Demand Forecasting

Total Page:16

File Type:pdf, Size:1020Kb

Demand Forecasting Jernbaneverket Norwegian High Speed Railway Assessment Project Contract 5: Market Analysis Subject 1: Demand Forecasting Final Report 04/03/2011 (With additional information) /Market Analysis Demand Forecasting Final Report_UPDATED_040311.docx Contract 5, Subject 1: Demand Forecasting 2 Notice This document and its contents have been prepared and are intended solely for Jernbaneverket’s information and use in relation to The Norwegian High Speed Rail Assessment Project. WS Atkins International Ltd assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document History DOCUMENT REF: Market Analysis Demand Forecasting JOB NUMBER: 5096833 Final Report_UPDATED_040311.docx Revision Purpose Description Originated Checked Reviewed Authorised Date 1 Skeleton of Final Report MH LMG JD MH 29/10/10 2 Interim Report TH/JM LMG MH WL 12/01/11 3 Draft Final Report TH/JM LMG MH WL 02/02/11 4 Final Report TH AB MH WL 18/02/11 5 Additional Information TH MH JD MH 04/03/11 5096833/Market Analysis Demand Forecasting Final Report_UPDATED_040311.docx Contract 5, Subject 1: Demand Forecasting 3 Contract 5: Market Analysis Subject: Demand Forecasting Final Report 5096833/Market Analysis Demand Forecasting Final Report_UPDATED_040311.docx Contract 5, Subject 1: Demand Forecasting 4 Table of contents Executive Summary 10 1 Introduction 16 1.1 Background 16 1.2 Overall Context of the Market Analysis Contract 17 1.3 Purpose of Subject 1: Demand Potential for HSR in Norway 17 1.4 This Report 18 2 Current Travel Markets 19 2.1 Introduction 19 2.2 Size of Existing Travel Markets 19 2.3 Comparison of Services 40 2.4 International Benchmarking 52 2.5 Key Overall Conclusions 57 3 Future ‘Do Minimum’ Travel Market 58 3.1 Introduction 58 3.2 Overview of Future Year Forecasting Approach – NTM5 matrices 58 3.3 Future Year „Do Minimum‟ Demand Growth 62 3.4 Comparison of Medium Term Forecasts: NTM5 versus Transport Operators 70 3.5 Conclusions 72 4 HSR Demand and Revenue Forecasts 73 4.1 Introduction 73 4.2 Approach to demand and revenue forecasting 73 4.3 Traffic forecasts on national corridors 77 4.4 Oslo – Bergen corridor 78 4.5 Bergen/Stavanger – Oslo corridor (Haukeli route – Y shaped route) 89 4.6 Stavanger – Bergen corridor (Haugesund route) 94 4.7 Stavanger – Kristiansand – Oslo corridor 98 4.8 Trondheim – Oslo corridor 109 4.9 Oslo – Stockholm corridor 121 4.10 Oslo – Gothenburg corridor 130 5 Conclusions 136 5.1 Introduction 136 5.2 Summary of Current Travel Markets 136 5.3 Future (Do Minimum) Travel Market 136 5.4 Commentary on demand and revenue forecasts 137 5.5 Recommendations for Phase 3 141 5096833/Market Analysis Demand Forecasting Final Report_UPDATED_040311.docx Contract 5, Subject 1: Demand Forecasting 5 List of Tables Table 2.1 – Total annual demand for key corridors in Norway for main transport modes (2010) 23 Table 2.2 – Annual business demand for key corridors in Norway for main transport modes (2010) 26 Table 2.3 – Annual leisure demand for key corridors in Norway for main transport modes (2010) 27 Table 2.4 – Top ten ticketed tourist attractions in Norway (2007) 35 Table 2.5 – Top ten free tourist attractions in Norway (2006) 35 Table 2.6 – Summary of rail level of service in Trondheim corridor (2010) 41 Table 2.7 – Summary of rail level of service in Bergen corridor (2010) 41 Table 2.8 – Summary of rail level of service in Kristiansand-Stavanger corridor (2010) 42 Table 2.9 – Summary of rail level of service in Gothenburg corridor (2010) 42 Table 2.10 – Summary of rail level of service in Stockholm corridor (2010) 43 Table 2.11 – Summary of local rail services in Norway 43 Table 2.12 – Summary of coach level of service in Trondheim corridor (2010) 44 Table 2.13 – Summary of coach level of service in Bergen corridor (2010) 45 Table 2.14 – Summary