Metro-2B and Metro-4 Info and Maps

Total Page:16

File Type:pdf, Size:1020Kb

Metro-2B and Metro-4 Info and Maps METRO-2B AND METRO-4 INFO AND MAPS DN Nagar-Bandra-Mankhurd Metro-2B Corridor – 23.5-km – Rs. 10,986 crore · The 23.5-km long Metro corridor will have 22 stations • 6-coach trains will carry 1,800 commuters per trip (8 commuters per square meter) • Expected Daily Ridership – 8.099 Lakh in 2021 • Will save fuel, time and improve environment Stations on the corridor – DN Nagar, ESIC Nagar, Prem Nagar, Indira Nagar, Nanavati Hospital, Khira Nagar, Saraswat Nagar, National College, Bandra, MMRDA, Income Tax Office, ILFS, MTNL Metro, SG Barve Marg, Kurla Terminal, Kurla-E, EEH, Chembur, Diamond Garden, Shivaji Chowk, BSNL Metro, Mankhurd, Mandala (Depot). Interchange available at – 1. D. N. Nagar (Metro Line 1) 2. Bandra (Suburban) 3. ITO junction (Metro Line 3) 4. Kurla East (Suburban & Metro Line 4) 5. Chembur (Monorail) 6. Mankhurd (Suburban, CST-Panvel fast corridor, Mumbai–Navi Mumbai Airport fast corridor) Wadala-Ghatkopar-Thane -Kasarvadavli Metro-4 corridor – 32-km – Rs. 14,549 crore • The 32.32-km long Metro corridor will have 32 stations • 6-coach trains will carry 1,800 commuters per trip (8 commuters per square meter) • Expected Daily Ridership – 8.7 Lakh in 2021-22 • Will save fuel, time and improve environment Stations on the Corridor – Wadala Depot, Bhakti Park Metro, Anik Nagar Bus Depot, Suman Nagar, Siddharth Colony, Amar Mahal Junction, Garodia Nagar, Pant Nagar, Laxmi Nagar, Shreyas Cinema, Godrej Company, Vikhroli Metro, Surya Nagar, Gandhi Nagar, Naval Housing, Bhandup Mahapalika, Bhandup Metro, Shangrila, Sonapur, Mulund Fire Sta tion, Mulund Naka, Teen Haath Naka (Thane), RTO Thane, Mahapalika Marg, Cadbury Junction, Majiwada, Kapurbawdi, Manpada, Tikuji -ni-wadi, Dongri Pada, Vijay Garden, Kasarvadavali with car depot at Owale . Interchange available at – 1. Wadala (Monorai l) 2. Kurla EEH (Metro Line 2B) 3. Kapurbawdi (Metro Line 5) Metro corridors that are approved and will be implemented in the city of Mumbai – Sr. No. Metro Corridor k.m. Cost in crore Dahisar to D.N.Nagar 1. Metro-2A Corridor 18.5-km Rs. 6,410 DN Nagar-Bandra-Mankhurd 2. Metro-2B Corridor 23.5-km Rs. 10,986 Colaba-Bandra-Seepz 3. Metro-3 Corridor 33.5-km Rs. 23,136 Wadala-Ghatkopar-Thane- Kasarvadavli Metro-4 4. 32-km Rs. 14,549 corridor Dahisar-East to Andheri-East 5. Metro-7 corridor 16.5-km Rs. 6,208 Total kms Total Cost 124-km Rs. 61,289 ALL METRO MAP .
