Presentation

Presentation

YaraTrinidad Revamp project Content Introduction Yara/YPO: – Small history of Yara – Yara International A.S.A. – Small history of YPO – Introduction of myself Tringen 1 Energy Efficiency Project – Electrical Upgrade subproject – Project Goal – Main Equipment – ABB – Norms and Standards – Pictures/drawings/screenshots Small history of Yara 1905 – Norsk Hydro Elektrisk Kvaelstofaktieselskab (Hydro Norsk) – Sam Eyde, Kristian Birkeland & Marcus Wallenberg. – Vision : ‘Create feeding plants to feed people’. 25 March 2004 – Yara demerged from Norsk Hydro and listed on the Oslo Stock Exchange as Yara International A.S.A. Presence in +/- 50 countries – + 160 plants, terminals & warehouses Sales to + 120 countries Yara International A.S.A. demerges from Norsk Hydro Yara International Norsk Hydro A.S.A. • Bauxite & Alumina • Fertilizers • Casthouse Products • Environmental • Welded tubes solutions • Rolled products • Chemicals • Extruded products • Carbon Dioxide • Precision tubing • Dry ice • Building systems • Technical Nitrates • Animal Nutrition Small history YPO 1929: founded as technical department for NSM NSM licensing Begin 90’s HAE-L&E Hydro Agri Europ Licensing and Engineering Late 90’s: HTP Hydro Technology and Projects Another name change: GPS General project support Change to current name YPO Yara Project Office – Yara Upstream – Internal engineering department Introduction of myself Perry Jaspers – Born April 15, 1975 – Not married, one son – Graduated at KUL as Master of Science, Electro-Mechanics, option Electrical Energy in 1999 – PM at Vanparijs-Maes from 1999-2005 – Started at YPO in 2005 as Electrical Engineer – Currently Principal Engineer Electrical and Automation, heading the electrical department Project Goal Increase of Electrical Capacity of Tringen 1 Ammonia Plant from 7.5 MVA to 15 MVA Rationalization of motor and steam turbine driven loads – Less energy required to run motors compared with steam turbine – Some steam turbine driven loads upgraded to dual drives with motor as Main Equipment - ABB MV Switchgear – ABB Unigear ZS1 LV switchgear – ABB MNSiS RTU SCADA system Opportunities : – 5 year migration plan for replacement of all LV MCC with MNSiS Motor relays preconfigured inside each motor controller for easy installation Interface meetings (YPO – YTL – ABB Belgium – ABB Czech -….) Norms and Standards IEC Arc Proof <-> ANSI/IEEE Arc Resistant – IEC was chosen • Maintenance • Footprint • Dimensions Pictures during installation Single line MV Single line LV FAT RTU – Screen Shots RTU – Screen Shots (cont’d) RTU – Screen Shots (cont’d) RTU – Screen Shots (cont’d) RTU – Screen Shots (cont’d) Thank you for your attention. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    19 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us