of coach level of service in Kristiansand-Stavanger corridor (2010) 45 Table 2.15 – Summary of coach level of service in Bergen-Stavanger corridor (2010) 45 Table 2.16 – Summary of coach level of service in Gothenburg corridor (2010) 46 Table 2.17 – Summary of coach level of service in Stockholm corridor (2010) 46 Table 2.18 – Summary of ferry level of service in Bergen-Stavanger corridor (2010) 47 Table 2.19 – Summary of air level of service on key routes within Norway and to Sweden (2010) 47 Table 2.20 – Access to key airports in Norway and Sweden (2010) 48 Table 2.21 – Summary of 2010 service frequency on key corridors 49 Table 2.22 – Summary of 2010 fastest journey times on key corridors (hr:min) 49 Table 2.23 – Summary of 2010 range of fares on key corridors (NOK) 50 Table 2.24 – Size of HSR markets in other European countries (2008) 52 Table 2.25 – Market share of HSR and air on key routes in other European countries (2008) 53 Table 2.26 – Summary of level of service on HSR in Sweden (2010) 53 Table 2.27 – Summary of level of service on HSR in France (2010) 54 Table 2.28 – Summary of level of service on HSR in Germany (2010) 54 Table 2.29 – Summary of level of service on HSR in Spain (2010) 55 Table 2.30 – Summary of level of service on HSR in the UK (2010) 56 Table 3.1 – Population projections index – Statistics Norway (SSB) 59 Table 3.2 – NSB‟s future rail demand indices: 2009-2017 (selected years) 70 Table 3.3 – Comparison of medium-term rail demand growth rates 2010-2018 71 Table 3.4 – Comparison of medium-term air growth rates 2010-2018 71 Table 4.1 – Representation of Changes in Supply in NTM5B 74 Table 4.2 – HSR / Classic Corridor Level of Service by Scenario 76 Table 4.3 – Summary of HSR Routes and Scenarios tested 77 Table 4.4 – Corridor Demand by Mode and Purpose (Scenarios A and B1) 79 Table 4.5 – Rail demand by trip type and exogenous growth (Scenario A 2024 to 2043) 80 Table 4.6 – Impact of Scenario B1 (additional rail journeys over Do Minimum 2024, 2043) 81 Table 4.7 – Summary of HSR Demand and Revenue: Scenario C Oslo – Bergen (Hallingdal route via Hønefoss, Gol and Voss) 2024 81 Table 4.8 – HSR Demand by Origin/Destination type: Scenario C Oslo – Bergen (Hallingdal route via Hønefoss, Gol and Voss) 2024 82 Table 4.9 – Boardings by station Scenario C Oslo – Bergen (Hallingdal route via Hønefoss, Gol and Voss) 2024 82 Table 4.10 – Summary of HSR Demand and Revenue: Scenario D Oslo – Bergen (via Voss) 2024 85 Table 4.11 – HSR Demand by Origin/Destination type: Scenario D Oslo – Bergen (via Voss) 2024 85 5096833/Market Analysis Demand Forecasting Final Report_UPDATED_040311.docx Contract 5, Subject 1: Demand Forecasting 6 Table 4.12 – Boardings by station: Scenario D Oslo – Bergen (via Voss) 2024 86 Table 4.13 – Summary of HSR Demand and Revenue: Scenario D Oslo – Bergen/Stavanger (Haukeli route non-stop) 2024 89 Table 4.14 – HSR Demand by Origin/Destination type: Scenario D Oslo – Bergen/Stavanger (Haukeli route non-stop) 2024 90 Table 4.15 – Boardings by station: Scenario D Oslo – Bergen/Stavanger (Haukeli route non-stop) 2024 90 Table 4.16 – Summary of HSR Demand and Revenue: Scenario D Stavanger – Bergen (via Haugesund) 2024 94 Table 4.17 – HSR Demand by Origin/Destination type: Scenario D Stavanger – Bergen (via Haugesund) 2024 95 Table 4.18 – Boardings by station: Scenario D Stavanger – Bergen (via Haugesund) 2024 95 Table 4.19 – Corridor Demand by Mode and Purpose (Scenarios A and B2) 99 Table 4.20 – Rail demand by trip type and exogenous growth (Scenario A 2024 to 2043) 100 Table 4.21 – Growth over Scenario A – Scenario B2 101 Table 4.22 – Summary of HSR Demand and Revenue: Scenario C Oslo –Stavanger (via Drammen, Porsgrunn, Arendal, Kristiansand) 2024 101 Table 4.23 – HSR Demand by Origin/Destination type: Scenario C Oslo –Stavanger (via Drammen, Porsgrunn, Arendal, Kristiansand) 2024 