village of Nandikotkur Mandal of Kurnool District. 10 HNSS MAIN CANAL 11 KRISHNA GIRI RESERVOIR 12 PATHIKONDA RESERVOIR 13 NECESSITY OF THE PROJECT TO PROTECT RAYALA SEEMA FROM RAVAGES OF DROUGHT & FAMINE AND TO REVERSE THE DESERTIFICATION PROCESS, HNSS PROJECT IS PROPOSED. HNSS IRRIGATION PROJECT PHASE-I ➢ ADMINISTRATIVE SANCTION : RS. 1305.00 CRORES (24.07.2004) ➢ 1ST REVISED ADMINISTRATIVE SANCTION : RS. 2774.00 CRORES (03.01.2007) ➢ 2ND REVISED ADMINISTRATIVE SANCTION : RS. 4317.49 CRORES (25.02.2016) H.N.S.S IRRIGATION PROJECT PHASE–I SALIENT FEATURES ❖ Envisages utilization of 40 TMC of Krishna flood Water ❖ Irrigation for 6.025 Lakh acres - Kharif ID ❖ Drinking water for 33 Lakh people ❖ Districts benefited: Kurnool Anantapuramu Chittoor & Kadapa SALIENT FEATURES OF THE PROJECT PHASE-I 1. AYACUT : ORIGINALLY CONTEMPLATED AYACUT IN KURNOOL DISTRICT - 80000 ACRES CONTEMPLATED AYACUT IN ANANTHAPURAMU DISTRICT - 1,18,000 ACRES TOTAL - 1,98,000 ACRES SALIENT FEATURES OF THE PROJECT 2. DRINKING WATER SUPPLY : VILLAGES – 120 POPULATION – 10,00,000 3. RESERVOIRS : KRISHNAGIRI – 0.161 TMC PATTIKONDA – 1.126 TMC JEEDIPALLI – 1.680 TMC TOTAL – 2.967 TMC 4. REQUIRED POWER – 454.29 MW 5. LENGTH OF CANAL – 216.30 KM 17 HNSS PHASE - I DETAILS 1 Length of Main Canal : 216.300 Km (From Malyala to Jeedipalli Reservoir) 2 Discharge : 76.50 cumecs (2700.00 cusecs) 3 Water Utilization : 14 .00 TMC 4 Pumping Stations : Main Canal : 8 Nos (12 Pumps & Motors in each PS) Additional : 1No (16 Pumps & Motors) (12 Nos to (PS0 at Muchumarri) HNSS and 4 Nos to K.C.C) TOTAL REQUIREMENT OF LAND : 9879.96 ACRES LAND ACQUIRED : 9522.80 ACRES BALANCE TO BE ACQUIRED : 357.16 ACRES ( For Distributory System only) AMOUNT REQUIRED FOR LAND ACQUISITION : 12.13 CRORES PRESENT STAGE:- 1) HNSS MAIN CANAL:- HNSS MAIN CANAL OF 114.00 KM LENGTH IN KURNOOL DISTRICT IS ALMOST COMPLETED AND WATER IS BEING RELEASED TO THE CANAL SYSTEM SINCE 2012 BY LIFTING WATER THROUGH 6 PUMPS AGAINST 12 PUMPS IN EACH PUMPING STATION. 2) CONSTRUCTION OF CM & CD WORKS:- TOTAL CM & CD WORKS (138 STRUCTURES) WERE COMPLETED. 3) DISTRIBUTORY SYSTEM:- DISTRIBUTORY SYSTEM FOR AN EXTENT OF 15,300 ACERS IS COMPLETED AND BALANCE DISTRIBUTORY SYSTEM FOR AN EXTENT OF 64,700 ACERS IS UNDER PROGRESS. THE ENTIRE DISTRIBUTORY SYSTEM IS PROGRAMMED TO BE COMPLETED BEFORE THE ENSUING KHARIFF SEASON 2017. 