Center for Human Genetics, Inc

Total Page:16

File Type:pdf, Size:1020Kb

Center for Human Genetics, Inc Center for Human Genetics, Inc. Jeff Milunsky, M.D., F.A.C.M.G. Aubrey Milunsky, M.D., D.Sc., Co‐Director, Center for Human Genetics, Inc. F.R.C.P., F.A.C.M.G., D.C.H. Director, Clinical Genetics Founder and Co‐Director, Senior Director, Molecular Genetics Center for Human Genetics, Inc [email protected] [email protected] Directions to: THE CENTER FOR HUMAN GENETICS, INC. RIVERSIDE TECHNOLOGY CENTER 840 MEMORIAL DRIVE, SUITE 101 CAMBRIDGE, MA 02139 From Points North Take Route 93 South to Exit 26: the “Storrow Drive/Back Bay” exit. Follow Storrow Drive West for approximately 2 miles. Continue onto Soldiers Field Road. Take the exit towards Central Square/Massachusetts Turnpike (Interstate 90). Turn right onto Cambridge Street /River Street Bridge. Cross over Memorial Drive at the end of the bridge onto River Street. Take the first left onto Blackstone Street. The entrance to 840 Memorial Drive, also referred to as the Riverside Technology Center, will be the first driveway on the left side of Blackstone Street. There is visitor parking at the front of the building. The Center for Human Genetics, Inc. is located on the 1st Floor. From Points South Take Route 93 North to Exit 26: the “Storrow Drive/Back Bay” exit. Follow Storrow Drive West for approximately 2 miles. Continue onto Soldiers Field Road. Take the exit towards Central Square/Massachusetts Turnpike (Interstate 90). Turn right onto Cambridge Street /River Street Bridge. Cross over Memorial Drive at the end of the bridge onto River Street. Take the first left onto Blackstone Street. The entrance to 840 Memorial Drive, also referred to as the Riverside Technology Center, will be the first driveway on the left side of Blackstone Street. There is visitor parking at the front of the building. The Center for Human Genetics, Inc. is located on the 1st Floor. From Points West Take the Massachusetts Turnpike (I-90) to Exit 18: "Allston/Cambridge." This is on the left-hand side. After the toll, bear right towards Cambridge. Go straight through two sets of lights and over the River Street Bridge. Cross over Memorial Drive at the end of the bridge and take the first left onto Blackstone Street. The entrance to 840 Memorial Drive, also referred to as the Riverside Technology Center, will be the first driveway on the left side of the street. There is visitor parking at the front of the building. The Center for Human Genetics, Inc. is located on the 1st Floor. From Logan Airport Follow signs to the Sumner Tunnel. Upon exiting the tunnel, stay to the left and follow signs for Route 93 North. Take 93 North to Exit 26: the "Storrow Drive/Back Bay" exit. Once on Storrow Drive follow the signs for the "Government Center/Kendall Square" exit. Take the Government Center/Kendall Sq. exit and at the stop sign, turn right and cross over the Longfellow Bridge. Take a right at the end of the bridge onto Memorial Drive/Route 3 West. Follow Memorial Drive through four sets of traffic lights. At the fifth set of lights, turn right onto River Street (Mobil Station on corner). Take first left onto Blackstone Street. The entrance to 840 Memorial Drive, also referred to as the Riverside Technology Center, will be the first driveway on the left side of the street. There is visitor parking at the front of the building. The Center for Human Genetics, Inc. is located on the 1st Floor. Riverside Technology Center. 840 Memorial Drive, Suite 101. Cambridge, Massachusetts 02139 tel. 617-492-7083 fax. 617-492-7092 www.CHGINC.org A non-profit corporation From Storrow Drive Follow Storrow Drive until you reach the River Street Bridge. If coming from the east, the bridge is on your right; from the west, it's on your left. Cross over Memorial Drive at the end of the bridge and take the first left onto Blackstone Street. The entrance to 840 Memorial Drive, also referred to as the Riverside Technology Center, will be the first driveway on the left side of Blackstone Street. There is visitor parking at the front of the building. The Center for Human Genetics, Inc. is located on the 1st Floor. From Memorial Drive Follow Memorial Drive until you reach River Street. If coming from the east, River Street is on the right; from the west, it's on the left. When on River Street., take the first left onto Blackstone Street. The entrance to 840 