House Journal 67Th Legislature Twenty-Second Legislative Day

Total Page:16

File Type:pdf, Size:1020Kb

House Journal 67Th Legislature Twenty-Second Legislative Day HOUSE JOURNAL 67TH LEGISLATURE TWENTY-SECOND LEGISLATIVE DAY Helena, Montana House Chambers February 2, 2021 State Capitol House convened at 1:00 p.m. Mr. Speaker presiding. Invocation by Representative Galloway. Pledge of Allegiance to the Flag. Roll Call. All members present, except Representative Whiteman Pena, excused. Quorum present. BILLS (J. Hinkle, Chair): 2/2/2021 Correctly engrossed: HB 98, HB 164. Transmitted to the Senate: HB 141, HB 178, SB 1, SB 21, SB 65. REPORTS OF STANDING COMMITTEES NATURAL RESOURCES (Gunderson, Chair): 2/1/2021 HB 131, introduced bill, be amended as follows: 1. Page 1, line 10. Strike: "The" Insert: "Subject to subsection (7), the" 2. Page 2. Following: line 17 Insert: "(7) Before January 1, 2022, the department shall determine what cabin sites would be adversely affected by an expansion of a state water project. Lessees of those lots may not request them to be sold pursuant to this section." 3. Page 4, line 5. Strike: "82" in two places Insert: "85" in two places And, as amended, do pass. Report adopted. HB 173, do pass. Report adopted. STATE ADMINISTRATION (McKamey, Chair): 2/2/2021 HB 176, introduced bill, be amended as follows: 1. Title, line 5. Strike: "ON THE FRIDAY" Insert: "AT NOON THE DAY" STATE INTERNET/BBS COPY 1 HOUSE JOURNAL TWENTY-SECOND LEGISLATIVE DAY - FEBRUARY 2, 2021 2. Page 2, line 6. Strike: "5 p.m. on the day Friday" Insert: "noon the day" 3. Page 4, line 13. Following: "(2)" Strike: "(a)" 4. Page 4, line 15. Strike: "(b)" Insert: "(3) (a)" 5. Page 4, line 16 through line 17. Following: "to" on line 16 Strike: ":" on line 16 through "(i)" on line 17 6. Page 4, line 18 through line 19. Following: "13-2-222" on line 18 Strike: "; or" on line 18 through "13-2-304" on line 19 7. Page 4, line 20. Strike: "(3)" Insert: "(b)" 8. Page 4, line 23. Following: "ballot" Strike: "and vote it" And, as amended, do pass. Report adopted. TAXATION (Beard, Chair): 2/2/2021 SB 6, be concurred in. Report adopted. SB 30, be concurred in. Report adopted. SB 34, be concurred in. Report adopted. TRANSPORTATION (Loge, Chair): 2/1/2021 HB 184, introduced bill, be amended as follows: 1. Title, line 7 through line 8. Strike: "REQUIRING" on line 7 through "TIMES;" on line 8 2. Page 1, line 18. Strike: "should view" Insert: "shall treat" STATE INTERNET/BBS COPY 2 HOUSE JOURNAL TWENTY-SECOND LEGISLATIVE DAY - FEBRUARY 2, 2021 3. Page 1, line 19. Following: "traffic" Insert: "that would be impeded by passing the bicycle" 4. Page 1, line 20. Strike: "3" Insert: "5" 5. Page 1, line 21. Following: "traffic" Insert: "that would be impeded by passing the bicycle" 6. Page 2, line 2. Strike: "or" Insert: "and" 7. Page 2, line 3. Following: "limit" Insert: "in excess" Following: "hour" Strike: "or greater" 8. Page 2, line 5. Following: "riding." Insert: "Garments may include but are not limited to any of the following meeting the color or retroreflective requirement: (a) bicycle jerseys; (b) athletic apparel; (c) safety vests; (d) hunter vests; or (e) garments on which retroreflective tape has been applied." 