Dosti Greater Thane Brochure
Total Page:16
File Type:pdf, Size:1020Kb
THE CITY OF HAPPINESS CITY OF HAPPINESS Site Address: Dosti Greater Thane, Near SS Hospital, Kalher Junction 421 302. T: +91 86577 03367 Corp. Address: Adrika Developers Pvt. Ltd., Lawrence & Mayo House, 1st Floor, 276, Dr. D. N. Road, Fort, Mumbai - 400 001 • www.dostirealty.com Dosti Greater Thane - Phase 1 project is registered under MahaRERA No. P51700024923 and is available on website - https://maharerait.mahaonline.gov.in under registered projects Disclosures: (1) The artist’s impressions and stock image are used for representation purpose only. (2) Furniture, fittings and fixtures as shown/displayed in the show flat are for the purpose of showcasing only and do not form part of actual standard amenities to be provided in the flat. The flats offered for sale are unfurnished and all the amenities proposed to be provided in the flat shall be incorporated in the Agreement for Sale. (3) The plans are tentative in nature and proposed but not yet sanctioned. The plans, when sanctioned, may vary from the plans shown herein. (4) Dosti Club Novo is a Private Club House. It may not be ready and available for use and enjoyment along with the completion of Dosti Greater Thane - Phase 1 as its construction may get completed at a later date. The right to admission, use and enjoyment of all or any of the facilities/amenities in the Dosti Club Novo is reserved by the Promoters and shall be subject to payment of such admission fees, annual charges and compliance of terms and conditions as may be specified from time to time by the Promoters. (5) The Bullet Train Corridor, the DP Road, the Existing Road, the School Plot, the Garden Reservation, the Amenity Plot and the Dosti Dosti Greater Thane - Phase 1 is registered under MahaRERA No. P51700024923 and is available on website - https://maharerait.mahaonline.gov.in under registered projects Novo Club House and the Club House Plot shall be formally sub-divided from the rest of the layout Land in due course, and shall not form part of the layout which shall be ultimately conveyed to the Apex Body or Federation. (6) The sale of all the premises in the Dosti Greater Thane - Phase 1 Project shall be governed by terms and conditions incorporated in the Agreement for Sale. WELCOME TO GREATER THANE... THE LAND OF SMART OPPORTUNITIES • Just 7 Km (10 Mins)* from Viviana Mall • Just 4 Km (6 Mins)* from Balkum, Thane • The Newly Emerging Destination with every lifestyle convenience • Strategic connectivity with the Metro Line 5 (Thane-Bhiwandi-Kalyan) - Kalher Station right outside Dosti Greater Thane • Easy accessibility to Thane, Kalyan, Navi Mumbai, Mumbai & key localities via rail and road. • Desirable lifestyle amenities and all the comforts of a modernistic life • Various Schools, Hospitals, Malls, Temples and Shops right within its vicinity • Dosti Greater Thane offers the liberty to live the much-desired life at an extremely affordable pricing * Source: Google Maps. As per normal trafc conditions. Stock Image Used For Representation Purpose Only PROPOSED THANE-BORIVALI TUNNEL This 10 km long tunnel will start from Tikujiniwadi (Thane) and connect with the Western Express Highway at Borivali passing through Sanjay Gandhi National Park. Source: The Asian Age article dated Sep 21 2019 A NEW CITY Link: https://www.asianage.com/metros/mumbai/210919/ underground-road-to-link-borivali-and-thane.html UNDER CONSTURCTION RAJNOLI IN THE MAKING BRIDGE This 650-meter-long 4-lane yover eases the trafc congestion at Rajnoli and Mankoli bypass junctions on Mumbai-Nashik highway. The trafc issues at the Kalyan-Bhiwandi road shall be solved owing to this yover. Source: The Times of India article dated Nov 4 2019 Link: http://timesondia.indiatimes.com/articleshow/71904197.cms?utm_source=contentonterest& utm_medium=text&utm_campaign=cppst VIRAR ALIBAUG MULTIMODAL DISTANCE FROM VIVIANA MALL TRANSPORT CORRIDOR The rst phase of the project is a 79 km stretch between Virar and Balavali. And the second stretch between Balavali to 25 km Alibaug is 47 km. This corridor will have 72 bridges, 21 yovers, 22.3 kms 2 over passes and 35 vehicular underpasses thus cutting down 20 kms travel time between Virar and Alibaug by approximately 50%. 