Reference List / Glas Trösch Ag Rail

Total Page:16

File Type:pdf, Size:1020Kb

Reference List / Glas Trösch Ag Rail 02.10.2017/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery TSI HS RST Front windscreen with film Ansaldo Breda ETR 1000 EUROPA V300 Zefiro Trenitalia Norm: 600 km/h Italy 2012 heating system EN 15152 High speed TSI HS RST Front windscreen with Bombardier CRH1-380 ASIA Zefiro China Railways Norm: 540 km/h China 2011 wire heating system EN 15152 High speed TSI HS RST Front windscreen Upper SIEMENS VELARO RENFE AVES103 530 km/h Spain EUROPA 2003 and lower with wire Norm: UIC 651 heating system High speed TSI HS RST Front windscreen Upper SIEMENS ICE 3 DB 403 530 km/h Germany EUROPA 1998 and lower with wire Norm: UIC 651 heating system High speed TSI HS RST Front windscreen with SIEMENS 411 EUROPA VELARO D DB Norm: 520 km/h Germany 2009 wire heating system EN 15152 High speed TSI HS RST United Front windscreen with SIEMENS 320 EUROPA VELARO D EUROSTAR Norm: 520 km/h Kingdom - 2012 wire heating system EN 15152 France High speed page 1 of 4 02.10.2017/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery TSI HS RST Front windscreen with SIEMENS HT 80001 EUROPA VELARO D Norm: 520 km/h Turkey 2014 wire heating system EN 15152 Turkey Railway High speed TSI HS RST Front windscreen Upper SIEMENS VELARO China Railways CRH3 510 km/h China ASIA 2009 and lower with wire Norm: UIC 651 heating system High speed Norm: Front windscreen with CAF CC7 OARIS RENFE AVES105 510 km/h Spain EUROPA 2010 EN 15152 wire heating system High speed TSI HS RST Front windscreen with TALGO Prototipe EUROPA Avril -- Norm: 490 km/h Spain 2012 wire heating system EN 15152 High speed HYUNDAI Front windscreen with film KTX II KORAIL KTX II Norm: UIC 651 490 km/h South Korea ASIA 2007 ROTEM heating system High speed TSI HS RST Front windscreen with SIEMENS -- EUROPA ICx DB Norm: 480 km/h Germany 2014 wire heating system EN 15152 High speed page 2 of 4 02.10.2017/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery Norm: Front windscreen with film Ansaldo Breda -- Trenitalia ETR500 460 km/h Italy EUROPA 2014 308474 esp.7 heating system and frame High speed TSI HS RST Saudi Railways Front windscreen with TALGO 350 SRO -- Norm: 460 km/h Saudi Arabia ASIA 2014 Organisation wire heating system EN 15152 High speed TSI Rolling Stock Front windscreen with film Stadler Rail EC250 SBB -- 450 km/h Switzerland EUROPA 2016 Norm: heating system and frame EN 15152 High speed TSI HS RST Front windscreen with film Ansaldo Breda EMU V250 -- Prototipe 450 km/h Czech Republic EUROPA 2006 Norm: UIC 651 heating system and frame High speed TSI Rolling Stock Front windscreen with film CAF FLYTOGET - 435 km/h Norway EUROPA 2016 Norm: heating system EN 15152 FLYTOGET High speed TSI HS RST Front windscreen with film Bombardier -- EUROPA FV Dosto SBB Norm: 420 km/h Switzerland 2013 heating system and frame EN 15152 High speed page 3 of 4 02.10.2017/JG REFERENCE LIST / GLAS TRÖSCH AG RAIL Train Identification Train Identification Homologation Impact Speed Country of Year of the first Train Manufacture Operator / Owner Continent Other information Photo from Manufacture from Operator Standard (Test projectile) operation delivery TSI HS RST Front windscreen with TALGO 250 RENFE AVES130 410 km/h Spain EUROPA 2005 Norm: UIC 651 wire heating system High speed TSI HS RST Front windscreen with TALGO 250 -- 410 km/h Uzbekistan ASIA 2016 Norm: UIC 651 wire heating system Uzbekistan Railways High speed Front windscreen with film ALSTOM RABDe 500 EUROPA ICN SBB Norm: UIC 651 360 km/h Switzerland 1998 heating system High speed Midland Norm: BR 566 United Front windscreen with film Bombardier Midlan Mainline Class 222 350 km/h EUROPA 2002 Mainline type 3 Kingdom heating system and frame High speed Virgin Cross Virgin Cross Norm: BR 566 United Front windscreen with film Bombardier Class 220/221 350 km/h EUROPA 2000 Country Country type 3 Kingdom heating system and frame High speed page 4 of 4.
