LEVY MARION

LK488 Gulf of Mexico PORT LK39 Jc CITRUS

RQ200

LK44 LK486 581 98 LK ¤£ CRYSTAL RIVER CITRUS COUNTY q® RQ44 9-27 EXTENSION, FY 2024 LK490 INVERNESS AIRPORT CITRUS INVERNESS REHABILITATE AIRFIELD SECURITY FENCING AND GATES, FY 2021 q® TAXILANES FOR T-HANGARS, FY 2022 AIRPORT CONSTRUCT ACCESS AND UTILITIES TO HANGARS, FY 2023 491 DESIGN AND CONSTRUCT VEHICLE PARKING FOR T-HANGERS, FY 2023 LK 581 REHABILITATE AND RECONSTRUCT TAXILANES, FY 2023 LK ¤£41 UPDATE AIRPORT MASTER PLAN, FY 2023 MAINTENANCE AND REMARKING OF RUNWAY/TAXIWAY, FY 2024

480 ¤£98 LK LK39 HERNANDO COUNTY SUMTER BROOKSVILLE- REGIONAL AIRPORT 700 WESTSIDE INFRASTRUCTURE, FY 2021 RQ WILDLIFE HAZARD REMEDIATION, FY 2021 RUNWAY 9-27 RECONSTRUCTION, FY 2022 RUNWAY 3 SHIFT EXTEND RUNWAY, FY 2023 HERNANDO LK480

PASCO COUNTY LK550 RQ50 ¤£98 ZEPHYRHILLS AIRPORT REHABILITATE TAXIWAY A PAVEMENT, FY 2021 LK581 50 NEW FBO TERMINAL, INCLUDING PARKING LOT, FY 2022 RQ REHAB TAXIWAY A, A1, A2, FY 2023 DESIGN AND CONSTRUCT PARALLEL TAXIWAY, FY 2024 NEW ITINERANT AIRCRAFT PARKING AREA, FY 2024 BROOKSVILLE-TAMPA BAY q® REGIONAL AIRPORT

¤£98 578 HILLSBOROUGH COUNTY LK LK41

PETER O. KNIGHT AIRPORT HANGAR S REHABILITATION, FY 2021 INSTALL INSTRUMENT APPROACH AID, FY 2023 RUNWAY & TAXIWAY EDGE LIGHTING REPLACEMENT, FY 2024 RUNWAY 36 PAPI LIGHTS REPLACEMENT, FY 2024 PASCO RUNWAY 10/28 REILS REPLACEMENT, FY 2022 52 TAXILANE AND APRON REHABILITATION, FY 2023 RQ589 RQ PORT TAMPA BAY 98 HOOKERS POINT IMPROVEMENTS, FY 2021 1 587 ¤£ EASTPORT BERTH DEVELOPMENT, FY 2021, 2022 LK LK

