Parkways to Be Cleared by Massdot

Total Page:16

File Type:pdf, Size:1020Kb

Parkways to Be Cleared by Massdot Parkways to be cleared by MassDOT Roadway Name and Description Agassiz Road, Fenway Alewife Brook Parkway from Route 2 to Concord Avenue Arsenal Street Birmingham Parkway, Watertown Blue Hill River Road, Milton Blue Hills Parkway, Milton Boundary Road, Milton Boylston Street, Fenway – From Park Drive intersection to Brookline Avenue, Fenway Brooks Street, Brighton Casey Overpass, Jamaica Plain Centre Street, Jamaica Plain Charles River Dam Road Charles River Road, Watertown Charles Street (portion) Charlesbank Road, Newton Bowker Overpass Charlesgate (East & West) Chestnut Street, Boston Chickatawbut Road, Braintree, Milton and Quincy Columbia Road, Dorchester ( Dorchester section only) Concord Avenue East Border Road, Malden Eastern Avenue, Lynn Embankment Road, including Mugar Way Fellsway East, Malden Forest Grove Road and Woerd Avenue , Waltham Forsyth Way, Fenway, Boston Fresh Pond Parkway from Concord Avenue to Fresh Pond Furnace Brook Parkway and rotary, Quincy Gallivan Boulevard, Boston Green Street, Canton Greenough Blvd., Cambridge and Watertown Grove Street, Watertown – From Coolidge Ave. to Greenough Blvd. Harvard Avenue, Arlington and Medford – From Mystic River Road to Mystic Valley Parkway Hayden Street, Quincy – Spur From Furnace Brook Parkway to Willard Street High Street, Medford and Medford Street, Arlington (these are the roadways between Highland Avenue, Malden and Medford. Hillside Street, Blue Hills Reservation, Canton and Milton Page 1 of 5 Hull Shore Drive Humphrey Street, Swampscott- Lynn Shore Drive Turn Around Jack Shea Circle Jamaicaway Lynnway/ Carroll Parkway) McGrath Highway Middlesex Avenue, Medford Morton Street, Boston Mystic River Road and Jerome Street, Medford Mystic Valley Parkway from Route 16 to Wellington Circle Mystic Valley Parkway, Arlington, Medford, Somerville and Winchester Mystic Valley Parkway in Medford to parkway of same name in Arlington) Nantasket Avenue (Hull) Neponset Valley Parkway, Hyde Park and Milton New South Street, Stoneham Nonantum Road, Brighton, Newton and Watertown North Beacon Street, Brighton and Watertown North Border Road, Stoneham O'Brien Highway Park Drive, Boston – Main road only Park Street, Stoneham Parkman Drive, Boston Perkins Street, Boston Pond Street, Stoneham Ravine Road, Stoneham Revere Beach Parkway - From Interstate 93 to Route 107 Santilli Circle Connector Soldiers Field Road South Border Road, Medford