The Plan for Harvard in Allston (Draft) Executive Summary
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Debating Diversity Following the Widely Publicized Deaths of Black Tape
KENNEDY SCHOOL, UNDER CONSTRUCTION. The Harvard Kennedy School aims to build students’ capacity for better public policy, wise democratic governance, international amity, and more. Now it is addressing its own capacity issues (as described at harvardmag.com/ hks-16). In January, as seen across Eliot Street from the northeast (opposite page), work was well under way to raise the level of the interior courtyard, install utility space in a new below-grade level, and erect a four-story “south building.” The project will bridge the Eliot Street opening between the Belfer (left) and Taubman (right) buildings with a new “gateway” structure that includes faculty offices and other spaces. The images on this page (above and upper right) show views diagonally across the courtyard from Taubman toward Littauer, and vice versa. Turning west, across the courtyard toward the Charles Hotel complex (right), affords a look at the current open space between buildings; the gap is to be filled with a new, connective academic building, including classrooms. Debating Diversity following the widely publicized deaths of black tape. The same day, College dean Toward a more inclusive Harvard African-American men and women at the Rakesh Khurana distributed to undergrad- hands of police. Particularly last semester, uates the results of an 18-month study on di- Amid widely publicized student protests a new wave of activism, and the University’s versity at the College. The day before, Presi- on campuses around the country in the last responses to it, have invited members of the dent Drew Faust had joined students at a year and a half, many of them animated by Harvard community on all sides of the is- rally in solidarity with racial-justice activ- concerns about racial and class inequities, sues to confront the challenges of inclusion. -
2017 Stormwater Management Report
Municipality/Organization: Boston Water and Sewer Commission EPA NPDES Permit Number: MASO 10001 Report/Reporting Period: January 1, 2017-December 31, 2017 NPDES Phase I Permit Annual Report General Information Contact Person: Amy M. Schofield Title: Project Manager Telephone #: 617-989-7432 Email: [email protected] Certification: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accuratnd complete. I am aware that there are significant penalties for submitting false ivfothnation intdng the possibiLity of fine and imprisonment for knowing violatti Title: Chief Engineer and Operations Officer Date: / TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Permit History…………………………………………….. ……………. 1-1 1.2 Annual Report Requirements…………………………………………... 1-1 1.3 Commission Jurisdiction and Legal Authority for Drainage System and Stormwater Management……………………… 1-2 1.4 Storm Drains Owned and Stormwater Activities Performed by Others…………………………………………………… 1-3 1.5 Characterization of Separated Sub-Catchment Areas….…………… 1-4 1.6 Mapping of Sub-Catchment Areas and Outfall Locations ………….. 1-4 2.0 FIELD SCREENING, SUB-CATCHMENT AREA INVESTIGATIONS AND ILLICIT DISCHARGE REMEDIATION 2.1 Field Screening…………………………………………………………… 2-1 2.2 Sub-Catchment Area Prioritization…………………………………..… 2-4 2.3 Status of Sub-Catchment Investigations……………………….…. 2-7 2.4 Illicit Discharge Detection and Elimination Plan ……………………… 2-7 2.5 Illicit Discharge Investigation Contracts……………….………………. -
Harvard Square Cambridge, Ma 5 Jfk St & 24 Brattle St