9. Page 2, line 9. Following: "shoulder" Insert: "when it is possible to do so safely" 10. Page 2, line 25. Strike: "and" Insert: "or" 11. Page 3, line 11. Following: "nighttime" Insert: "at dawn, dusk, or nighttime" STATE INTERNET/BBS COPY 3 HOUSE JOURNAL TWENTY-SECOND LEGISLATIVE DAY - FEBRUARY 2, 2021 12. Page 3, line 12. Strike: "an illuminated" Insert: "a" 13. Page 3, line 15. Strike: "an illuminated" Insert: "a" And, as amended, do pass. Report adopted. HB 256, do pass. Report adopted. SB 3, be concurred in. Report adopted. MESSAGES FROM THE SENATE Senate bills passed and transmitted to the House for concurrence: 1/29/2021 SB 18, introduced by D. Salomon SB 40, introduced by J. Ellis SB 58, introduced by M. Cuffe SB 75, introduced by D. Salomon SB 104, introduced by J. Welborn SB 114, introduced by J. Ellsworth FIRST READING AND COMMITMENT OF BILLS The following House bills were introduced, read first time, and referred to committees: HB 281, introduced by S. Gunderson, referred to Transportation. HB 282, introduced by F. Anderson, D. Bedey, S. Berglee, M. Bertoglio, J. Carlson, R. Fitzgerald, S. Galloway, W. Galt, S. Gist, S. Greef, L. Jones, referred to Business and Labor. HB 283, introduced by F. Anderson, D. Bedey, S. Berglee, M. Bertoglio, R. Fitzgerald, S. Galloway, F. Garner, S. Gist, S. Greef, L. Jones, referred to Business and Labor. HB 284, introduced by M. Dunwell, referred to Business and Labor. HB 285, introduced by J. Trebas, S. Berglee, W. Galt, C. Hinkle, J. Kassmier, C. Knudsen, R. Marshall, M. Stromswold, K. Zolnikov, M. Blasdel, K. Bogner, B. Brown, J. Ellsworth, C. Glimm, J. Small, G. Vance, referred to Business and Labor. HB 286, introduced by J. Windy Boy, K. Abbott, D. Bedey, M. Caferro, T. France, M. Hopkins, S. Novak, T. Running Wolf, S. Stewart Peregoy, referred to Education. HB 287, introduced by K. Kortum, referred to State Administration. HB 288, introduced by B. Phalen, M. Binkley, W. Galt, C. Hinkle, J. Hinkle, C. Knudsen, B. Ler, A. Regier, referred to Taxation. HB 289, introduced by M. Regier, S. Berglee, E. Buttrey, S. Galloway, D. Harvey, J. Keane, J. Patelis, A. Regier, K. Seekins-Crowe, B. Tschida, B. Usher, D. Ankney, M. Blasdel, J. Ellsworth, C. Glimm, G. Hertz, D. Kary, K. Regier, D. Salomon, J. Small, C. Smith, G. Vance, J. Welborn, referred to Business and Labor. STATE INTERNET/BBS COPY 4 HOUSE JOURNAL TWENTY-SECOND LEGISLATIVE DAY - FEBRUARY 2, 2021 The following Senate bills were introduced, read first time, and referred to committees: SB 18, introduced by D. Salomon (by request of the State-Tribal Relations Committee), referred to Education. SB 40, introduced by J. Ellis (by request of the Department of Natural Resources and Conservation), referred to Natural Resources. SB 58, introduced by M. Cuffe, J. Kassmier, referred to Agriculture. SB 75, introduced by D. Salomon, referred to Education. SB 104, introduced by J. Welborn, referred to Judiciary. SB 114, introduced by J. Ellsworth, referred to Judiciary. THIRD READING OF BILLS The following bills having been read three several times, title and history agreed to, were disposed of in the following manner: HB 3 passed as follows: Yeas: Abbott, Anderson, Bartel, Beard, Bedey, Berglee, Bertoglio, Binkley, Bishop, Brewster, Buckley, Buttrey, Caferro, Carlson, Curdy, Custer, Dooling, Dunwell, Duram, Farris-Olsen, Fern, Fielder, Fitzgerald, Fleming, France, Frazer, Fuller, Funk, Galloway, Garner, Gillette, Gist, Greef, Gunderson, Hamilton, Harvey, Hawk, Hayman, Hill, Hinkle C, Hinkle J, Holmlund, Hopkins, Jones, Karjala, Kassmier, Keane, Kelker, Keogh, Kerns, Kerr-Carpenter, Knudsen C, Knudsen R, Kortum, Lenz, Loge, Malone, Marler, Marshall, McKamey, Mercer, Mitchell, Moore, Nave, Noland, Novak, Olsen, Patelis, Phalen, Putnam, Read, Regier