and Winchester South Street, Winchester Storrow Drive The Fenway and Fenway Connector to Park Drive, Boston The Riverway, Boston Truman Parkway (a/k/a Truman Highway), Boston and Milton Unquity Road, Milton VFW Parkway Wampatuck Road, Quincy West Border Road, Malden Wharf Avenue (Hull) Woodland Road, Medford and Stoneham Wyoming Avenue, Stoneham Page 2 of 5 Parkways to be cleared by DCR ROAD NAME ARBORWAY AUSTIN STREET BABE RUTH PARK DRIVE BELLEVUE HILL ROAD BOSTON UNIVERSITY BRIDGE BOWKER OVERPASS OFF RAMPS BOYLSTON STREET BOYLSTON STREET SERVICE ROAD BROAD SOUND AVENUE BROADWAY BROOKLINE STREET CAMBRIDGE PARKWAY CAMBRIDGE PARKWAY CONNECTOR CAMBRIDGE STREET CASASSA OVERPASS CHARLES STREET CIRCLE CHARLESTOWN AVENUE CHESTNUT HILL DRIVEWAY COLUMBIA ROAD ( South Boston section only) COMMANDANT'S WAY CONNECTOR TO ELIOT BRIDGE CONSTITUTION BEACH ROAD DEDHAM BOULEVARD DEDHAM PARKWAY EARHART DAM ROAD EAST BROADWAY ELIOT CIRCLE ELM STREET ENNEKING PARKWAY ENNEKING PARKWAY BRANCH FELLSWAY WEST FENWAY SERVICE ROAD FIRST STREET FOREST STREET FRESH POND PARKWAY GERRYS LANDING ROAD HAMMOND POND PARKWAY HEMLOCK ROAD HILLCREST PARKWAY Page 3 of 5 HORACE JAMES CIRCLE HYDE PARK AVENUE JFK-UMASS STATION ROAD JOHN F KENNEDY STREET KOSCIUSZKO CIRCLE LAND BOULEVARD LONGFELLOW BRIDGE LYNN SHORE DRIVE LYNNWAY LYNNWAY UNDERPASS - RT 1A SB TO LYNNWAY MAIN STREET MASSACHUSETTS AVENUE MEMORIAL DRIVE MEMORIAL DRIVE UNDERPASS METROPOLITAN ROAD NORTH METROPOLITAN ROAD SOUTH MILTON STREET MONSIGNOR CASEY HIGHWAY MORRISSEY SERVICE ROAD MOUNT VERNON STREET MYSTIC AVENUE NAHANT CIRCLE NAHANT ROAD NEPONSET AVENUE NEPONSET VALLEY PARKWAY NOBLE STREET NORTH HARVARD STREET OAK ISLAND STREET OCEAN AVENUE OLD COLONY AVENUE PELTON STREET QUINCY SHORE DRIVE RAMP-BU BRIDGE TO MEMORIAL DR EB RAMP-CAMBRIDGEPRT CIR TO BU BRIDGE RAMP-CAMBRIDGEPRT CIR TO MEM DR WB RAMP-CHARLES ST TO LONGFELLOW BRIDGE RAMP-CHARLESGATE OVERPASS TO CHARLESGATE RAMP-MEM DR TO CAMBRIDGEPRT CIR EB RAMP-MEM DR TO CAMBRIDGEPRT CIR WB RAMP-N HARVARD ST TO SOLDIERS FIELD WB RAMP-RT 107 NB TO RT 16 EB RAMP-STORROW DR TO RT 2A WB Page 4 of 5 REID ROTARY RESERVATION ROAD RESERVOIR STREET REVERE BEACH BOULEVARD REVERE BEACH PARKWAY REVERE STREET RIVER STREET SAWMILL LANE SHIRLEY AVENUE SHORE ROAD SMITH FIELD ROAD STATE ROAD TERMINAL ROAD TURTLE POND PARKWAY TURTLE POND PARKWAY BRANCH WAVE AVENUE WEST ROXBURY CENTRE STREET ROTARY WEST ROXBURY PARKWAY WEST STREET WESTERN AVENUE WILLIAM DAY BOULEVARD WILLIAM T MORRISSEY BOULEVARD WINTHROP PARKWAY WINTHROP SHORE DRIVE Page 5 of 5 .
