KARI's Space Program Updat

KARI's Space Program Updat

10th J-K Joint Seminar on Space Environment Utilization Research KARI’s Space Program Updates 1 I. Introduction of KARI II. KARI Space Activities III. Current Status of Joint Mission Cooperation with JAXA 2 KARI-JAXA Feasibility Study for Joint Space Experiment Introduction of KARI 3 Mission and Major Functions Aims to contribute to the development of the national economy and improvement of the quality of life in Korea through research & development in the field of aerospace science & technology 4 Vision 2020 5 National Space Development Plan Plan 2009/10 2010 2012 STSAT-2 2009 COMS 2013 Naro Space KOMPSAT-3 Center 2009/10/13 STSAT-2C KSLV-1 2008 KAP 2013 1992 KOMPSAT-5 2006 KITSAT-1 KOMPSAT-2 2003 STSAT-1 1993 KITSAT-2 2013 STSAT-3 2002 1993 KSR-3 KSR-1 1998 KSR-2 1999 1999 2014 KOMPSAT-1 KITSAT-3 KOMPSAT-3A 2016 CAS-100 2017 GEOKOMPSAT-2A 2018 CAS-500 2017 2019 GEOKOMPSAT-2B 2023 2021 2025 Lunar KOMPSAT-6 Lunar Orbiter KSLV-2 Lander 6 Domestic Environment Changes Launched the new Government - President Geun-hye Park was inaugurated as the 18th President of the Republic of Korea in February 2013 - The president has emphasized the importance of science and technology, especially the necessity to support the early development of KSLV-II (Korea Space Launch Vehicle II) as well as the implementation of the following lunar exploration projects - Government reorganization : MEST (Ministry of Education, Science Technology) => MSIP (Ministry of Science, ICT and future Planning) 7 KARI-JAXA Feasibility Study for Joint Space Experiment KARI Space Activities (2013) 8 KSLV-I (Naro)Space Launch Vehicle Overview • Objective : Development of a Space Launch Vehicle to launch a small (100Kg) LEO satellite • Dev. Period : 2002 ~ 2010 • Specification : - <1st Stage> Russia (Liquid Engine) - <2nd Stage> Korea (Solid Engine) - Payload : STSAT • Launch : Naro Space Center - 1st Launch : 2009, - 2nd Launch : 2010 - 3rd Launch : 2013 • Expected Effect - 9 KSLV-II Space Launch Vehicle Overview • Objective : Development of a Space Launch Vehicle to launch a 1.5 ton LEO satellite • Dev. Period : 2010 ~ 2021 • Specification - 3 stage Launch vehicle (1st : 4 Liquid Engine(75ton) Clustering, 2nd : 1 Liquid Engine(75 ton), 3rd : 1 Liquid Engine (7 ton) - Length : approx. 46 m - Orbit : 600∼800km SSO (Sun-Synchronous Orbit) • R&D - Launch Vehicle System, Liquid Engine Design, Manufacture & Test - Development of related facilities & equipment - Naro Space Center (2nd Stage) • Expected Result - 10 Satellite Program(KOMPSAT 5) Overview • O • Specification • Launch : August 2013 • Expected effects : 11 Researches for Lunar Exploration Overview • National Lunar Program - Based on the development plan of KSLV-II in 2021 (1.5 ton), - Lunar Orbiter in 2023 & Lander in 2025 The feasibility study for the lunar mission will be completed within this month • Preliminary Research for the Lunar Exploration - Lunar mission & architecture development - Lunar orbiter & lander bus system - Lunar exploration rover system - Lunar scientific study & payload instrument 12 KARI-JAXA Feasibility Study for Joint Space Experiment Current Status of Joint Mission Cooperation with JAXA 13 Overview 14 Cooperation Frame : STAR ISS partner ▪ Documentation Works Coordination ▪ Joint review activities ▪ Information Exchange ▪ H/W development ▪ Mission development Implementing ▪ Mass up &downloading ▪ Experiment Ground Control (TKSC) Agreement ▪ Collaboration coordination(w/JAXA) Japanese PI Korean PI (Tokushima Univ.) ▪ Define mission/science requirements (Yonsei Univ.) ▪ H/W development support Support contractor H/W manufacturing contractor Engineering: JAMSS ▪ Laboratory Model Science: JSF ▪ EM /QM/FM fabrications ▪ Safety Review Support 15 Future Schedule for STAR (Tentative) Reviewer Review Title Date Place KARI JAXA Flight Preparation Transfer Review Oct. 2013 ◎ ○ KARI (MDR/SDR) Preliminary Design Review(PDR) Jan. 2014 ○ △ KARI Critical Design Review(CDR) May 2014 ○ △ KARI Post Qualification Review(PQR) 2015 (TBD) ○ △ KARI Development Completion Review 2015 (TBD) ○ JAXA Experiment Implementation Transfer Review 2015 (TBD) ○ JAXA Increment Operation Review 2015 (TBD) ○ JAXA Post Flight Analysis Review 2015 (TBD) ○ ○ KARI/JAXA 16 17 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us