WELCOME

Welcome to a public exhibition and consultation on the extension of The Mall.

This £200 million project will transform Town Centre, providing more retail and leisure space, creating hundreds of jobs, and delivering new community facilities and hundreds of new homes.

Planning consent for the extension of The Mall was granted in July 2018.

Since then, the owner of The Mall, Capital & Regional, has been working with Waltham Forest Council and Transport for to identify ways the consented extension can be improved, including safeguarding for the ability to provide a new entrance to the Victoria line platform at Walthamstow Central underground station.

This exhibition 1. A Section 73 application from Capital is part of an & Regional to make improvements to the ongoing public existing consent to improve design and consultation layout, incorporate a potential future station entrance to the Victoria line and speed up process for two the delivery programme. forthcoming planning 2. A full planning application from Transport applications: for London for a new entrance to the Walthamstow Central underground station with a bigger ticket hall.

www.TheMallWalthamstowConsultation.co.uk EXISTING PLANNING CONSENT

The extension of part of The Mall was approved by Waltham Forest Council Planning Committee in December 2017 and by the Mayor of London in March 2018.

This gave consent for: • 8,769 sq m of new retail and leisure floorspace • 502 new homes directly above The Mall extension • A redesigned Town Square, including a new children’s play space, landscaping and lighting • Extended the basement car park, creating 33 new spaces and redesigned entrance to The Mall

These plans deliver 20% afordable housing on site (including 10% at social rent) and provide a further 10% financial contribution to Waltham Forest Council to deliver a total of 30% afordable housing.

THE CONSENTED PLANS

Ground Floor Residential Blocks

www.TheMallWalthamstowConsultation.co.uk TRANSFORMING WALTHAMSTOW TOWN CENTRE

The consented plans for the extension of The Mall will make Walthamstow Town Centre a better place to live, work and visit.

MORE JOBS VACANCY Over 800 people already work in The Mall, over half of whom live in Waltham Forest. The extension will create up to 350 more jobs.

NEW HOMES The extension will deliver up to 502 new homes, including 30% afordable.

INCREASED RETAIL PROVISION By providing an extra 50,000 sq ft of retail, restaurant and leisure space, it will create a more vibrant Town Centre and boost the night time economy.

REDESIGNED TOWN SQUARE New landscaping, public art and seating will create a space more suited to outdoor events. The number of trees in the Town Square will be increased.

IMPROVED CHILDREN’S PLAY AREA A new, permanent play area will be delivered early in the extension and the existing play space will be maintained until then.

Since planning consent was granted, Capital & Regional has worked closely with Transport for London and Waltham Forest Council to respond to the feedback that was received and identify ways to improve the consented plans.

www.TheMallWalthamstowConsultation.co.uk SECTION 73 APPLICATION

Capital & Regional is consulting with local residents and businesses on proposed changes to the current planning consent (a Section 73 application) to better integrate the retail space, homes and potential new underground station entrance with the Town Square and provide access to the residential blocks from Selborne Road.

These changes are an evolution LAYOUT IMPROVEMENTS of the approved scheme and will:

X25 X26A X26B X27 X28 X29 X30 X31 X32 X33 X34 X35 X36 X37 X38 X39 X40 X41 • Change the design of the

R4 245.19 m² residential buildings to reduce 2,639 ft²

LIBRARY

the massing and make Selborne EXISTING SERVICE YARD B R3 214.88 m² BANK 2,313 ft² Road more active and vibrant OFFICE POST

B1 52.85 m² 569 ft²

R1 R2 • Redesign the retail and 179.24 m² 186.09 m² UNIT 1 1,929 ft² 2,003 ft² 176.28 m² 23030 1,897 ft² 23530

restaurant units to better 23030 23030 Car Park Access

UNIT 2 UNIT 3 UNIT 4 UNIT 5 UNIT 6 UNIT 7 94.90 m² 97.26 m² 97.26 m² 97.28 m² 97.28 m² 132.49 m² UNIT 9 1,021 ft² 1,047 ft² 1,047 ft² 1,047 ft² 1,047 ft² 1,426 ft² 177.75 m² integrate with the public space 1,913 ft² Retail Service Route UNIT 10 353.33 m² 3,803 ft² UNIT 8 Refuse Refuse 238.92 m² 136sqm 125sqm 2,572 ft² 23530 Cycle Store 407sqm

Plant 218sqm Retail Service Route Route Service Retail

and accommodate a potential 2000 Unit 11 234.95 m² Parcel Back of Feature Lettings 2,529 ft²

Storage House Staircase Offices

P

P P

P r

Fire escape route r r r

i

i i 7

i

m

m m

m 7

.