A, Regier M, Reksten, Ricci, Running Wolf, Schillinger, Seekins-Crowe, Sheldon-Galloway, Skees, Smith, Stafman, Stewart Peregoy, Stromswold, Sullivan, Tenenbaum, Thane, Trebas, Tschida, Usher, Vinton, Walsh, Weatherwax, Welch, Whiteman Pena, Whitman, Windy Boy, Zolnikov, Mr. Speaker. Total 99 Nays: Ler. Total 1 Voted absentee: None. Excused: None. Total 0 Absent or not voting: Total 0 HB 141 passed as follows: Yeas: Abbott, Anderson, Bartel, Beard, Bedey, Berglee, Bertoglio, Binkley, Bishop, Brewster, Buckley, Buttrey, Caferro, Carlson, Curdy, Custer, Dooling, Dunwell, Duram, Farris-Olsen, Fern, STATE INTERNET/BBS COPY 5 HOUSE JOURNAL TWENTY-SECOND LEGISLATIVE DAY - FEBRUARY 2, 2021 Fielder, Fitzgerald, Fleming, France, Frazer, Fuller, Funk, Galloway, Garner, Gillette, Gist, Greef, Gunderson, Hamilton, Harvey, Hawk, Hayman, Hill, Hinkle C, Hinkle J, Holmlund, Hopkins, Jones, Karjala, Kassmier, Keane, Kelker, Keogh, Kerns, Kerr-Carpenter, Knudsen C, Knudsen R, Kortum, Lenz, Ler, Loge, Malone, Marler, Marshall, McKamey, Mercer, Mitchell, Moore, Nave, Noland, Novak, Olsen, Patelis, Phalen, Putnam, Read, Regier A, Regier M, Reksten, Ricci, Running Wolf, Schillinger, Seekins-Crowe, Sheldon-Galloway, Skees, Smith, Stafman, Stewart Peregoy, Stromswold, Sullivan, Tenenbaum, Thane, Trebas, Tschida, Usher, Vinton, Walsh, Weatherwax, Welch, Whiteman Pena, Whitman, Windy Boy, Zolnikov, Mr. Speaker. Total 100 Nays: None. Total 0 Voted absentee: None. Excused: None. Total 0 Absent or not voting: None. Total 0 HB 178 passed as follows: Yeas: Abbott, Anderson, Bartel, Beard, Bedey, Berglee, Bertoglio, Binkley, Bishop, Brewster, Buckley, Buttrey, Caferro, Carlson, Curdy, Custer, Dooling, Dunwell, Duram, Farris-Olsen, Fern, Fielder, Fitzgerald, Fleming, France, Frazer, Fuller, Funk, Galloway, Garner, Gillette, Gist, Greef, Gunderson, Hamilton, Harvey, Hawk, Hayman, Hill, Hinkle C, Hinkle J, Holmlund, Hopkins, Jones, Karjala, Kassmier, Keane, Kelker, Keogh, Kerns, Kerr-Carpenter, Knudsen C, Knudsen R, Kortum, Lenz, Ler, Loge, Malone, Marler, Marshall, McKamey, Mercer, Mitchell, Moore, Nave, Noland, Novak, Olsen, Patelis, Phalen, Putnam, Read, Regier A, Regier M, Reksten, Ricci, Running Wolf, Schillinger, Seekins-Crowe, Sheldon-Galloway, Skees, Smith, Stafman, Stewart Peregoy, Stromswold, Sullivan, Tenenbaum, Thane, Trebas, Tschida, Usher, Vinton, Walsh, Weatherwax, Welch, Whiteman Pena, Whitman, Windy Boy, Zolnikov, Mr. Speaker. Total 100 Nays: None. Total 0 Voted absentee: None. Excused: None. Total 0 Absent or not voting: None. Total 0 STATE INTERNET/BBS COPY 6 HOUSE JOURNAL TWENTY-SECOND LEGISLATIVE DAY - FEBRUARY 2, 2021 SB 1 concurred in as follows: Yeas: Abbott, Anderson, Bartel,
Recommended publications
  • Download 3.94 MB
    Environmental Monitoring Report Semiannual Report (March–August 2019) Project Number: 49469-007 Loan Number: 3775 February 2021 India: Mumbai Metro Rail Systems Project Mumbai Metro Rail Line-2B Prepared by Mumbai Metropolitan Development Region, Mumbai for the Government of India and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ABBREVATION ADB - Asian Development Bank ADF - Asian Development Fund CSC - construction supervision consultant AIDS - Acquired Immune Deficiency Syndrome EA - execution agency EIA - environmental impact assessment EARF - environmental assessment and review framework EMP - environmental management plan EMR - environmental Monitoring Report ESMS - environmental and social management system GPR - Ground Penetrating Radar GRM - Grievance Redressal Mechanism IEE - initial environmental examination MMRDA - Mumbai Metropolitan Region Development Authority MML - Mumbai Metro Line PAM - project administration manual SHE - Safety Health & Environment Management Plan SPS - Safeguard Policy Statement WEIGHTS AND MEASURES km - Kilometer