HARVARD SQUARE CAMBRIDGE, MA 5 JFK ST & 24 BRATTLE ST. RETAIL FOR LEASE 600 – 11,000 SF SUBDIVIDABLE THE ABBOT is THE epicenter of Harvard Square. This iconic property is undergoing a complete redevelopment to create an irreplaceable world class retail and office destination. LEASING HIGHLIGHTS TRANSIT ORIENTED EXCEPTIONAL DEMOGRAPHICS Steps away from 3rd most active MBTA station, Harvard Square’s One-mile population count of over 58,000, daytime population of Red Line station is the life of the “Brain-Train” 170,000, an average household income in excess of 130,500 and 82% of residents holding a college degree COMPLETE REDEVELOPMENT DOMINANT RETAIL LOCATION Regency Centers is delivering a world-class, fully Over 350 businesses in less than ¼ mile serving 8 million annual gut-renovated building from inside out tourists, 40,000 Harvard University students and employees, and 4.8 million SF of office and lab workers ICONIC PROPERTY EPICENTER OF HARVARD SQUARE One of the most well-known buildings in the Boston area being Prominently sits at the heart of The Square next to Harvard Yard, thoughtfully revitalized by blending historical preservation with Out of Town News, and two MBTA transit stations on both sides modern amenities 99 ® 81 98 THE SQUARE Walk Score Good Transit® Bike Score WALKER’S PARADISE EXCELLENT TRANSIT BIKER’S PARADISE Daily errands do not require a car. Transit is convenient for most trips. Flat as a pancake, excellent bike lanes. BRA TREET TTLE S CHURCH S TREET TREET MA BRATTLE S SSACHUSETT S A MT VENUE . AUBURN S TREET TREET WINTHROP S JFK S MT. -
Seeking a Forgotten History
HARVARD AND SLAVERY Seeking a Forgotten History by Sven Beckert, Katherine Stevens and the students of the Harvard and Slavery Research Seminar HARVARD AND SLAVERY Seeking a Forgotten History by Sven Beckert, Katherine Stevens and the students of the Harvard and Slavery Research Seminar About the Authors Sven Beckert is Laird Bell Professor of history Katherine Stevens is a graduate student in at Harvard University and author of the forth- the History of American Civilization Program coming The Empire of Cotton: A Global History. at Harvard studying the history of the spread of slavery and changes to the environment in the antebellum U.S. South. © 2011 Sven Beckert and Katherine Stevens Cover Image: “Memorial Hall” PHOTOGRAPH BY KARTHIK DONDETI, GRADUATE SCHOOL OF DESIGN, HARVARD UNIVERSITY 2 Harvard & Slavery introducTION n the fall of 2007, four Harvard undergradu- surprising: Harvard presidents who brought slaves ate students came together in a seminar room to live with them on campus, significant endow- Ito solve a local but nonetheless significant ments drawn from the exploitation of slave labor, historical mystery: to research the historical con- Harvard’s administration and most of its faculty nections between Harvard University and slavery. favoring the suppression of public debates on Inspired by Ruth Simmon’s path-breaking work slavery. A quest that began with fears of finding at Brown University, the seminar’s goal was nothing ended with a new question —how was it to gain a better understanding of the history of that the university had failed for so long to engage the institution in which we were learning and with this elephantine aspect of its history? teaching, and to bring closer to home one of the The following pages will summarize some of greatest issues of American history: slavery. -
Harvard Plans Its Sizable Allston Future
Forging a Connection with immigrants and literacy PAGE6 ~ Community Newspaper Company Ill www.allstonbrightontab.com FRIDAY, OCTOBER 24, 2003 Vol. 8, No. 12 Iii 52 Pages Ill 3 Sections 75¢ New fashions Harvard plans its sizable Allston future By Jill Casey STAFF WRITER "I for one don't want his week Harvard Uni versity released its broad Allston to be just T vision for the next phase student housing and of development in Allston. The long-awaited statement did not nothing more. I want offer too many specifics, but did the academic uses and give indication that they hope to transfer many of its integral aca bio-tech and medical demic programs across the research. I think the Charles River to Allston. 'This is a critical time in Har life sciences are the vard's history, as it is for all high future for much of er education .... At such a time, the properties Harvard has acquired Allston Landing." in Allston afford us a historic op portunity to innovate, to grow City Councilor and to build our long-term acade Jeny McDennott mic strength, while also con tributing to the vitality of our im With more than 200 acres of portant home communities," said property holdings that they have Harvard University President PHOTO ev ZAAA TZANEV acquired in Allston since the Last week, many people ventured from watchln# the Red Sox at home t o watching the Models from Maggie Inc. show the latest Lawrence Summers in an open fashions at Saks 5th Avenue at Tonic - the Mel L,ounge In Brighton. -
