Foreseen Challenges in Underground Tunneling for Mumbai Metro Line 3

Total Page:16

File Type:pdf, Size:1020Kb

Foreseen Challenges in Underground Tunneling for Mumbai Metro Line 3 Foreseen Challenges In Underground Tunneling For Mumbai Metro Line 3 S.K.GUPTA Director (Projects)/MMRCL 25.05.2018 CONTENTS OF PRESENTATION • Project Route • Project Overview • Challenges • MML – 3 Geology, Mumbai • Technical challenges • NATM • TBMs selection • Building Condition • Monitoring • Quality Assurance PROJECT ROUTE PROJECT ROUTE Fully Underground • Length: 33.5 Km • Stations: 27 (26 U/G + 1) • Completion Cost: US$ 3.5 Billion • Phase 1: SEEPZ to BKC- June 2021 Phase 2: BKC to Cuffe Parade- Dec 2021 2021 2031 Ridership 1.22 Million 1.70 Million Headway 4 min, 16sec 2 min, 55 sec (CP-BKC) 256 sec 175 sec Coaches 248 (31 x 8 336 (42 x 8 cars) cars) PROJECT OVERVIEW PROJECT OVERVIEW(CIVIL WORKS) Contract Packages – Civil Works Packag Length Stations Limits e No. (K.M.) Cut & Cover NATM Cuffe Parade, Vidhan Bhavan, Hutatma Chowk 1 Cuffe Parade to CST 4.20 Churchgate C.S.T. Kalbadevi, Girgaoan, 2 CST to Mumbai Central 4.05 Grant Road Mumbai Central, Mahalakshami, 3 Mumbai Central to Worli 5.06 Science Museum, Acharya Atre - Chowk, Worli Siddhi Vinayak, Dadar Shitaladevi 4 Worli to Dharavi 6.08 5 Dharavi to Santacruz 4.94 Dharavi, B.K.C., VidyaNagari Santa Cruz Santacruz to CSIA CSIA Domestic, Sahar Road, 6 4.45 - (International) CSIA International Airport CSIA (International) to MIDC, SEEPZ Marol Naka 7 4.16 SEEPZ Total Length of the Corridor 33.5 CHALLENGES The Mumbai city will see such a big scale infrastructure intervention, spanning 33.5 km in the city for the first time in recent history. The project poses number of challenges: Administrative Geological Technical Logistics etc. I will cover only the Geological and Technical Challenge(Topographical and QA related) Mumbai Geology Reclamation History of Mumbai City TOWARDS SEEPZ PAREL MAZGAON B.K.C. LITTLE COLABA GIRGAON CUFFE PARADE DADAR MUMBAI CHURCHGATE RECLAIMED LAND CENTRAL MAHIM WORLI BOMBAY COLABA Mumbai Geology, Historical Background 9 Mumbai Geology • Mumbai : Seven islands with history of reclamation since 1800 • Deccan trap formation – 65 Ma ago • Parent rocks of Mumbai region are volcanic in nature • Basalt, Breccia, Tuff • Intertrappean Sedimentary Rocks like Shale (long period of quiescence in volcanic activity) • Thickness of overburden soil 1.0 m to 14.0 m. • Predominantly: Marine Clay, boulders, filled-up material • Ground Water is close to ground level MML – 3 GEOLOGY, MUMBAI Anticipated Construction Challenges Geological Possible Construction Issues Condition Compact Basalt High degree of jointing, water bearing strata, rock fall, instability Contact Boundary Filling of clay at contact plane, weak rock mass at contact zone between Basalt and Breccia Tuff, Tuff Breccia Clay minerals in rocks produce sticky muck and may jam cutters affecting progress Intertrappean Shale Unstable due to their inherent softness which may be aggravated by their closely spaced laminations, water seepage along bedding planes, rock fall due to softening in contact with water, swelling behaviour MML – 3 GEOLOGY, MUMBAI Varying Geological Conditions Ground Water Table 18.6 STATION m Shale, Breccia, Basalt Grade IV, V Basalt Grade I, TUNNEL II Challenges in TBM Tunnelling - Varying Geological Conditions TECHNICAL CHALLANGES Technical • The corridor passes through densely populated and congested parts of Mumbai • It is practically unavoidable not to have tunnels passing directly underneath or in a close proximity of existing buildings and existing infrastructure. The alignment is in proximity of : • High Rise Buildings (existing) • Proposed Development / Redevelopment • Heritage Buildings • Dilapidated Buildings • Flyovers and Metro Viaduct • Railway Lines • Most of the Stations are on road and