    [Show full text]
  • Mumbai Metro Rail Systems Project
    Report and Recommendation of the President to the Board of Directors Project Number: 49469-007 January 2019 Proposed Loan India: Mumbai Metro Rail Systems Project This is the version of the document approved by ADB’s Board of Directors that excludes information that is subject to exceptions to disclosure set forth in ADB’s Access to Information Policy. CURRENCY EQUIVALENTS (as of 11 January 2019) Currency unit – rupee (₹) ₹1.00 = $0.0141895295 $1.00 = ₹70.474500 ABBREVIATIONS ADB – Asian Development Bank CAG – comptroller and auditor general CTS – comprehensive transport study DMRC – Delhi Metro Rail Corporation EIRR – economic internal rate of return GESI – gender equality and social inclusion JICA – Japan International Cooperation Agency km – kilometer MMR – Mumbai Metropolitan Region MMRDA – Mumbai Metropolitan Region Development Authority O&M − operation and maintenance PAM – project administration manual NOTES (i) The fiscal year (FY) of the Government of India and its agencies ends on 31 March. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2018 ends on 31 March 2018. (ii) In this report, “$” refers to United States dollars. Vice-President Shixin Chen, Operations 1 Director General Hun Kim, South Asia Department (SARD) Director Ravi Peri, Transport and Communications Division, SARD Team leader Sharad Saxena, Principal Transport Specialist, SARD Team members Cynthia Gutierrez, Associate Project Analyst, SARD Prabhjot Khan, Social Development Officer (Gender), SARD Ma. Laureen Laurito, Senior Social
    [Show full text]
  • Detailed Project Report Extension of Mumbai Metro Line-4 from Kasarvadavali to Gaimukh
    DETAILED PROJECT REPORT EXTENSION OF MUMBAI METRO LINE-4 FROM KASARVADAVALI TO GAIMUKH MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY (MMRDA) Prepared By DELHI METRO RAIL CORPORATION LTD. October, 2017 DETAILED PROJECT REPORT EXTENSION OF MUMBAI METRO LINE-4 FROM KASARVADAVALI TO GAIMUKH MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY (MMRDA) Prepared By DELHI METRO RAIL CORPORATION LTD. October, 2017 Contents Pages Abbreviations i-iii Salient Features 1-3 Executive Summary 4-40 Chapter 1 Introduction 41-49 Chapter 2 Traffic Demand Forecast 50-61 Chapter 3 System Design 62-100 Chapter 4 Civil Engineering 101-137 Chapter 5 Station Planning 138-153 Chapter 6 Train Operation Plan 154-168 Chapter 7 Maintenance Depot 169-187 Chapter 8 Power Supply Arrangements 188-203 Chapter 9 Environment and Social Impact 204-264 Assessment Chapter 10 Multi Model Traffic Integration 265-267 Chapter 11 Friendly Features for Differently Abled 268-287 Chapter 12 Security Measures for a Metro System 288-291 Chapter 13 Disaster Management Measures 292-297 Chapter 14 Cost Estimates 298-304 Chapter 15 Financing Options, Fare Structure and 305-316 Financial Viability Chapter 16 Economical Appraisal 317-326 Chapter 17 Implementation 327-336 Chapter 18 Conclusions and Recommendations 337-338 Appendix 339-340 DPR for Extension of Mumbai Metro Line-4 from Kasarvadavali to Gaimukh October 2017 Salient Features 1 Gauge 2 Route Length 3 Number of Stations 4 Traffic Projection 5 Train Operation 6 Speed 7 Traction Power Supply 8 Rolling Stock 9 Maintenance Facilities