TAMPA EXECUTIVE AIRPORT HANGAR 3700/A REHABILITATION, FY 2021 LK77 54 HANGAR 3800/B REHABILITATION, FY 2021 LK RUNWAY 18/36 PAPI LIGHT REPLACEMENT, FY 2021 ZEPHYRHILLS RUNWAY 18/36 REIL LIGHT REPLACEMENT, FY 2021 q® AIRPORT RUNWAY 18/36 & TAXIWAY A & C REHABILITATION, FY 2022 RQ54 RUNWAY 5/23 REHABILITATION, FY 2022 ¤£19 RUNWAY PROTECTION ZONE TREE TRIMMING, FY 2022 POLK TAXIWAY C REHABILITATION, FY 2022 RQ54 TAXIWAY D REHABILITATION, FY 2022 TAXIWAY E REHABILITATION, FY 2022 TAXIWAY F REHABILITATION, FY 2022 TERMINAL CHILLER SYSTEM REPLACEMENT, FY 2022 RUNWAY 18/36 LIGHTING CIRCUITS REHAB, FY 2023 APRONS A, B, AND C SEAL COATING, FY 2024 HILLSBOROUGH TAMPA INTERNATIONAL AIRPORT ¤£19A AERIAL SURVEY OF RUNWAY APPROACHES, FY 2021 RQ597 ¨¦§275 AIRPORT OPERATIONS DATA BASE, FY 2021 587 BAGGAGE HANDLING SYSTEMS SERVERS, FY 2021 LK 39 CARGO PARKING LOT REHABILITATION, FY 2021 ¨¦§75 RQ LANDSIDE ELEVATOR REPLACEMENTS, FY 2021 LANDSIDE FIRE SUPPRESSION SYSTEM REFURB, FY 2021 586 582 RAMP A CONCRETE JOINT AND SLAB REHAB, FY 2021 RQ RQ 589 STRUCTURAL AND PAVEMENT REPAIRS, FY 2021 LK TAMPA EXECUTIVE TAXIWAY T, FY 2021 PHASE 2 AND 3 MASTER PLAN PROJECTS, FY 2021, 2022, 2023, 2024 AIRPORT TAMPA £92 AIRFIELD SLAB REPLACEMENT, FY 2022 CLEARWATER q® ¨¦§4 ¤ EXPANSION OF MAIN TERMINAL, FY 2022 INTERNATIONAL PLANT CITY AIRPARK 580 MASTER PLAN UPDATE, FY 2022 590 RQ AIRPORT ¤£92 q® AIRPORT STRUCTURAL AND PAVEMENT INSPECTION, FY 2022 RQ 574 AIRSIDE A BOARDING BRIDGES, FY 2023 q® q® RQ RAMP BLUE (PEMCO), FY 2023 60 39 RAMP FEDEX/EMORY AND TAXIWAY K, FY 2023 RQ RQ RAMP RED (DELTA) CONCRETE/SLAB REHAB, FY 2023 ST. PETE-CLEARWATER PORT RAMP RED (PEMCO), FY 2023 19 ¤£ INTERNATIONAL AIRPORT TAMPA BAY 60 REHAB RUNWAY 10/28 E OF RUNWAY 19L, FY 2023 I6 RQ TAXIWAY B CONCRETE AND JOINT REHAB, FY 2024 275 676 TAXIWAYS A, C, D, J, V AND W, FY 2024 q® ¨¦§ q® RQ WEST SIDE (AIRSIDE E & F), FY 2024 PINELLAS PETER O. KNIGHT RQ686 AIRPORT ¤£92 LK640 ¤£19A

694 RQ699 RQ

Tampa Bay ¤£41 LK39 LK581 ALBERT WHITTED ¤£301 q® AIRPORT ¨¦§75 LK672 PINELLAS COUNTY RQ699 I6 PORT ST. PETERSBURG CONSTRUCT PAPIS/REILS FOR RUNWAY 18/36, FY 2021 CONSTRUCT RUNWAY 18/36 AND STUB CONNECTORS, FY 2021 RQ674 REHAB AIRFIELD VAULT, FY 2022 TAXIWAY A REHAB, FY 2023 RQ679 LK579 CLEARWATER AIRPARK ¨¦§275 SECURITY SYSTEM UPGRADE, FY 2021 RECONSTRUCTION AND MILL/OVERLAY, FY 2023

PORT ST. PETERSBURG 679 NO PROJECTS LK

ST PETE-CLEARWATER INTERNATIONAL AIRPORT AIRFIELD DRAINAGE REHAB, FY 2021 TAXIWAY T EXPANSION, FY 2021 CONSTRUCT ARFF BUILDING, FY 2022 REHABILITATE RUNWAY 4/22, FY 2022 MANATEE PASSENGER TERMINAL IMPROVEMENTS, FY 2022, 2023 ² MAP AS OF OCTOBER 2019

0 2 4 6 8 10 Miles

CONSTRUCTION (CST) DESIGN-BUILD (DSB) DEPARTMENT Airport and Seaport Projects ENVIRONMENTAL (ENV) OF TRANSPORTATION PROJECT DEVELOPMENT & ENVIRONMENT (PDE) DRAFT TENTATIVE FIVE-YEAR WORK PROGRAM FOR FY 2021 THROUGH FY 2025 PRELIMINARY ENGINEERING (PE) DISTRICT SEVEN JULY 1, 2020 THROUGH JUNE 30, 2025 RIGHT-OF-WAY (ROW) www.d7wpph.com RAILROAD & UTILITIES (RRU)