very close to buildings • There is limited space for planning and implementing: • Traffic Diversion • Utility Diversion Heritage Buildings HUTATMA CHOWK STATION Arrangement for Cut & Cover Box with One NATM Platform Tunnel outside the Box HUTATMA CHOWK STATION HERITAGE PRECINCT 19 Dilapidated Buildings GIRGAON TBM Tunnel s Girgaon Crossing Railway Lines & Water Bodies Stabling Sidings & Cross- Passages by NATM Tunnel Crown 19.0 m below water Tunnel Crown 15 m below Suburban Railway level Tracks Tunnels under Flyovers A CSIA International A Foundation Details of Sahar Elevated Road based on actual piling records Variation in rock head SECTION A-A Tunnels in Proximity of High Rise Buildings 70 m 4.7 m 2.8 4.9 m m 25 m ROCK LEVEL New Austrian Tunneling Method (NATM) NATM TUNNELING • New Austrian Tunneling Method (NATM) is being employed extensively in stations to excavate where ground access is not available. Seven stations out of 26 have a component of NATM in 4 structural forms • Reversal siding at Cuffe Parade as well as siding at BKC below a large water body are to be done by NATM • NATM requires less land, and are chosen based on the type of locality /land availability/geology • Cross-Overs proposed at CST and Sahar Road • All Cross passages are by NATM Contract Packages – NATM Work Scope Package Limits NATM Work Scope No. Turn back/stabling siding tunnels at Cuffe Parade, UGC-01 Cuffe Parade to CST Hutatma Chowk station Cross Passages Kalbadevi station Girgaoan station UGC-02 CST to Mumbai Central Grant Road station Cross Passages UGC-03 Mumbai Central to Worli Cross Passages Shitaladevi station UGC-04 Worli to Dharavi Cross Passages Santacruz station UGC-05 Dharavi to Santacruz Two stabling siding tunnels at BKC Cross Passages UGC-06 Santacruz to CSIA (International) Cross Passages Marol Naka station UGC-07 CSIA (International) to SEEPZ Cross Passages NATM TUNNELING KALBADEVI -CROSS SECTION Cross Section at Cut & Cover Box Cross Section at NATM TBM For Mumbai Metro Line 3 TBM Design Approval Process - Introduction TBM by Category Design Challenges • Complexity of Geology and Hydrogeological conditions • Heritage, religious, high rise and dilapidated building • Extremely congested city • Fast Track Project Approval Process TBM by Contractor and Supplier • TBM selection by contractors • Standardised Design Approval process o Integrated approach to design approval o Re-iterative design review process as more geotechnical data became available o Collaborative debates and discussions TBM Design Requirements Following TBM design approval parameters were established during Kick-off meetings • Initial TBM design was based on Tender Geotechnical Data, GIR & GFR • Geometric parameters o Alignment, excavation diameter, segmental lining preliminary design, minimum radius of curvature etc. • Geotechnical and hydrogeological parameters o Rock Types and Class, water table, permeability, cohesion etc. • Mechanical requirements of the TBM o Thrust pressure, torque, cutter head design (Particularly on Used TBM) , main bearing loads, thrust pad and annular grouting requirements • Other TBM Design Requirements o Transportation through congested and constrained road network o Geo-statical, dead loads, and erection loads TBM TYPES SELECTED DUAL MODE HARD ROCK TBM ROCK EPB TBM Building Condition Principle Control Process to Protect the Existing Heritage Buildings and Adjacent Structure MML3 Project has established a very stringent process in design and construction stages to safeguard and protect existing heritage buildings, weak buildings and adjacent structures with respect to structures integrity and safety. The control process broadly consists of four(4) stages: 1. Assessment of existing building condition and assigning allowable impact limit categories. 