20 WATER REGULATION: - Ayacut irrigated in Water released Water utilized S.No. Acres under during the years in T.M.C kurnool district 2.00(For Trail 1 2012-13 - Run) 2 2013-14 9.900 13823 3 2014-15 16.806 13823 4 2015-16 7.79 - HNSS 32.071 KCC 5 2016-17 05.255 19147.85 Lift Total 37.326 21 22 02.01.2017 వ 遇頿న 屌రవ ముఖ్యమంత్రి శ్రీ నా쀾 చం額ర 뀾끁 నాయు葁 尾రు ముచ్చుమర్రీ ఎత్రిꡋతల పథకము ప్రరరం둋తసవ �젾ఫలక 額ృశ్యo. 23 02.01.2017 వ 遇頿న 屌రవ ముఖ్యమంత్రి శ్రీ నా쀾 చం額ర 뀾끁 నాయు葁 尾రు ముచ్చుమర్రీ ఎత్రిꡋతల పథకముꁁ స్వి桍 ఆꁍ 桇స్వ 瀾త్ర吿 అం吿తము 桇యుచ్చనన 額ృశ్యo. 24 Sri.N.Chandrababu Naidu, Hon’ble Chief Minister of Andhra Pradesh has inaugurated the Mutchumarri Lift Irrigation Scheme on 02.01.2017 and dedicated to the Nation. 25 MUTCHUMARRI LIFT IRRIGATION SCHEME 26 MUTCHUMARRI LIFT IRRIGATION SCHEME ➢ Government of AP have accorded Administrative approval for additional Pump House for HNSS Project at Mutchumarri vide Govt Memo No.9022/ Maj.Irr.VI/2007-01, dt:22.05.2007 for Rs.261.00 Crores ➢ Government of AP have accorded Administrative approval for KCC Lift Scheme @ Mutchumarri vide G.O.Ms No.196/I& CAD(PW- Maj.Irr.V)Dept., dt:31.08.2007 for Rs.120.00 Crores ➢ To draw water during lean period from Srisailam Reservoir back water at Mutchumarri when the water level is in between 834 feet and 798 feet. ➢ To Supplement water for K.C.Canal system, when there is no water flow in Tungabhadra river. ➢ Provided 12 pumps to HNSS with a discharge of 3850 cusecs and 4 pumps to K.C.C with the discharge of 1000 cusecs. WIDENING OF HNSS MAIN CANAL 28 WIDENING OF HNSS MAIN CANAL IN PHASE-I ❖ Administrative approval: G.O.Ms No.189 dt 20-04-2017 for Rs.1030.0078 crores ❖ HNSS MAIN CANAL PHASE-I STARTS FROM KM (-)1.15 PS-1 AT MALYALA (V), KURNOOL (DISTRICT) TO KM 216.300 ie., UPTO JEEDIPALLI RESERVOIR IN ANANTHAPURAMU DISTRICT. ❖ THE CANAL IS DESIGNED FOR CARRYING CAPACITY OF 109 CUMECS BY WIDENING THE EXISTING SECTIONS. ❖ OBJECTIVE : PRESENT CAPACITY : 76.50 CUMECS. CAPACITY AFTER WIDENING : 109 .00 CUMECS29 . DESIGN OF HNSS MAIN CANAL(PRESENT/PROPOSED) DETAILS PRESENT PROPOSED WIDENING Designed Discharge 76.50 109.20 BED WIDTH 11.00 19.5 FULL SUPPLY 4.7 4.7 DEPTH Value of n 0.018 0.03 No. of CM & CD 245 06 structures 30 DETAILS OF WORKS S. Name of work Name of the Agreement Remarks No agency amount Rs. in crores 1 Widening of M/S Rithwik Work is in HNSS main canal Projects progress 343.35 from K.M.(-)1.150 Private to K.M.78.670 Limited 2 Widening of M/S HES infra Work is in HNSS main canal Private progress 234.09 from K.M.79.075 Limited to K.M.134.270 23 Widening of M/S MEIL, Work is in HNSS main canal Hyderabad progress from K.M.