    [Show full text]
  • THE Louis Berger Group, INC. Institution of Engineers, 4Th Floor, Plot No-106, Sector-15, Belapur (East), Navi Mumbai - 400 614 Tel No
    THE Louis Berger Group, INC. Institution of Engineers, 4th Floor, Plot No-106, Sector-15, Belapur (East), Navi Mumbai - 400 614 Tel No. +91(22) - 3267 0796, Fax No. +91(22)- 2757 7973, www.louisberger.com ENGINEERS • P L A N N E R S • S C IEN T IS T S • ECONOMISTS Letter of Recommendation To whom so ever it may concern Dear Sir/Madam, I am team leader for Navi Mumbai Metro (NMM) Project at The Louis Berger Group INC, and am writing to recommend Gauri Jumde. I have known Gauri Jumde through her work experience with our firm during the Navi Mumbai Metro Project, when she served as an Architect cum Infrastructure Planner in our Navi Mumbai office. Gauri became immediately involved in the master planning and designing of depot for NMM, conducting much of the detailed design, site assessment. In addition to the designing, Gauri was instrumental in the development of the final technical specification report. She was in a team to provide accurate, effective and concise statistical and anecdotal data to a variety of constituents in order to support various infrastructure related projects such as Feasibility study for multimodal corridor & Mumbai Metro Line 3 Project, master planning for Navi Mumbai International & other regional airports in Maharashtra State. Gauri has shown the kind of initiative that is necessary to be successful over the long term in the urban and transportation planning field. I believe she has an excellent future in the urban and transportation planning field. She is a conscientious worker and has an excellent work ethic.
    [Show full text]
  • Dosti Greater Thane Brochure
    THE CITY OF HAPPINESS CITY OF HAPPINESS Site Address: Dosti Greater Thane, Near SS Hospital, Kalher Junction 421 302. T: +91 86577 03367 Corp. Address: Adrika Developers Pvt. Ltd., Lawrence & Mayo House, 1st Floor, 276, Dr. D. N. Road, Fort, Mumbai - 400 001 • www.dostirealty.com Dosti Greater Thane - Phase 1 project is registered under MahaRERA No. P51700024923 and is available on website - https://maharerait.mahaonline.gov.in under registered projects Disclosures: (1) The artist’s impressions and stock image are used for representation purpose only. (2) Furniture, fittings and fixtures as shown/displayed in the show flat are for the purpose of showcasing only and do not form part of actual standard amenities to be provided in the flat. The flats offered for sale are unfurnished and all the amenities proposed to be provided in the flat shall be incorporated in the Agreement for Sale. (3) The plans are tentative in nature and proposed but not yet sanctioned. The plans, when sanctioned, may vary from the plans shown herein. (4) Dosti Club Novo is a Private Club House. It may not be ready and available for use and enjoyment along with the completion of Dosti Greater Thane - Phase 1 as its construction may get completed at a later date. The right to admission, use and enjoyment of all or any of the facilities/amenities in the Dosti Club Novo is reserved by the Promoters and shall be subject to payment of such admission fees, annual charges and compliance of terms and conditions as may be specified from time to time by the Promoters.