Recommended publications
  • Operations and Maintanence Syetems for Metro Railways
    GOVERNMENT OF INDIA MINISTRY OF URBAN DEVELOPMENT REPORT OF THE SUB-COMMITTEE ON OPERATIONS AND MAINTANENCE SYETEMS FOR METRO RAILWAYS NOVEMBER 2013 Sub-Committee on Operation & Maintenance Practices Ministry of Urban Development Final Report PREFACE 1) In view of the rapid urbanization and growing economy, the country has been moving on the path of accelerated development of urban transport solutions in cities. The cities of Kolkata, Delhi and Bangalore have setup Metro Rail System and are operating them successfully. Similarly the cities of Mumbai, Hyderabad and Chennai are constructing Metro Rail system. Smaller cities like Jaipur, Kochi and Gurgaon too are constructing Metro Rail system. With the new policy of Central Government to empower cities and towns with more than two million population With Metro Rail System, more cities and towns are going to plan and construct the same. It is expected that by the end of the Twelfth Five Year Plan, India will have more than 400 Km of operational metro rail network (up from present 223 Km Approximate). The National Manufacturing Competitiveness Council (NMCC) has been set up by the Government of India to provide a continuing forum for policy dialogue to energise and sustain the growth of manufacturing industries in India. A meeting was organized by NMCC on May 03, 2012 and one of the agenda items in that meeting was “Promotion of Manufacturing for Metro Rail System in India as well as formation of Standards for the same”. In view of the NMCC meeting and heavy investments planned in Metro Rail Systems, Ministry of Urban Development (MOUD) has taken the initiative of forming a Committee for “Standardization and Indigenization of Metro Rail Systems” in May 2012.
    [Show full text]
  • Estate 5 BHK Brochure
    4 & 5 BHK LUXURY HOMES Hiranandani Estate, Thane Hiranandani Estate, Off Ghodbunder Road, Thane (W) Call:(+91 22) 2586 6000 / 2545 8001 / 2545 8760 / 2545 8761 Corp. Off.: Olympia, Central Avenue, Hiranandani Business Park, Powai, Mumbai - 400 076. [email protected] • www.hiranandani.com Rodas Enclave-Leona, Royce-4 BHK & Basilius-5 BHK are mortgaged with HDFC Ltd. The No Objection Certificate (NOC)/permission of the mortgagee Bank would be provided for sale of flats/units/property, if required. Welcome to the Premium Hiranandani Living! ABUNDANTLY YOURS Standard apartment of Basilius building for reference purpose only. The furniture & fixtures shown in the above flat are not part of apartment amenities. EXTRAVAGANTLY, oering style with a rich sense of prestige, quality and opulence, heightened by the cascades of natural light and spacious living. Actual image shot at Rodas Enclave, Thane. LUXURIOUSLY, navigating the chasm between classic and contemporary design to complete the elaborated living. • Marble flooring in living, dining and bedrooms • Double glazed windows • French windows in living room • Large deck in living/dining with sliding balcony doors Standard apartment of Basilius building for reference purpose only. The furniture & fixtures shown in the above flat are not part of apartment amenities. CLASSICALLY, veering towards the modern and eclectic. Standard apartment of Basilius building for reference purpose only. The furniture & fixtures shown in the above flat are not part of apartment amenities. EXCLUSIVELY, meant for the discerning few! Here’s an access to gold class living that has been tastefully designed and thoughtfully serviced, oering only and only a ‘royal treatment’. • Air-conditioner in living, dining and bedrooms • Belgian wood laminate flooring in common bedroom • Space for walk–in wardrobe in apartments • Back up for selected light points in each flat Standard apartment of Basilius building for reference purpose only.