Recommended publications
  • Page 1 of 5 Review of Prioritized Projects Hon'ble CM Conducted
    Review of Prioritized Projects Hon’ble CM conducted Review for Prioritized Projects RECORD OF DISCUSSION Date Monday, 15th October 2018 Time 10:30 AM to 01:30 PM Agenda Progress review on Prioritized projects by Hon’ble Chief Minister, A.P Venue Prajavedika (Grievance Hall), Near Hon’ble CM Residence. Shri. D. Uma Maheswara Rao, Hon’ble Minister, WRD . Shri G Sai Prasad. Principle secretary to Hon’ble CM. Shri. Shashi Bhushan Kumar, Secretary, WRD . Smt. Rekha Rani – Commissioner, R&R . Shri M. Venkateswara Rao, EnC, WRD Attendees . District collectors . Forest department . Ground water department, APSRAC and M/s Vassar Labs . Chief Engineers from Tirupathi, Ananthapuram, Kadapa, Ongole, Vijayawada & Visakhapatnam . Consultants to APWRD Page 1 of 5 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble CM and Minister of water resources reviewed status of prioritized projects. Overall status of 61 prioritized projects : Projects inaugurated: 15 nos. For 1 Overall status - Projects ready for inauguration: 4 nos. information Projects in progress: 42 nos. Hon’ble CM requested to provide timelines for all the prioritized projects. Hon’ble Minister, WRD reviewed the status of the projects/areas/ acres of lands affected by the Titli Cyclone in Srikakulam district. CE, Srikakulam informed around 325 Tanks and Canals are affected by the cyclone and rectification measures are taken up immediately. Around 83,550 acres of crop is affected by the Vamshadhara flow. Hon’ble Minister, WRD raised concern for the underutilization of 90TMC of flood water from Vamshadhara and also instructed to make a committee with Expert Team, Hydrology Team, M/s Vassar labs to study on Temporary and Permanents Titli Cyclone For 2 solutions for the Flood banks.
    [Show full text]
  • Page 1 of 6 Review of Prioritized Projects Hon'ble CM Conducted
    Review of Prioritized Projects Hon’ble CM conducted Review for Prioritized Projects RECORD OF DISCUSSION Date Monday, 12th November 2018 Time 08:20 PM to 09:00 PM Agenda Progress review on Prioritized projects by Hon’ble Chief Minister, A.P Venue Conference room, AP Secretariat, Velagapudi. Shri. D. Uma Maheswara Rao, Hon’ble Minister, WRD . Smt. Rekha Rani, Commissioner R&R . District collectors Attendees . Forest department . Ground water department . Chief Engineers from Tirupathi, Anantapuram, Kadapa, Ongole, Vijayawada & Visakhapatnam . Consultants to APWRD Page 1 of 6 Action to be # Project / Topic Gist of discussions Timeline taken by Hon’ble CM reviewed status of prioritized projects. Overall status of 62 prioritized projects : Projects inaugurated: 16 nos. For 1 Overall status - Projects ready for inauguration: 6 nos. information Projects in progress: 40 nos. Hon’ble CM requested to provide timelines for all the prioritized projects. Hon’ble CM and Hon’ble Minister reviewed the water flow/release of HNSS. CE, Anantapuram informed the water shall reach as per the below plan: th — Lepakshi – 20 Nov’18 For 2 Release of Water - — Madaksira – 15th Nov’18 information — Cherlopally – 15th Nov’18 — Water will reach Chittor border via PBR by 20th Dec’18. Hon’ble CM instructed to ensure that water reaches Kuppam region by 15th Jan’19. Hon’ble CM reviewed the status of following projects (Detailed progress of projects attached in annexure): — Adavipalli Reservoir – CE, TGP informed reservoir works are completed and requested for extension of time for Peddamandyam lift till 20th Feb’18 — Kuppam Branch Canal (HNSS Phase II) – CE, TGP informed only 100m of LA is pending and expediting the works.