102 Table 4.24 – Boardings by station: Scenario C Oslo –Stavanger (via Drammen, Porsgrunn, Arendal, Kristiansand) 2024 102 Table 4.25 – Summary of HSR Demand and Revenue: Scenario D Oslo – Stavanger (via Porsgrunn and Kristiansand) 2024 105 Table 4.26 – HSR Demand by Origin/Destination type: Scenario D Oslo – Stavanger (via Porsgrunn and Kristiansand) 2024 105 Table 4.27 – Boardings by station: Scenario D Oslo – Stavanger (via Porsgrunn and Kristiansand) 2024 106 Table 4.28 – Corridor Demand by Mode and Purpose (Scenarios A and B3) 110 Table 4.29 – Rail Demand by Sector (Scenarios A and B3) 111 Table 4.30 – Growth Over Scenario A – Scenario B3 112 Table 4.31 – Summary of HSR Demand and Revenue: Scenario C Oslo – Trondheim (via Gardermoen, Hamar, Lillehammer and Otta) 2024 112 Table 4.32 – HSR Demand by Origin/Destination type: Scenario C Oslo – Trondheim (via Gardermoen, Hamar, Lillehammer and Otta) 2024 113 Table 4.33 – Boardings by station: Scenario C Oslo – Trondheim (via Gardermoen, Hamar, Lillehammer and Otta) 2024 113 Table 4.34 – Summary of HSR Demand and Revenue: Scenario D Oslo – Trondheim (via Gardermoen) 2024 116 Table 4.35 – HSR Demand by Origin/Destination type: Scenario D Oslo – Trondheim (via Gardermoen) 2024116 Table 4.36 – Boardings by station: Scenario D Oslo – Trondheim (via Gardermoen) 2024 117 Table 4.37 – Corridor Demand by Mode and Purpose 122 Table 4.38 – Rail Demand by Sector (Scenarios A and B5) 123 Table 4.39 – Growth over Scenario A – Scenario B5 124 Table 4.40 – Summary of HSR Demand and Revenue: Scenario C Oslo – Stockholm (via Lillestrøm and Kongsvinger) 2024 124 Table 4.41 – HSR Demand by Origin/Destination type: Scenario D Oslo – Stockholm (via Lillestrøm and Kongsvinger) 2024 125 Table 4.42 – Boardings by station: Scenario C Oslo – Stockholm (via Lillestrøm and Kongsvinger)
Recommended publications
  • Mal Rapporter
    TØI report 1420/2015 Erik Figenbaum Marika Kolbenstvedt Pathways to electromobility - perspectives based on Norwegian experiences TØI Report 1420/2015 Pathways to electromobility - perspectives based on Norwegian experiences Erik Figenbaum Marika Kolbenstvedt This report is covered by the terms and conditions specified by the Norwegian Copyright Act. Contents of the report may be used for referencing or as a source of information. Quotations or references must be attributed to the Institute of Transport Economics (TØI) as the source with specific mention made to the author and report number. For other use, advance permission must be provided by TØI. ISSN 0808-1190 ISBN 978-82-480-1645-8 Paper version ISBN 978-82-480-1643-4 Electronic version Oslo, May 2015 Title: Pathways to electromobility - perspectives based on Tittel: Veier til elektromobilitet - perspektiver basert på norske Norwegian experiences erfaringer Author(s): Erik Figenbaum Forfattere: Erik Figenbaum Marika Kolbenstvedt Marika Kolbenstvedt Date: 05.2015 Dato: 05.2015 TØI report: 1420/2015 TØI rapport: 1420/2015 Pages 65 Sider 65 ISBN Paper: 978-82-480-1645-8 ISBN Papir: 978-82-480-1645-8 ISBN Electronic: 978-82-480-1643-4 ISBN Elektronisk: 978-82-480-1643-4 ISSN 0808-1190 ISSN 0808-1190 Financed by: EU 7th FP (Electromobility+) Finansieringskilde: EU 7th FP (Electromobility+) Institute of Transport Economics Norges forskningsråd The Research Council of Norway Transnova Transnova Transportøkonomisk institutt Project: 3826 - Compett Prosjekt: 3826 - Compett Project manager: Erik Figenbaum Prosjektleder: Erik Figenbaum Quality manager: Terje Assum Kvalitetsansvarlig: Terje Assum Key words: Diffusion Emneord: Brukergrupper Electric Vehicles Diffusjon Multi-Level Perspective Elbil Policy Fler-nivå analyse Regional transition Politikk User groups Regional endring Summary: Sammendrag: The report presents two analyses of the Norwegian Electric Rapporten presenterer to analyser av den norske elbilhistorien.