Recommended publications
  • Mezinárodní Komparace Vysokorychlostních Tratí
    Masarykova univerzita Ekonomicko-správní fakulta Studijní obor: Hospodářská politika MEZINÁRODNÍ KOMPARACE VYSOKORYCHLOSTNÍCH TRATÍ International comparison of high-speed rails Diplomová práce Vedoucí diplomové práce: Autor: doc. Ing. Martin Kvizda, Ph.D. Bc. Barbora KUKLOVÁ Brno, 2018 MASARYKOVA UNIVERZITA Ekonomicko-správní fakulta ZADÁNÍ DIPLOMOVÉ PRÁCE Akademický rok: 2017/2018 Studentka: Bc. Barbora Kuklová Obor: Hospodářská politika Název práce: Mezinárodní komparace vysokorychlostích tratí Název práce anglicky: International comparison of high-speed rails Cíl práce, postup a použité metody: Cíl práce: Cílem práce je komparace systémů vysokorychlostní železniční dopravy ve vybra- ných zemích, následné určení, který z modelů se nejvíce blíží zamýšlené vysoko- rychlostní dopravě v České republice, a ze srovnání plynoucí soupis doporučení pro ČR. Pracovní postup: Předmětem práce bude vymezení, kategorizace a rozčlenění vysokorychlostních tratí dle jednotlivých zemí, ze kterých budou dle zadaných kritérií vybrány ty státy, kde model vysokorychlostních tratí alespoň částečně odpovídá zamýšlenému sys- tému v ČR. Následovat bude vlastní komparace vysokorychlostních tratí v těchto vybraných státech a aplikace na český dopravní systém. Struktura práce: 1. Úvod 2. Kategorizace a členění vysokorychlostních tratí a stanovení hodnotících kritérií 3. Výběr relevantních zemí 4. Komparace systémů ve vybraných zemích 5. Vyhodnocení výsledků a aplikace na Českou republiku 6. Závěr Rozsah grafických prací: Podle pokynů vedoucího práce Rozsah práce bez příloh: 60 – 80 stran Literatura: A handbook of transport economics / edited by André de Palma ... [et al.]. Edited by André De Palma. Cheltenham, UK: Edward Elgar, 2011. xviii, 904. ISBN 9781847202031. Analytical studies in transport economics. Edited by Andrew F. Daughety. 1st ed. Cambridge: Cambridge University Press, 1985. ix, 253. ISBN 9780521268103.
    [Show full text]
  • Neuchâtel- Arc Jurassien
    Septembre 2010 No 7 Transports romands Claude Nicati (sp) Neuchâte l-Arc jurassien: 150 ans Bulletin d’information sur les transports publics de Suisse romande et de France voisine EDITORIAL Vision multimodale u cœur de l’Arc jurassien, le Le rail célèbre 150 ans de Pays de Neuchâtel jouit d’une situation géographique privi - légiée à tous égards et est largement vitalité en pays neuchâtelois Aouvert sur le monde par son histoire et sa trajectoire économique. Frontalier de la France, il ne se trouve qu’à une demi-heure de la Ville fédé - rale, à trois-quarts d’heure de Lausanne et à un peu plus d’une heure de la métropole économique de Zurich et de la cité internationale de Genève. Certes, le canton de Neuchâtel a dû faire face dans son passé à de nom - breuses difficultés économiques et financières. Des solutions adéquates ont cependant toujours été trouvées pour les surmonter. Actuellement, de nombreux efforts sont déployés en vue de le doter de structures modernes et attractives nécessaires à une dyna - mique de développement économique durable. La politique des transports neuchâte - ICN près de Colombier, sur la ligne du Pied du Jura, axe majeur du réseau des CFF. (photo cff) lois n’échappe pas à ce processus. C’est ainsi que notre canton a décidé d’ins - crire ses projets de transports dans une ssez curieusement, le qu’à se brancher aux réseaux châtel – Berne), à voie normale, vision multimodale, d’adopter une canton de Neuchâtel a été international et confédéral. puis par les lignes à voie métrique approche coordonnée et convergente un pionnier ferroviaire en Dès lors, le canton se divisa (déjà) La Chaux-de-Fonds – Les Ponts- de la planification des transports et du Suisse.