    [Show full text]
  • Irrigation Profile Anathapuram
    10/31/2018 District Irrigation Profiles IRRIGATION PROFILE OF ANANTAPURAMU DISTRICT *Click here for Ayacut Map INTRODUCTION Ananthapuramu District is situated in Rayalseema region of Andhra Pradesh state and lies between 13°-40'N to 15°-15'N Latitude and 76°-50'E to 78°-30'E Longitude with a population of 40,83,315 (2011 census). One of the famous spiritual center in this district is Puttaparthi and it is 80Km. away from Ananthapuramu. The District falls partly in Krishna basin and partly in Pennar basin. The District is surrounded by Bellary, Kurnool Districts on the North, Kadapa and Kolar Districts of Karnataka on South East and North respectively. The district is principally a hot country and temperatures vary from 17°C-40°C. The important rivers flowing in the District are (1) Pennar (2) Jayamangali (3) Chitravathi (4) Vedavathi (also called Hagari), (5) Papagni, (6) Maddileru. The district head quarter is connected by S.C. Railways broad gauge railway line from Secunderabad, Guntakal, Bangalore and Bellary (Via) Guntakal to Pakala. Most of the area in this District is covered under Minor Irrigation Sources only in addition to one completed Major Irrigation Project viz., Tungabhadra Project High level canal (TBP HLC) system stage-I (A joint venture of Karnataka and Andhra Pradesh States). The Right Bank High level canal (R.B.H.L.C.) takes off from right bank of T.B. Dam and runs in Karnataka and enters in Andhra Pradesh at Km. 105.437 and contemplated to irrigate an ayacut of 2.849 Lakh acres out of this 1,45,236 acres in Ananthapuramu district and remaining is Kurnool and Kadapa District.
    [Show full text]
  • White Paper on Natural Resources Management
    White Paper on Natural Resources Management 1. Important achievements since 2014: 1.1 After analyzing the deficiencies in Jalayagnam projects, Government adopted 3 pronged strategy - Water conservation, River Linkage including Completion of pending projects and Water Management including micro irrigation to achieve the vision of making the state drought proof and to provide water security to all its Citizens. To overcome spreading out of expenditure thinly over large number of projects taken up under Jalayagnam, Government prioritized certain projects which will realize maximum benefits with the available funds to complete them in a time bound manner. 1.2 An Expenditure of Rs.63,657.52 Crore is incurred in Water Resources Sector and irrigation facilities are provided to an extent of 32.02 Lakh acres including stabilization. 1.3 Polavaram Project: Government have given highest importance for the completion of the project, which is the lifeline of the state. Total Expenditure incurred is Rs. 15,363.79 Crores, out of which Rs. 10,227.92 Crores is incurred after 1.4.2014. Government of India reimbursed only Rs. 6,727.264 Cr. and Rs. 3500.66 Cr. is yet to be reimbursed. Works are in full swing and it is scheduled to supply water by gravity in next Khariff season. It is programmed to complete the project by 2019. 1.4 To realize early benefits of Polavaram Project, Government completed Patiseema lift Scheme and linked two major rivers Godavari and Krishna. During the last 4 crop seasons, 263 TMC of Godavari Water is diverted to Krishna. This facilitated commencement of khariff crop in Krishna delta in June itself, so that crop is completed by November, avoiding damages due to cyclones.