Memorial Drive, also referred to as the Riverside Technology Center, will be the first driveway on the left side of Blackstone Street. There is visitor parking at the front of the building. The Center for Human Genetics, Inc. is located on the 1st Floor. From the T Take the Red Line train to Central Square. The Center for Human Genetics, Inc. is about a 15 minute walk from Central Square. Buses run from Central Square down Western Avenue (see below). Walk northwest on Massachusetts 2A W and turn left at Western Avenue. Continue to follow Western Avenue. Turn left at Blackstone Street. The entrance to 840 Memorial Drive, also referred to as the Riverside Technology Center, will be on the right side of Blackstone Street. The Center for Human Genetics, Inc. is located on the 1st Floor. Buses that run from Central Square down Western Avenue (Western Ave/Putnam Square bus stop is 100 yards from building entrance): 70 Cedarwood, No. Waltham or Watertown Sq. -- University Park via Central Sq., Cambridge, Arsenal St., and Western Ave 70A Cedarwood, No. Waltham or Watertown Sq. -- University Park via Central Sq., Cambridge, Arsenal St., and Western Ave .
Recommended publications
  • 2017 Stormwater Management Report
    Municipality/Organization: Boston Water and Sewer Commission EPA NPDES Permit Number: MASO 10001 Report/Reporting Period: January 1, 2017-December 31, 2017 NPDES Phase I Permit Annual Report General Information Contact Person: Amy M. Schofield Title: Project Manager Telephone #: 617-989-7432 Email: [email protected] Certification: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accuratnd complete. I am aware that there are significant penalties for submitting false ivfothnation intdng the possibiLity of fine and imprisonment for knowing violatti Title: Chief Engineer and Operations Officer Date: / TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Permit History…………………………………………….. ……………. 1-1 1.2 Annual Report Requirements…………………………………………... 1-1 1.3 Commission Jurisdiction and Legal Authority for Drainage System and Stormwater Management……………………… 1-2 1.4 Storm Drains Owned and Stormwater Activities Performed by Others…………………………………………………… 1-3 1.5 Characterization of Separated Sub-Catchment Areas….…………… 1-4 1.6 Mapping of Sub-Catchment Areas and Outfall Locations ………….. 1-4 2.0 FIELD SCREENING, SUB-CATCHMENT AREA INVESTIGATIONS AND ILLICIT DISCHARGE REMEDIATION 2.1 Field Screening…………………………………………………………… 2-1 2.2 Sub-Catchment Area Prioritization…………………………………..… 2-4 2.3 Status of Sub-Catchment Investigations……………………….…. 2-7 2.4 Illicit Discharge Detection and Elimination Plan ……………………… 2-7 2.5 Illicit Discharge Investigation Contracts……………….……………….
    [Show full text]
  • MDC Charles River Pathway Distances
    lcome to the Charles River Basin, a nine mile stretch of accessible river with WEendless recreational opportunities. Whether your interest is canoeing or ice BOATING MIT skating, baseball or in-lineskating, the Charles Riverisabeautifulresource for you. Since Memorial Drive upstream of the 1893. the Metropolitan District Commission has preserved the region's unique land- BOAT TOURS Mass. Ave. Bridge scapes by acquiring and protecting park lands, river corridors and coastal areas; (617) 253-1698. reclaiming and restoring abused and neglected sites, and setting aside areas ofgreat scenic Charles River Boat Company Cambridgeside Galleria Summer program. Sculling only, for beauty for the recreation and health of the region's residents. The New Charles River beginners and experienced rowers. Basin is one of our most prized possessions. We invite you to explore and enjoy all that (617) 621-3001 Season April to May - weekends; it has to offer. Northeastern University June to September - 7 days Regular sightseeing tours noon to Herter Park off Soldiers Field Road (617) 782-1933 ATHLETIC FIELDS 500 p.m. leaving on the hour, Permits are required for all activities charters available. Summer programs for ages 15 and unless otherwise noted. Please UP. Sweeps program for beginners and address all requests in writing to Boston Duck Tours intermediate rowers. MDC Recreation Division, 20 Departs from the front of New. Somerset Street, Boston, MA 02108 England Aquarium, Long Wharf, Boston University (61 7) 727-9547 (6 17) 723-DUCK Memorial Drive just downstream of Season April to November, seven the BU Bridge (617) 353-2748 or Lederman Fleld days a week.