    [Show full text]
  • Vehicle Authorisation After Political Investigation & Safe Integration in the Netherlands
    Vehicle Authorisation after political investigation & safe integration in the Netherlands Conference /Training Budapest 28th June 2017 ing. Krijn van Herwaarden NSA NL (National Safety Authority) Vehicle Authorisation -NSA NL APS (Authorisation of Placing into Service) by NSA in the Netherlands: - Pre-engagement (one meeting free of charge); - Application form available on our (ILT)-website; All possible products (derogations / APS / addition APS) on the form; - National law/policy document to determine which modifications the NSA needs to know about (and which we do not want to know about); - Confirmation of completeness to the applicant; - Decision on the application within 8 weeks; - Assessment follows EU and National laws and guidelines. (Interop Directive / DV29bis / Safety Directive / CSMs / etc.); - Only type-authorisations plus direct registration of vehicles in NVR with declarations ‘conformity to an authorised type’ (EU 2011/201). Inspectie Leefomgeving en Transport DV29 bis (recommendation ‘2014/897/EU’) 117 recommendations. Different titles and subjects: 2 ‘Authorisation for the placing in service of subsystems’. 15 ‘Type Authorisation’. 25 ‘Essential requirements, technical specifications for interoperability (TSI) and national rules’. 38 ‘Use of the common safety methods for risk evaluation and assessment (CSM RA) and the safety management system (SMS)’ 52 ‘Mutual recognition of rules and verifications on vehicles’ 55 ‘Roles and responsibilities’ 60 ‘National safety authorities should not repeat any of the checks carried
    [Show full text]
  • Bijlage Waarde Voor De Reiziger HSL-Zuid
    Waarde voor de Reiziger HSL-Zuid 25 september 2013 Inhoudsopgave Hoofdstuk Pagina I Samenvatting 3 II Inleiding 6 1 Bedieningspatroon en rijtijden 8 2 Tarieven 15 3 Kwaliteit voor de reiziger 19 4 Betrouwbaarheid vervoersaanbod 24 5 Match tussen vervoersvraag en vervoersaanbod 29 6 Operationele & Technische maakbaarheid 32 7 Additionele onderwerpen 36 Bijlagen 1 Achtergrond gegevens vergelijking HSL Kilometers 39 2 Detaillering rijtijden 40 2 Ministerie van Infrastructuur en Milieu 25 september 2013 Hoofdstuk I SAMENVATTING 3 Ministerie van Infrastructuur en Milieu 25 september 2013 Samenvatting Inleiding • De waarde voor de reiziger wordt geanalyseerd vanuit twee • Als gevolg van de problemen die medio januari 2013 zijn perspectieven: opgetreden, hebben de vervoerders NS en NMBS op 17 januari jl. 1. de individuele reiziger en besloten de V250-treinen uit dienst te nemen. 2. het maatschappelijk perspectief. • Eind mei/begin juni zijn de vervoerders tot het oordeel gekomen dat zij niet met het V250–materieel willen doorgaan. Het kabinet • De toetsing heeft uitgewezen dat de waarde voor de reiziger heeft geen aanleiding gezien een ander standpunt dan de minstens gelijkwaardig is aan én op enkele punten een vervoerders in te nemen. verbetering is ten opzichte van het oorspronkelijke • Met deze situatie is duidelijk geworden dat de vervoerders op vervoeraanbod. korte termijn geen uitvoering zullen geven aan het bedieningspatroon op de verbindingen Amsterdam–Brussel en • Hierna worden de voornaamste resultaten van de vergelijking Breda–Antwerpen, waartoe zij op grond van de vervoerconcessie tussen de bestaande afspraken en het Venus aanbod van NS voor het hogesnelheidsnet, respectievelijk de overeenkomst van 3 beschreven. december 2012 gehouden zijn.