Harvard Library Bulletin</Em>
The Kentucky Review Volume 8 | Number 2 Article 5 Summer 1988 Keyes Metcalf and the Founding of The Harvard Library Bulletin Dennis Carrigan University of Kentucky, [email protected] Follow this and additional works at: https://uknowledge.uky.edu/kentucky-review Part of the Library and Information Science Commons Right click to open a feedback form in a new tab to let us know how this document benefits you. Recommended Citation Carrigan, Dennis (1988) "Keyes Metcalf and the Founding of The Harvard Library Bulletin," The Kentucky Review: Vol. 8 : No. 2 , Article 5. Available at: https://uknowledge.uky.edu/kentucky-review/vol8/iss2/5 This Article is brought to you for free and open access by the University of Kentucky Libraries at UKnowledge. It has been accepted for inclusion in The Kentucky Review by an authorized editor of UKnowledge. For more information, please contact [email protected]. Keyes Metcalf and the Founding of The Harvard Library Bulletin Dennis Carrigan In Random Recollections of an Anachronism, the first volume of his autobiography, Keyes Metcalf has told how he came to head the Harvard Library. In 1913 he had joined the New York Public Library, and had expected to work there until retirement. One day early in 1936, however, he was summoned to the office of his superior, Harry Miller Lydenberg, and there introduced to James Bryant Conant, the President of Harvard, who was in New York to discuss with Mr. Lydenberg a candidate to be Librarian of Harvard College, a position that was expected to lead to that of Director of the University Library. -
MDC Charles River Pathway Distances
lcome to the Charles River Basin, a nine mile stretch of accessible river with WEendless recreational opportunities. Whether your interest is canoeing or ice BOATING MIT skating, baseball or in-lineskating, the Charles Riverisabeautifulresource for you. Since Memorial Drive upstream of the 1893. the Metropolitan District Commission has preserved the region's unique land- BOAT TOURS Mass. Ave. Bridge scapes by acquiring and protecting park lands, river corridors and coastal areas; (617) 253-1698. reclaiming and restoring abused and neglected sites, and setting aside areas ofgreat scenic Charles River Boat Company Cambridgeside Galleria Summer program. Sculling only, for beauty for the recreation and health of the region's residents. The New Charles River beginners and experienced rowers. Basin is one of our most prized possessions. We invite you to explore and enjoy all that (617) 621-3001 Season April to May - weekends; it has to offer. Northeastern University June to September - 7 days Regular sightseeing tours noon to Herter Park off Soldiers Field Road (617) 782-1933 ATHLETIC FIELDS 500 p.m. leaving on the hour, Permits are required for all activities charters available. Summer programs for ages 15 and unless otherwise noted. Please UP. Sweeps program for beginners and address all requests in writing to Boston Duck Tours intermediate rowers. MDC Recreation Division, 20 Departs from the front of New. Somerset Street, Boston, MA 02108 England Aquarium, Long Wharf, Boston University (61 7) 727-9547 (6 17) 723-DUCK Memorial Drive just downstream of Season April to November, seven the BU Bridge (617) 353-2748 or Lederman Fleld days a week. -
Klarman Hall/ G2 Pavilion at Harvard Business School