16 kms It is also expected to provide easy access to upcoming Navi 20 km 15.7 kms Mumbai International Airport and Jawaharlal Nehru Port & 15.5 kms Mumbai Trans Harbour Link. 15.2 kms Source: - Free Press Journal, article dated Dec 31st 2019. https://www.freepressjournal.in/mumbai/virar-alibaug-multimodal-corridor-work-to-begin-by-mid-2020 15 km 14.9 kms 14.8 kms 13.4 kms THANE WATERWAYS 11 kms The rst phase of the inland water transport project that will 10 km connect Thane, Kalyan and Vasai thus reducing the strain on 7 kms the roads and railways in those areas. (10 mins) 5 km Source: Times of India, article dated July 18, 2019 Link: https://timesondia.indiatimes.com/city/thane/thane-plans-waterways-by-october/articleshow/ 70271330.cms PROPOSED RO-RO WATERWAYS 0 This would be a hovercraft service between South Mumbai and Viviana Dosti Lodha Godrej Tata Mahindra Utsav Ornate Arihant Regal Ambika Runwal Navi Mumbai in Phase 1 with plans to extend the same to Mall Greater Upper Nirvaan Amantra Happinest Ahuja Kallisto City Square City Gardens Thane in Phase 2. This is expected to be a cost effective Thane Thane transport solution which will help ease road and rail trafc congestion within MMR. Source: BusinessWire India, article dated 1st Oct 2019. Link: https://www.businesswireindia.com/hovercraft-likely-script-water-transport-success-story mumbai-dr-niranjan-hiranandani-65132.html PROPOSED CST - THANE UNDERGROUND RAILWAY LINE The railways have proposed a 34 km fully underground high-speed route between Chhatrapati Shivaji Maharaj Terminus (CSTM) and Thane that will run under the current corridor and is expected to halve the commuting time. Source: Times of India, article dated July 25, 2019 Link: https://timesondia.indiatimes.com/city/mumbai/railways-mootsunderground-cst-thane-ride- in-21-minute/articleshow/70373109.cms Stock images used for representation purpose only ALL THESE DISTANCES ARE FROM VIVIANA MALL Source: Google Maps. Not to Scale. As per normal traffic conditions. *Source: Google Maps. As per normal trac conditions. BHIWANDI MIRA ROAD GAIMUKH ROAD GHODBUNDER ROAD TO NASIK PROPOSED Airport KOLSHET NOW DISTANCES ARE JETTY UNDER Eastern Express Highway CONSTRUCTION WATER WAYS PROJECT KALHER Western Express Highway METRO STATION MEASURED PROPOSED THANE - BORIVALI TUNNEL Ghodbunder Road Chembur - Jacob Circle Monorail Line IN MINUTES PROPOSED VIRAR-ALIBAUG CORRIDOR THANE - DOMBIVLI FLYOVER Santacruz - Chembur Link Road Eastern Freeway Kasheli Toll Naka 2.0 Km 04 mins Mumbai Coastal Road Balkum 4.0 Km 06 mins Bandra - Worli Sea Link DOMBIVALI Business Hub Bhiwandi 4.0 Km 07 mins Ghatkopar - Versova Metro Line 1 Bhiwandi Station 4.3 Km 08 mins Western Railway Central Railway Kapurbawdi Naka 6.3 Km 08 mins Harbour Railway Majiwada Naka 6.6 Km 09 mins Ferry Wharf Jetty Viviana Mall 7.0 Km 10 mins UNDER CONSTRUCTION INFRASTRUCTURE R Mall 8.0 Km 12 mins DN Nagar - Dahisar Metro Line 2A DN Nagar - Bandra - Mandale Metro Line 2B Korum Mall 8.5 Km 13 mins Colaba - Bandra - Seepz Metro Line 3 Kalwa 8.7 Km 20 mins Wadala - Ghatkopar - Thane Metro Line 4 Thane - Bhiwandi - Kalyan Metro Line 5 Vasant Vihar 9.0 Km 15 mins Swami Samarth Nagar-Jogeshwari Vikhroli Metro Line 6 Vartak Nagar 9.5 Km 18 mins Andheri (E) - Dahisar (E) Metro Line 7 TALOJA Andheri (E) - CSIA (E) Metro Line 7A Thane Station 10.0 Km 20 mins CSIA - Navi Mumbai Int. Airport Metro Line 8 Kalyan 15.0 Km 30 mins Dahisar (E) - Mira Bhayandar Metro Line 9 Wadala-GPO (CST) Metro Line 11 Dombivli 23.0 Km 40 mins Mumbai Trans Harbour Link (Sewri - Nhava Sheva) Navi Mumbai 28.0 Km 50 mins Navi Mumbai International Airport Thane Water Ways Transport Along Ulhas River (Thane to Vasai, Kalyan & Bhiwandi) Borivali 30.0 Km 52 mins International Airport 30.0 Km 52 mins PROPOSED INFRASTRUCTURE FERRY Thane - Borivali Tunnel WHARF JETTY UNDER CONSTRUCTION Domestic Airport 33.0 Km 57 mins NAVI MUMBAI INTERNATIONAL AIRPORT Virar-Alibaug Multi-modal transport Corridor Under Construction Thane - Dombivli Flyover Navi Mumbai International Metro Line 10 Gaimukh (Ghodbunder) Airport 35.0 Km 60 mins - Shivaji Chowk (Mira Road) Metro Line 12 Kalyan - Taloja Kolshet Jetty Bandra Versova Sea Link# Source: Google Maps. Not to Scale. As per normal traffice conditions. Coastal Road from Kandivali to Ghodbunder Road *All proposed infrastructures mentioned are as per what is shown on MMRDA website as on 25th November, 2020 & Article: https://indianexpress.com/article/cities/mumbai/coastal-road-will-be-extended-to-ghodbunder-from-bandra-versova-sea-link-5156559/ Under Construction Metro Line 5 Proposed Stations NOW, NO DISTANCE IS OUT OF YOUR REACH Bhiwandi Gopal Nagar * Dhamankar THANE BHIWANDI KALYAN (METRO LINE 5) Naka Themghar Line 5 of the Mumbai Metro or the Thane Bhiwandi Line is an important part of the metro system. The 24.9 km-long Thane-Bhiwandi-Kalyan Metro-5 corridor will have 16 stations and will be a totally elevated corridor. It will connect Rajnoli Village Anjurphata Thane to Bhiwandi and Kalyan in the eastern suburbs. Kalher Station is located just outside DOSTI GREATER THANE. Gove Gaon MIDC Kon Gaon Purna METRO LINE 4 Durgadi Fort This under construction Metro Line 4 connects Wadala - Ghatkopar - Mulund - Thane - Kasarvadavali thereby reducing travel time between the south central and northern central locations. Sahajanand Chowk KALHER FUTURE METRO LINES* Kasheli KALYAN Metro-10 (Gaimukh to Shivaji Chowk, Mira Road) | Metro-11 (Wadala to CSMT) | Metro-12 (Kalyan to Taloja) Disclaimer: The polygon of Greater Thane is not to scale.