    [Show full text]
  • Evaluating Technological Progress in Public Policies: the Case of the High-Speed Railways in the Netherlands
    Complexity, Governance & Networks - Special Issue: Complexity Innovation and Policy (2017) 48-62 Peter Marks, Lasse Gerrits: Eval uating technological progress in public policies: the case of the high-speed railways in the Netherlands 48 DOI: http://dx.doi.org/10.20377/cgn-42 Evaluating technological progress in public policies: the case of the high-speed railways in the Netherlands Authors: Peter Marksa, Lasse Gerritsb a Department of Public Administration, Erasmus University Rotterdam, The Netherlands, E-mail: [email protected] b Department of Political Science, University of Bamberg, Germany, E-mail: [email protected] Main-stream evaluations of failed policies are geared towards finding a limited set of factors that are deemed to have caused the problem. This is particularly so in the case of high-profile public projects such as in technology and infrastructure development. While justified from the point of political accountability, this article presents an alternative view. Following insights from evolutionary economics and complex systems about the embedded nature of technological systems and the role of chance next to purposeful planning, we demonstrate that traditional policy evaluations are misguided when geared towards simplistic cause-and-effect relations. To this end, we analyze the reasons for the mixed results in the Dutch high-speed railway case. The findings show that, contrary to popular opinions in the political domain, technological progress did take place. However, misalignment between social practices and technological systems masked that progress. Keywords: Innovation policy, complexity science, socio-technological innovation, policy evaluation 1. Introduction High-speed railway projects are important in many ways. They enable people to travel longer distances in shorter time spans, which promotes economic activities.
    [Show full text]
  • Netherlands HSL-Zuid
    Netherlands HSL-Zuid - 1 - This report was compiled by the Dutch OMEGA Team, Amsterdam Institute for Metropolitan Studies, University of Amsterdam, the Netherlands. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. - 2 - CONTENTS A PROJECT INTRODUCTION Type of project • Project name • Technical specification • Principal transport nodes • Major associated developments • Parent projects Spatial extent • Bridge over the Hollands Diep • Tunnel Green Heart Current status B PROJECT BACKGROUND Principal project objectives Key enabling mechanisms and decision to proceed • Financing from earth gas • Compensation to Belgium Main organisations involved • Feasibility studies • HSL Zuid project team • NS – the Dutch Railways • The broad coalition Planning and environmental regime • Planning regime • Environmental statements and outcomes related to the project • Overview of public consultation • Regeneration, archaeology and heritage
    [Show full text]
  • Train Parameters Study Part 1 - Development of Concept and Design Criteria