    [Show full text]
  • Clean Energy Finance Investment Program - Tranche 1
    Environment Due Diligence Report Project Number: 46268-002 December 2017 Part B: Annexures IND: Clean Energy Finance Investment Program - Tranche 1 Subproject: 100.8MW Wind Power Project at Beluguppa, Anantapur District, Andhra Pradesh Submitted by Indian Renewable Energy Development Agency, New Delhi This environment due diligence report has been prepared by the Indian Renewable Energy Development Agency, New Delhi for the Asian Development Bank and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This environment due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. TABLE OF CONTENTS 1 INTRODUCTION 1 1.1 BASIS OF THE REPORT 1 1.2 APPLICABLE REFERENCE FRAMEWORK 1 1.3 ORANGE RENEWABLE POWER PVT. LTD. 2 1.4 OVERVIEW OF THE PROJECT 2 1.5 PURPOSE OF THIS REPORT 7 1.6 OBJECTIVES OF THE STUDY 7 1.7 SCOPE OF THE STUDY 7 1.8 APPROACH AND METHODOLOGY 8 1.8.1 Preliminary Discussions with Project Proponent 9 1.8.2 Scoping Study 9 1.8.3 Document Review 9 1.8.4 Site Survey and Preliminary Consultations 9 1.8.5 Environmental
    [Show full text]
  • Form 1 & Terms of Reference
    ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED Master Plan& EIA Study for Industrial Park at Gudipalli Ananthapur, District, Andhra Pradesh Form 1 & Terms of Reference January 2018 L&T Infrastructure Engineering Ltd. Client: Andhra Pradesh Industrial Infrastructure Corporation Limited(APIIC) Project: Master Plan& EIA Study for Industrial Project No.: Park at Gudipalli C1172905 Title: Document No.: Rev.: Terms of Reference RP002 0 This document is the property of L&T Infrastructure Engineering Ltd. and File path: must not be passed on to any person or body not authorised by us to receive it l:\roads\2017\c1172905 - mp & eia for ip gudipalli\working\reports\002-form nor be copied or otherwise made use of either in full or in part by such person or 1and tor\rp002-sap-r0-tor.doc body without our prior permission in writing. Notes: 1. Revision Details: MRU SAP TKS 0 05.01.2018 First Submission SNV BRT CVS Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved Table of contents Master Plan& EIA Study for Industrial Park at Gudipalli C1172905 Terms of Reference RP002 rev. 0 TABLE OF CONTENTS 1 Proposed Terms of Reference for EIA Study ............................................................................. 1 1.1 Introduction to Project .............................................................................................................. 1 1.2 Project Description ................................................................................................................... 1 1.3 Methodology
    [Show full text]
  • Visit Arranged to Enable Understanding of Cultivation Practices of Andhra Pradesh Farmers
    Published: December 12, 2011 00:00 IST | Updated: December 12, 2011 04:17 IST 17 scientists from TNAU to go on exposure visit Special Correspondent Seventeen scientists from Tamil Nadu Agriculture University, Tamil Nadu Rice Research Institute at Aduthurai and other research stations of the TNAU will attend an exposure visit to rice fallow black gram fields at Vijayawada and Guntur in Andhra Pradesh from December 21 to 23, according to a press release issued by Dhanuka Agritech Ltd here on Sunday. The company, as part of its public-private partnership activities, is arranging the visit. In delta districts, pulses are cultivated after harvesting of paddy in an area of 3 lakh acres with very low crop yields per acre as compared to the same crop raised in Krishna delta districts of Andhra Pradesh. In a bid to understand the Andhra Pradesh pulses cultivation methods, the exposure visit has been arranged. Scientists from Thanjavur district to take part in visit are T.Jayaraj, Director, Tamil Nadu Rice Research Institute (TRRI), Aduthurai, V.Ravi, Professor, Agronomy, TRRI, R.Panneerselvam, Professor, Agronomy, TRRI, K.Cholan, Professor, Agronomy, (Entomology), TRRI, Assistant Professors T.Ramesh and S.Vallakannan, TRRI, and T.Senguttuvan of Krishi Vigyan Kendra, Needamangalam. Other scientists are from Tamil Nadu Agriculture University, Coimbatore, and other Krishi Vigyan Kendras and Agriculture Research Stations affiliated to TNAU. The public-private partnership activities are carried out with Krishi Vigyan Kendras, Agriculture departments, Agriculture Universities, and Agriculture Research Stations for Transfer of New Crop Improvement Technologies to ensure food security and sustainability in the future.