    [Show full text]
  • Product Manual
    PRODUCT MANUAL The Sami of Finnmark. Photo: Terje Rakke/Nordic Life/visitnorway.com. Norwegian Travel Workshop 2014 Alta, 31 March-3 April Sorrisniva Igloo Hotel, Alta. Photo: Terje Rakke/Nordic Life AS/visitnorway.com INDEX - NORWEGIAN SUPPLIERS Stand Page ACTIVITY COMPANIES ARCTIC GUIDE SERVICE AS 40 9 ARCTIC WHALE TOURS 57 10 BARENTS-SAFARI - H.HATLE AS 21 14 NEW! DESTINASJON 71° NORD AS 13 34 FLÅM GUIDESERVICE AS - FJORDSAFARI 200 65 NEW! GAPAHUKEN DRIFT AS 23 70 GEIRANGER FJORDSERVICE AS 239 73 NEW! GLØD EXPLORER AS 7 75 NEW! HOLMEN HUSKY 8 87 JOSTEDALSBREEN & STRYN ADVENTURE 205-206 98 KIRKENES SNOWHOTEL AS 19-20 101 NEW! KONGSHUS JAKT OG FISKECAMP 11 104 LYNGSFJORD ADVENTURE 39 112 NORTHERN LIGHTS HUSKY 6 128 PASVIKTURIST AS 22 136 NEW! PÆSKATUN 4 138 SCAN ADVENTURE 38 149 NEW! SEIL NORGE AS (SAILNORWAY LTD.) 95 152 NEW! SEILAND HOUSE 5 153 SKISTAR NORGE 150 156 SORRISNIVA AS 9-10 160 NEW! STRANDA SKI RESORT 244 168 TROMSØ LAPLAND 73 177 NEW! TROMSØ SAFARI AS 48 178 TROMSØ VILLMARKSSENTER AS 75 179 TRYSILGUIDENE AS 152 180 TURGLEDER AS / ENGHOLM HUSKY 12 183 TYSFJORD TURISTSENTER AS 96 184 WHALESAFARI LTD 54 209 WILD NORWAY 161 211 ATTRACTIONS NEW! ALTA MUSEUM - WORLD HERITAGE ROCK ART 2 5 NEW! ATLANTERHAVSPARKEN 266 11 DALSNIBBA VIEWPOINT 1,500 M.A.S.L 240 32 DESTINATION BRIKSDAL 210 39 FLØIBANEN AS 224 64 FLÅMSBANA - THE FLÅM RAILWAY 229-230 67 HARDANGERVIDDA NATURE CENTRE EIDFJORD 212 82 I Stand Page HURTIGRUTEN 27-28 96 LOFOTR VIKING MUSEUM 64 110 MAIHAUGEN/NORWEGIAN OLYMPIC MUSEUM 190 113 NATIONAL PILGRIM CENTRE 163 120 NEW! NORDKAPPHALLEN 15 123 NORWEGIAN FJORD CENTRE 242 126 NEW! NORSK FOLKEMUSEUM 140 127 NORWEGIAN GLACIER MUSEUM 204 131 STIFTELSEN ALNES FYR 265 164 CARRIERS ACP RAIL INTERNATIONAL 251 2 ARCTIC BUSS LOFOTEN 56 8 AVIS RENT A CAR 103 13 BUSSRING AS 47 24 COLOR LINE 107-108 28 COMINOR AS 29 29 FJORD LINE AS 263-264 59 FJORD1 AS 262 62 NEW! H.M.
