x Already-Planned Improvements t This map shows projects currently in the design or

t S d r Community Update a rv a H construction stage N

Rd S eld o i l

F d ers ldi i e Summer 2019 Rd So by other agencies Field r ers ve s Soldi stern A We F

i

e

l

d

R d at both City and

N Harvard St Find out about our summer events at bit.ly/ABMobility t State levels. These S ge id br m con St Ca N Bea ks St Birmingham Pkwy projects vary oo N Br Beacon St Nonantum Rd Lincoln St t 90 S t ¨¦§ t e

er

v E between corridor-

t

S s N Beacon St k

o L o Parsons St i r wide redesigns, n

B d t e l S n ui Cambridge St e S an t F Brighton Ave Market St intersection Learn about the Work Plan to analyze possible mobility improvements in Allston-Brighton W Arlington St Brighton Ave So a H ld sh ier in a s Field g r Rd Storrow Dr t v o e n G a Storrow Dr v t

S S o r t A e g d geometry fixes, Sparhawk St rid r

d q b m A o Tr S Ca v e n e m k

o S nt a St O t

Beechcroft St Warren St ve traffic signal A th al Washington St we on m m d Park Dr C Co What’s in this pamphlet? R What are the goals of this study?

h d er upgrades, bike e Kelton St in s ra t B t n n S u aco t Be H Winship St Kenrick St i l l A

v infrastructure

e

R Allston St i v e For the past several months, our There are several goals driving the A-B Mobility Study. t r S w

e a Washington St y k a projects, and more. L Foster St team has been engaging with In the spring of 2019, these goals were vetted with the Corey Rd Legend Descriptions of the Allston-Brighton community community to provide a vision for the Study. Among Planned 2019 Improvement these projects are

Commonwea Brookline Ave to determine these goals is to: l C = Intersections priority areas for th Ave h e d s R y

t a n d Lo n n u w located on the g t a r l w

H e r oo il e v l = Corridors i d h A A t R mobility improvements. From these v v e u e S Allston-Brighton Planned Improvement Beyond 2019 conversations we have identified a list Increase safety for all modes--pedestrian, St Francis St Beacon = Intersections Mobility Study of mobility improvement options at bicycles, transit, and passenger vehicles--while

= Corridors Huntington Ave websitee at bit.ly/ Av Huntingto n different locations throughout Allston- working towards a Vision Zero . t S = I-90 Interchange Project n co

a P J ABMobility. e

a B a

r

m k a e Brighton and developed a Work Plan i c r a Hill w A a ve y for modeling and analyzing them. Turn the page for a map and summary To see the other goals and to see a list of community of the Work Plan. meetings in July, visit bit.ly/ABMobility. Study Timeline

= Major Task

= Community Engagement Some possible outcomes of the Work Plan include: Fall 2018 Spring/Summer 2019 Winter 2019-20 Kick off Study; Develop and analyze Draft Final Background research and transportation Transportation model building improvement Action Plan options

Winter 2018-19 Fall 2019 Spring 2020 Identify issues; Refine and prioritize F i n a l Confirm principles transportation Transportation and goals We Are Here improvement options Action Plan These are only a handful of the possible outcomes of the Work Plan. For more possible outcomes, Ongoing check out the Transportation Toolbox on the A-B Mobility website. Transportation improvement implementation support; Coordination with partner agencies

LearnWebsite: more: bit.ly/ABMobility LearnWebsite: more: bit.ly/ABMobility Email:Email: [email protected] Email:Email: [email protected] Share: #ABMobility @BostonPlans Share: #ABMobility @BostonPlans

A-B Mobility Study: Work Plan Analysis Areas

Sol

d

i

er

s

ie

F Key Analysis Area Topics = Pedestrian

ld

d 1 Multimodal Corridor = Bicycle d

ld ie 2 Washington Street F s aterton r = Transit ie ld So 3 Harvard Avenue = Vehicle (Operations and/or arvard St See d 24 4 Brighton Avenue d estern Ave Traffic Calming) ers Field St verett Soldi St elord 23 15 5 North n Ave 16 ester indom St = Placemaking 8 8 arvard St e St 24 averly St Cambride 6 Guest Street 9 Cambrid olton St = Curbside Regulations 22 7 Lincoln Street inc ortsmout St St 26 oln St e eo Birminam y 10 Anter St elord St t 7 verett St mbrid a Ca uest St incoln S 8 Everett Street/Telford Street rsons et S t

Falland St Bielo St 6 St Mar 21 Be 9 Waverly Street/Holton Street ie St acon arvard Ave St inden St Artur St St St St Malvern uil 5 Be verett St enniman d 10 Leo Birmingham Parkway ne oodenou a Fa con St Cambride St Bielo St 11

20 Corridor Analysis

Broos St 4 Arlinton St Briton Ave asin 12 11 Market Street

ton St Commonealt Ave t S Sar 3 remont St Faneuil St Ave 1 a e St 12 Faneuil Street Sq St Murdoc St St 17 mbrid ccrot obart Ca onantum St e 19 ve a e Maret St arren Ave Crescent Circuit B St alt A 13 Foster Street asinton St asinton St 18 18 e mone BrecS Crescent Circuit v t A a Com s e S t lton nerd d 14 Lake Street St i l i n rai e a B s t S on e t enri a St c St in n nion St o 15 Western Avenue 2 m m o C 13 16 North Harvard Street asinton St LEGEND 14 Corey d Ave PROPOSED ANALYSIS eton St ll 17 Oak Square i # Multimodal Corridor tnut Foster s 18 Brighton Center Ce Intersection/Square Analysis Commonealt Ave # Ce 19 Murdock Street/Sparhawk Street s tnut # Corridor Analysis ill

Ave 20 Union Square Candidate for Traffic Calming St Brooline con PLANNED IMPROVEMENTS 25 Bea 21 I-90 Pedestrian Bridge Intersection Improvements 22 Windom Street Corridor Improvements I-90 Interchange Project 23 Speedway Avenue *Additional Analysis Not Mapped 0 500 1,000

Feet ast dated 00 24 River Crossings

Examples of Analysis to be Conducted Intersection/Square Analysis 25 Cleveland Circle Corridor Analysis - a comprehensive review of transportation Parking Utilization - measuring how parking spaces are used 26 Leo Birmingham Pkwy/Market St/Lincoln St conditions along a stretch of street and sidewalks across the day *Some Additional Analysis (Not Mapped) Will Include: Targeted Analysis - a focused review of transportation Curbside Management - understanding how parking, loading, - Targeted analysis focused on improving pedestrian and bicycle connectivity across Soldiers Field Road conditions at a square, intersection, or focused geographic and other spaces next to the curb are used New Transit Connections - Transit analysis focused on identifying possible new services for underserved neighborhoods location Sight Distance - measuring the visibility of traffic conflicts at an Transit Enforcement - Analysis focused on identifying locations to pilot automated enforcement for bus stops and transit lanes Transit Passenger Information - Analysis focused on identifying locations to pilot enhanced customer information Placemaking - transforming public space to create places intersection or driveway Shuttle Strategy - Analysis focused on developing a strategy for a publicly accessible shuttle network people can enjoy Traffic calming - designing streets to discourage speeding Electric Bus Charging Station - Analysis to identify location(s) for charging future electric bus fleet