Presentation
Total Page:16
File Type:pdf, Size:1020Kb
YaraTrinidad Revamp project Content Introduction Yara/YPO: – Small history of Yara – Yara International A.S.A. – Small history of YPO – Introduction of myself Tringen 1 Energy Efficiency Project – Electrical Upgrade subproject – Project Goal – Main Equipment – ABB – Norms and Standards – Pictures/drawings/screenshots Small history of Yara 1905 – Norsk Hydro Elektrisk Kvaelstofaktieselskab (Hydro Norsk) – Sam Eyde, Kristian Birkeland & Marcus Wallenberg. – Vision : ‘Create feeding plants to feed people’. 25 March 2004 – Yara demerged from Norsk Hydro and listed on the Oslo Stock Exchange as Yara International A.S.A. Presence in +/- 50 countries – + 160 plants, terminals & warehouses Sales to + 120 countries Yara International A.S.A. demerges from Norsk Hydro Yara International Norsk Hydro A.S.A. • Bauxite & Alumina • Fertilizers • Casthouse Products • Environmental • Welded tubes solutions • Rolled products • Chemicals • Extruded products • Carbon Dioxide • Precision tubing • Dry ice • Building systems • Technical Nitrates • Animal Nutrition Small history YPO 1929: founded as technical department for NSM NSM licensing Begin 90’s HAE-L&E Hydro Agri Europ Licensing and Engineering Late 90’s: HTP Hydro Technology and Projects Another name change: GPS General project support Change to current name YPO Yara Project Office – Yara Upstream – Internal engineering department Introduction of myself Perry Jaspers – Born April 15, 1975 – Not married, one son – Graduated at KUL as Master of Science, Electro-Mechanics, option Electrical Energy in 1999 – PM at Vanparijs-Maes from 1999-2005 – Started at YPO in 2005 as Electrical Engineer – Currently Principal Engineer Electrical and Automation, heading the electrical department Project Goal Increase of Electrical Capacity of Tringen 1 Ammonia Plant from 7.5 MVA to 15 MVA Rationalization of motor and steam turbine driven loads – Less energy required to run motors compared with steam turbine – Some steam turbine driven loads upgraded to dual drives with motor as Main Equipment - ABB MV Switchgear – ABB Unigear ZS1 LV switchgear – ABB MNSiS RTU SCADA system Opportunities : – 5 year migration plan for replacement of all LV MCC with MNSiS Motor relays preconfigured inside each motor controller for easy installation Interface meetings (YPO – YTL – ABB Belgium – ABB Czech -….) Norms and Standards IEC Arc Proof <-> ANSI/IEEE Arc Resistant – IEC was chosen • Maintenance • Footprint • Dimensions Pictures during installation Single line MV Single line LV FAT RTU – Screen Shots RTU – Screen Shots (cont’d) RTU – Screen Shots (cont’d) RTU – Screen Shots (cont’d) RTU – Screen Shots (cont’d) Thank you for your attention. .