Recommended publications
  • Public Comments
    Arborway Parkways Improvement Project Public Comments Submitted via DCR Online Comment Portal deadline 11/6/2020 Time Comment First Last Address (City) State Zipcode 10/21/20 3:27 PM The 2 circles alternative is the one that I prefer (followed by the 1 circle, then no circle designs). Roundabouts are a safer intersection design compared to a signalized intersection and should be used to Domenic Privitera Boston MA 02120 improve the safety of the Arborway. 10/22/20 10:18 AM 1. The paths should not be shared use. With E‐bikes, micro mobility, cargo bikes, accessible conveyances, and pedestrians wearing ear buds and not able to hear an approaching bicyclist, there will be crashes if Anne Lusk Brookline MA 02445‐6756 it is shared use due to speed differentials and widths of cargo/Fun2Go/child carrier bikes. 2. Bicyclists should not be on a path beside the traffic while the pedestrians have paths with wide green spaces by the homes, trees, and lawns. Riding beside the sound, mobile source air pollution, and dust from fast moving vehicles is not pleasant or healthy, Also, on a two way path, bicyclists riding with approaching vehicular traffic on their right would not be comfortable. At night, the intense and direct‐beam LED bike lights would be confusing to drivers who would see a beam of light approaching on their right. 3. The bicyclists should be shaded by trees, especially with hot summers, and for 24 hour riding, have continuous lighting directly over the two way bike path. The lighting should not be from the tall cobra head for the road because tree limbs obstruct the light from reaching the bike path, creating light and dark sections on the pathway.
    [Show full text]
  • Commonwealth of Massachusetts Department of Conservation And
    Commonwealth of Massachusetts Department of Conservation and Recreation Request for Proposals for Mobile Food Concession Operation at the Cambridge Esplanade, Charles River Reservation, Cambridge MA For Annual Fourth of July Event RFP # DCR 2015 416 Table of Contents I. Introduction ......................................................................................................................................... 2 II. Proposal Process ................................................................................................................................. 3 III. Description of the Premises and Applicable Information ................................................................... 5 IV. Submission Requirements for Proposal .............................................................................................. 7 A. Mandates ............................................................................................................................................................ 7 B. Description of Entity and Related Experience ................................................................................................... 8 C. Description of Services to be Provided .............................................................................................................. 9 D. Financial and Budget Information ................................................................................................................... 10 E. Compensation to the Commonwealth .............................................................................................................
    [Show full text]
  • DCR Parking Meter Proposal
    DCR Parking Meter Proposal October 14 and 15, 2020 • Two ways to ask questions during the meeting​ • Raise your hand • Use Q&A feature​ • You will have the opportunity to submit comments over the course of the next two weeks at: • DCR Public Comments​ https://www.mass.gov/forms/dcr-public-comments • Via email – [email protected]​ Please note that this meeting will be recorded; Meeting Logistics the recording will be a public record​ Commonwealth of Massachusetts Governor Charles D. Baker Lieutenant Governor Karyn E. Polito Energy and Environmental Secretary Kathleen A. Theoharides Department of Conservation and Recreation Commissioner Jim Montgomery • Welcome and Introductions • Project Background • Project Scope and Timeline • Q&A • Closing and Next Steps Agenda DCR manages state parks and oversees more than 450,000 acres throughout Massachusetts. It protects, promotes, and enhances the state’s natural, cultural, and recreational resources. DCR Mission To implement parking strategies on DCR roadways that are consistent with the host municipalities, generating revenue that will aid in all aspects of DCR's mission by supporting staff, materials, and programs without putting additional strain on the commonwealth’s overall budget. DCR Parking Program Objective Economic Stability Customer Centric Environmentally Friendly DCR Parking Philosophy Why Implement Paid On-street Parking? Provides more on-street Consistent parking experience Funds DCR park operations parking for visitors for all parkers Enhances decision- Discourages “vehicle storage” making through data analysis DCR Analysis • Analysis of a DCR curbside parking management program on specific parkways began in 2014 with a Harvard Kennedy School of Government parking revenue study. • The analysis used the existing fee in regulations, $1.25/hour, which is comparable to, or less than, rates charged for on street parking in the respective municipalities.