HARVARD | BUSINESS | SCHOOL KLARMAN HALL/ G2 PAVILION AT HARVARD BUSINESS SCHOOL BOSTON CIVIC DESIGN COMMISSION BRIEFING PACKAGE SEPTEMBER 30, 2015 TABLE OF CONTENTS PAGE I. PROJECT INFORMATION 1.1 II. PROJECT TEAM 2.1 III. PROJECT BACKGROUND 3.1 IV. COMMUNITY REVIEW 4.1 V. KLARMAN HALL PROJECT 5.1 A. Project Summary 5.1 B. Project Dimensions 5.2 C. Architectural & Urban Design Goals 5.3 D. Illustrations 5.5 HARVARD | BUSINESS | SCHOOL Klarman Hall/ G2 Pavilion at BOSTON CIVIC DESIGN COMMISSION KLARMAN HALL AND G2 PAVILION Harvard Business School BRIEFING PACKAGE: 09.30.2015 PART I. PROJECT INFORMATION PROJECT NAME: Klarman Hall at Harvard Business School CURRENT PROPERTY OWNER: Harvard University PROJECT PROPONENT: President and Fellows of Harvard College on behalf of the Harvard Business School Holyoke Center, Suite #900 1350 Massachusetts Avenue Cambridge, MA 02138 Drew Faust, President, Harvard University Nitin Nohria, Dean, Harvard Business School Angela Crispi, Associate Dean, Harvard Business School Andy O’Brien, Chief of Operations, Harvard Business School CONTACT: Harvard Business School Shad Hall 70 North Harvard Street Boston, MA 02163 Andy O’Brien Chief of Operations Phone | (617) 496-3534 Fax | (617) 496-7456 HARVARD | BUSINESS | SCHOOL Klarman Hall/ G2 Pavilion at BOSTON CIVIC DESIGN COMMISSION KLARMAN HALL AND G2 PAVILION Harvard Business School BRIEFING PACKAGE: 09.30.2015 1.1 PART II. PROJECT TEAM ARCHITECT SUSTAINABILITY CONSULTANT William Rawn Associates, Architects, Inc., Boston, MA Atelier Ten, New York, NY William -
The History of Lowell House
The History Of Lowell House Charles U. Lowe HOW TO MAKE A HOUSE Charles U. Lowe ’42, Archivist of Lowell House Lucy L. Fowler, Assistant CONTENTS History of Lowell House, Essay by Charles U. Lowe Chronology Documents 1928 Documents 1929 Documents 1930-1932 1948 & Undated Who’s Who Appendix Three Essays on the History of Lowell House by Charles U. Lowe: 1. The Forbes story of the Harvard Riverside Associates: How Harvard acquired the land on which Lowell House was built. (2003) 2. How did the Russian Bells get to Lowell House? (2004) 3. How did the Russian Bells get to Lowell House? (Continued) (2005) Report of the Harvard Student Council Committee on Education Section III, Subdivision into Colleges The Harvard Advocate, April 1926 The House Plan and the Student Report 1926 Harvard Alumni Bulletin, April, 1932 A Footnote to Harvard History, Edward C. Aswell, ‘26 The Harvard College Rank List How Lowell House Selected Students, Harvard Crimson, September 30, 1930, Mason Hammond “Dividing Harvard College into Separate Groups” Letter from President Lowell to Henry James, Overseer November 3, 1925 Lowell House 1929-1930 Master, Honorary Associates, Associates, Resident and Non-Resident Tutors First Lowell House High Table Harvard Crimson, September 30, 1930 Outline of Case against the Clerk of the Dunster House Book Shop for selling 5 copies of Lady Chatterley’s Lover by D. H. Lawrence Charles S. Boswell (Undated) Gift of a paneled trophy case from Emanuel College to Lowell House Harvard University News, Thursday. October 20, 1932 Hizzoner, the Master of Lowell House - Essay about Julian Coolidge on the occasion of his retirement in 1948 Eulogy for Julian L. -
MOUNT AUBURN CEMETERY Page 1 United States Department of the Interior, National Park Service National Register of Historic Places Registration Form
NATIONAL HISTORIC LANDMARK NOMINATION NFS Form 10-900 USDI/NPS NRHP Registration Form (Rev. 8-8 OMB No. 1024-0018 MOUNT AUBURN CEMETERY Page 1 United States Department of the Interior, National Park Service National Register of Historic Places Registration Form 1. NAME OF PROPERTY Historic Name: Mount Auburn Cemetery Other Name/Site Number: n/a 2. LOCATION Street & Number: Roughly bounded by Mount Auburn Street, Not for publication:_ Coolidge Avenue, Grove Street, the Sand Banks Cemetery, and Cottage Street City/Town: Watertown and Cambridge Vicinityj_ State: Massachusetts Code: MA County: Middlesex Code: 017 Zip Code: 02472 and 02318 3. CLASSIFICATION Ownership of Property Category of Property Private: X Building(s): _ Public-Local: _ District: X Public-State: _ Site: Public-Federal: Structure: _ Object:_ Number of Resources within Property Contributing Noncontributing 4 4 buildings 1 ___ sites 4 structures 15 ___ objects 26 8 Total Number of Contributing Resources Previously Listed in the National Register: 26 Name of Related Multiple Property Listing: n/a NFS Form 10-900 USDI/NPS NRHP Registration Form (Rev. 8-86) OMB No. 1024-0018 MOUNT AUBURN CEMETERY Page 2 United States Department of the Interior, National Park Service National Register of Historic Places Registration Form 4. STATE/FEDERAL AGENCY CERTIFICATION As the designated authority under the National Historic Preservation Act of 1966, as amended, I hereby certify that this ___ nomination ___ request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. -
Directions to Arsenal Field: from Boston/Cambridge: Take Either Memorial Drive Or Storrow Drive/ Soldiers Field Road to Greenough Boulevard
Directions to Arsenal Field: From Boston/Cambridge: Take either Memorial Drive or Storrow Drive/ Soldiers Field Road to Greenough Boulevard. From Memorial Drive bear left at the split which leads to the Fresh Pond Parkway (when you bear left you want to go Past Buckingham, Brown and Nichols School-this is Greenough Blvd). From Storrow Drive Soldiers Field Road at the intersection past the Harvard stadium/fields continue over the bridge to cross the River into Cambridge (the Buckingham Brown and Nichols school will be right in front of you and you want to bear left onto Greenough Blvd.). At the end of Greenough Blvd. Bear right onto Arsenal Street. Proceed on Arsenal street west past the Arsenal Mall parking garage to the main entrance of the mall (extreme western end of Arsenal mall-there is a Marshall’s at this end). Take a left at the light at the main entrance to the mall (not the parking garage) and then take the first right in the parking lot. When you get to a stop sign to enter the Harvard Pilgrim Health Building take a left. Proceed over the speed bumps between the Marshall’s end of the Mall and the HPHC building and you will come to the parking lot for Arsenal field. From Wyeth: Take Fresh Pond parkway all the way to Greenough Blvd. And follow the directions above. If you stay to the extreme right after the Mt Auburn street intersection (don’t go on either Memorial Drive or Storrow Drive-stay to the extreme right lane) you will pass the BB&N school and end up on Greenough Blvd.. -
The Ruth Mulan Chu Chao Center at Harvard Business School
The Ruth Mulan Chu Chao Center at Harvard Business School BCDC Presentation | November 5, 2013 1. SHIELD LOGO “CENTERED” ABOVE THE NAME LOGO The relative sizes and position should not be changed. Note the shield logo is visually centered between the rules of the name logo (this is not the actual center of name logo); the bottom tip of 1 the shield should point between the “i” and “n” in “Business.” 2. SHIELD LOGO TO THE LEFT OF THE NAME LOGO It is also acceptable for the shield to the left of the name logo. The relative sizes and position should not be changed. 3. SEPARATED In addition, the two logos can be positioned to balance one another on a page (a good rule of thumb for achieving this balance is to position the logos in different quadrants of the page) or appear on separate pages (of a publication). RELATIVE POSITIONS P9 THE RUTH MULAN CHU CHAO CENTER AT HARVARD BUSINESS SCHOOL Project Summary Introduction Existing Site and Context Urban Design The President and Fellows of Harvard College on behalf of the Harvard Business School The site of the Project is in the northeast corner of the HBS campus, to the east of the The Project is located at an important place in the physical geometry of the HBS campus (HBS) propose the construction of the Ruth Mulan Chu Chao Center, a building envi- original HBS campus designed by McKim, Mead and White in the late 1920s. The Project at the end of Harvard Way, and in the social geography of HBS, connecting Executive Edu- sioned as a social center for Executive Education, consisting of approximately 75,000 site is currently occupied by Kresge Hall.