    Train Parameters Study Part 1 - Development of Concept and Design Criteria Delivering a Step-Improvement in Passenger Experience HIGH SPEED 2 LTD TRAIN PARAMETERS STUDY PART 1 – DEVELOPMENT OF CONCEPT AND DESIGN CRITERIA Presented to: HS2 Ltd Eland House Bressenden Place London SW1E 5DU Prepared by: Design Triangle Limited The Maltings Burwell Cambridge CB25 0HB © Copyright Design Triangle Limited 2013 281/R/HS2 Rep 03C.doc 1 of 104 revised: 18th June 2013 CONTENTS Synopsis Introduction 1.0 Passenger Capacity 2.0 Station Dwell Time 3.0 Step Improvement in Passenger Experience 4.0 Reference Layout 5.0 Options Appendix 1 ‐ Research Into Boarding and Alighting Times Appendix 2 ‐ Human Factors Research Appendix 3 ‐ Research Into Existing High Speed Trains Appendix 4 ‐ Potential Seating Capacity of Existing High Speed Trains Appendix 5 ‐ Research Into the Exterior Dimensions of Existing High Speed Trains Appendix 6 ‐ Comparison Of Existing High Speed Trains Appendix 7 ‐ Research Into Exterior Details of Existing High Speed Trains Appendix 8 ‐ Research Into Existing UK Trains Appendix 9 ‐ UK Rail Survey Appendix 10 ‐ Research Into Catering Facilities Appendix 11 ‐ Research Into Display Technology Appendix 12 ‐ Brainstorm Ideas List Appendix 13 ‐ Rendered Images Appendix 14 ‐ Station Dwell Time Estimates Appendix 15 ‐ Seat Space Annex A ‐ Concept Sketches (separate document) Annex B ‐ Layout Drawings (separate document) 281/R/HS2 Rep 03C.doc 2 of 104 revised: 18th June 2013 SYNOPSIS Aims The aim of the HS2 Train Parameters Study is to demonstrate how the train capability requirements associated with Passenger Capacities and Station Dwell Times can be best achievable while delivering a Step Improvement in Passenger Experience.
    [Show full text]
  • Die SBB in Zahlen Und Fakten. 2013 «Unterwegs Zuhause»
    Die SBB in Zahlen und Fakten. 2013 «unterwegs zuhause» Zahlen und Fakten zur SBB – das ist der Inhalt der vorliegenden Unternehmensstatistik. Hinter den Zahlen stehen Menschen: Kunden, Partner, Mitarbeitende. Sie machen die SBB zu dem, was sie ist: grösste Mobilitätsdienstleisterin sowie wichtige Arbeit- und Auftraggeberin für Wirtschaft und Bevölkerung. Und Garantin für den sorgfältigen Umgang mit Umwelt und Ressourcen. Damit auch die Kinder unserer Kinder gerne Bahn fahren. KundenzufriedenheitKonzernimagePersonalzufriedenheitKundenpünktlichkeit und -motivationSicherheit JahresergebnisFree Cash FlowWettbewerbspositionÖkologische Nachhaltigkeit Cover: «unterwegs zuhause»-Momente von SBB Kundinnen und Kunden, Oktober 2013. sbb.ch/geschaeftsbericht Inhaltsverzeichnis. S 02 Konzern S 03 Kundenzufriedenheit – Pünktlichkeit – Marktanteile Personenverkehr S 05 Verkehr – Betriebsleistung – Produktivität und Effizienz S 07 Personal – Rollmaterial – Infrastruktur S 09 Erfolgsrechnung – Frei verfügbarer Cash Flow S 11 Bilanz – Leistungen der öffentlichen Hand S 12 Personenverkehr S 13 Finanzen – Verkauf S 15 Betriebsleistung – Verkehr S 17 Personal – Rollmaterial S 18 Immobilien S 19 Finanzen – Personal – Bestände S 20 Streckennetzkarte S 22 Güterverkehr S 23 Finanzen – Verkehr S 25 Betriebsleistung – Alpenquerender Güterverkehr SBB Cargo S 27 Personal – Rollmaterial S 28 Infrastruktur S 29 Finanzen – Verkehr S 31 Bestände S 33 Personal – Elektrische Energie für den Bahnbetrieb – Alpenquerender Güterverkehr Schiene S 34 Umwelt Ökologische Nachhaltigkeit
    [Show full text]
  • Traction Transformers for Rolling Stock Landmark Projects