    [Show full text]
  • Metro-2B and Metro-4 Info and Maps
    METRO-2B AND METRO-4 INFO AND MAPS DN Nagar-Bandra-Mankhurd Metro-2B Corridor – 23.5-km – Rs. 10,986 crore · The 23.5-km long Metro corridor will have 22 stations • 6-coach trains will carry 1,800 commuters per trip (8 commuters per square meter) • Expected Daily Ridership – 8.099 Lakh in 2021 • Will save fuel, time and improve environment Stations on the corridor – DN Nagar, ESIC Nagar, Prem Nagar, Indira Nagar, Nanavati Hospital, Khira Nagar, Saraswat Nagar, National College, Bandra, MMRDA, Income Tax Office, ILFS, MTNL Metro, SG Barve Marg, Kurla Terminal, Kurla-E, EEH, Chembur, Diamond Garden, Shivaji Chowk, BSNL Metro, Mankhurd, Mandala (Depot). Interchange available at – 1. D. N. Nagar (Metro Line 1) 2. Bandra (Suburban) 3. ITO junction (Metro Line 3) 4. Kurla East (Suburban & Metro Line 4) 5. Chembur (Monorail) 6. Mankhurd (Suburban, CST-Panvel fast corridor, Mumbai–Navi Mumbai Airport fast corridor) Wadala-Ghatkopar-Thane -Kasarvadavli Metro-4 corridor – 32-km – Rs. 14,549 crore • The 32.32-km long Metro corridor will have 32 stations • 6-coach trains will carry 1,800 commuters per trip (8 commuters per square meter) • Expected Daily Ridership – 8.7 Lakh in 2021-22 • Will save fuel, time and improve environment Stations on the Corridor – Wadala Depot, Bhakti Park Metro, Anik Nagar Bus Depot, Suman Nagar, Siddharth Colony, Amar Mahal Junction, Garodia Nagar, Pant Nagar, Laxmi Nagar, Shreyas Cinema, Godrej Company, Vikhroli Metro, Surya Nagar, Gandhi Nagar, Naval Housing, Bhandup Mahapalika, Bhandup Metro, Shangrila, Sonapur, Mulund Fire Sta tion, Mulund Naka, Teen Haath Naka (Thane), RTO Thane, Mahapalika Marg, Cadbury Junction, Majiwada, Kapurbawdi, Manpada, Tikuji -ni-wadi, Dongri Pada, Vijay Garden, Kasarvadavali with car depot at Owale .
    [Show full text]
  • Travel and Land-Use Impacts of the Mumbai–Ahmedabad High-Speed Rail in the Mumbai Metropolitan Region
    ADBI Working Paper Series TRAVEL AND LAND-USE IMPACTS OF THE MUMBAI–AHMEDABAD HIGH-SPEED RAIL IN THE MUMBAI METROPOLITAN REGION Chetan Kumar Hanni, Akash Yewale, Soham Chintawar, and K. V. Krishna Rao No. 963 May 2019 Asian Development Bank Institute Chetan Kumar Hanni is a PhD student, Akash Yewale and Soham Chintawar are MTech students, and K. V. Krishna Rao is a professor, all at the Department of Civil Engineering of the Indian Institute of Technology Bombay in Mumbai, India. The views expressed in this paper are the views of the author and do not necessarily reflect the views or policies of ADBI, ADB, its Board of Directors, or the governments they represent. ADBI does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequences of their use. Terminology used may not necessarily be consistent with ADB official terms. Working papers are subject to formal revision and correction before they are finalized and considered published. The Working Paper series is a continuation of the formerly named Discussion Paper series; the numbering of the papers continued without interruption or change. ADBI’s working papers reflect initial ideas on a topic and are posted online for discussion. Some working papers may develop into other forms of publication. Suggested citation: Hanni, C. K., A. Yewale, S. Chintawar, and K. V. K. Rao. 2019. Travel and Land-Use Impacts of Mumbai–Ahmedabad High-Speed Rail in Mumbai Metropolitan Region. ADBI Working Paper 963. Tokyo: Asian Development Bank Institute. Available: https://www.adb.org/publications/travel-and-land-use-impacts-mumbai-ahmedabad-high- speed-rail Please contact the authors for information about this paper.