2. Design the station and tunnelling excavation method impacts to be within limits of the adjacent buildings categories 3. Design and installation of protection and mitigation measures where necessary. 4. Close and continuous monitoring duration construction and revising designs as per steps 2 and 3 • Keeping watch on and getting early warning of any excessive and undue movement and/or distortion of adjacent ground and buildings is the underlined principle of the monitoring philosophy. • Instrumentations are installed on the buildings and ground before commencement of work to monitor vital parameters of the building and ground during Construction: • Settlements • Tilting • Distortions • Ground water level • Stress and displacement in excavation and support system • Vibrations Monitoring Mumbai Metro Line 3 Monitoring and TBM Active Control Control System • Controlling of Boring Process: guide parameters from interdisciplinary processing of geotechnical, geodetic and machine data QUALITY ASSURANCE Quality Assurance General Quality Assurance of MML3 is implemented on a well structured state-of-art System, monitored and recorded to ensure 120 years Infrastructure Design Life. • Mainstays for assuring quality: • Contract Documents • ISO, BIS,DIN, EN • Project Quality Plan • Design Quality Plan • Manufacturer Quality Plan • Approved Design and Drawings • Approved Method Statements & ITPs • Instruments used for ensuring quality: • Routine Audits & Construction Monitoring • Approval Process • Assessment Process • Request for Inspection (RFIs) • Contractor’s Surveillance Inspections • Non Conformance Report (NCRs) • Corrective Action Report (CARs) Conclusion Conclusion • Dealing with advance geology within an urban environment, similar to Mumbai, can be problematic, leading to significant tunnelling delays if not foreseen. • In variable ground conditions this can prove demanding depending on Stress State, Rock Competence and Groundwater inflows. Mitigating delays associated with bad ground at significant depth requires foresight, comprehensive design solutions and advance planning. • Tunnelling operations has commenced with 8 TBMs with all TBMs performing satisfactorily. General Consultants Thank you .
Recommended publications
  • The Municipal Co-Operative Bank Ltd.,Mumbai DEAF DATA
    The Municipal Co-operative Bank Ltd.,Mumbai DEAF DATA CUSTOMER_NAME ADDRESS DHAR DHONDU DHURI JAIRBAI WADIA RD MUNICIPAL CHAWL NO.92 3RD FLOOR 400012 PAREL,MUMBAI MAHARASHTRA DHAR GANGADHAR BEDEKAR G/S WARD PANDURANG BUDHKAR MARG NULL .,MUMBAI MAHARASHTRA DHAR HANUMANT PATWARDHAN C/202 MINAL CHHAYA CO OP HOS NULL NULL MAHARASHTRA KANT GANPATRAO KENI 750 BLISS APTS 1ST FLOOR ROAD 6 PAVJ I COLONY DADAR 4000014 DADAR,MUMBAI MAHARASHTRA PAD VISHNU DEO 3/32 AHMED SAILOR BLDG DADAR 400014 NULL NULL MAHARASHTRA A AND CDEPARMENT MUMBAI MUMBAI A B PARAB NAGRIK VIKAS SEVA MANDAL PAVWALLA CHAWL NO.5,SAVARKAR NAGARKHAR (E) MUMBAI 400055 A D KAMBLE . NULL NULL MAHARASHTRA A H HYMAVATHI 32/559, KANNAMVAR NAGAR-1 VIKROLI EAST MUMBAI-83 NULL MAHARASHTRA A K RELE MUMBAI MUMBAI A N CHAURASIYA RAM GOVIND STORES MURGIWALA CHAWL, SHOP NO 6, N M JOSHI MARG MUMBAI A S KARAMBELKAR 25/32 IBRAHIM MANSION DR B R AMBEDKAR R D 400012 PAREL,MUMBAI MAHARASHTRA A S SOLANKI . NULL NULL MAHARASHTRA ABBAJI PANDURANG CHUNGLE 16/B VIMAL NIWAS J B MARG 400012 NULL PAREL,MUMBAI MAHARASHTRA ABDON FERNANDES 3/9 MUNICIPAL BLOCK S,V ROAD KHAR MUMBAI ABDUL AHMED ABDUL MATUNGA LABOUR CAMP, TATA POWER HOUSE A-WARD CHAWL NO 2,R.NO 14 MATUNGA MUMBAI 400019 ABDUL BAPU MATUNGA LABOUR CAMP OPP BLDG NO 4 ZOPA DPATTI SHAKA NO 238 MILIND NAGAR 40001 NULL MAHARASHTRA ABDUL J A GAFOOR DHARVAI DONGARI KHANA SION ABDUL KADAR BUZARAT ALI TATA NAGAR ZOPADPATTI GOVANDI STATION,RO OM NO 533 DIVA E,MUMBAI MAHARASHTRA ABDUL MAJID SHAIKH NEW B D D CHAWL NO 21 ROOM NO 61 NAIGAON NULL DAHISAR,MUMBAI MAHARASHTRA ABDUL R BIPAT KADIPUR MOHALLAH JAWAHER NAGAR BADA POST KADIPUR DIST -SULTANPUR U.P.