    [Show full text]
  • Archives I A-6 BPC Arnold Arboretum and Boston Parks Commission Partnership Records, 1882
    Archives I A-6 BPC Arnold Arboretum and Boston Parks Commission partnership records, 1882 - : Guide. The Arnold Arboretum of Harvard University © 2011 President and Fellows of Harvard College I A-6 BPC Arnold Arboretum and Boston Parks Commission partnership records, 1882 - : Guide Archives of the Arnold Arboretum of Harvard University 125 Arborway, Jamaica Plain, Massachusetts © 2012 President and Fellows of Harvard College Descriptive Summary Repository: Arnold Arboretum, Jamaica Plain, MA 02130 Call No.: I A-6 BPC Location: Archives Title: Arnold Arboretum and Boston Parks Commission partnership records, 1882- Dates: 1882- Creator(s): Arnold Arboretum; Boston Parks Commission Quantity: 4 linear inches Language of material: English Abstract: The Arnold Arboretum and Boston Parks Commission partnership records focus on the relations between the Arboretum and the city of Boston in administrating their shared responsibilities in the care and maintenance of the Arboretum. The bulk of the materials consist of correspondence from the office of the Director of the Arboretum to the Chairman of the Parks Commission. Note: Access to Finding Aid record in Hollis Classic or Hollis. Preferred Citation: Arnold Arboretum and Boston Parks Commission partnership records, 1882- . Archives of the Arnold Arboretum of Harvard University. Additional material: Sargent correspondence with the Boston Parks Department or the Chair’s designees may be found by searching the Arnold Arboretum Correspondence Database and the papers of the Arboretum’s subsequent directors: Oakes Ames (Supervisor) 1927-1935, Archives I B EDM Elmer Drew Merrill (1876- 1956) papers, 1920-1956 Karl Sax 1946-1954, Richard A. Howard, 1954-1978, Peter S. Ashton 1978-1987, Robert E.
    [Show full text]
  • 202 Bus Time Schedule & Line Route
    202 bus time schedule & line map 202 Fields Corner via Neponset Ave - Keystone Apts View In Website Mode via Adams St The 202 bus line (Fields Corner via Neponset Ave - Keystone Apts via Adams St) has 5 routes. For regular weekdays, their operation hours are: (1) Adams & Gallivan: 2:07 PM - 2:59 PM (2) Fields Corner Via Neponset Ave: 5:41 AM - 7:13 PM (3) Fields Corner Via Neponset Ave & Puritan Mall: 10:25 AM - 3:30 PM (4) Hallet Square Via Adams St: 5:30 AM - 6:30 AM (5) Keystone Apts Via Adams St: 7:00 AM - 6:57 PM Use the Moovit App to ƒnd the closest 202 bus station near you and ƒnd out when is the next 202 bus arriving. Direction: Adams & Gallivan 202 bus Time Schedule 14 stops Adams & Gallivan Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 2:07 PM - 2:59 PM Fields Corner 16 Charles Street, Boston Tuesday 2:07 PM - 2:59 PM Park St Busway @ Dorchester Ave Wednesday 2:07 PM - 2:59 PM Dorchester Avenue, Boston Thursday 2:07 PM - 2:59 PM Gibson St @ Dorchester Ave Friday 2:07 PM - 2:59 PM 2-4 Gibson Street, Boston Saturday Not Operational Gibson St @ Adams St 329 Adams Street, Boston Adams St @ Parkman St 361 Adams Street, Boston 202 bus Info Direction: Adams & Gallivan Adams St @ Centre St Stops: 14 404 Centre Street, Boston Trip Duration: 10 min Line Summary: Fields Corner, Park St Busway @ Adams St @ King St Dorchester Ave, Gibson St @ Dorchester Ave, Gibson King Street, Boston St @ Adams St, Adams St @ Parkman St, Adams St @ Centre St, Adams St @ King St, Adams St @ Adams St @ Lonsdale St Lonsdale St, Adams St @ Msgr Lydon Way, Adams St 531 Adams Street, Boston @ Ashmont St, Adams St @ Helena Rd, Adams St @ Westmoreland St, Adams St @ Minot St, Adams St @ Adams St @ Msgr Lydon Way Gallivan Blvd 138 Monsignor Patrick J.