    [Show full text]
  • Directions to Arsenal Field: from Boston/Cambridge: Take Either Memorial Drive Or Storrow Drive/ Soldiers Field Road to Greenough Boulevard
    Directions to Arsenal Field: From Boston/Cambridge: Take either Memorial Drive or Storrow Drive/ Soldiers Field Road to Greenough Boulevard. From Memorial Drive bear left at the split which leads to the Fresh Pond Parkway (when you bear left you want to go Past Buckingham, Brown and Nichols School-this is Greenough Blvd). From Storrow Drive Soldiers Field Road at the intersection past the Harvard stadium/fields continue over the bridge to cross the River into Cambridge (the Buckingham Brown and Nichols school will be right in front of you and you want to bear left onto Greenough Blvd.). At the end of Greenough Blvd. Bear right onto Arsenal Street. Proceed on Arsenal street west past the Arsenal Mall parking garage to the main entrance of the mall (extreme western end of Arsenal mall-there is a Marshall’s at this end). Take a left at the light at the main entrance to the mall (not the parking garage) and then take the first right in the parking lot. When you get to a stop sign to enter the Harvard Pilgrim Health Building take a left. Proceed over the speed bumps between the Marshall’s end of the Mall and the HPHC building and you will come to the parking lot for Arsenal field. From Wyeth: Take Fresh Pond parkway all the way to Greenough Blvd. And follow the directions above. If you stay to the extreme right after the Mt Auburn street intersection (don’t go on either Memorial Drive or Storrow Drive-stay to the extreme right lane) you will pass the BB&N school and end up on Greenough Blvd..
    [Show full text]
  • Improved Soldiers Field Road Crossings
    Improved Soldiers Field Road Crossings DCR Public Meeting Monday, November 19th – 6:00pm-7:30pm Josephine A. Fiorentino Community Center Charlesview Residences 123 Antwerp Street Extension, Brighton, MA 02135 Commonwealth of Massachusetts Governor Charles D. Baker Lieutenant Governor Karyn E. Polito Energy and Environmental Secretary Matthew A. Beaton Department of Conservation and Recreation Commissioner Leo P. Roy DCR Mission Statement To protect, promote and enhance our common wealth of natural, cultural and recreational resources for the well-being of all. Purpose of Public Meeting • Project Overview • Overview of Public Input from Previous Outreach Efforts • Design Options for Telford Street Crossing • Proposed Concept • Input from Public Soldiers Field Road Crossings 1. Public Input after Meeting #1 – why revisit the design concept? 2. At-Grade Crossing at Telford Street – what will this look like? 3. Design and Construction Methods – how will changes to design affect construction? Project Partners Harvard’s Total Contribution: $ 3,500,000 Feasibility Study: -$ 150,000 Total Project Allocation: $ 3,350,000 Initial Improvements Concept Initial Improvements Concept Initial Improvements Concept Public Input from Meeting #1 Overall support for the project, but with comments Connections to the river should accommodate cyclists, pedestrians, and disabled users Bridge rehabilitation will leave bridge too narrow and ramp switchbacks too difficult to accommodate bicycles, strollers, and pedestrians Desire for more landscaping throughout
    [Show full text]
  • Boston Water and Sewer Commission
    Permit No. MAS010001 Page 1 of 20 AUTHORIZATION TO DISCHARGE UNER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of the federal Clean Water Act, as amended, 33 U. C. 1251 et seq ., and the Massachusetts Clean Waters Act, as amended, Mass. Gen. Laws. ch. 21, 26­ the Boston Water and Sewer Commission is authorized to discharge from all of its new or existing separate storm sewers: 195 identified Separate Stor. Sewer Outfalls and associated receiving waters are Listed in Attachment A to receiving waters named: Belle Island Inlet, Boston Harbor, Boston Inner Harbor, Brook Far. Brook, Bussey Brook, Canterbury Brook, Chandler' s Pond, Charles River, Chelsea River, Cow Island Pond, Dorchester Bay, Fort Point Channel, Goldsmith Brook, Jamaica Pond, Little Mystic Channel, Mill Pond, Millers River, Mother Brook, Muddy River, Mystic River, Neponset River, Old Harbor, Patten' s Cove, Reserved Channel, Sprague Pond, Stony Brook, Turtle Pond and unnamed wetlands, brooks and streams. in accordance with effluent limitations, monitoring requirements and other conditions set forth herein. This permit shall become effective 30 days from date of signature. This permit and the authorization to discharge expire at midnight, five years from the effective date. This permit consists of 20 pages and Attachment A in Part I including monitoring requirements, etc., and 35 pages in Part II including General Conditions and Definitions. 