    [Show full text]
  • Download 3.94 MB
    Environmental Monitoring Report Semiannual Report (March–August 2019) Project Number: 49469-007 Loan Number: 3775 February 2021 India: Mumbai Metro Rail Systems Project Mumbai Metro Rail Line-2B Prepared by Mumbai Metropolitan Development Region, Mumbai for the Government of India and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ABBREVATION ADB - Asian Development Bank ADF - Asian Development Fund CSC - construction supervision consultant AIDS - Acquired Immune Deficiency Syndrome EA - execution agency EIA - environmental impact assessment EARF - environmental assessment and review framework EMP - environmental management plan EMR - environmental Monitoring Report ESMS - environmental and social management system GPR - Ground Penetrating Radar GRM - Grievance Redressal Mechanism IEE - initial environmental examination MMRDA - Mumbai Metropolitan Region Development Authority MML - Mumbai Metro Line PAM - project administration manual SHE - Safety Health & Environment Management Plan SPS - Safeguard Policy Statement WEIGHTS AND MEASURES km - Kilometer
    [Show full text]
  • Mumbai Metro Rail Systems Project
    Report and Recommendation of the President to the Board of Directors Project Number: 49469-007 January 2019 Proposed Loan India: Mumbai Metro Rail Systems Project This is the version of the document approved by ADB’s Board of Directors that excludes information that is subject to exceptions to disclosure set forth in ADB’s Access to Information Policy. CURRENCY EQUIVALENTS (as of 11 January 2019) Currency unit – rupee (₹) ₹1.00 = $0.0141895295 $1.00 = ₹70.474500 ABBREVIATIONS ADB – Asian Development Bank CAG – comptroller and auditor general CTS – comprehensive transport study DMRC – Delhi Metro Rail Corporation EIRR – economic internal rate of return GESI – gender equality and social inclusion JICA – Japan International Cooperation Agency km – kilometer MMR – Mumbai Metropolitan Region MMRDA – Mumbai Metropolitan Region Development Authority O&M − operation and maintenance PAM – project administration manual NOTES (i) The fiscal year (FY) of the Government of India and its agencies ends on 31 March. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2018 ends on 31 March 2018. (ii) In this report, “$” refers to United States dollars. Vice-President Shixin Chen, Operations 1 Director General Hun Kim, South Asia Department (SARD) Director Ravi Peri, Transport and Communications Division, SARD Team leader Sharad Saxena, Principal Transport Specialist, SARD Team members Cynthia Gutierrez, Associate Project Analyst, SARD Prabhjot Khan, Social Development Officer (Gender), SARD Ma. Laureen Laurito, Senior Social
    [Show full text]
  • Trade Marks Journal No: 1796 , 08/05/2017 Class 35
    Trade Marks Journal No: 1796 , 08/05/2017 Class 35 1556539 08/05/2007 LGC USA HOLDINGS, INC. 580 FIFTH AVENUE NEW YORK, NY 10036 USA SERVICES A DELAWARE CORPORATION, Address for service in India/Agents address: ALG INDIA LAW OFFICES. 30 SIRI FORT ROAD, NEW DELHI-110049. Proposed to be Used DELHI RETAIL STORE SERVICES AND ONLINE RETAIL STORE SERVICES. 5138 Trade Marks Journal No: 1796 , 08/05/2017 Class 35 JU'S 1798525 23/03/2009 JAIN UDHAY FABRICS PVT. LIMITED B - XXXIII, 212, G.T. ROAD WEST, LUDHIANA - 8, (PB.). SERVICES Address for service in India/Agents address: MAHTTA & CO. 43 - B/3, MAHTTA HOUSE,UDHAM SINGH NAGAR, LUDHIANA - 141 001, (PUNJAB). Used Since :01/04/2005 DELHI Advertising, Business Admiiustration & Management Activities, Wholesale and Retail Outlets including Services relating to Distribution, Trading, Marketing and Exporting of Hosiery and Readymade Garments for sale in India and for export 5139 Trade Marks Journal No: 1796 , 08/05/2017 Class 35 1829460 15/06/2009 ABDUL QAYYUM, trading as ;IRAM LOCK INDUSTRIES RORABAR, KARBALA ROAD, ALIGARH MANUFACTURER & MERCHANT Address for service in India/Attorney address: SHELTER BUREAU OF INTELLECTUAL PROPERTY A-3 NEELKANTH BHAWAN PART-II MAIN BURARI ROAD DELHI Used Since :10/04/1995 DELHI ADVERTISING, BUSINESS MANAGEMENT, BUSINESS ADMINISTRATION, OFFICIAL FUNCTIONS, DISTRIBUTION, MARKETING, WHOLESALE AND RETAIL SERVICES RELATING TO LOCKS AND HARDWARE OF ALL KINDS, BEING INCLUDED IN CLASS-35. THIS IS CONDITION OF REGISTRATION THAT BOTH/ALL LABELS SHALL BE USED TOGETHER.. 