    [Show full text]
  • Download 3.94 MB
    Environmental Monitoring Report Semiannual Report (March–August 2019) Project Number: 49469-007 Loan Number: 3775 February 2021 India: Mumbai Metro Rail Systems Project Mumbai Metro Rail Line-2B Prepared by Mumbai Metropolitan Development Region, Mumbai for the Government of India and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ABBREVATION ADB - Asian Development Bank ADF - Asian Development Fund CSC - construction supervision consultant AIDS - Acquired Immune Deficiency Syndrome EA - execution agency EIA - environmental impact assessment EARF - environmental assessment and review framework EMP - environmental management plan EMR - environmental Monitoring Report ESMS - environmental and social management system GPR - Ground Penetrating Radar GRM - Grievance Redressal Mechanism IEE - initial environmental examination MMRDA - Mumbai Metropolitan Region Development Authority MML - Mumbai Metro Line PAM - project administration manual SHE - Safety Health & Environment Management Plan SPS - Safeguard Policy Statement WEIGHTS AND MEASURES km - Kilometer
    [Show full text]
  • Chembur, Mumbai
    ® Chembur, Mumbai Disappearing Old Chimneys to Emerging Swanky High-Rises Micro Market Overview Report November 2017 Micro Market Overview Report | Chembur, Mumbai About Micro Market The realty landscape of Chembur has witnessed a Whilst most of the residential developments shifted paradigm shift over the past few years. Primarily towards suburbs and peripheral areas of Mumbai known as an industrial destination with the presence due to a land shortage in the core city precincts, of reputed companies such as RCF and BARC, Chembur unlocked large industrial land parcels and Chembur is rapidly transforming into a premium attracted several developers to participate in the residential destination of the Central Suburbs. city’s vertical growth. In addition, the Santacruz Industrial units, dilapidated slums and old buildings Chembur Link Road (SCLR) and Eastern Freeway are being redeveloped into modern residential added a feather in its cap by providing seamless complexes. connectivity to western suburbs and South Mumbai. Chembur altered rapidly due to its proximity to major commercial office destinations such as Wadala, BKC, Powai and Ghatkopar. Availability of large industrial land parcels for residential developments ably supported this transformation. Chembur is rapidly transforming into a premium residential destination of the Central Suburbs. ® Disappearing Old Chimneys to Emerging Swanky High-Rises 1 Chembur is well-connected to various parts of Mumbai through a grid of roads and an established rail network. Santacruz Chembur Link Road Connectivity Road Rail Eastern Express Highway – Chembur lies in Suburban rail – The harbor line of Mumbai proximity to Eastern Express Highway, which suburban railway has a station at Chembur, which provides excellent connectivity to South Mumbai, provides connectivity to CST in South Mumbai and central suburbs as well as the metropolitan area of Panvel in Navi Mumbai.
    [Show full text]
  • Detailed Project Report for Nagpur Metro
    Detailed Project Report for Nagpur Metro Presentation By Delhi Metro Rail Corporation Sep.02, 2013 22, 2013 NAGPUR AT A GLANCE • Nagpur is the third largest city of Maharashtra and also the winter capital of the state. • With a population of approximately 25 lakhs, Nagpur Metropolitan Area is the 13th largest urban conglomeration in India. • The last decade population Growth rate in NMC area was 17.26%. • Current Vehicle Statistics (2012) shows number of registered vehicles are 12.37 lakh out of which 10.32 lakhs are two wheelers. • As per provisional reports of Census India, population of Nagpur NMC in 2011 is 2,405,421; of which male and female are 1,226,610 and 1,178,811 respectively. Although Nagpur city has population of 2,405,421; its urban UA / metropolitan population is 2,497,777 of which 1,275,750 are males and 1,222,027 are females. http://www.census2011.co.in/census/city/353- nagpur.html 9/17/2013 DMRC 2 REGISTERED VEHICLES IN NAGPUR CITY (As per Motor Transport Statistics of Maharashtra as on 31st March, 2012) CATEGORY VEHICLES % TOTAL OF TWO WHEELERS 1032607 83.47 AUTO RICKSHAWS 17149 1.38 CARS (Cars, Jeeps, Station Wagons 132709 10.73 & Taxi) OTHERS (Bus, Truck, LCV, 54634 4.42 Tractors etc.) TOTAL OF ALL TYPES 1237099 100 9/17/2013 DMRC 3 RAIL AND AIR TRANSPORT IN NAGPUR CITY • A total of 160 trains from various destinations halt at Nagpur. • Almost 1.5 lakh passengers board/alight different stations in Nagpur Daily. • Nagpur central alone is used by nearly 100,000 passengers.