    [Show full text]
  • Directions to the State Transportation Building City Place Parking Garage
    Directions to the State Transportation Building By Public Transit | By Automobile Photo ID required for building entry. ​ ​ ​ City Place Parking Garage is next to the entrance GPS address is 8 Park Plaza Boston MA By Automobile: FROM THE NORTH: Take 93 South to the Leverett Connector (immediately before the Lower Deck). Follow all the way into Leverett Circle, and get onto Storrow Drive West. Pass the government center exit on the left, and take the 2nd exit (Copley Square), which will also be on the left side. Get in the left lane, and at the lights, take a left onto Beacon Street. Take an immediate right onto Arlington Street. Follow Arlington past the Public Garden and crossing Boylston and St. James Streets. After passing the Boston Park Plaza Hotel on the left, take a left onto Stuart Street. The Motor Mart garage will be on the left and the Radisson garage will be on the right. The State Transportation Building is located at the intersection of Stuart and Charles Streets. FROM THE SOUTH: Take 93 North to the South Station exit (#20). Bear left and follow the frontage road towards South Station. The frontage road ends at Kneeland Street, and a prominent sign says to go left to Chinatown. Turn left and follow Kneeland Street (which becomes Stuart Street after a few blocks). Within a mile of South Station, the State Transportation Building will be on your right. After a mandatory right turn, the entrance to the garage is first driveway on the right. FROM THE WEST: Take the Masspike (90) East to the Prudential Center/Copley Square exit (#22); follow tunnel signs (right lane) to Copley Square.
    [Show full text]
  • Draft Summary of Public Comments Draft Ffys 2018-2022 Transportation Improvement Program (TIP)
    Draft Summary of Public Comments Draft FFYs 2018-2022 Transportation Improvement Program (TIP) SUPPORT OPPOSE Page PROJECT(S) /ISSUE(S) COMMENTER(S) COMMENT (SUMMARIZED) Draft Response REQUEST in PDF Regional Transportation Advisory Council Organization: RTAC Thanks the MPO staff for its attention to reframing and improving communication, information, and material related Thank you for your comment. to the TIP. States this information has been helpful in explaining the TIP processes to stakeholders and the public. TIP Outreach Support 1 Organization: RTAC Expresses appreciation for the MPO's attention to newly established priorities and the "binning" approach by which Thank you for your comment. projects are compared to other projects of the same type in the TIP scoring. The Community Transportation/Parking/Clean Air and Mobility investment program will be defined by the MPO and MPO staff during Requests the MPO begin to consider criteria related to the sustainability of projects in the Community FFY 2018. Project Scoring & Transportation category. Notes a study has been identified to do this in the FFY 2018 UPWP. Request 1 Evaluation MPO Staff will work with MassDOT to ensure that projects listed in the Universe of Projects are active and remain priorities of the States there are several projects on the TIP programming scenario list that were given initial approval as much as municipal project proponents. If considered necessary, projects will be reevaluated and rescored during TIP development. 15 or 20 years ago. Notes there have been many examples of changes in both regional and local priorities since that time. Requests that the MPO reconfirm that those projects are still priorities with the project sponsors, and to re-score the projects on a regular basis.