5140 Trade Marks Journal No: 1796 , 08/05/2017 Class 35 1880546 04/11/2009 MANIK MOHAN PURI & AMIT PURI trading as ;M/S MOHAN BAKERS 148 - 149, HSIDC, FOOD PARK, SAHA, AMBALA - 133 104 (HARYANA) INDIA MANUFACTURING, MARKETING & TRADING Address for service in India/Agents address: P.
    [Show full text]
  • Detailed Project Report Extension of Mumbai Metro Line-4 from Kasarvadavali to Gaimukh
    DETAILED PROJECT REPORT EXTENSION OF MUMBAI METRO LINE-4 FROM KASARVADAVALI TO GAIMUKH MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY (MMRDA) Prepared By DELHI METRO RAIL CORPORATION LTD. October, 2017 DETAILED PROJECT REPORT EXTENSION OF MUMBAI METRO LINE-4 FROM KASARVADAVALI TO GAIMUKH MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY (MMRDA) Prepared By DELHI METRO RAIL CORPORATION LTD. October, 2017 Contents Pages Abbreviations i-iii Salient Features 1-3 Executive Summary 4-40 Chapter 1 Introduction 41-49 Chapter 2 Traffic Demand Forecast 50-61 Chapter 3 System Design 62-100 Chapter 4 Civil Engineering 101-137 Chapter 5 Station Planning 138-153 Chapter 6 Train Operation Plan 154-168 Chapter 7 Maintenance Depot 169-187 Chapter 8 Power Supply Arrangements 188-203 Chapter 9 Environment and Social Impact 204-264 Assessment Chapter 10 Multi Model Traffic Integration 265-267 Chapter 11 Friendly Features for Differently Abled 268-287 Chapter 12 Security Measures for a Metro System 288-291 Chapter 13 Disaster Management Measures 292-297 Chapter 14 Cost Estimates 298-304 Chapter 15 Financing Options, Fare Structure and 305-316 Financial Viability Chapter 16 Economical Appraisal 317-326 Chapter 17 Implementation 327-336 Chapter 18 Conclusions and Recommendations 337-338 Appendix 339-340 DPR for Extension of Mumbai Metro Line-4 from Kasarvadavali to Gaimukh October 2017 Salient Features 1 Gauge 2 Route Length 3 Number of Stations 4 Traffic Projection 5 Train Operation 6 Speed 7 Traction Power Supply 8 Rolling Stock 9 Maintenance Facilities
    [Show full text]
  • THE Louis Berger Group, INC. Institution of Engineers, 4Th Floor, Plot No-106, Sector-15, Belapur (East), Navi Mumbai - 400 614 Tel No
    THE Louis Berger Group, INC. Institution of Engineers, 4th Floor, Plot No-106, Sector-15, Belapur (East), Navi Mumbai - 400 614 Tel No. +91(22) - 3267 0796, Fax No. +91(22)- 2757 7973, www.louisberger.com ENGINEERS • P L A N N E R S • S C IEN T IS T S • ECONOMISTS Letter of Recommendation To whom so ever it may concern Dear Sir/Madam, I am team leader for Navi Mumbai Metro (NMM) Project at The Louis Berger Group INC, and am writing to recommend Gauri Jumde. I have known Gauri Jumde through her work experience with our firm during the Navi Mumbai Metro Project, when she served as an Architect cum Infrastructure Planner in our Navi Mumbai office. Gauri became immediately involved in the master planning and designing of depot for NMM, conducting much of the detailed design, site assessment. In addition to the designing, Gauri was instrumental in the development of the final technical specification report. She was in a team to provide accurate, effective and concise statistical and anecdotal data to a variety of constituents in order to support various infrastructure related projects such as Feasibility study for multimodal corridor & Mumbai Metro Line 3 Project, master planning for Navi Mumbai International & other regional airports in Maharashtra State. Gauri has shown the kind of initiative that is necessary to be successful over the long term in the urban and transportation planning field. I believe she has an excellent future in the urban and transportation planning field. She is a conscientious worker and has an excellent work ethic.
