Irrigation Profile Anathapuram
Total Page:16
File Type:pdf, Size:1020Kb
10/31/2018 District Irrigation Profiles IRRIGATION PROFILE OF ANANTAPURAMU DISTRICT *Click here for Ayacut Map INTRODUCTION Ananthapuramu District is situated in Rayalseema region of Andhra Pradesh state and lies between 13°-40'N to 15°-15'N Latitude and 76°-50'E to 78°-30'E Longitude with a population of 40,83,315 (2011 census). One of the famous spiritual center in this district is Puttaparthi and it is 80Km. away from Ananthapuramu. The District falls partly in Krishna basin and partly in Pennar basin. The District is surrounded by Bellary, Kurnool Districts on the North, Kadapa and Kolar Districts of Karnataka on South East and North respectively. The district is principally a hot country and temperatures vary from 17°C-40°C. The important rivers flowing in the District are (1) Pennar (2) Jayamangali (3) Chitravathi (4) Vedavathi (also called Hagari), (5) Papagni, (6) Maddileru. The district head quarter is connected by S.C. Railways broad gauge railway line from Secunderabad, Guntakal, Bangalore and Bellary (Via) Guntakal to Pakala. Most of the area in this District is covered under Minor Irrigation Sources only in addition to one completed Major Irrigation Project viz., Tungabhadra Project High level canal (TBP HLC) system stage-I (A joint venture of Karnataka and Andhra Pradesh States). The Right Bank High level canal (R.B.H.L.C.) takes off from right bank of T.B. Dam and runs in Karnataka and enters in Andhra Pradesh at Km. 105.437 and contemplated to irrigate an ayacut of 2.849 Lakh acres out of this 1,45,236 acres in Ananthapuramu district and remaining is Kurnool and Kadapa District. The T.B.P.H.L.C. Stage-II scheme, which is an Ongoing Project has been taken up during 1967 with a cost of Rs 914.70 Lakhs to provide irrigation facilities to an extent of 2,83,041 acres (including 1,01,600 acres under PABR Stage-II, i.e., Yadiki Canal System) in Ananthapuramu, Kadapa and Kurnool districts. Out of the total ayacut of 2,83,041 acres ayacut contemplated under T.B.P.H.L.C. Stage-II scheme, an ayacut of 1,33,807 acres is situated in Ananthapuramu district. Thus the total Ayacut contemplated in Ananthapuramu district under TBP HLC Scheme (Stage-I and II) is 2, 34,177 acres. Handri Neeva Sujala Sravanthi is another ongoing major Irrigation Project takenup in the district with utilization of 40 TMCft of Krishna water to irrigate 6.025 Lakh Acres in drought prone areas of Kurnool, Ananthapuramu and Chittoor Districts, out of this 3, 45,000 Acres is situated in Ananthapuramu District. Further in this district there are four Medium Irrigation projects 1) Upper Pennar Project (Ayacut 10048 Acres) 2) Pennar Kumudvathi Project (Ayacut 6126 Acres) 3) Bhairavanithippa Project ((Ayacut 12000 Acres) and 4) Yogivemana Reservoir Project (Ayacut 11510 Acres) and also called Maddileru Project. The classification of total area of the District is as follows: Population : 40,83,315 Mandals : 63 Nos. Geographical Area Area in hectares % of Total Area Total geographical area 19,13,000 100 Forest area 1,96,978 10.30 Cultivable area 11,79,000 61.63 Barren and uncultivable land 1,87,305 9.67 Land put to Non Agricultural use 1,20,791 6.31 http://irrigationap.cgg.gov.in/wrd/getDistricts 1/23 10/31/2018 District Irrigation Profiles Sown area 10,82,867 56.60 Irrigated area 1,39,885 7.31 Normal Average Rainfall 552 mm -- Details Of Irrigation Projects S.No Projects Nos Ayacut in acres A Completed Projects I Major Irrigation Projects a) Tunga Bhadra Project High Level Canal System (Stage-I) 1 1,07,516 Total 1 1,07,516 II Medium Irrigation Projects a) Upper Pennar Project 1 10,048 b) Pennar Kumudvathi Project (which is a diversion scheme) 1 6,126 c) Bhairavanithippa Project 1 12,000 d) Yogivemana Reservoir Project 1 12,880 Total 4 41,054 III Minor Irrigation a) I& CAD, tanks (above 100 Acres ayacut) 303 87806 b) I& CAD, tanks (below 100 Acres ayacut) 960 29490 c) Lift Irrigation schemes (APSIDC) (above 100 Acres ayacut) 12 6160 d) Lift Irrigation schemes (APSIDC) (below 100 Acres ayacut) 1 89 Total 1276 123553 Total Completed Projects 1281 272123 B Ongoing Projects I Major Irrigation a) Tunga Bhadra Project High Level Canal System Stage -II (Pennar Ahobilam Balancing Reservoir Stage - II) 1 133807 b) Handri Neeva Sujala Sravanthi (HNSS) 1 3,45,000 Total 2 478807 II Medium Irrigation Nil Nil III Minor Irrigation a) I&CAD, tanks (Above 100 Acres ayacut) 1 2792 b) Lift Irrigation schemes (APSIDC) 3 645 Total 4 3437 Total Ongoing Projects 6 482244 C Contemplated Projects I Major Irrigation Nil Nil II Medium Irrigation Nil Nil III Minor Irrigation a) I&CAD, tanks Nil Nil b) Lift Irrigation schemes (APSIDC) 5 2381 Total 5 2381 Total Contemplated Projects 4 1294 Grand Total of A+B+C 1292 756748 Rainfall Particulars South-west Monsoon North-East Monsoon Winter Period Hot weather period S.No Year Total June(mm) July(mm) Aug(mm) Sep(mm) Oct(mm) Nov(mm) Dec(mm) Jan(mm) Feb(mm) Mar(mm) Apr(mm) May(mm) 2004- 1 18.18 108.34 14.82 121.53 69.76 10.68 0.00 1.45 5.33 1.53 28.03 53.89 433.56 05 2005- 2 48.79 145.42 98.03 134.36 190.91 49.50 11.90 0.00 0.00 40.76 11.72 59.76 791.20 06 2006- 3 79.22 21.76 15.40 86.01 45.16 74.21 0.87 0.00 0.00 0.00 19.78 65.46 407.87 07 2007- 4 150.72 73.33 122.16 197.36 94.57 9.37 17.42 0.00 21.10 84.55 0.37 57.83 828.80 08 http://irrigationap.cgg.gov.in/wrd/getDistricts 2/23 10/31/2018 District Irrigation Profiles 5 2008- 62.47 87.38 108.55 211.21 111.87 48.64 0.54 0.47 0.00 6.67 4.68 71.44 713.92 09 2009- 6 55.31 8.98 102.87 191.31 61.49 67.15 4.00 4.42 0.86 2.50 33.47 83.25 615.60 10 2010- 7 77.26 107.82 149.75 68.77 72.86 150.80 3.53 0.00 0.59 0.00 33.26 57.62 722.26 11 2011- 8 46.97 85.40 113.04 26.19 91.58 24.26 3.04 0.61 0.00 5.35 65.75 33.50 495.69 12 2012- 9 19.20 76.37 110.97 68.90 68.37 62.10 4.74 0.00 6.10 0.65 12.42 25.85 455.66 13 2013- 10 47.10 34.00 34.20 239.00 86.60 88.80 0.10 0.00 0.00 18.20 12.90 57.80 618.70 14 2014- 11 44.90 35.70 56.80 35.00 84.90 11.70 4.10 0.80 0.20 13.40 65.20 23.90 376.60 15 COMPLETED MAJOR IRRIGATION PROJECTS 1. Tungabhadra Project Hight Level Canal System ( TBPHLC) Preamble The T.B.P.H.L.C. scheme is a joint venture of Karnataka and Andhra Pradesh states. The Right Bank High Level Canal (R.B.H.L.C) takes off from Right bank of T.B. Dam and runs in Karnataka and enters in Andhra Pradesh at Km 105.437 and contemplated to irrigate an ayacut of 2.849 Lakhs Acres out of this 1,45,236 Acres are in Ananthapuramu District and the remaining is Kurnool and Kadapa Districts. The distribution of 21.73 T.M.Cft. of water within Ananthapuramu District for T.B.P.H.L.C. System is as given below. S.No. Subsystem Entitlement out of 32.50 T.M.Cft. Ananthapuramu District 1 H.L.M.C (from A.P.Border to Mid Pennar Reservoir T.B.P HLC Stage-I 7.32 T.M.cft. 2 Guntakal Branch Canal (G.B.C.) System. (a) G.B.C. Stage-I 2.77 T.M.cft. (b) Gooty Sub Branch Canal (G.S.B.C) Stage-I 1.75 T.M.cft. 3 Mid Pennar South Canal 4.32 T.M.cft. 4 Mid Pennar North Canal 1.87 T.M.cft. 5 T.B.C. including M.B.R & S.S.B.R. T.B.P HLC Stage-I 3.70 T.M.cft. Total 21.73 T.M.cft. The scheme has been taken up in the following two stages. T.B.P.H.L.C. Scheme Stage-I T.B.P.H.L.C. Scheme Stage-II T.B.P.H.L.C. Stage-I: The T.B.P.H.L.C. Scheme Stage-I has been taken up in the year 1960 and completed by 1966 with a cost of Rs.11.74 Crores creating an Irrigation Potential of 1,07,516 in Ananthapuramu District The T.B.P HLC consists of the following Components. http://irrigationap.cgg.gov.in/wrd/getDistricts 3/23 10/31/2018 District Irrigation Profiles 1. High Level Main Canal (H.LM.C) from A.P. Border to Vagu leading to Mid Pennar Reservoir (M.P.R) 2. Mid Pennar Reservoir (M.P.R) with a Gross Storage Capacity of 5 T.Mcft. 3. Mid Pennar South Canal (M.P.S.C) 4. Tadipatri Branch Canal (T.B.C).