    Traction transformers for rolling stock Landmark projects Project Country Operator/Integrator Type Voltage RBe 91/FLIRT Algeria Algeria SNTF, Stadler Regional 25 kV Series 200-220-260/SMU Australia QR, Bombardier Regional 25 kV E4023, E4024, E4124/E-Talent Austria ÖBB, Siemens/Bombardier Regional 15 kV ET 22.151/LILO Austria Linzer Lokalbahn, Bombardier/Stadler TramTrain 15/(25 kV) FLIRT Belarus Belarus Belarussian Railway, Stadler Regional 25 kV HXD2B China MOR, Datong Locomotive 25 kV CRH1, 2, 3, 5 China MOR, CNR - CSR Very High Speed 25 kV HXD2C/PRIMA China MOR, Datong Locomotive 25 kV 308.0/109E Czech Republic CD, Skoda Locomotive 15/25 kV/3kV DC X31K/OTU Denmark/ Sweden DSB/SJ, Bombardier Regional 15/25 kV Sm4/Pendolino Finland VR, Alstom Regional 25 kV B 81 500/AGC France SNCF, Bombardier Regional 25 kV/1.5 kV DC Regiolis/PP France SNCF, Alstom Regional 25 kV/1.5 kV DC BB 27300 series/IDF- Prima France SNCF, Alstom Locomotive 25 kV/1.5 kV DC Class 92/Euroshuttle France/UK Eurotunnel, Bombardier Locomotive 25 kV/750 V DC RABe 522/FLIRT France/CH SBB/CFF, Stadler Regional 15/25 kV BR 423/ET 430 Germany DB, Bombardier Regional 15 kV BR 185/TRAXX AC Germany EU, Bombardier Locomotive 15/25 kV BR 440/Coradia Xcc Germany DB, Alstom Regional 15 kV BR 407/Velaro-D Germany DB, Siemens Very High Speed 15/25 kV / 3/1.5 kV DC BR 428.2/Talent 2 Germany DB, Bombardier Regional 15 kV V250 Albatros Holland/Belgium SNCB/NMBS, AnsaldoBreda High Speed 25 kV / 3/1.5 kV DC 53 41 001/FLIRT MAV Hungary MAV, Stadler Regional 25 kV GP 194/MRVC India IR (
    [Show full text]
  • Ministére Des Transports Du Québec Ontario Ministry of Transportation Transports Canada
    MINISTÉRE DES TRANSPORTS DU QUÉBEC ONTARIO MINISTRY OF TRANSPORTATION TRANSPORTS CANADA Étude d’actualisation concernant la faisabilité d’un train à haute vitesse dans le corridor Québec – Windsor Livrable No 04-Examen de la technologie de THV disponible Juin 2010 N/Ref.: P020563-0400-010-FR-00 i Ministère desTransports duQuébec, Ontario Ministr File:No. 3301-08-AH01 – N/Réf.: P020563-0400--010 y of yof Transportation, etTransports Canada Étude – d’a -En-00 Juin – 2010 ctualisationconcernant faisabilitéla d’untrain à hautevitesse ledans corridor Québec - Windsor ii Ministère des Transports du Québec Ministère desTransports duQuébec, Ontario Ministr Ontario Ministry of Transportation File:No. 3301-08-AH01 – N/Réf.: P020563-0400--010 Transports Canada Étude d’actualisation concernant la faisabilité d’un train haute vitesse dans le corridor Québec - Windsor Livrable no. 04- Examen de la technologie de THV disponible yof Transportation, etTransports Canada Étude – d’a -En-00 Juin – 2010 Préparé par : Dipl,-Ing. Ottmar Grein Chef de groupe, Technologie ctualisationconcernant faisabilitéla d’untrain à Approuvé par : hautevitesse ledans corridor Québec - Windsor Bernard-André Genest, ing., P. Eng., Ph. D. Chargé de projet EcoTrain 1060, rue University, bureau 600 Montréal (Québec) Canada H3B 4V3 Téléphone : 514.281.1010 Télécopieur : 514.281.1060 Courriel : [email protected] Site Web : www.dessau.com iii Ministère desTransports duQuébec, Ontario Ministr File:No. 3301-08-AH01 – N/Réf.: P020563-0400--010 y of yof Transportation, etTransports Canada Étude – d’a -En-00 Juin – 2010 ctualisationconcernant faisabilitéla d’untrain à hautevitesse ledans corridor Québec - Windsor iv Ministère desTransports duQuébec, Ontario Ministr TABLE DES MATIÈRES File:No.