    [Show full text]
  • Mumbai Metro One Sop for Resumption of Services
    MUMBAI METRO ONE SOP FOR RESUMPTION OF SERVICES OBJECTIVE This SOP has been prepared in the framework of the Coronavirus disease (COVID-19) outbreak with an objective to enlist the mitigation measures required post lock-down period for safe metro travel with Mumbai Metro One in coming times. CONTEXT Public transport systems are perceived as a high-risk environment for the ongoing Covid-19 Pandemic. This requires the mitigation for the associated risks/challenges, namely: Requirement to take additional cleaning and hygiene relate measures to prevent the spread of Covid-19. Requirement to run the public awareness campaigns to build the confidence of public. Staff awareness measures and provision of necessary PPEs to prevent spread of infection amongst its staff and preparation to deal with absenteeism due to various logistical or personal health related disruptions. 1 Mumbai Metro One – SOP for Resumption of Services Table of Contents 1. COMMUTER EXPERIENCE: HEALTH & HYGIENE 4 1.1 Cleaning and disinfection measures 4 1.1.1 On train 4 1.1.2 At stations 5 1.2 Health & hygiene guidelines for commuters 6 1.3 Public education & awareness 7 2. STAFF HEALTH & HYGIENE 10 2.1 General measures 10 2.2 Actions and facilities at entry gates 10 2.3 Staff health committee and helpline 11 2.3.1 Metro 1 Health Committee (M1HC) 11 2.3.2 Emergency helpline 12 2.3.3 Staff rotation and seating 12 2.3.4 Work from Home (WFH) 12 2.3.5 Control and Sanitization measures at offices 13 2.3.6 Canteen and cafeteria facilities 14 2.3.7 Absenteeism 14 2.3.8 Logistical support 14 2.3.9 Rest rooms 15 2.3.10 Actions related to affected area 15 3.
