KARI's Space Program Updat
Total Page:16
File Type:pdf, Size:1020Kb
10th J-K Joint Seminar on Space Environment Utilization Research KARI’s Space Program Updates 1 I. Introduction of KARI II. KARI Space Activities III. Current Status of Joint Mission Cooperation with JAXA 2 KARI-JAXA Feasibility Study for Joint Space Experiment Introduction of KARI 3 Mission and Major Functions Aims to contribute to the development of the national economy and improvement of the quality of life in Korea through research & development in the field of aerospace science & technology 4 Vision 2020 5 National Space Development Plan Plan 2009/10 2010 2012 STSAT-2 2009 COMS 2013 Naro Space KOMPSAT-3 Center 2009/10/13 STSAT-2C KSLV-1 2008 KAP 2013 1992 KOMPSAT-5 2006 KITSAT-1 KOMPSAT-2 2003 STSAT-1 1993 KITSAT-2 2013 STSAT-3 2002 1993 KSR-3 KSR-1 1998 KSR-2 1999 1999 2014 KOMPSAT-1 KITSAT-3 KOMPSAT-3A 2016 CAS-100 2017 GEOKOMPSAT-2A 2018 CAS-500 2017 2019 GEOKOMPSAT-2B 2023 2021 2025 Lunar KOMPSAT-6 Lunar Orbiter KSLV-2 Lander 6 Domestic Environment Changes Launched the new Government - President Geun-hye Park was inaugurated as the 18th President of the Republic of Korea in February 2013 - The president has emphasized the importance of science and technology, especially the necessity to support the early development of KSLV-II (Korea Space Launch Vehicle II) as well as the implementation of the following lunar exploration projects - Government reorganization : MEST (Ministry of Education, Science Technology) => MSIP (Ministry of Science, ICT and future Planning) 7 KARI-JAXA Feasibility Study for Joint Space Experiment KARI Space Activities (2013) 8 KSLV-I (Naro)Space Launch Vehicle Overview • Objective : Development of a Space Launch Vehicle to launch a small (100Kg) LEO satellite • Dev. Period : 2002 ~ 2010 • Specification : - <1st Stage> Russia (Liquid Engine) - <2nd Stage> Korea (Solid Engine) - Payload : STSAT • Launch : Naro Space Center - 1st Launch : 2009, - 2nd Launch : 2010 - 3rd Launch : 2013 • Expected Effect - 9 KSLV-II Space Launch Vehicle Overview • Objective : Development of a Space Launch Vehicle to launch a 1.5 ton LEO satellite • Dev. Period : 2010 ~ 2021 • Specification - 3 stage Launch vehicle (1st : 4 Liquid Engine(75ton) Clustering, 2nd : 1 Liquid Engine(75 ton), 3rd : 1 Liquid Engine (7 ton) - Length : approx. 46 m - Orbit : 600∼800km SSO (Sun-Synchronous Orbit) • R&D - Launch Vehicle System, Liquid Engine Design, Manufacture & Test - Development of related facilities & equipment - Naro Space Center (2nd Stage) • Expected Result - 10 Satellite Program(KOMPSAT 5) Overview • O • Specification • Launch : August 2013 • Expected effects : 11 Researches for Lunar Exploration Overview • National Lunar Program - Based on the development plan of KSLV-II in 2021 (1.5 ton), - Lunar Orbiter in 2023 & Lander in 2025 The feasibility study for the lunar mission will be completed within this month • Preliminary Research for the Lunar Exploration - Lunar mission & architecture development - Lunar orbiter & lander bus system - Lunar exploration rover system - Lunar scientific study & payload instrument 12 KARI-JAXA Feasibility Study for Joint Space Experiment Current Status of Joint Mission Cooperation with JAXA 13 Overview 14 Cooperation Frame : STAR ISS partner ▪ Documentation Works Coordination ▪ Joint review activities ▪ Information Exchange ▪ H/W development ▪ Mission development Implementing ▪ Mass up &downloading ▪ Experiment Ground Control (TKSC) Agreement ▪ Collaboration coordination(w/JAXA) Japanese PI Korean PI (Tokushima Univ.) ▪ Define mission/science requirements (Yonsei Univ.) ▪ H/W development support Support contractor H/W manufacturing contractor Engineering: JAMSS ▪ Laboratory Model Science: JSF ▪ EM /QM/FM fabrications ▪ Safety Review Support 15 Future Schedule for STAR (Tentative) Reviewer Review Title Date Place KARI JAXA Flight Preparation Transfer Review Oct. 2013 ◎ ○ KARI (MDR/SDR) Preliminary Design Review(PDR) Jan. 2014 ○ △ KARI Critical Design Review(CDR) May 2014 ○ △ KARI Post Qualification Review(PQR) 2015 (TBD) ○ △ KARI Development Completion Review 2015 (TBD) ○ JAXA Experiment Implementation Transfer Review 2015 (TBD) ○ JAXA Increment Operation Review 2015 (TBD) ○ JAXA Post Flight Analysis Review 2015 (TBD) ○ ○ KARI/JAXA 16 17 .