Airport and Seaport Projects
Total Page:16
File Type:pdf, Size:1020Kb
INVERNESS AIRPORT BUSINESS PARKING, FY 2019 CONSTRUCT TAXIWAY TO T HANGARS (PHASE 1 OF 2), FY 2020 PORT CITRUS DESIGN AND CONSTRUCT VEHICLE PARKING FOR T-HANGARS, FY 2020 KL488 MAINTENANACE AND REMARKING OF RUNWAY/TAXIWAY, FY 2020 39 REHABILITATE AIRFIELD SECURITY FENCING AND GATES, FY 2021 KL TAXILANES FOR T-HANGARS, FY 2022 Jc RQ200 KL44 CRYSTAL RIVER AIRPORT 486 581 CONSTRUCT HANGAR, FY 2019 KL KL ACQUIRE PARCELS - NORTH OF RUNWAY 18, FY 2020 ¤£98 q® RQ44 KL490 CITRUS q® 491 KL 581 KL ¤£41 KL480 KL39 ZEPHYRHILLS AIRPORT £98 CONSTRUCT ACCESS ROAD TO SOUTHEAST DEVELOPMENT, FY 2019 ¤ CONSTRUCT NEW ROTATING AIRFIELD BEACON, FY 2019 POLYURETHANE COATING ON T-HANGAR ROOFS, FY 2019 DESIGN AND CONSTRUCT PARALLEL TAXIWAY, FY 2020 SELF FUELING AREA, FY 2020 BROOKSVILLE-TAMPA BAY REGIONAL AIRPORT REHABILITATE TAXIWAY A PAVEMENT, FY 2021 RUNWAY REHABILITATION, FY 2019 HERNANDO 700 NEW FBO TERMINAL, INCLUDING PARKING LOT, FY 2022 WESTSIDE INFRASTRUCTURE, FY 2021 RQ WILDLIFE HAZARD REMEDIATION, FY 2021 KL480 KL550 RQ50 ¤£98 KL581 RQ50 75 KL572 §¨¦ KL589 q® ¤£301 KL578 98 TAMPA INTERNATIONAL AIRPORT ¤£ AIRSIDE F ROOF REPAIR, FY 2019 KL41 CONSTRUCT CROSSFIELD TAXIWAY A, FY 2019 WIDEN AND REHAB GEORGE BEAN PARKWAY, FY 2019 GATEWAY CENTER - AUTOMATED PEOPLE MOVER, FY 2019 AIRFIELD SLAB REPLACEMENT, FY 2020 AIRSIDE A BOARDING BRIDGES, FY 2020 AIRSIDE A ROOF REPAIR, FY 2020 REHAB RUNWAY 10/28 E OF RUNWAY 19L, FY 2020 AERIAL SURVEY OF RUNWAY APPROACHES, FY 2021 AIRPORT OPERATIONS DATA BASE, FY 2021 BAGGAGE HANDLING SYSTEMS SERVERS, FY 2021 52 CARGO PARKING LOT REHABILITATION, FY 2021 589 RQ LANDSIDE ELEVATOR REPLACEMENTS, FY 2021 RQ LANDSIDE FIRE SUPPRESSION SYSTEM REFURB, FY 2021 98 PHASE 2 AND 3 MASTER PLAN PROJECTS, FY 2021, 2022 1 587 ¤£ RAMP A CONCRETE JOINT AND SLAB REHAB, FY 2021 KL KL STRUCTURAL AND PAVEMENT REPAIRS, FY 2021 TAXIWAY T, FY 2021 AIRFIELD SLAB REPLACEMENT, FY 2022 KL77 KL54 STRUCTURAL AND PAVEMENT INSPECTION, FY 2022 PASCO RAMP BLUE (PEMCO), FY 2023 RAMP BLUE (US AIR) CONCRETE/SLAB REHAB, FY 2023 54 q® RAMP FEDEX/EMORY AND TAXIWAY K, FY 2023 RQ RAMP RED (DELTA) CONCRETE/SLAB REHAB, FY 2023 19 RAMP RED (PEMCO), FY 2023 ¤£ RQ54 HILLSBOROUGH CLEARWATER AIRPARK 597 275 REPLACE HANGAR C, FY 2019 RQ 587 §¨¦ CONSTRUCT MULTIPLANE HANGAR, 2020 KL 39 SECURITY SYSTEM UPGRADE, FY 2021 §¨¦75 RQ RQ582 KL589 92 q® §¨¦4 ¤£ 580 92 Gulf