    [Show full text]
  • Trade Marks Journal No: 1796 , 08/05/2017 Class 16 1564967 04/06/2007 Address for Service in India/Agents Address
    Trade Marks Journal No: 1796 , 08/05/2017 Class 16 Advertised before Acceptance under section 20(1) Proviso 1564967 04/06/2007 POLYPLEX CORPORATION LIMITED B-37, Sector 1, Noida, Gautam Budh Nagar, Uttar Pradesh - 201 301 India MANUFACTURERS AND MERCHANTS Address for service in India/Agents address: PRATHIBA M SINGH, ADVOCATE. F - 12, JANGPURA EXTENSION, NEW DELHI - 110 014. Used Since :01/08/2005 DELHI All types of packing materials made of starches; packing paper; plastic material for packing, PET Films of various types including Silicone coated PET films, Metallised PET Films, Precoated PET Films, Coated PET Films, Silicone coated plastic films, Extensible films for palletization falling in Class 16 2820 Trade Marks Journal No: 1796 , 08/05/2017 Class 16 REFRESH YOUR JOURNEY 1731530 12/09/2008 SHREE VASUDEVA DESIGN CONCEPTS PVT LTD H-304, PHASE-I, BHIWARI INDUSTRIAL AREA, DISTRICT ALWAR, BHIWARI, RAJASTHAN. MANUFACTURERS &MERCHANTS A COMPANY INCORPORATED IN INIDA. Address for service in India/Agents address: L.S. DAVAR & CO. 5/1, FIRST FLOOR, KALKAJI EXTENSION., NEW DELHI - 110 019. INDIA. Used Since :26/10/2005 DELHI PAPER, CARDBOARD AND GOODS MADE FROM THESE MATERIALS, NOT INCLUDED IN OTHER CLASSES; PRINTED MATTER, BOOKBINDING MATERIALS, PHOTOGRAPHS; STATIONERY; ADHESIVES AND STATIONERY OR HOUSEHOLD PURPOSES; ARTISTS" MATERIALS; PAINT BRUSHES; TYPEWRITERS AND OFFICE REQUISITES (EXCEPT FURNITURE); INSTRUCTIONAL AND TEACHING MATERIAL (EXCEPT APPARATUS); PLASTIC MATERIALS FOR PACKAGING (NOT INCLUDED IN OTHER CLASSES); PLAYING CARDS; PRINTERS" TYPE; PRINTED BLOCKS. 2821 Trade Marks Journal No: 1796 , 08/05/2017 Class 16 1893593 09/12/2009 ZEE ENTERTAINMENT ENTERPRISES LTD. B - 10, LAWRENCE ROAD, INDUSTRIAL AREA, NEW DELHI - 110035.
    [Show full text]
  • Dosti Greater Thane Brochure
    THE CITY OF HAPPINESS CITY OF HAPPINESS Site Address: Dosti Greater Thane, Near SS Hospital, Kalher Junction 421 302. T: +91 86577 03367 Corp. Address: Adrika Developers Pvt. Ltd., Lawrence & Mayo House, 1st Floor, 276, Dr. D. N. Road, Fort, Mumbai - 400 001 • www.dostirealty.com Dosti Greater Thane - Phase 1 project is registered under MahaRERA No. P51700024923 and is available on website - https://maharerait.mahaonline.gov.in under registered projects Disclosures: (1) The artist’s impressions and stock image are used for representation purpose only. (2) Furniture, fittings and fixtures as shown/displayed in the show flat are for the purpose of showcasing only and do not form part of actual standard amenities to be provided in the flat. The flats offered for sale are unfurnished and all the amenities proposed to be provided in the flat shall be incorporated in the Agreement for Sale. (3) The plans are tentative in nature and proposed but not yet sanctioned. The plans, when sanctioned, may vary from the plans shown herein. (4) Dosti Club Novo is a Private Club House. It may not be ready and available for use and enjoyment along with the completion of Dosti Greater Thane - Phase 1 as its construction may get completed at a later date. The right to admission, use and enjoyment of all or any of the facilities/amenities in the Dosti Club Novo is reserved by the Promoters and shall be subject to payment of such admission fees, annual charges and compliance of terms and conditions as may be specified from time to time by the Promoters.
    [Show full text]
  • Metro-2B and Metro-4 Info and Maps
    METRO-2B AND METRO-4 INFO AND MAPS DN Nagar-Bandra-Mankhurd Metro-2B Corridor – 23.5-km – Rs. 10,986 crore · The 23.5-km long Metro corridor will have 22 stations • 6-coach trains will carry 1,800 commuters per trip (8 commuters per square meter) • Expected Daily Ridership – 8.099 Lakh in 2021 • Will save fuel, time and improve environment Stations on the corridor – DN Nagar, ESIC Nagar, Prem Nagar, Indira Nagar, Nanavati Hospital, Khira Nagar, Saraswat Nagar, National College, Bandra, MMRDA, Income Tax Office, ILFS, MTNL Metro, SG Barve Marg, Kurla Terminal, Kurla-E, EEH, Chembur, Diamond Garden, Shivaji Chowk, BSNL Metro, Mankhurd, Mandala (Depot). Interchange available at – 1. D. N. Nagar (Metro Line 1) 2. Bandra (Suburban) 3. ITO junction (Metro Line 3) 4. Kurla East (Suburban & Metro Line 4) 5. Chembur (Monorail) 6. Mankhurd (Suburban, CST-Panvel fast corridor, Mumbai–Navi Mumbai Airport fast corridor) Wadala-Ghatkopar-Thane -Kasarvadavli Metro-4 corridor – 32-km – Rs. 14,549 crore • The 32.32-km long Metro corridor will have 32 stations • 6-coach trains will carry 1,800 commuters per trip (8 commuters per square meter) • Expected Daily Ridership – 8.7 Lakh in 2021-22 • Will save fuel, time and improve environment Stations on the Corridor – Wadala Depot, Bhakti Park Metro, Anik Nagar Bus Depot, Suman Nagar, Siddharth Colony, Amar Mahal Junction, Garodia Nagar, Pant Nagar, Laxmi Nagar, Shreyas Cinema, Godrej Company, Vikhroli Metro, Surya Nagar, Gandhi Nagar, Naval Housing, Bhandup Mahapalika, Bhandup Metro, Shangrila, Sonapur, Mulund Fire Sta tion, Mulund Naka, Teen Haath Naka (Thane), RTO Thane, Mahapalika Marg, Cadbury Junction, Majiwada, Kapurbawdi, Manpada, Tikuji -ni-wadi, Dongri Pada, Vijay Garden, Kasarvadavali with car depot at Owale .
