Umeda 1-1 Project Dai Hanshin Building and Shin Hankyu Building Rebuilding Projects
Total Page:16
File Type:pdf, Size:1020Kb
Special Enhance value along rail lines including the Umeda area Feature Umeda 1-1 Project Dai Hanshin Building and Shin Hankyu Building Rebuilding Projects Overview of Main Upgraded Public Facilities Located Nearby Implementation of projects symbolic of the integration of Hankyu and Hanshin ■ This project involves rebuilding the Dai Hanshin Building (in which the Hanshin Department Store’s Umeda Flagship The vicinity of the Dai Hanshin Building and Shin Hankyu Building Diagram of Upgraded Area Store is located) and the opposite Shin Hankyu Building into an integrated complex. A new high-rise building approxi- features an upgraded three-level (underground, ground level, JR Osaka Sta. mately 190m high will be built on a prime location facing Umeda (Osaka) Station. deck level) pedestrian network that improves the comfort and South Gate Bldg. Umeda conveniences of pedestrian spaces and, in turn, contributes to Hankyu Bldg. the revitalisation of the immediate area and the rest of Osaka city. Hanshin Umeda Sta. HERBIS ENT Osaka Overview of Umeda 1-1 Project Dai-ichi Dai Hanshin Bldg. Widen and perform regular maintenance of Seimei Bldg. Sta. Umeda Higashi Line Tanimachi east-west underpass (the urban development Hilton Hotel project’s passageway No.1 in front of Osaka We will undertake this rebuilding project using the space above promote the development of a comfortable, superior-quality Osaka Shin Hankyu Bldg. Underground Station) Marubiru the road separating the Dai Hanshin Building and Shin Hankyu community by undertaking this project in conjunction with Umeda DT Make surrounding sites barrier free Yotsubashi Line Nishi Umeda Sta. Tower Building. This is the first time that an area specified for urgent upgrades to surrounding public facilities. Looking ahead, we aim Upgrade underpasses at surrounding sites Osaka Ekimae 1st Bldg. Osaka Ekimae urban regeneration work in accordance with the Act on Special to complete this project by 2022 through the ongoing coopera- Widen, perform regular maintenance and 4th Bldg. improve attractiveness of Midosuji passageway [Underground] Underpass upgrading Measures concerning Urban Regeneration is being used to ease tion of the government and business partners. Ground level Osaka Ekimae Upgrade the on-site plazas on the planned west Barrier free 2nd Bldg. side regulations on aboveground construction. In addition, we will [Ground level] Widen and improve attractiveness of passageways Osaka Ekimae Improve decorations and seismic resistance of 3rd Bldg. Upgrade plaza Deck level the new Umeda elevated walkway [Aboveground] Elevated walkway (aboveground) Upgrade on-site passageways Sections above road Overview of Umeda 1-1 Project Building (provisional name) (2nd floor of the planned building) Office Zone • Start of construction: Around autumn 2014 Featuring advanced equipment, a high-rise section • Date of completion: Around spring 2022 (11th–38th floors) is planned to have western Japan’s larg- • Total investment: Approx. ¥90 billion est* floor space per storey of approximately 4,500m2. Overview of Construction Plan * Covering office buildings built after 2000 Conference Zone Current state N Dai Hanshin Bldg. Taking advantage of the large space made possible by Construction Phase I N Shin Hankyu Dai Hanshin Bldg. Bldg. building above roads, we plan to construct an approxi- 1. Commencement of Shin Hankyu Building mately 4,000m2 conference zone on the 11th floor that will demolition work Around autumn 2014 Shin contribute to revitalised business activities in the Umeda Hankyu 2. Commencement of East Wing of Dai Hanshin Bldg. area. During disasters, these facilities function as temporary Building demolition work shelters for those unable to return home. Around spring 2015 3. Umeda 1-1 Project Building (provisional name) Department Store Zone Commencement of construction of Phase I portion Around autumn 2015 Construction The total floor space of the newly refurbished Hanshin Dai Hanshin Bldg., 4. Completion of Phase I construction Phase I West Wing Dai Hanshin Bldg., Department Store Umeda Flagship Store at present is (Shin Hankyu Building, East Wing of Dai Hanshin (in business) East Wing and Dai Hanshin Bldg., Shin Hankyu Bldg. 2 Building) West Wing approximately 100,000m and is planned to encompass 11 (under construction) (in business) Around spring 2018 Construction floors (9 floors above ground and 2 below). In addition, the * Partial opening of new department store Phase I store is scheduled to remain open during rebuilding work. Construction Phase II ■ The Planned Building 5. Commencement of Dai Hanshin Building West Umeda 1-1 Project Building (provisional name) Wing demolition work Location 1-1 Umeda, Kita-ku, Osaka Department store zone Around spring 2018 Construction 2 9 floors above ground and 2 below 6. Umeda 1-1 Project Building (provisional name) DaiDai Hanshin Hanshin Building, Bldg., Site area Approx. 12,200m (includes the space used above the road separating the two sites) 2 West Wing Total floor space approx. 100,000m Commencement of construction of Phase II portion Phase II (under construction) Specified floor-area ratio 2,000% Construction Phase II Office zone Around spring 2019 2 Phase I Area Total floor area Approx. 257,000m 11th to 38th floors above ground (in business) 7. Completion of Phase II construction 2 Floors 38 above ground and 3 below Facility composition Total floor space approx. 140,000m (new department store) Conference zone Around autumn 2021 Phase I Area Height Approx. 190m (in business) 11th floor above ground * Full opening of new department store Major uses Department store, office, hall, etc. Total floor space approx. 4,000m2 8. Full completion of construction Structure Steel constructions (portion below ground: steel framed reinforced concrete) Other (parking lot, passageways, etc.) Around spring 2022 Construction completion 2022 (planned) Total floor space approx. 13,000m2 * Opening of office portion.