    [Show full text]
  • 380 Bus Time Schedule & Line Route
    380 bus time schedule & line map 380 Amrut Nagar (Vikhroli-W) View In Website Mode The 380 bus line (Amrut Nagar (Vikhroli-W)) has 2 routes. For regular weekdays, their operation hours are: (1) Amrut Nagar (Vikhroli-W): 5:12 AM - 5:52 AM (2) Anushakti Nagar: 8:18 AM - 8:10 PM Use the Moovit App to ƒnd the closest 380 bus station near you and ƒnd out when is the next 380 bus arriving. Direction: Amrut Nagar (Vikhroli-W) 380 bus Time Schedule 44 stops Amrut Nagar (Vikhroli-W) Route Timetable: VIEW LINE SCHEDULE Sunday 5:12 AM - 5:52 AM Monday 5:12 AM - 5:52 AM Anushakti Nagar V.N. Purav Marg, Mumbai Tuesday 5:12 AM - 5:52 AM Agarwadi (Mankhurd) Wednesday 5:12 AM - 5:52 AM V.N. Purav Marg, Mumbai Thursday 5:12 AM - 5:52 AM Mankhurd Railway Station (N) Friday 5:12 AM - 5:52 AM Maharashtra Nagar Saturday 5:12 AM - 5:52 AM Mohite Patil Nagar Railway Colony 380 bus Info Annabhau Sathe Ngr. Direction: Amrut Nagar (Vikhroli-W) Stops: 44 B.M.C.Compost Plant Trip Duration: 33 min Line Summary: Anushakti Nagar, Agarwadi Bainganwadi (Mankhurd), Mankhurd Railway Station (N), Maharashtra Nagar, Mohite Patil Nagar, Railway Colony, Annabhau Sathe Ngr., B.M.C.Compost Plant, Bainganwadi Bainganwadi, Bainganwadi, 600 Tenament Gate, Tata Nagar / Sambhaji Nagar, Deonar Municipal Cly., 600 Tenament Gate Deonar Police Station, New Gautam Ngr., Ashish Nagar, Narayan Guru High School, Shivsena O∆ce, Tata Nagar / Sambhaji Nagar Ambedkar Nagar, Amar Mahal, Amar Mahal, Sahakar Talkies, Pestam Sagar / Glass Factory, Sommaiya Deonar Municipal Cly.
    [Show full text]
  • ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr
    GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:672 ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr. Hari Babu;Mohammed Shri Faizal P.P.;Senguttuvan Shri Balasubramaniam;Somaiya Dr. Kirit;Thomas Prof. Kuruppassery Varkey;Venugopal Dr. Ponnusamy Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the MINISTER OF URBAN DEVELOPMENT be pleased to state: (a) the details of metro rail proposals received by the Government during the last three years and the current year, stretch and State/ UT-wise along with the estimated cost of each stretch; (b) the details of proposals cleared and lying pending stretch and State-wise, the reasons for pendency along with the time by which pending proposals are likely to be cleared; (c) the funds sanctioned, released and utilized during the above period for various projects, stretch and State/UT-wise; (d) the present status of various under construction and sanctioned metro rail stretches, stretch and city-wise and the time by which these are likely to be completed and operationalized; and (e) Whether various metro rail projects are going behind schedule and if so, the details thereof, stretch and city-wise and the details of cost escalated as a result thereof along with the steps taken/being taken to complete these projects within a reasonable period of time? Answer THE MINISTER OF STATE IN THE MINISTRY OF URBAN DEVELOPMENT (RAO INDERJIT SINGH) (a)& (b) : The details of metro rail proposals received/ cleared/pending during the last three years and the current year along with the names of stretch and the estimated cost stretch wise, State/UT-wise are given in Annexure-I & IA.
