Existing Use of Pendrethen Quarry 2003 to 2015
Total Page:16
File Type:pdf, Size:1020Kb
Mulciber Ltd Lunnon Farm, St Mary's Isles of Scilly, TR21 0NZ Diccon Rogers Tel: 0845 5143123 / 07785 520274 Email: [email protected] [email protected] Vat Reg No 900 9655 28 Existing Use of Pendrethen Quarry 2003 to 2015 Quarter (Q) dates: Q1 – January 1st – March 31st ; Q2 –April; 1st – June 30th; Q3 –July 1st – September 30th; Q4 – October 1st –December 31st. Year Date Activities/Key Information Mulciber Invoice No. or other Evidence Please note: this is a table of activities based principally on issued and paid invoices. For every sale of recycled aggregates and materials from Pendrethen Quarry, there will also be extensive processing works ongoing throughout to produce the material. 2003 Q2 – Deposit of inert C&D waste in pit of quarry for future recycling by DoC Photographs Q3 2004 Importation to site, stockpiling, processing, exporting to local markets throughout the year Q1 28th January Chestnut paling fence to be erected around Pendrethen Quarry by Duchy Contractors, working alongside Mulciber 30th March Clearance work begins by Mulciber Work & production records Q2 4th June Scrap metal clearance and recycling at Quarry by Mulciber Ltd 143 & 145 onwards First supplies of local recycled ram and sand from Quarry from Mulciber Ltd, recovered from old stockpiles and cleaned, graded and supplied for new building at St Mary’s Riding Centre. 154 Q3 Clearance and recycling operations continue Q4 November Crusher unit salvaged from redundant quarry plant, refurbished and converted to mobile crusher by Mulciber Ltd. On Correspondence hire around St Mary’s, including at Star Castle Hotel providing crushing and recycling services. Crusher used at (Mulciber Ltd & Pendrethen Quarry for recycling. Crusher based at Pendrethen Quarry. mainland crushing equipment suppliers as to performance improvements of mobile crusher). Further supply and delivery of quantity of recycled ram from Pendrethen Quarry to new building of St Mary’s Riding 151 Centre 1st December Additional supplies of crushed/graded recycled aggregates from Pendrethen to local market. Quantities supplied to 152 Garrison Campsite. 1 Mulciber Ltd Lunnon Farm, St Mary's Isles of Scilly, TR21 0NZ Diccon Rogers Tel: 0845 5143123 / 07785 520274 Email: [email protected] [email protected] Vat Reg No 900 9655 28 2005 Importation to site, stockpiling, processing, exporting to local markets throughout the year Q1 24th February Supply quantity of crushed graded recycled rubble from Pendrethen Quarry for land drainage at St. Mary’s Riding 158 -2nd March Centre. March 4th- Supply crushed recycled aggregate from Pendrethen Quarry (mixed grades) to Star Castle Hotel 155 15th March Supply further block rubble and process into crushed recycled aggregate; sources include Duchy of Cornwall Waste at 158 Longstone Farm and further supplies from Pendrethen Quarry. General movements of materials. Q2 19th April At Garrison, St Mary’s; Mulciber Ltd breaking out and removing degraded concrete road, hauling away arisings to 156 Pendrethen Quarry, screening and crushing arisings at quarry, resupply to Garrison site and relay as new track, and supply additional crushed recycled aggregate from Pendrethen Quarry to complete new track. 27th April Supply quantity of graded cleaned topsoil from Pendrethen Quarry for new garden area at Star Castle Hotel. 159 May Supply quantity of 20mm-dust graded crushed recycled aggregate from Pendrethen Quarry to Star Castle 159 4th June Supply and deliver bagged recycled aggregate from Pendrethen Quarry to new parking area at Star Castle. 161 30th June Continuation of supply of local recycled aggregate for ongoing construction of St. Marys Riding Centre; during this 166 period large volumes and tonnages of material supplied from CIOS Moorwell tip as raw crusher feedstock for processing at stables construction site and at Pendrethen Quarry. Q3 24th August Supply of crushed recycled aggregate from Pendrethen Quarry to Ray Warnes at McFarlands Down; road repair to 164 McFarlands Down track outside Ray Warnes house Continued As above, continuation of supply of local recycled aggregate for ongoing construction of St. Marys Riding Centre; 166 from Q2 during this period large volumes and tonnages of material supplied from CIOS Moorwell tip as raw crusher feedstock for processing at stables construction site and at Pendrethen Quarry. During this project large tonnages of cleaned recycled crushed aggregates and recyclates were supplied. Q4 Continued As above completed supply of local recycled aggregate for ongoing construction of St. Marys Riding Centre; during this 166 from Q2 period large volumes and tonnages of material supplied from CIOS Moorwell tip as raw crusher feedstock for processing at stables construction site and at Pendrethen Quarry. October Brian Sandford and Diccon Rogers/Mulciber Ltd working together at Porthcressa on a hard rock granite removal 165 project using equipment and techniques formerly employed at Pendrethen Quarry; some materials from site are Witness statement removed to Pendrethen for recycling. 