of Mexico 590 RQ ¤£ q® RQ RQ574 q® 60 ® 39 RQ q RQPLANT CITY AIRPORT CONSTRUCT NEW FUEL FARM, FY 2019, 2020 19 REHABILITATE MAINTENANCE FACILITY, FY 2019 ¤£ RQ60 RUNWAY REHABILITATION, FY 2019 HANGAR E REHABILITATION, FY 2020 ST PETERSBURG/CLEARWATER INTERNATIONAL AIRPORT I6 676 275 RUNWAY 10/28 REILS REPLACEMENT, FY 2022 RUNWAY 18/36 AND TAXIWAY, FY 2019 RQ q® §¨¦ TAXILANE AND APRON REHABILITATION, FY 2023 TAXIWAY T EXPANSION, FY 2019, 2021 q® AIRFIELD DRAINAGE REHAB, FY 2021 686 CONSTRUCT ARFF BUILDING, FY 2022 RQ 640 REHABILITATE RUNWAY 4/22, FY 2022 ¤£92 KL ¤£19A 694 RQ699 RQ TAMPA EXECUTIVE AIRPORT FIRE SUPPRESSION SYSTEM REHABILITATION, FY 2019 REHABILITATE MAINTENANCE FACILITY, FY 2019 PINELLAS REHABIL3IT9ATE SERVICE ROAD, FY 2019 ALBERT WHITTED AIRPORT 41 REHABIKLITATE TERMINAL BUILDING, FY 2019 ¤£ RUNWAY 5/23 AND ASSOCIATED TAXIWAY, FY 2020 DESIGN AND CONSTRUCT HANGARS, FY 2019 301 MASTER PLAN UPDATE, FY 2019 KL581 Tampa Bay ¤£ RUNWAY 5/23 MALSR LIGHT POLE REPLACEMENTS, FY 2020 DESIGN OF PAPI AND REILS FOR RUNWAY 18/36, FY 2020 672 RUNWAY 5/23 PAPI REPLACEMENT, FY 2020 DESIGN OF RUNWAY 18/36 AND STUB CONNECTORS, FY 2020 q® 75 KL RUNWAY 5/23 REILS REPLACEMENT, FY 2020 CONSTRUCT PAPIS/REILS FOR RUNWAY 18/36, FY 2021 §¨¦ RUNWAY PROTECTION ZONE TREE TRIMMING, FY 2020, 2022 TAXIWAY C REHABILITATION, FY 2020 CONSTRUCT RUNWAY 18/36 AND STUB CONNECTORS, FY 2021 699 REHAB AIRFIELD VAULT, FY 2022 RQ TAXIWAY F REHABILITATION, FY 2020 TERMINAL CHILLER SYSTEM REPLACEMENT, FY 2020 I6 HANGAR 3700/A REHABILITATION, FY 2021 RQ674 HANGAR 3800/B REHABILITATION, FY 2021 RUNWAY 18/36 PAPI LIGHT REPLACEMENT, FY 2021 PORT ST. PETERSBURG 679 579 RUNWAY 18/36 REIL LIGHT REPLACEMENT, FY 2021 INFRASTRUCTURE IMPROVEMENTS, FY 2019 RQ KL TAXIWAY E REHABILITATION, FY 2022 §¨¦275 KL679 PETER O. KNIGHT AIRPORT REHABILITATE MAINTENANCE FACILITY, FY 2019 PORT TAMPA BAY TIE DOWN AREA E REHABILITATION, FY 2020 BIG BEND CHANNEL IMPROVEMENTS, FY 2019 ² HANGAR S REHABILITATION, FY 2021 EASTPORT UPLAND CARGO IMPROVEMENTS, FY 2019 HOOKERS POINT IMPROVEMENTS, FY 2019 HOOKERS POINT INTERMODAL IMPROVEMENTS, FY 2019 0 2 4 6 8 10 EASTPORT BERTH DEVELOPMENT, FY 2021 Miles FLORIDA DEPARTMENT OF TRANSPORTATION Airport and Seaport Projects DISTRICT SEVEN DRAFT TENTATIVE FIVE-YEAR WORK PROGRAM FOR FY 2019 THROUGH FY 2023 MAP AS OF OCTOBER 2017 JULY 1, 2018 THROUGH JUNE 30, 2023 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SEVEN.