    [Show full text]
  • Residences on Morrissey Boulevard, 25 Morrissey Boulevard, Dorchester
    NOTICE OF INTENT (NOI) TEMPORARY CONSTRUCTION DEWATERING RESIDENCES AT MORRISSEY BOULEVARD 25 MORRISSEY BOULEVARD DORCHESTER, MASSACHUSETTS by Haley & Aldrich, Inc. Boston, Massachusetts on behalf of Qianlong Criterion Ventures LLC Waltham, Massachusetts for US Environmental Protection Agency Boston, Massachusetts File No. 40414-042 July 2014 Haley & Aldrich, Inc. 465 Medford St. Suite 2200 Boston, MA 02129 Tel: 617.886.7400 Fax: 617.886.7600 HaleyAldrich.com 22 July 2014 File No. 40414-042 US Environmental Protection Agency 5 Post Office Square, Suite 100 Mail Code OEP06-4 Boston, Massachusetts 02109-3912 Attention: Ms. Shelly Puleo Subject: Notice of Intent (NOI) Temporary Construction Dewatering 25 Morrissey Boulevard Dorchester, Massachusetts Dear Ms. Puleo: On behalf of our client, Qianlong Criterion Ventures LLC (Qianlong Criterion), and in accordance with the National Pollutant Discharge Elimination System (NPDES) Remediation General Permit (RGP) in Massachusetts, MAG910000, this letter submits a Notice of Intent (NOI) and the applicable documentation as required by the US Environmental Protection Agency (EPA) for temporary construction site dewatering under the RGP. Temporary dewatering is planned in support of the construction of the proposed Residences at Morrissey Boulevard in Dorchester, Massachusetts, as shown on Figure 1, Project Locus. We anticipate construction dewatering will be conducted, as necessary, during below grade excavation and planned construction. The site is bounded to the north by the JFK/UMass MBTA red line station, to the east by William T. Morrissey Boulevard, to the south by paved parking associated with Shaw’s Supermarket, beyond which lies the Shaw’s Supermarket, and to the west by MBTA railroad tracks and the elevated I-93 (Southeast Expressway).
    [Show full text]
  • Open Space Plan 2009-2016
    CityCity of ofSomerville Somerville ZONING OVERHAUL www.somervillezoning.com December 04, 2018 We were asked to do two things for today: 1. Present the roadmap to 125 acres 2. Review the zoning petition Mayor Joseph A Curtatone Office of Strategic Planning & Community Development Executive Summary • The City is launching a SomerVision update: • We are committed to putting a stronger focus on planning for public space. • We need additional indicators of success for future planning; The adequacy and validity of using acreage alone for our specific situation and objectives is questionable. • About 20 acres of public space has been created since 2010. Another 11.75 acres is in planning stages right now. 88.25 acres is still needed. • Sites for the remaining 88.25 acres will be hard to find and will cost an estimated $550+ million dollars to acquire, design, and construct. • This cost is too much for the City of Somerville or for development to bear alone. How much each party should provide remains unanswered. • The City is forming a task force to answer these questions by weighing costs/benefits in relation to other objectives. • Interim zoning was prepared, but long term zoning solutions are needed. Mayor Joseph A Curtatone Office of Strategic Planning & Community Development Agenda • Planning for public space • The roadmap to 125 acres • Financing the 125 acre goal • Zoning petition review and next steps Mayor Joseph A Curtatone Office of Strategic Planning & Community Development Planning for Public Space Mayor Joseph A Curtatone Office of Strategic Planning & Community Development Mayor Joseph A Curtatone Office of Strategic Planning & Community Development We all agree… There is NOT enough public space in Somerville.
    [Show full text]
  • District Journal for Jun 29, 2021 - Jun 30, 2021, District: ALL
    District Journal for Jun 29, 2021 - Jun 30, 2021, District: ALL Date: Reported Record Count: 212 Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:21:24 AM 212044094-00 6/28/2021 11:18:00 PM 055238 BRIAN DELAHANTY Location of Occurrence 38 WARREN ST Nature of Incident ASSAULT - AGGRAVATED Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:38:36 AM 212044098-00 6/28/2021 11:26:00 PM 132064 SEAN L. O'BRIEN Location of Occurrence 162 MAGNOLIA ST Nature of Incident ASSAULT - SIMPLE Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:45:15 AM 212044097-00 6/28/2021 11:39:00 PM 056354 KEVIN DONAHUE Location of Occurrence 51 THOMAS PARK Nature of Incident THREATS TO DO BODILY HARM Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:59:35 AM 212044102-00 6/29/2021 12:25:00 AM 144304 ADILSON ROSA Location of Occurrence 412 POPLAR ST Nature of Incident INVESTIGATE PERSON Report Date & Time Complaint # Occurrence Date & Time Officer 6/30/2021 3:02:32 PM Boston Police Department 6/29/2021 1:59:26 AM 212044107-00 6/29/2021 1:41:00 AM 140305 JASON HESSLER Location of Occurrence 1850 SOLDIERS FIELD RD Nature of Incident ASSAULT - SIMPLE Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 2:21:29 AM 212044108-00 6/29/2021 12:58:00 AM 103536 NORMAN TEXERIA Location of Occurrence 120 CRAWFORD ST Nature of Incident VAL - OPERATING AFTER REV/SUSP.