    [Show full text]
  • Brass Bands of the World a Historical Directory
    Brass Bands of the World a historical directory Kurow Haka Brass Band, New Zealand, 1901 Gavin Holman January 2019 Introduction Contents Introduction ........................................................................................................................ 6 Angola................................................................................................................................ 12 Australia – Australian Capital Territory ......................................................................... 13 Australia – New South Wales .......................................................................................... 14 Australia – Northern Territory ....................................................................................... 42 Australia – Queensland ................................................................................................... 43 Australia – South Australia ............................................................................................. 58 Australia – Tasmania ....................................................................................................... 68 Australia – Victoria .......................................................................................................... 73 Australia – Western Australia ....................................................................................... 101 Australia – other ............................................................................................................. 105 Austria ............................................................................................................................
    [Show full text]
  • Measuring the Inaccurate: Causes and Consequences of Train Delays
    Summary: Measuring the inaccurate: Causes and consequences of train delays TØI Report 1459/2015 Author(s): Askill Harkjerr Halse, Vegard Østli and Marit Killi Oslo 2015, 71 pages Norwegian language In this report, we argue that the rich available data on train performance and railway infrastructure should be used to get precise measurements of economic relationships in railway management. As one such exercise, we first show how temporary speed reductions on railway links caused by low infrastructure quality affects running time and delays for Norwegian freight trains. Even though each speed reduction only adds about 44-50 seconds to running time, speed reductions still contribute to delay at the destination. Secondly, we show that delays has a negative effect on demand for passenger and freight trains services. The corresponding demand elasticity is lower than the one implied by willingness-to-pay studies, consistent with evidence from Great Britain. In is widely acknowledged in the transportation economics literature that more reliable transport time constitutes an economic benefit. In the presence of unreliability, individuals and firms adjust by taking costly measures like departing early or keeping a safety stock of goods. The ‘cost’ of train delays is therefore the foregone benefits that could have been achieved if all trains were running on time. Much of the existing literature on railway punctuality is based on optimization and/or simulation, calling for more empirical studies. In the innovation project PRESIS, funded by the Research Council of Norway and the Norwegian National Rail Administration, we have developed methods to survey reliability in the Norwegian rail sector.
    [Show full text]
  • Piezoelectric Flooring Share
    Commuting = Energy PiezoApp: Piezoelectric Flooring Share Distance Energy 1.9 km 2.6watts Total Nearest! Energy PieZone Topic: Explore how citizens, establishments and urban What I learned: Piezoelectric applications can serve as an Where: Oslo, Norway! streets can integrate Piezoelectric Flooring and innovative way to generate electricity with the everyday Why Oslo, Norway? Being the country’s largest city, Oslo complimentary PiezApp to produce and monitor energy movements of the communal population. This platform has the largest public transportation system in Norway. This creation and expenditures. The combined technologies track would create wonderful data points on traffic congestion, system, called Ruter, includes Oslo Metro, the Oslo how much energy has been captured to the dedicated grids traffic flows, best routes and identifying peak hours of Tramway, the Oslo Commuter Rail, the city regional bus and how much energy each individual has produced in the traffic in certain areas in Oslo, Norway. ! system, and a ferry system for the islands of Akershus cycle of their day, week, year, lifetime. This would be ! County as well as for Germany and Denmark. Oslo’s designed as such:! Through the platform, opportunities for civic engagement transportation system is one of the the most comprehensive, ! and sustainability of urban spaces, which use the effective, and best integrated systems in Europe. With a. Developing a system and infrastructure where piezoelectric flooring (i.e. Dance Halls and Dense Transit multiple forms of transportation at both the urban and Piezoelectric Flooring can be installed throughout high Stations). The device could serve as monitoring and metropolitan level, the system is never over capacity, and pedestrian and vehicle traffic zones in urban analytical device to secure transparency, gathering data when combined with high number of stops it allows for a communities.! points to increase the user experience of commuting.