    [Show full text]
  • RAPPORTS No 40 & DOCUMENTS
    2011 RAPPORTS no 40 & DOCUMENTS La grande vitesse ferroviaire Développement durable Rapport du groupe de travail présidé par Jean-Noël Chapulut La grande vitesse ferroviaire 2011 Jean-Noël Chapulut Président Jean-Didier Blanchet Vice-président Christine Raynard François Vielliard Rapporteurs Dominique Auverlot Coordinateur LA GRANDE VITESSE FERROVIAIRE 2 INTRODUCTION Avant-propos e TGV est l’une de nos belles réussites techno­ L logiques. Même si la grande vitesse ferroviaire a été inventée par les Japonais, les multiples records établis par Alstom, en partenariat avec la SNCF et RFF, ont régulièrement confirmé l’excellence technologi­ que française : le dernier record, qui date d’avril 2007, Vincent Chriqui s’établit à 574,8 km/h. Directeur général Le TGV transporte quotidiennement, depuis plus de du Centre d’analyse trente ans, un nombre important de passagers – plus de stratégique 108 millions de voyageurs en 2010 – dans des condi­ tions reconnues de confort, de fiabilité et de sécurité. Les principales métropoles françaises sont déjà desservies. D’autres villes le seront bientôt, grâce aux 2 000 kilo­ mètres de lignes supplémentaires prévues par la loi de programmation relative à la mise en œuvre du Grenelle de l’environnement. La grande vitesse ne représente que 10 % environ du marché total de l’industrie ferroviaire française. Elle n’en constitue pas moins un marché stratégique, en raison de son caractère symbolique, de la notoriété technologique qu’elle confère à l’entreprise qui la maî­ trise et au pays qui la développe, en raison enfin de l’écosystème industriel créé autour de ce secteur. Cependant, le contexte mondial change.
    [Show full text]
  • Price List 2021 ESU Gmbh & Co
    Price list 2021 ESU GmbH & Co. KG Recommended retail price list in EUR Edisonallee 29 • D - 89231 Neu-Ulm +49 (0) 731 – 18 47 80 Valid from September 1st 2021 Fax: +49 (0) 731 – 18 47 82 99 All former prices are now invalid. www.esu.eu Art. Description Quar- MSRP Art. Description Quar- MSRP No. ter price No. ter price Pullman Gauge H0 Class T16.1 in H0 n-car «Silberling» in H0 31100 Steam loco, 94 1292, DR, black, Era III/IV, Sound+Smoke, DC/AC 569,00 € 36467 n-car, H0, Bnb719, 22-11 611-7, 2. Kl., DB Era IV, silver 69,90 € 31101 Steam loco, 94 1243, DB, black, Era III, Sound+Smoke, DC/AC 569,00 € 36483 n-car, H0, Bnrz 725, 22-34 106-1, 2. Kl, DB Era IV, silver 69,90 € 31102 Steam loco, 94 652-5, DB, black, Era IV, Sound+Smoke, DC/AC 569,00 € 36484 n-car, H0, Bnrz 725, 22-34 078-2, 2. Kl, DB Era IV, silver 69,90 € 31103 Steam loco, 8158 Essen, KPEV, green, Era I, Sound+Smoke, DC/AC 569,00 € 36485 n-car, H0, ABnrzb 704, 31-34 057-5, 1./2. Kl, DB Era IV, silver 69,90 € 31104 Steam loco, 94 535, DRG, black, Era II, Sound+Smoke, DC/AC 569,00 € 36486 n-car, H0, BDnrzf 740.2, 82-34 322-1, Steuerwagen, DB Era IV, silver 124,90 € 31105 Steam loco, 694 1266, ÖBB, black, Era III, Sound+Smoke, DC/AC 569,00 € 36487 n-car, H0, AB4nb-59, 31479 Esn, 1./2.
    [Show full text]