    [Show full text]
  • How to Find Us: by Car
    HOW TO FIND US: BY CAR Tufts Medical Center is easily accessible by car from the Massachusetts Turnpike (Route 90), the Central Artery and the Southeast Expressway (Route 93). The hospital is located in downtown Boston—in Chinatown and the Theater District—and within walking distance of the Boston Common, Downtown Crossing and many hotels and restaurants. The main entrance for patients and visitors at Tufts Medical Center is 800 Washington Street, Boston, MA 02111. Floating Hospital for Children is located at 755 Washington Street. Emergency services for adult as well as pediatric patients are located at the North Building, 830 Washington Street. Telephone driving directions are available by calling 617-636-5000, ext. 5 or visit www.tuftsmedicalcenter.org/directions. By cab and train: The hospital is a 15-to-20-minute cab ride from Logan Airport and within walking distance of South from from New Hampshire 93 95 New Hampshire Station. 128 and Maine 2 From the north (I-93 southbound): from 95 Western MA » 1 Take Exit 20 A (South Station) onto Purchase Street. Continue along Purchase Street (this becomes the Logan International TUFTS MEDICAL CENTER Airport Surface Artery). & FLOATING HOSPITAL from New York FOR CHILDREN » Turn right onto Kneeland Street. Go straight several blocks. » Turn left onto Tremont Street. The hospital’s garage is on 90 Boston Harbor your left, just past the Wang Theatre/Boch Center. 95 From the south (I-93 northbound): 93 128 » Take Exit 20 (Exit 20 is a two-lane ramp for I-90 East & from West, and South Station). 3 Cape Cod from Providence, RI » Stay left, following South Station/Chinatown signs.
    [Show full text]
  • Improved Soldiers Field Road Crossings
    Improved Soldiers Field Road Crossings DCR Public Meeting Monday, November 19th – 6:00pm-7:30pm Josephine A. Fiorentino Community Center Charlesview Residences 123 Antwerp Street Extension, Brighton, MA 02135 Commonwealth of Massachusetts Governor Charles D. Baker Lieutenant Governor Karyn E. Polito Energy and Environmental Secretary Matthew A. Beaton Department of Conservation and Recreation Commissioner Leo P. Roy DCR Mission Statement To protect, promote and enhance our common wealth of natural, cultural and recreational resources for the well-being of all. Purpose of Public Meeting • Project Overview • Overview of Public Input from Previous Outreach Efforts • Design Options for Telford Street Crossing • Proposed Concept • Input from Public Soldiers Field Road Crossings 1. Public Input after Meeting #1 – why revisit the design concept? 2. At-Grade Crossing at Telford Street – what will this look like? 3. Design and Construction Methods – how will changes to design affect construction? Project Partners Harvard’s Total Contribution: $ 3,500,000 Feasibility Study: -$ 150,000 Total Project Allocation: $ 3,350,000 Initial Improvements Concept Initial Improvements Concept Initial Improvements Concept Public Input from Meeting #1 Overall support for the project, but with comments Connections to the river should accommodate cyclists, pedestrians, and disabled users Bridge rehabilitation will leave bridge too narrow and ramp switchbacks too difficult to accommodate bicycles, strollers, and pedestrians Desire for more landscaping throughout
    [Show full text]