    [Show full text]
  • Switching Relations: the Rise and Fall of the Norwegian Telecom Industry
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by NORA - Norwegian Open Research Archives Switching Relations The rise and fall of the Norwegian telecom industry by Sverre A. Christensen A dissertation submitted to BI Norwegian School of Management for the Degree of Dr.Oecon Series of Dissertations 2/2006 BI Norwegian School of Management Department of Innovation and Economic Organization Sverre A. Christensen: Switching Relations: The rise and fall of the Norwegian telecom industry © Sverre A. Christensen 2006 Series of Dissertations 2/2006 ISBN: 82 7042 746 2 ISSN: 1502-2099 BI Norwegian School of Management N-0442 Oslo Phone: +47 4641 0000 www.bi.no Printing: Nordberg The dissertation may be ordered from our website www.bi.no (Research - Research Publications) ii Acknowledgements I would like to thank my supervisor Knut Sogner, who has played a crucial role throughout the entire process. Thanks for having confidence and patience with me. A special thanks also to Mats Fridlund, who has been so gracious as to let me use one of his titles for this dissertation, Switching relations. My thanks go also to the staff at the Centre of Business History at the Norwegian School of Management, most particularly Gunhild Ecklund and Dag Ove Skjold who have been of great support during turbulent years. Also in need of mentioning are Harald Rinde, Harald Espeli and Lars Thue for inspiring discussion and com- ments on earlier drafts. The rest at the centre: no one mentioned, no one forgotten. My thanks also go to the Department of Innovation and Economic Organization at the Norwegian School of Management, and Per Ingvar Olsen.
    [Show full text]
  • To Post-Tectonic Sveconorwegian Granitic Magmatism in South Norway
    TOM ANDERSEN,ARILD ANDRESEN & ARTHUR G.SYLVESTER NGU-BULL 440, 2002 - PAGE 5 Timing of late- to post-tectonic Sveconorwegian granitic magmatism in South Norway TOM ANDERSEN, ARILD ANDRESEN & ARTHUR G. SYLVESTER Andersen, T., Andresen, A. & Sylvester, A.G. 2002: Timing of late- to post-tectonic Sveconorwegian granitic magma- tism in South Norway. Norges geologiske undersøkelse Bulletin 440, 5-18. Dating of late- to post-tectonic Sveconorwegian granitic intrusions from South Norway by the SIMS U-Pb method on zircons and by internal Pb-Pb isochrons on rock-forming minerals indicates a major event of granitic magmatism all across southern Norway in the period 950 to 920 Ma. This magmatic event included emplacement of mantle- derived magma into the source region of granitic magmas in the lower crust east of the Mandal-Ustaoset shear zone, and formation of hybrid magmas containing crustal and mantle-derived components. West of the Mandal- Ustaoset shear zone, granitic magmatism started earlier, at c. 1030 Ma. A distinct group of granites, characterized by low Sr concentration and a high Rb/Sr ratio, is restricted to central Telemark, and shows evidence of involvement of a component related to the ca. 1500 Ma metarhyolite of the Telemark supracrustal sequence.Whereas one of these granites clearly belongs to the 920-950 Ma age group, two of the intrusions dated in this study (Otternes and Gunnarstul) are significantly older and may be genetically related to an earlier event of anorogenic magmatism in the region at c. 1120 to 1150 Ma. Tom Andersen and Arild Andresen, Department of Geology, University of Oslo, PO Box 1047 Blindern, N-0316 Oslo, Norway.