    [Show full text]
  • Annual Report 2018-19
    Empowering farmers towards agro-ecology drought mitigation and sustainable livelihoods in Ananthapuramu Photo credit Salil Sakhalkar Empowering farmers towards agro-ecology drought mitigation and sustainable livelihoods in Ananthapuramu Annual Report 2018–19 Acronyms AF Accion Fraterna AGEEWA Achieving Gender Equality through Empowerment of Women in Agriculture APDMP Andhra Pradesh Drought Mitigation Project APGB Andhra Pragathi Grameena Bank APWALTA Andhra Pradesh Water Land and Trees Act ANGRAU Acharya N. G. Ranga Agricultural University ADATS Agricultural Development and Training Society APMAS Andhra Pradesh Mahila Abhivruddhi Society AP-MARKFED Andhra Pradesh Marketing Federation ASMS Apex Sasya Mitra Samakhya BC Backward Classes CDM Clean Development Mechanism CBO Community Based Organisation CMSS Community Managed Seed System CRZBNF Climate Resilient Zero Budget Natural Farming DPMU District Project Management Units FAs Facilitating Agencies FPO Farmer Producer Organisations GIZ Deutsche Gesellschaft für Internationale Zusammenarbeit- German Society for International Cooperation GSMS Grama Sasya Mitra Samakhya HEIDA High External Input Destructive Agriculture HMV Heavy Motor Vehicle HNSS Handri Neeva Sujala Sravanthi HRP Human Resource Policy IFAD International Fund for Agriculture Development IWMP Integrated Watershed Management Programme ICRISAT International Crops Research Institute for the Semi-Arid Tropics IGP Income Generation Programme JLG Joint Liability Groups KVK Krishi Vignan Kendre KfW Kreditanstalt für Wiederaufbau -
    [Show full text]
  • SOCIO ECONOMIC SURVEY 2017-18 I
    SOCIO ECONOMIC SURVEY 2017-18 i SOCIO ECONOMIC SURVEY 2017-18 PLANNING DEPARTMENT GOVERNMENT OF ANDHRA PRADESH ii SOCIO ECONOMIC SURVEY 2017-18 SOCIO ECONOMIC SURVEY 2017-18 iii PREFACE At the national level, the Ministry of Finance, Government of India presents the Economic Survey in both houses of the Parliament every year, just before the Union Budget. It is the ministry’s view on the annual economic development of the country. Annual document of the Ministry of Finance, Government of India, Economic Survey, reviews the developments in the Indian economy over the previous 12 months, summarizes the performance on major development programs, and highlights the policy initiatives of the government and the prospects of the economy in the short to medium term. It contains certain prescriptions that may find a place in the Union Budget which is presented a day or two later. The Government of Andhra Pradesh publishes ‘Socio-Economic Survey’ report every year and places it in both Houses of the State Legislature along with the budget documents. The report is a unique volume that captures the socio-economic changes took place in the state since the beginning of the financial year. The report essentially attempts to present the growth performance of the state economy by capturing the progress under key macro-economic aggregates and physical outcomes because of implementation of various programmes / schemes during the year 2017-18. The Socio Economic Survey 2017-18 is an outcome of the collective effort of all the stakeholders including the government departments, consultations made with experts from research bodies and interested readers who have offered their valuable advice.
    [Show full text]
  • Performance Appraisal & District Economic Scenario
    DISTRICT ECONOMICSCENARIO DISTRICT PERFORMANCE APPRAISAL& PERFORMANCE Government of Andhra Pradesh ofAndhra Government 2017-18 Krishna 189121 Pe Visakhapatnam 178166 r Ca West Godavari 172006 pi ta SPSR Nellore 156106 In Andhra co 142054 Pradesh me Guntur 141098 at East 136007 Cu Godavari Chittoor 135008 rr en Prakasam 134014 t Pr YSR 125319 ic es-2017-1 Kurnool 119638 Anantapuramu 118451 Vizianagaram 105434 8 Srikakulam 99792 Government of Andhra Pradesh PERFORMANCE APPRAISAL & DISTRICT ECONOMIC SCENARIO 2017-18 Directorate of Economics & Statistics Planning Department Government of Andhra Pradesh Sri Nara Chandrababu Naidu Hon'ble Chief Minister Government of Andhra Pradesh FOREWORD The Government of Andhra Pradesh, converting the divergent challenges emerged since state bifurcation into opportunities, have developed a model to transform the State as a Happy, Inclusive and a Globally competitive society through accomplishing sustainable Double Digit Growth over a period of time. I would like to re-iterate the Vision 2029 statement which reads - “The people of Andhra Pradesh envision transforming their state into a happy, inclusive, responsible, globally competitive and innovation-driven society through structural transformation and by sustaining inclusive double-digit economic growth, to become one among the best states by 2022, the best state by 2029 and a leading investment destination by 2050”. In order to translate the vision of the state into reality, the government has taken up a mission approach focusing on the dynamics of the economy to accelerate the growth trajectory for which innovative initiatives under each sector have been taken up besides adopting best practices and these efforts have proved fruitful in targeting national / global benchmarks.