4;1;ctor , D ' isi n '- f Office of Ecosystem Protection Watershed Management Enyironmental Protection Agency Department of Environmental Region I Protection Boston Commonwealth of Massachusetts , MA Boston, MA ). ). Page 2 of 20 Permit No. MASOIOOOl PART MUICIPAL SEPARTE STORM SEWER SYSTEM DISCHARGES THROUGH THE MUNICIPAL SEPARATE STORM SEWER SYSTEM AUTHORIZED UNER THIS PERMIT permit Area.
    [Show full text]
  • Expanded Comments on the City of Boston Placemaking Study Comments Submitted to the BRA on July 14, 2016
    Expanded Comments on the City of Boston Placemaking Study Comments submitted to the BRA on July 14, 2016 A Better City is pleased to comment on the Placemaking Study conducted by the City of Boston and its consultants, supported by MassDOT, as presented to the I-90 Allston Interchange Task Force on June 27, 2016 and further discussed with the Task Force on July 13, 2016. The Placemaking Study places due emphasis on the Interchange project as both a transportation initiative and a community development opportunity that over time will immeasurably improve the immediate Allston Neighborhood as well as create a vital new quarter for the City and region as a whole. We hope that the dialogue begun by the Placemaking Study will continue during the preparation of the Draft EIR and beyond as the designs for the area are further developed and implemented. The listed placemaking issues cover and summarize the range well. A Better City has developed and advanced an at-grade alternative in the “throat” area, which we believe is a key issue that will affect constructability, initial construction and on- going maintenance costs, and the nature of connections across the area, and we are pleased that your analysis has indicated that this is a key placemaking issue. Each of the other issues listed is also very important, several of which are critical to the success of West Station as a multi-modal hub that will support future development as well as enhance transit service for the adjacent neighborhoods and institutions. The listed goals are all laudable and necessary.
    [Show full text]
  • Artesani Park, 1255 Soldiers Field Rd, Boston Maps
    Moving Day ® Boston | Artesani Park, 1255 Soldiers Field Rd, Boston Maps ............................................................................................................................................................. 2 From Downtown Boston or Back Bay via Storrow Drive / Soldiers Field Road ............................................ 3 From Interstate 93 South: ............................................................................................................................. 4 From Route 1 South ...................................................................................................................................... 5 From the Massachusetts Turnpike (I-90) East .............................................................................................. 6 From the Massachusetts Turnpike (I-90) West, the Ted Williams Tunnel or I-93 from the South............... 7 From Alewife/Route 2 ................................................................................................................................... 8 GPS directions ............................................................................................................................................... 9 From Artesani drop-off to the New Balance Garage .................................................................................. 10 By Public Transportation ............................................................................................................................. 11 Google Map Directions Back to Top Maps Back
    [Show full text]
  • Improved Soldiers Field Road Crossings