    [Show full text]
  • Finding the Optimal Seat Capacity for Train-Services Using Transport Models
    TECHNICAL UNIVERSITY OF DENMARK June 2014 FINDING THE OPTIMAL SEAT CAPACITY FOR TRAIN-SERVICES USING TRANSPORT MODELS DEPARTMENT OF TRANSPORT María Díez Gutiérrez – s121456 Finding the optimal seat capacity for train services using transport models MSc Thesis – Transport Engineering ACKNOWLEDGEMENTS It is with gratitude to my supervisor Kim Bang Salling for making possible this thesis project and encouraging me during the process. I would like to express my appreciation to Trude Tørset whose enthusiasm for transport models has been inspiring to focus my research on the field. I thank her for following up my thesis from the earlier stages, providing me support and guidance. My sincere thanks to Jernbaneverket, in particular Per Jorulf Overvik and Patrick Ranheim, who helped me to specify the topic and to obtain the required data. I thank them for the useful observations along the learning process of this master thesis. I would like to express my gratitude to Stefano Manzo for the worthwhile comments and remarks on this project. I want to thank Olav Kåre Malmin who has helped me to understand better the technical aspects of the model. Thanks to NSB for providing me with necessary data and resources for the Jæren line analyses. Last but not least, I would like to express my love and gratitude to my family for their understanding, encouragement and support. I Finding the optimal seat capacity for train services using transport models MSc Thesis – Transport Engineering ABSTRACT This master thesis project aims to estimate the optimal capacity for the rush period in the Jæren line, particularly in the service between Stavanger and Egersund.
    [Show full text]
  • Upcoming Projects Infrastructure Construction Division About Bane NOR Bane NOR Is a State-Owned Company Respon- Sible for the National Railway Infrastructure
    1 Upcoming projects Infrastructure Construction Division About Bane NOR Bane NOR is a state-owned company respon- sible for the national railway infrastructure. Our mission is to ensure accessible railway infra- structure and efficient and user-friendly ser- vices, including the development of hubs and goods terminals. The company’s main responsible are: • Planning, development, administration, operation and maintenance of the national railway network • Traffic management • Administration and development of railway property Bane NOR has approximately 4,500 employees and the head office is based in Oslo, Norway. All plans and figures in this folder are preliminary and may be subject for change. 3 Never has more money been invested in Norwegian railway infrastructure. The InterCity rollout as described in this folder consists of several projects. These investments create great value for all travelers. In the coming years, departures will be more frequent, with reduced travel time within the InterCity operating area. We are living in an exciting and changing infrastructure environment, with a high activity level. Over the next three years Bane NOR plans to introduce contracts relating to a large number of mega projects to the market. Investment will continue until the InterCity rollout is completed as planned in 2034. Additionally, Bane NOR plans together with The Norwegian Public Roads Administration, to build a safer and faster rail and road system between Arna and Stanghelle on the Bergen Line (western part of Norway). We rely on close
    [Show full text]
  • Iceland, Norway & Faroes
    Port Handbook Chapter A - The Baltic Chapter B - United Kingdom & Ireland Chapter C - Atlantic Europe Chapter D - Iceland, Norway & Faroes Chapter E - Associated Members Copyright 2021 Cruise Europe Word of the chairman Matching cruise industry growth and cruise port capacities Cruise Europe and its more than 100 member ports between Gibraltar in the South, Kirkenes in the North and Lulea in the Baltic still has the potential for growth. Only 75% of the potential cruise ports along the Atlantic coast are members; also one has to include the potential of the cruise ports in Greenland and the area east of the North Cape. The tourist organisations of the ports, the regions, the countries can help as members to make Cruise Europe stronger in marketing the destination Northern Europe to the cruise lines. The aim for Cruise Europe is to match the ongoing growth of the cruise industry in offering better infrastructure in the member ports, which means more cruise terminals, or to point out the diversity of the many destinations and attractions in Northern Europe. Cruise Europe has to open a dialogue with the cruise lines with the intention to spread the growing number of cruise ships and the even bigger cruise passenger capacities over more ports, over more cruise areas, over more countries. The success of the Baltic is also possible in the areas of West Europe, of UK & Ireland and of Norway and Iceland. Cruise lines have to be convinced that all four cruise areas in Northern Europe have equal attractions and many Captain Michael McCarthy good ports to host the growing cruise fleet.