    [Show full text]
  • Beluguppa, Anantapur District, Andhra Pradesh, India
    Resettlement Planning Document Project Number: 46268-002 February 2018 IND: Clean Energy Finance Investment Program - Tranche 1 Subproject: 100.8MW Wind Power Project at Beluguppa, Anantapur District, Andhra Pradesh Submitted by Indian Renewable Energy Development Agency, New Delhi This social safeguards due diligence report has been prepared by the Indian Renewable Energy Development Agency, New Delhi for the Asian Development Bank and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This social safeguards due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. DUE DILIGENCE REPORT ON SOCIAL SAFEGUARDS (LOAN 3186 IND: CLEAN ENERGY INVESTMENT PROGRAM) Subproject: 100.8MW Wind Power Project at Beluguppa, Anantapur District, Andhra Pradesh Subproject Developer: Orange Uravakonda Wind Power Pvt Ltd (Subsidiary of Orange Renewable Power Private Limited) M K MOHANTY, ADB TA, Prepared by Social Safeguard Specialist RUCHIKA DRALL, Review by Environmental & Social Officer, ESSU, IREDA KHEKIHO YEPTHO, Head Approved by ESSU
    [Show full text]
  • from Water Resources Department, Anantapurarnu. Vijayawada. Lr.No
    GOVERNMINT OF ANDHRA PRADESH WATER RESOURCES DEPARTMENT . From To Sri B.Sudhakara Babu, M.Tech., The Engineer-In-Chief(Irrigation), Chief Engineer (Projects), Water Resources Department, Water Resources Department, Irrigation compound, Anantapurarnu. GovernerPet, Vijayawada. ENe Lr.No.CE(P) /HNSS /P-I/ATP/Dw lM-16 IDEE4lAEEs/ 18" Sir, Sub: Single Desk Policy - Filling of Common Application with the Nodal Agency of the state level single window clearance committee - forwarding of application of M/s Andhra Pradesh Aerospace & Defence Electronics Park Private Limited, Palaasamudram Village, Gorantla Mandal, Ananthaptramu District - Permission for drawl of 3500 KLD (I.4306 Cusces)water from Gollapalli Reservoir - Report Submitted - Regarding. Ref: 1) Govt. of A.P,Industries & Commerce(INF) Dept., G. O.Ms.N o.2O2; Dated: 06 . 12.2O 14. 2) Govt.memo.no. 277 2,dt:-30.09.20 1 5. 3) Govt. of A.P,Industries & Commerce(P&! Dept., G.O.Ms.No.56; Dated:-26.O4.2OI7 . 4) Engineer-In-Chief(Irr),Vij ayawada, Lr.no.ENC(I) / DCE(GDS) / DEE2 I AEEI2 I CE(P) Antpr/ Misc, dt:-9.0 1.20 1 8. 5) Engineer-In- Chief(Irr),Vij ayawada, Lr.No.ENC(I)/EE/DEEI IAEE2/ IWS(AP Aerospace & Defence Ltd); Dt: 10.07.2OL8 communicated to the Superintending Engineer, HNSS C-II, Ananthapuramu vide t.o. Endt..No.CE(P)/ATP/HNSS P-II/ F.M- 16 / 468 ATP,DT;- L9.O7 .2OI8. 6) Superintending Engineer, HNSS circle No-II, Ananthapur€unu, Lr.No.SE/HNSS C2 / ATP IDBlTo/JTo2 lF.P.s3 (A)/363 CE, Dt:27.O7.2OI8.
    [Show full text]