    Improved Soldiers Field Road Crossings DCR Public Meeting Tuesday, July 10th – 6:30pm-8:00pm Hotel Studio Allston – Lobby Meeting Room 1234 Soldiers Field Road, Boston, MA 02135 Commonwealth of Massachusetts Governor Charles D. Baker Lieutenant Governor Karyn E. Polito Energy and Environmental Secretary Matthew A. Beaton Department of Conservation and Recreation Commissioner Leo P. Roy DCR Mission Statement To protect, promote and enhance our common wealth of natural, cultural and recreational resources for the well-being of all. Purpose of Public Meeting • Project Overview • Feasibility Study Results • Existing Conditions • Proposed Concepts • Input from Public Project Partners Harvard’s Total Contribution: $ 3,500,000 Feasibility Study: -$ 150,000 This Project’s Allocation: $3,350,000 Improved Soldiers Field Road Crossings At Telford Street and Everett Street Soldiers Field Road Crossings 1. Improved Bicycle/Pedestrian Access Between the Charles River Reservation and Neighborhoods – why? 2. Bridge, Sidewalk, Intersection Improvements – what? 3. Design and Construction Methods – how? Feasibility Study • Previous Studies o DCR Bike-Ped Connectivity, Harvard IMP, Smith Field MP • Scope of Study o Arsenal Street to Eliot Bridge o West of Telford St, Telford St, Everett St, Smith Field o Traffic Counts o Conceptual Improvements • Findings and Recommendations o Improvements to existing Telford Street Overpass o At-Grade pedestrian crossing at Everett Street Project Area Existing Conditions Telford Street Bridge Existing Conditions Telford
    [Show full text]
  • Ocm30840849-5.Pdf (2.204Mb)
    XT y. rf lJ:r-, Metropolitan District Commission)nj FACILITY GUIDE A " Metropolitan Parks Centennial • 1893-1993 "Preserving the past.,, protecting the future. The Metropolitan District Commission is a unique multi-service agency with broad responsibihties for the preservation, main- tenance and enhancement of the natural, scenic, historic and aesthetic qualities of the environment within the thirty-four cit- ies and towns of metropolitan Boston. As city and town boundaries follow the middle of a river or bisect an important woodland, a metropolitan organization that can manage the entire natural resource as a single entity is essential to its protec- tion. Since 1893, the Metropolitan District Com- mission has preserved the region's unique resources and landscape character by ac- quiring and protecting park lands, river corridors and coastal areas; reclaiming and restoring abused and neglected sites and setting aside areas of great scenic beauty as reservations for the refreshment, recrea- tion and health of the region's residents. This open space is connected by a network Charles Eliot, the principle of landscaped parkways and bridges that force behind today's MDC. are extensions of the parks themselves. The Commission is also responsible for a scape for the enjoyment of its intrinsic val- vast watershed and reservoir system, ues; providing programs for visitors to 120,000 acres of land and water resources, these properties to encourage appreciation that provides pure water from pristine and involvment with their responsible use, areas to 2.5 million people. These water- providing facilities for active recreation, shed lands are home to many rare and en- healthful exercise, and individual and dangered species and comprise the only team athletics; protecting and managing extensive wilderness areas of Massachu- both public and private watershed lands in setts.
    [Show full text]
  • Boston University Data Sciences Center – 665 Commonwealth Avenue
    KPMB ARCHITECTS Boston Planning and Development Agency PUBLIC MEETING Boston University Data Sciences Center 665 Commonwealth Ave June 04, 2019 Agenda Data Sciences Center Project Introduction • Tim Czerwienski, AICP BPDA Project Manager • Paul Rinaldi, Boston University Building • Luigi LaRocca, KPMB Architects Landscape • Skip Burck, Richard Burck Associates Sustainability • Jacob Knowles, BR+A • Matt Smith, The Green Engineer Transportation • Jay Doyle, AECOM Warren Towers Digital Signage • Paul Rinaldi, Boston University Boston University Data Sciences Center KPMB ARCHITECTS june 04, 2019 BPDA PUBLIC MEETING 2 Lead Consultants Data Sciences Center Project KPMB Architects Architect Fort Point Associates Planning and Permitting Richard Burck