    [Show full text]
  • Mumbai Infrastructure: What Is and What Will Be?
    MUMBAI INFRASTRUCTURE: WHAT IS AND WHAT WILL BE? Infrastructure development acts as a cornerstone for any city in order to determine the growth trajectory and to become an economic and real estate powerhouse. While Mumbai is the financial capital of India, its infrastructure has not been able to keep pace with the sharp rise in its demographic and economic profile. The city’s road and rail infrastructure is under tremendous pressure from serving a population of more than 25 million people. This report outlines major upcoming infrastructure projects and analyses their impact on the Mumbai real estate market. This report is interactive CBRE RESEARCH DECEMBER 2018 Bhiwandi Dahisar Towards Nasik What is Mumbai’s Virar Towards Sanjay Borivali Gandhi Thane Dombivli National current infrastructure Park framework like? Andheri Mumbai not only has a thriving commercial segment, but the residential real estate development has spread rapidly to the peripheral areas of Thane, Navi Mumbai, Vasai-Virar, Dombivli, Kalyan, Versova Ghatkopar etc. due to their affordability quotient. Commuting is an inevitable pain for most Mumbai citizens and on an average, a Mumbai resident Vashi spends at least 4 hours a day in commuting. As a result, a physical Chembur infrastructure upgrade has become the top priority for the citizens and the government. Bandra Mankhurd Panvel Bandra Worli Monorail Metro Western Suburban Central Rail Sea Link Phase 1 Line 1 Rail Network Network Wadala P D’Mello Road Harbour Rail Thane – Vashi – Mumbai Major Metro Major Railway WESTERN
    [Show full text]
  • A Better Relationship Between Transit-Oriented Development and Pedestrian Connectivity" (2019)
    Iowa State University Capstones, Theses and Creative Components Dissertations Summer 2019 Connecting the Nodes: A better relationship between Transit- Oriented Development and Pedestrian Connectivity Tanvi Halde [email protected] Follow this and additional works at: https://lib.dr.iastate.edu/creativecomponents Part of the Urban, Community and Regional Planning Commons Recommended Citation Halde, Tanvi, "Connecting the Nodes: A better relationship between Transit-Oriented Development and Pedestrian Connectivity" (2019). Creative Components. 312. https://lib.dr.iastate.edu/creativecomponents/312 This Creative Component is brought to you for free and open access by the Iowa State University Capstones, Theses and Dissertations at Iowa State University Digital Repository. It has been accepted for inclusion in Creative Components by an authorized administrator of Iowa State University Digital Repository. For more information, please contact [email protected]. CONNECTING THE NODES A better Relationship between TOD and Pedestrian Connectivity By Tanvi Sharad Halde A creative component submitted to the graduate faculty in Partial fulfillment of the requirements for the degree of MASTER OF COMMUNITY AND REGIONAL PLANNING MASTER OF URBAN DESIGN Major: Community and regional planning and Urban Design Program of Study Committee: Professor Carlton Basmajian, Major Professor Professor Sungduck Lee, Major Professor Professor Biswa Das, Committee Member Iowa State University Ames Iowa 2019 Copyright Tanvi Sharad Halde, 2019. All rights reserved.