    [Show full text]
  • Annual Report 2004
    Annual Report 2004 1 Contents Time for trains 3 What is Jernbaneverket? 4 Organisational structure 5 Safety 6 Finance and efficiency 10 Operations 10 Maintenance 11 Capital expenditure – rail network development 12 State Accounts for 2004 14 Human resources 16 Personnel and working environment 16 JBV Ressurs 16 Competitiveness 18 Train companies operating on the national rail network 18 Infrastructure capacity – Jernbaneverket’s core product 18 Operating parameters 19 Key figures for the national rail network 21 Traffic volumes on the national rail network 23 Punctuality 24 Environmental protection 26 International activities 28 Contact details 30 www.jernbaneverket.no 2 Cover: Jernbaneverket’s celebrations to mark 150 years of Norwegian railways. Photo: Øystein Grue Time for trains The past year marked the 150th anniversary of the railways in Norway and proved a worthy celebration. Punctuality has never been better, rail traffic is growing, and in summer 2004 the Norwegian Parliament took the historic decision to invest NOK 26.4 billion in developing a competitive rail network over the ten years from 2006 to 2015. In other words, the anniversary year not only provided the opportunity for a nostalgic look back, but also confirmed that the railways will continue to play a central role in the years ahead. In line with Parliament’s decision, value our good working relationship with autumn 2005. This brings us one step clo- Jernbaneverket has drawn up an action the trade unions. The railway has a culture ser to our goal of an efficient, modern rail programme which, if implemented, will and a historic legacy which need to be network in the Oslo region.
    [Show full text]
  • Frysetunnel Splitt Siberia Extreme Co2
    nr. 2 2018 www.kulde.biz FRYSETUNNEL SPLITT SIBERIA EXTREME CO2 Technoblock Sinop AS - leverandør av kuldeanlegg siden 2002 Norge: +47 22 37 22 00 Sverige: +46 (0) 855 11 11 55 Danmark: +45 36 98 04 30 [email protected] [email protected] [email protected] www.technoblock.no www.technoblock.se www.technoblock.dk TBS_2-18_forside.indd 1 16.04.2018 15:03 KULDETEKNIKK OG VARMEPUMPER Refrigeration • Air-conditioning • Heat Pump Journal Innhold: 4 Redaktøren har ordet 6 Varmepumpeprisen 2018 8 Varmepumpepris 2018 for større anlegg til Trangulum 10 Røyken ble årets varmepumpe- 12 Skiføre hele året utenfor Oslo kommune 38 Kreftfarlige kanaler 12 Skiføre hele året utenfor Oslo 13 Slutt å installere R404A og R507A 14 Rapport om HFOs miljøpåvirkning 18 Solceller i nordisk klima 15 Greenpeace reagere kraftig 16 Søkerrekord på kuldelinjen i Tromsø 18 Solceller i nordisk klima 20 Bitter kamp om HFC-forbud i USA 21 Kreftalarm for kjelanlegg 21 Oljefyringsforbudet kan gi et kjør uten like 22 Gode klimarutiner 23 Firmanytt 29 Kutter 7000 vogntog med frossen fisk til Danmark 31 Produktnytt 13 Slutt å installere R404A og 20 Bitter kamp om HFC-forbud 37 Hybrid høytemperatur varmepumpe R507A i USA til Bergen 39 R22 omsettes åpenlyst på kaia 38 Arbeidstilsynet slår ozon-alarm 38 Kreftfarlige kanaler 39 R22 omsettes åpenlyst på kaia 39 Trøndelag: Arbeider med kursopp- legg for bedre lærlinger 40 Sarpsborg Sol contra varmepumpe 41 Om å lagre spillvarme i sedimentært 29 Kutter 7000 vogntog med fjell frossen fisk til Danmark 43 Bruk av ammoniakksystemer med liten fylling 14 Rapport om HFOs miljøpå- 45 Store HFK-lekkasjer i næringsbygg virkning 47 Valdres første uten med varme- 43 Bruk av ammoniakksystemer pumpelån med liten fylling 48 Lovfesting av fagskoleutdanningen 49 NKM 2018 52 Rapport fra NKF 53 Status for Trond- heim tekniske fagskole og NTNU 54 Internasjonale nyheter 49 Armin 15 Greenpeace reagere kraftig 37 Hybrid høytemperatur varme- Hafner ny pumpe til Bergen NKF formann REDAKSJON ANNONSER DESIGN/LAYOUT Redaktør: Annonsesjef, Sirius Design Siv.ing.
    [Show full text]