    [Show full text]
  • Floor, Cuffe Parade, Mumbai 400 005 Tel
    Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: [email protected] Website: www.merc.gov.in Case No. 202 of 2020 Suo Motu Proceeding in the matter of Grid Failure in the Mumbai Metropolitan Region on 12 October 2020 at 10.02 Hrs. Coram I.M. Bohari, Member Mukesh Khullar, Member Parties to the proceeding 1. Maharashtra State Electricity Transmission Co. Ltd. 2. Maharashtra State Electricity Distribution Co. Ltd. 3. BEST Undertaking 4. Maharashtra State Load Dispatch Centre 5. State Transmission Utility 6. Tata Power Company Ltd.-Generation 7. Tata Power Company Ltd.- Transmission 8. Tata Power Company Ltd.- Distribution 9. Adani Electricity Mumbai Ltd.- Generation 10. Adani Electricity Mumbai Ltd. -Transmission 11. Adani Electricity Mumbai Ltd.-Distribution 12. Indian Railways 13. Mindspace Business Parks Pvt. Ltd. 14. Gigaplex Estate Pvt. Ltd. Appearance (All Representatives) 1. Maharashtra State Electricity Transmission Co. Ltd. …… Shri Sanjay Taksande 2. Maharashtra State Electricity Distribution Co. Ltd. …….Shri Paresh Bhagwat 3. BEST Undertaking …….Shri N.N. Chaugule 4. Maharashtra State Load Dispatch Centre …… Shri S.V. Jaltare 5. State Transmission Utility …….Shri S.V. Jewalikar 6. Tata Power Company Ltd.-Generation 7. Tata Power Company Ltd.- Transmission ……Shri Devanand Pallikuth 8. Tata Power Company Ltd.- Distribution 9. Adani Electricity Mumbai Ltd.- Generation ….. Shri Mahesh Bhadoria MERC Order in Case No. 202 of 2020 Page 1 of 24 10. Adani Electricity Mumbai Ltd. -Transmission ..…. Shri Dilip Devasthale 11. Adani Electricity Mumbai Ltd.-Distribution … . Shri Shrikant Yeole …… Shri Kapil Sharma …… Shri Kishor Patil 12.
    [Show full text]
  • Mumbai Metro Rail Systems Project
    Report and Recommendation of the President to the Board of Directors Project Number: 49469-007 January 2019 Proposed Loan India: Mumbai Metro Rail Systems Project This is the version of the document approved by ADB’s Board of Directors that excludes information that is subject to exceptions to disclosure set forth in ADB’s Access to Information Policy. CURRENCY EQUIVALENTS (as of 11 January 2019) Currency unit – rupee (₹) ₹1.00 = $0.0141895295 $1.00 = ₹70.474500 ABBREVIATIONS ADB – Asian Development Bank CAG – comptroller and auditor general CTS – comprehensive transport study DMRC – Delhi Metro Rail Corporation EIRR – economic internal rate of return GESI – gender equality and social inclusion JICA – Japan International Cooperation Agency km – kilometer MMR – Mumbai Metropolitan Region MMRDA – Mumbai Metropolitan Region Development Authority O&M − operation and maintenance PAM – project administration manual NOTES (i) The fiscal year (FY) of the Government of India and its agencies ends on 31 March. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2018 ends on 31 March 2018. (ii) In this report, “$” refers to United States dollars. Vice-President Shixin Chen, Operations 1 Director General Hun Kim, South Asia Department (SARD) Director Ravi Peri, Transport and Communications Division, SARD Team leader Sharad Saxena, Principal Transport Specialist, SARD Team members Cynthia Gutierrez, Associate Project Analyst, SARD Prabhjot Khan, Social Development Officer (Gender), SARD Ma. Laureen Laurito, Senior Social
    [Show full text]
  • Detailed Project Report Extension of Mumbai Metro Line-4 from Kasarvadavali to Gaimukh
    DETAILED PROJECT REPORT EXTENSION OF MUMBAI METRO LINE-4 FROM KASARVADAVALI TO GAIMUKH MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY (MMRDA) Prepared By DELHI METRO RAIL CORPORATION LTD. October, 2017 DETAILED PROJECT REPORT EXTENSION OF MUMBAI METRO LINE-4 FROM KASARVADAVALI TO GAIMUKH MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY (MMRDA) Prepared By DELHI METRO RAIL CORPORATION LTD. October, 2017 Contents Pages Abbreviations i-iii Salient Features 1-3 Executive Summary 4-40 Chapter 1 Introduction 41-49 Chapter 2 Traffic Demand Forecast 50-61 Chapter 3 System Design 62-100 Chapter 4 Civil Engineering 101-137 Chapter 5 Station Planning 138-153 Chapter 6 Train Operation Plan 154-168 Chapter 7 Maintenance Depot 169-187 Chapter 8 