    [Show full text]
  • Foreseen Challenges in Underground Tunneling for Mumbai Metro Line 3
    Foreseen Challenges In Underground Tunneling For Mumbai Metro Line 3 S.K.GUPTA Director (Projects)/MMRCL 25.05.2018 CONTENTS OF PRESENTATION • Project Route • Project Overview • Challenges • MML – 3 Geology, Mumbai • Technical challenges • NATM • TBMs selection • Building Condition • Monitoring • Quality Assurance PROJECT ROUTE PROJECT ROUTE Fully Underground • Length: 33.5 Km • Stations: 27 (26 U/G + 1) • Completion Cost: US$ 3.5 Billion • Phase 1: SEEPZ to BKC- June 2021 Phase 2: BKC to Cuffe Parade- Dec 2021 2021 2031 Ridership 1.22 Million 1.70 Million Headway 4 min, 16sec 2 min, 55 sec (CP-BKC) 256 sec 175 sec Coaches 248 (31 x 8 336 (42 x 8 cars) cars) PROJECT OVERVIEW PROJECT OVERVIEW(CIVIL WORKS) Contract Packages – Civil Works Packag Length Stations Limits e No. (K.M.) Cut & Cover NATM Cuffe Parade, Vidhan Bhavan, Hutatma Chowk 1 Cuffe Parade to CST 4.20 Churchgate C.S.T. Kalbadevi, Girgaoan, 2 CST to Mumbai Central 4.05 Grant Road Mumbai Central, Mahalakshami, 3 Mumbai Central to Worli 5.06 Science Museum, Acharya Atre - Chowk, Worli Siddhi Vinayak, Dadar Shitaladevi 4 Worli to Dharavi 6.08 5 Dharavi to Santacruz 4.94 Dharavi, B.K.C., VidyaNagari Santa Cruz Santacruz to CSIA CSIA Domestic, Sahar Road, 6 4.45 - (International) CSIA International Airport CSIA (International) to MIDC, SEEPZ Marol Naka 7 4.16 SEEPZ Total Length of the Corridor 33.5 CHALLENGES The Mumbai city will see such a big scale infrastructure intervention, spanning 33.5 km in the city for the first time in recent history. The project poses number of challenges: Administrative Geological Technical Logistics etc.
    [Show full text]
  • Monetising the Metro
    1 2 Indian Metro Systems – 2020 Analysis Contents Metro Rail In India: Introduction ............................................................................................................ 5 Brief Global History of Metro systems .................................................................................................... 5 Why is Metro the right MRT option? ...................................................................................................... 8 Key Benefits ........................................................................................................................................ 9 Impact on Urbanisation ...................................................................................................................... 9 When to Build a Metro ..................................................................................................................... 10 When Not to Build a Metro .............................................................................................................. 10 Implementation of Metro In Indian Context ........................................................................................ 11 Indian Issues with Implementation................................................................................................... 13 Metro in India: Spotlight Kolkata .......................................................................................................... 14 Metro in India: Spotlight Delhi .............................................................................................................
    [Show full text]
  • Alstom Wins €220 Million Contract to Design and Manufacture 234 Metro Cars for Mumbai Metro Lines 4 & 4A First Major Order for Company’S Extended Indian Portfolio
    PRESS RELEASE Alstom wins €220 million contract to design and manufacture 234 metro cars for Mumbai Metro Lines 4 & 4A First major order for company’s extended Indian portfolio 30 March 2021 – Alstom has been awarded by Mumbai Metropolitan Region KEY FIGURES Development Authority (MMRDA) the contract to design, manufacture, supply, test and commission 234 metro cars, including personnel training for Line 4 and the extension corridor (Wadala-Kasarvardavali-Gaimukh). The order is valued at €220 234 Metro cars million (INR 1854 Crores). 220 Million euros New products have been added to Alstom’s portfolio as part of the acquisition of 32 Metro stations Bombardier Transportation (BT) on January 29, 2021. The combined portfolio of products, signalling, engineering and services allows a significantly increased offering for customers across India and the Asia Pacific Region. “These are exciting times, and this first order, following our merger with Bombardier Transportation demonstrates our continued commitment towards partnering in the country’s Make-in-India mission. We are glad to have been awarded this prestigious project by MMRDA and look forward to commencing work on this. Alstom is proud to play a part in strengthening the country’s infrastructure and providing world-class mobility solutions to the commercial capital of India,” said Ling Fang, Region President, Alstom Asia Pacific. The Line is a 35.3-kilometre-long elevated corridor with 32 stations. It will provide interconnectivity among the existing Eastern Express Roadway, Mono Rail, the ongoing Metro Line 2B (D N Nagar - Mandale), and the proposed Metro Line 5 (Thane - Kalyan), Metro Line 6 (Swami Samarth Nagar - Vikhroli).
    [Show full text]