Associates Landscape Architect Bard, Rao + Athanas Consulting Engineering MEP Engineers AECOM Transportation Transsolar KlimaEngineering Sustainability Engineers Haley & Aldrich Geotechnical & Geothermal Nitsch Engineering Civil Engineer Suffolk Construction Pre-Construction Services The Green Engineer LEED Consulting Boston University Data Sciences Center KPMB ARCHITECTS june 04, 2019 BPDA PUBLIC MEETING 3 2013 -2023 IMP Projects Campus Development MASS AVE 502 619 504 506 608 SOLDIERS FIELD ROAD 518 512 316 491 493 497 520 499 MASSACHUSETTS TURNPIKE 501 503 285 505 507 509 MUDDY BOSTON UNIVERSITY BRIDGE STREET 511 120 Student Village Residence III CHARLES RIVER Academic Academic / 513 515 100 Myles Standish Residence 517 76 300 519 521 523 STREET 525 ASHFORD 427 527 531 429 431 33 Building Administration
    [Show full text]
  • 2020 Public Records Request
    MWRA Public Information Requests 2020 Nature of request The date on The date on Petitions submitted under The date on The number of The number of Fees charged to Requests The time The final which the which a clause (iv) of subsection (d) which a public hours required hours required to the person appealed required to adjudication of request was response is of section 10 (Yes/No) record is to fulfill the fulfill the request making the under section comply with any court received provided to provided to the request (hours) (minutes) request, if any 10A (Yes/No) supervisor of proceedings the requestor requestor records under subsection orders under (d) of said said section section 10A 10A 1 Record Plan: Section 111 1/2/2020 1/3/2010 1/3/2010 1 0 $0.00 No Oakdale Avenue and Fairview Street, Dedham 1 Record Plan: Section 77 1/2/2020 1/3/2020 1/3/2020 1 0 $0.00 No Lagrange Street, West Roxbury Sewer plans for Maple Street, 1/6/2020 1/6/2020 1/6/2020 1 30 $0.00 No Chilton Road and Avalon Road in Boston 5 Detail Records: Section 4 and 1/6/2020 01/06/20 01/06/20 1 0 $0.00 No Mystic 30" Main, Pearl Street, Somerville Sewer plans for an existing 1/7/2020 1/7/2020 1/7/2020 1 30 $0.00 No culvert beneath railroad tracks in Everett Remote Headworks Final 1/6/2020 1/6/2020 1/8/2020 0 45 $0.00 No Concept Design Report for Remote Headworks (August 19, 2009); Remote Headworks Final Concept Design Report on Solids Handling Systems (August 11, 2009); and Remote Headworks Upgrade PDR (September 2011) Engineering plans for Revere 1/7/2020 1/8/2020 1/8/2020 3
    [Show full text]
  • Congestion in the Commonwealth Report to the Governor 2019
    CONGESTION IN THE COMMONWEALTH REPORT TO THE GOVERNOR 2019 Acknowledgements It took the hard work of many people to compile the data and develop the analysis pre- sented in this report. In particular, it could not have happened without Liz Williams and Cassandra Bligh, who brought it from idea to completion. In addition, Neil Boudreau, Ethan Britland, Jackie DeWolfe, Katherine Fichter, Amy Getchell, Shannon Greenwell, Administrator Astrid Glynn, Administrator Jonathan Gulliver, Meghan Haggerty, Derek Krevat, Kevin Lopes, David Mohler, Quinn Molloy, Dave DiNocco, Ben Mueller, Caroline Vanasse, Corey O’Connor, Bryan Pounds, Argenis Sosa, Jules Williams, Jaqueline Goddard, Phil Primack, and Steve Woelfel of MassDOT; Kate Benesh, Wes Edwards, Phillip Groth, Mike Muller, Laurel Paget-Seekins, and General Manager Steve Poftak of the MBTA; Nicolette Hastings and Donald J. Cooke of VHB; and Nathan Higgins, Joseph Zissman, Scott Boone, Michalis Xyntarakis, Richard Margiotta, Alexandria Washington, and Kenneth Michek of Cambridge Systematics all contributed to the body of work compiled here. Angela Valenti of Cambridge Systematics prepared the design of the report. LETTER FROM THE SECRETARY Nobody likes being stuck in traffic. We all know the frustration that comes from sitting in a sea of taillights or watching a traffic signal repeatedly turn red as we creep toward an intersection. Congestion is nothing new in Massachusetts, but traffic data, anecdotal information, and our own daily experiences seem to be telling us that travel times are getting longer, becoming less predictable, or both. Congestion has become an unpleas- ant fact of life for too many Massachusetts drivers, who are finding that it takes longer than it used to in order to get where they are going.
    [Show full text]