Power Supply Arrangements 188-203 Chapter 9 Environment and Social Impact 204-264 Assessment Chapter 10 Multi Model Traffic Integration 265-267 Chapter 11 Friendly Features for Differently Abled 268-287 Chapter 12 Security Measures for a Metro System 288-291 Chapter 13 Disaster Management Measures 292-297 Chapter 14 Cost Estimates 298-304 Chapter 15 Financing Options, Fare Structure and 305-316 Financial Viability Chapter 16 Economical Appraisal 317-326 Chapter 17 Implementation 327-336 Chapter 18 Conclusions and Recommendations 337-338 Appendix 339-340 DPR for Extension of Mumbai Metro Line-4 from Kasarvadavali to Gaimukh October 2017 Salient Features 1 Gauge 2 Route Length 3 Number of Stations 4 Traffic Projection 5 Train Operation 6 Speed 7 Traction Power Supply 8 Rolling Stock 9 Maintenance Facilities
    [Show full text]
  • THE Louis Berger Group, INC. Institution of Engineers, 4Th Floor, Plot No-106, Sector-15, Belapur (East), Navi Mumbai - 400 614 Tel No
    THE Louis Berger Group, INC. Institution of Engineers, 4th Floor, Plot No-106, Sector-15, Belapur (East), Navi Mumbai - 400 614 Tel No. +91(22) - 3267 0796, Fax No. +91(22)- 2757 7973, www.louisberger.com ENGINEERS • P L A N N E R S • S C IEN T IS T S • ECONOMISTS Letter of Recommendation To whom so ever it may concern Dear Sir/Madam, I am team leader for Navi Mumbai Metro (NMM) Project at The Louis Berger Group INC, and am writing to recommend Gauri Jumde. I have known Gauri Jumde through her work experience with our firm during the Navi Mumbai Metro Project, when she served as an Architect cum Infrastructure Planner in our Navi Mumbai office. Gauri became immediately involved in the master planning and designing of depot for NMM, conducting much of the detailed design, site assessment. In addition to the designing, Gauri was instrumental in the development of the final technical specification report. She was in a team to provide accurate, effective and concise statistical and anecdotal data to a variety of constituents in order to support various infrastructure related projects such as Feasibility study for multimodal corridor & Mumbai Metro Line 3 Project, master planning for Navi Mumbai International & other regional airports in Maharashtra State. Gauri has shown the kind of initiative that is necessary to be successful over the long term in the urban and transportation planning field. I believe she has an excellent future in the urban and transportation planning field. She is a conscientious worker and has an excellent work ethic.
    [Show full text]
  • Brochure Are Subject to Change Without Any Notice
    Imagine bird watching every morning Imagine meditating 425 ft above sea level Imagine your fitness goals easily fitting into each day Imagine getting closer to the sunsets and Imagine thoughtful the stars each evening touches that enrich your family SIDDHA & SEJAL GROUPS ARE ADDING AN ICONIC LANDMARK TO MUMBAI’S FIRSTS. Siddha Sky is the first residential complex in Mumbai with a Rooftop Skywalk. The Rooftop Skywalk is a unique architectural marvel that spans 200+m in length spanning across 4 Towers. Siddha Sky is all set to redefine contemporary lifestyle with state-of-the-art amenities and facilities and a Rooftop Skywalk that has social, leisure & active spaces. And best of all, it makes this ‘impossibility’ possible in Wadala, the new strategic heart of Mumbai. Siddha Sky is the epitome of a lifestyle change that Mumbai needs today. With 1100+ residences, each 2, 3 & 4 BHK (552 to 1173 sq ft) apartment is designed to inspire the senses. Siddha Group, pioneer of the Rooftop Skywalk in India, have joined hands with Sejal Group to create a masterpiece - Siddha Sky, Mumbai’s first residential complex with a Rooftop Skywalk. LOCATION Andheri CSIA T2 CSIA T1 Chhatrapati Shivaji International Ghatkopar & Domestic Airport m Che bur uz Lin cr k R nta oa Sa d Pr op os ed B K C El ev at ed BKC R o Bandra Metro ad IMAX Dadar Five Gardens (Wadala) Trans-Harbour Link Byculla Mumbai Central Mumbai Central LANDMARKS CONNECTIVITY BUSINESS HUBS Chhatrapati Shivaji Maharaj Terminus Domestic Airport 10.0 km BKC 6.0 km International Airport 10.0 km Nariman
    [Show full text]