5

.

a

a a

a 5

t Unit 12

r r r

r

t

k k k

B

k

B

o

U

Build to Rent Forum U U

U o

x

r

r r

x r

b

b b b

V

a

a a V

339sqm a 40.39 m²

Move in / Move out a n

n n

n a

n

n

A

A A

A

r

r r

r

t

Temporary Storage t t

t

i

i i

i

c c c c 435 ft² station entrance in the future 33sqm Move in / Move out Loading / Unloading 109sqm 23750 TFL Fire escapeFire route 70sqm Unit 13 Unit 14

Cycle store accessroute store Cycle 541.21 m² 146.10 m² 5,826 ft² 1,573 ft² Access and vehicle tracking subject to review by Milestone

• Enable a more efcient and Primark Urban Artic 7 .5t Bo x Van PPrrimimaarrkk U Urbrbaann A Arrtitcic less disruptive development programme to allow the scheme to be delivered in a shorter time period

There are no changes to the approved plans for the Town Square and trees on the site. The approved plans will provide an improved Town Square with landscaping, public art and a new children’s play area.

www.TheMallWalthamstowConsultation.co.uk DESIGN IMPROVEMENTS

The existing planning consent provides no direct resident access onto Selborne Road for the two residential blocks. These sit directly above the shopping centre with no active frontage.

The proposed design improvements will:

• Provide direct access to the residential blocks from Selborne Road, creating a more vibrant and active street scene • Reduce the massing of the residential blocks to create a more slender form, while still providing up to 460 apartments

The existing height parameters will not be exceeded.

Consented scheme Proposed scheme 132.5m AOD 132.5m AOD

110.5m AOD 103.5m AOD 110.5m AOD

85m AOD 88.8m AOD

PUBLIC SQUARE PUBLIC SQUARE

The design improvements mean the residential blocks will be constructed next to the retail space, not directly above it. This will allow the construction period to be shortened while significantly reducing disruption for local residents, businesses and shoppers.

www.TheMallWalthamstowConsultation.co.uk BUILD-TO-RENT

Build-to-rent is a growing sector in the housing market, addressing a local need for professionally-managed, quality rental housing.

These developments are built specifically for rent and are not for sale. The benefits they provide for residents include:

• A range of housing types, from one-bed flats to family homes • A lively and exciting community with shared amenity areas • Stability and certainty for residents through flexible tenancies

In Walthamstow, this will provide homes for people across a range of incomes, ages and household types, from young people looking to share, to key workers or those planning to downsize.

This development will include a provision of afordable homes at Discount Market Rent.

The Mall provides an excellent location for a build-to-rent development, as residents will benefit from good access to public transport, shops, restaurants and local and community services in Walthamstow Town Centre.

This scheme will provide: An inclusive community Designed to meet the needs of residents of all ages and occupations in Walthamstow.

High quality service A dedicated-on site team will provide round the clock maintenance and security.

Flexibility Tenants always have transparent pricing with no hidden charges and can take flexible tenancies to fit their circumstances.

www.TheMallWalthamstowConsultation.co.uk WALTHAMSTOW CENTRAL UNDERGROUND STATION

Walthamstow Central underground station is nearing capacity.

Approximately 9,000 passengers enter or exit the station at peak times and Walthamstow Bus Station is the third busiest in London.

Transport for London (TfL) anticipates that these numbers will grow by another 30% by 2031.

Transport for London, Capital & Regional and Waltham Forest Council have worked together at looking at improving transport options as a result of the extension of The Mall.

TfL will be submitting a full planning application to take advantage of the opportunity presented by the construction work that will take place to build this new development.

TfL will be seeking permission to future proof a new entrance and ticket hall that will allow step-free access to the Victoria line from an entrance integrated into The Mall.

www.TheMallWalthamstowConsultation.co.uk NEW STATION ENTRANCE AND CUSTOMER JOURNEY IMPROVEMENTS

An additional entrance for Walthamstow Central station will be integrated with The Mall extension.

This will provide step-free access to the Victoria line from the improved Town Square.

www.TheMallWalthamstowConsultation.co.uk CONSULTATION AND NEXT STEPS

THANK YOU FOR TAKING THE TIME TO VIEW THIS EXHIBITION.

At this stage it is important that we understand the views of local residents and users of The Mall, and incorporate this feedback into the design process.

Please take this opportunity to fill in a feedback form and tell us your views.

You can also view this information online and submit feedback at: www.TheMallWalthamstowConsultation.co.uk

If you would like to get in contact with the project team, please email: [email protected]

WINTER 2019 Submission of Section 73 application by C&R and full planning application by Transport for London

TIME LINE SPRING/SUMMER 2020 AND NEXT Anticipated planning consent STEPS SPRING 2021 Start of works on site

SUMMER 2025 Anticipated completion