Quelle: Wikipedia
Smart Metering Activities of Linz AG
Paris, 29. September 2010
LINZ STROM Netz GmbH
DERLER LINZ STROM Netz GmbH 1 Quelle: Wikipedia Agenda
LINZ AG an innovative multi-utility company
SMART functionalitys new energy market, costs vs. benefit
SMART Metering project of LINZ AG
Improving customer benefits through smart metering
DERLER LINZ STROM Netz GmbH 2 Quelle: Wikipedia
SMART Services – Activities of LINZ AG
Electricity Gas, Dist-Heat Water Sewage Telekom Publ- Transp
SupplySupply
Supply
Supply
Supply
Supply
Network
Network
ProductionProduction
Network
Network
Telekom
Services
Network
and Trading Trading and and
Production
and Trading and
Production Production Assets Mob
Projekt IRON (FFG) Projekt eSESH R&D Projekts Projekt Opera
- SMART Fibre, Metering, SMART Products Passenger SMART Bandwidth, - Switching Metering Metering Display Services DG Generation (Internet, Videocam VoIP, Street lighting Process Communi- catio etc.)
IEM, RC, SCADA, GOC, ... Systems Safety of Transport Active Telecommunication Infrastructur (Quality, Procedures) (EU-Projekt OPERA) Passive Telecommunication Infrastructur (Lines, Fibre Optics) (Projekt NETQUEST (FFG))
DERLER LINZ STROM Netz GmbH 3 Quelle: Wikipedia IEM – Intelligent Energy Management EXPECTED BENEFITS AND ADDITIONAL EXPENSES FOR THE DSO
today
Field services at customer site
Meter Connection Trouble Meter Power limit in case reading Disconnection management Management of late payment
tomorrow
Potential of savings
-80 % -80 % - 50% -30 % -80 %
Additional expenses
System Data EDV Data Licenses Operation Transfer Equipment Processing
Expenses for SMART Metering today are higher than for business as usual of DSO!
DERLER LINZ STROM Netz GmbH 4 Quelle: Wikipedia IEM – Intelligent Energy Management RESPONSIBILITY OF THE MARKET PARTICIPANTS
Supplier Control area TSO Benefit: responsible Better Information by SMART Metering Who will pay for SMART Metering? Supplier: Fee for Benefits? Customer Customer: Individual Costs or Balancing responsible Benefit: socialisation by network fee? Cheaper energy by DSO: Costs are considerd by SMART Metering New offers regulatory authority!
DSO Generator Expenses: Trader Benefit: Investment into SMART Efficient operation Metering, Operating costs Benefit: by SMART Metering Benefit: Impoved forecast by Cheaper procedures SMART Metering
DERLER LINZ STROM Netz GmbH 5 Quelle: Wikipedia
SMART Metering-Project of LINZ AG
DERLER LINZ STROM Netz GmbH 6 Quelle: Wikipedia
PROJECT STATUS Metering - Readout of billing data for 49.000 meters - Daily load information for about 2.500 meters for research reasons and for customer information on the basis of individual contracts - Management of 400 data concentrators Load Management
- Management of 2.500 load management modules
Street Lighting - Control of street lights by means of load management modules - Sunrise and sunset computed by an astronomic calendar Enterprise Application Integration - Integration to IS-U from SAP (CRM-/Billing application) - Integration to Smallworld from GE Energy (GIS application)
DERLER LINZ STROM Netz GmbH 7 Quelle: Wikipedia
ROLLOUT PLAN
Rollout 2008 - 2015 Rollout 2009- 2010 Rollout 2009- 2010 Area: Linz city Area: Mauthausen Area: Baumgartenberg 170.000 meters (appr. 10% fin.) 10.000 meters (appr. 65% fin.) 10.000 meters (appr. 85% fin.)
Rollout 2008 Area: Enns 10.000 meters (finished)
8 DERLER LINZ STROM Netz GmbH Seite 8 Quelle: Wikipedia
The individual customer services of LINZ AG PLUS 24
- Unique registration (by the customer) - Login with username and password - Benefit: more comfort (unique sign on for all services) more service (data privacy, exclusivness)
DERLER LINZ STROM Netz GmbH 9 Quelle: Wikipedia
E.I.S – ENERGY INFORMATION SYSTEM a service of LINZ AG by request of a customer Multy-Utility - Consumption data for electricity / gas / water / heat Transparency - Comparison of actual values with historical data in a clear manner Benchmarking function - Comparison of individual energy consumption with normalized values Energy tips / - consulting - In case of increased energy demand tips and consulting by request
DERLER LINZ STROM Netz GmbH 10 Quelle: Wikipedia
Summary
Pre-requisite for an economic roll out of SMART Functions
- Cheap area-wide telecommunication network
Technology
- Technology for Smart Metering is available
Acceptance by customers
- Acceptance of customers is low (marginal benefits, data privacy)
Incentives for investments
- In the regulatory model of the liberalized energy market there are not adequate incentives for investments
DERLER LINZ STROM Netz GmbH 11 Quelle: Wikipedia
Many thanks for your attention!
LINZ STROM NETZ GmbH, Linz Fichtenstrasse 7, 4021 Linz http: www.linzag.at
Dipl- Ing. Dr. Karl Derler
DERLER LINZ STROM Netz GmbH 12