21st Supply of quantity of bagged recycled crushed aggregate 20mm-dust from Pendrethen Quarry to private 168 2 Mulciber Ltd Lunnon Farm, St Mary's Isles of Scilly, TR21 0NZ Diccon Rogers Tel: 0845 5143123 / 07785 520274 Email: [email protected] [email protected] Vat Reg No 900 9655 28 November client/agricultural client of St. Agnes. 21st Supply of quantity of bagged recycled crushed aggregate from Pendrethen Quarry to the Council of the Isles of Scilly, 171 November St. Mary’s Airport for use in airside concrete apron extension 2006 Importation to site, stockpiling, processing, exporting to local markets throughout the year Q1 16th – 19th Supply of quantity of crushed graded recycled aggregate from Pendrethen Quarry to Chiverton Builders St. Marys. 175 February March Supply recycled/recovered facing granite/walling stone from Pendrethen Quarry to Building contractors, St. Marys. 178 March Relocate mobile rock crusher from Pendrethen Quarry to St. Martins waste management site Highertown, St Martins 182 to the order of Duchy of Cornwall, Council of the Isles of Scilly and ReZolve Kernow in new initiative to resurface and reconstruct the St. Martins site. At site provide crushing services working with on island contractor crush and lay large quantities of block and stone into new surface. Q2 April Supply quantity of cleaned graded topsoil from Pendrethen Quarry to Star Castle for use in garden landscaping 185 April-May Provide demolition and recycling services to building contractor for local housing project at Branksea House; supply 188 crushed cleaned recycled aggregate from Pendrethen Quarry for local housing project. June Supply quantity of graded crushed recycled aggregate from Pendrethen Quarry to building contractor for use in local 189 housing project. Q3 14th July Supply quantity of crushed recycled aggregate from Pendrethen Quarry to private client for development work at 190 Porthmellon Industrial Estate. 17th August Supply and deliver quantity of cleaned recycled topsoil from Pendrethen Quarry to Star Castle staff accommodation. 198 Q4 1st October Improved trommell screen purchased from mainland Cornwall for refurbishment and use in Pendrethen Quarry. Also Receipts improved screening system and conveyor system purchased from wharves at Truro, ex Cornish Calcified Seaweed, shipped to Scilly by landing craft and installed at Quarry. New systems installed allow different grades of recycled aggregate to be produced. 13th October Supply quantity of cleaned crushed recycled aggregate from Pendrethen Quarry to building contractor for local 208 housing project. October Supply mobile electric recycling conveyor from Pendrethen Quarry to Tresco estate. 210 October- Supply quantity of cleaned crushed recycled aggregate from Pendrethen Quarry to building contractor for use in St. 212 November Marys housing project 1st November Application by Mulciber Ltd to Isles of Scilly Area of Outstanding Natural Beauty (AONB) for grant funding for Application by Mulciber screening machinery for rubble recycling to work alongside mobile rock crusher. Grant application cites >800 tonnes Ltd to ANOB SDF. 3 Mulciber Ltd Lunnon Farm, St Mary's Isles of Scilly, TR21 0NZ Diccon Rogers Tel: 0845 5143123 / 07785 520274 Email: [email protected] [email protected] Vat Reg No 900 9655 28 building waste currently stored in pit at Pendrethen Quarry St. Mary’s and note intention in grant application is stated as a focus on ‘providing high quality local recyclates for use as construction aggregates, sub-base and fill… [ and ]… to establish picking out of quality building granite from screened waste where possible. This will be stockpiled for reuse in construction projects.’ Application is successful and funding received. LJH tipsaver 200 mobile box screen duly purchased new and shipped to islands in early 2009. Screen unit goes straight to work at Pendrethen Quarry. Winning of clean graded recycled aggregate production from pit is accelerated for use in local projects December Demolition of redundant agricultural building at Normandy Farm St. Mary’s for redevelopment of site for local 213 housing; block and other C&D material hauled to Pendrethen Quarry for screening, crushing and recycling. Much material is “closed loop” recycling and is resupplied to the construction project after processing. 2007 Importation to site, stockpiling, processing, exporting to local