    [Show full text]
  • Mumbai Local Sightseeing Tours
    Mumbai Local Sightseeing Tours HALF DAY MUMBAI CITY TOUR Visit Gateway of India, Mumbai's principle landmark. This arch of yellow basalt was erected on the waterfront in 1924 to commemorate King George V's visit to Mumbai in 1911. Drive pass the Secretariat of Maharashtra Government and along the Marine Drive which is fondly known as the 'Queen's Necklace'. Visit Jain temple and Hanging Gardens, which offers a splendid view of the city, Chowpatty, Kamala Nehru Park and also visit Mani Bhavan, where Mahatma Gandhi stayed during his visits to Mumbai. Drive pass Haji Ali Mosque, a shrine in honor of a Muslim Saint on an island 500 m. out at sea and linked by a causeway to the mainland. Stop at the 'Dhobi Ghat' where Mumbai's 'dirties' are scrubbed, bashed, dyed and hung out to dry. Watch the local train passing close by on which the city commuters 'hang out like laundry' ‐ a nice photography stop. Continue to the colorful Crawford market and to the Flora fountain in the large bustling square, in the heart of the city. Optional visit to Prince of Wales museum (closed on Mondays). TOUR COST : INR 1575 Per Person The tour cost includes : • Tour in Ac Medium Car • Services of a local English‐speaking Guide during the tour • Government service tax The tour cost does not include: • Entry fees at any of the monuments listed in the tour. The same would be on direct payment basis. • Any expenses of personal nature Note: The above tour is based on minimum 2 persons traveling together in a car.
    [Show full text]
  • Bus Pass Scheme in Detail the Undertaking Has Introduced RF-ID Based Bus Passes for Its Esteemed Commuters
    Bus Pass Scheme in detail The Undertaking has introduced RF-ID based Bus Passes for its esteemed commuters. The Bus Pass will be issued at the authorized Point of Sale (PoS) of the Undertaking. The details of the scheme are as under. The following rates will come in force from 16/09/2015: i) Distance-wise bus pass values (on Km basis) Distance Fare (`) Within Mumbai Municipal Slab(Kms) Limits (`) Monthly Quarterly 2 8.00 390 1160 4 10.00 480 1440 6 14.00 680 2020 10 18.00 870 2600 14 22.00 1060 3170 20 26.00 1250 3750 Distance is computed on following principles: If direct route exists between the origin and destination, then distance between these stops is considered for calculating the bus pass value. If more than one direct route exists between the origin and destination, minimum distance between these stops is considered for calculating the bus pass value. If direct route is not available between the origin and destination, then distance is calculated of the routes with one change-over point. In case of multiple routes with one change-over point, minimum distance with change-over is considered for calculating the bus pass value. In the event of non-availability of connection between origin and destination even with one change-over, distance based bus pass cannot be given. Under such circumstances, passengers are advised to opt for fixed amount pass. As the bus operation is being changed as per the demand, distance between origin and destinations may not be constant. Under such circumstances bus pass values shall also increase or decrease.
    [Show full text]