The Back Bay / South End Gateway Project Boston, Massachusetts June 07, 2016 Boston Civic Design Commission Presentation Site

Total Page:16

File Type:pdf, Size:1020Kb

The Back Bay / South End Gateway Project Boston, Massachusetts June 07, 2016 Boston Civic Design Commission Presentation Site THE BACK BAY / SOUTH END GATEWAY PROJECT BOSTON, MASSACHUSETTS JUNE 07, 2016 BOSTON CIVIC DESIGN COMMISSION PRESENTATION SITE AERIAL VIEW PHOTOGRAPH 2 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 IMAGE: GOOGLE MAPS CONCEPTUAL DIVISION OF THE CONSOLIDATED SITE INTO 4 AREAS 3 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 SITE LIMITATIONS + DESIGN CONSIDERATIONS BOSTON HARBOR NORTH END NEIGHBORHOOD FINANCIAL DISTRICT DOWNTOWN CROSSING BEACON HILL NEIGHBORHOOD BOSTON COMMON BOSTON PUBLIC GARDEN BAY VILLAGE 200 NEIGHBORHOOD CLARENDON MASS TURNPIKE THE ESPLANADEBACK BAY NEIGHBORHOOD COPLEY SQUARE SITE SOUTH END NEIGHBORHOOD COMMONWEALTH AVE PRUDENTIAL CENTER IMAGE: GOOGLE MAPS NEIGHBORHOOD CONTEXT 5 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 IMAGE: GOOGLE MAPS GARAGE + STATION 6 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 GARAGE EXIT DRUM GARAGE ENTRY DRUM GARAGE BUS DROP-OFF STATION CONCOURSE STATION BUILDING EXISTING CONDITION 7 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 DEMOLITION OF EXIT DRUM TO FREE TERRA FIRMA FOR STRUCTURAL CORE DEMOLITION OF STRUCTURAL DECK AND ENTRY DRUM TO FREE TERRA FIRMA FOR STRUCTURAL CORE DEMOLITION OF WESTERN 1/3 OF EXISTING GARAGE TO ENABLE SITE GARAGE MODIFICATIONS 8 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 TERRA FIRMA ON-RAMP AVAILABLE TURNPIKE ACCESS ROAD TERRA FIRMA AVAILABLE EGRESS ZONE MASSACHUSETTS TURNPIKE “BUILD ZONE” TRAIN TRACKS SITE LIMITATIONS 9 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 STRUCTURAL SIDE-CORE DUE TO LIMITED TERRA FIRMA 6 MEGA-COLUMNS THREADED THROUGH GARAGE TRAPEZOIDAL STRUCTURAL CORE IN ORDER TO MAINTAIN ACCESS TO ON-RAMP SUPER STRUCTURE WITHIN SHEAR WALL FOR LATERAL THE BUILD ZONE THREADED SUPPORT IN TURNPIKE WALL THROUGH THE EXISTING DECK BASE SCHEME: STRUCTURAL FOOTPRINT 10 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 STRUCTURAL TRANSFER (SKY-MAT) TO ALLOW FOR RESIDENTIAL COLUMN GRID BRACING SYSTEM TO BEAR ABOVE FLOORS BACK TO CORE STRUCTURAL TRANSFER (TABLE TOP TRUSS SYSTEM) TO ALLOW FOR RESIDENTIAL COLUMN GRID ABOVE BASE SCHEME: STRUCTURAL FOOTPRINT UP TO “TABLE-TOP” AND “SKY-MAT” 11 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 RESIDENTIAL FLOOR OFFICE FLOOR PLATE SIZE: PLATE SIZE: 10,200SF 26,050SF RESIDENTIAL FLOOR PLATE SIZE: 11,950SF BASE SCHEME: FLOOR PLATE SIZES 12 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 SIMPLE VOLUMES 13 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 SIMPLE VOLUMES 14 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 MODIFIED VOLUMES 15 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 MODIFIED VOLUMES 16 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 RESIDENTIAL RESIDENTIAL MECH MECH MECH OFFICE 17 OFFICE OFFICE PODIUM PARKING RETAIL/LOBBY MODIFIED VOLUMES 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 STACKED EXPRESSION - EXTERIOR TERRACES 18 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 WIND MITIGATION 19 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 UNDULATING BLOCKS + CUT-OUTS - WIND MITIGATION + EXTERIOR TERRACES 20 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 DEVELOPMENT REFERENCE IN BILBAO SPAIN - PELLI CLARKE PELLI ARCHITECTS 21 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 RENDERINGS EXISTING VIEW FROM SOUTHWEST CORRIDOR 23 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 BASE SCHEME VIEW FROM SOUTHWEST CORRIDOR 24 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 IMAGE: BING MAPS EXISTING VIEW FROM STUART AND DARTMOUTH STREETS 25 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 BASE SCHEME VIEW FROM STUART AND DARTMOUTH STREETS 26 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 IMAGE: GOOGLE MAPS EXISTING VIEW FROM COLUMBUS AVE 27 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 BASE SCHEME VIEW FROM COLUMBUS AVE 28 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 IMAGE: GOOGLE MAPS EXISTING BUS LOOP FROM CLARENDON STREET 29 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 BASE SCHEME VIEW FROM CLARENDON STREET 30 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 STUART STREET PUBLIC OFFICE OFFICE LOBBY LOBBY RETAIL THE TRINITY PLACE BOH 40 TRINITY U-CLUB YWCA CLARENDON LOADING COPLEY DOCK PLACE BOH TURNPIKE ON-RAMP TOWER DARTMOUTH STREET STANHOPE STREET CLARENDON STREET LOADING DOCK RESIDENTIAL LOBBY BOH RAILROAD EASEMENT LINE STANHOPE STREET COPLEY PLACE FRIEDA GARCIA PARK RAILROAD EASEMENT LINE TURNPIKE WESTBOUND SOUTHWEST TURNPIKE EASTBOUND CORRIDOR PARK 131 DARTMOUTH STREET COLUMBUS AVENUE BASE SCHEME - STUART STREET / TURNPIKE / PLATFORM LEVEL 31 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE POTENTIAL FUTURE BRIDGE STUART STREET TO 200 CLARENDON OFFICE LOBBY BELOW RETAIL THE TRINITY PLACE 40 TRINITY U-CLUB YWCA CLARENDON COPLEY RETAIL PLACE TOWER DARTMOUTH STREET STANHOPE STREET CLARENDON STREET RETAIL RES LOBBY NEW GARAGE EXIT BELOW RAILROAD EASEMENT LINE EXISTING GARAGE UP STANHOPE STREET COPLEY DN PLACE PUBLIC FRIEDA GARCIA PARK RAILROAD EASEMENT LINE PUBLIC STATION CONCOURSE TURNPIKE WESTBOUND RETAIL UP SOUTHWEST TURNPIKE EASTBOUND CORRIDOR STATION PARK RETAIL ENTRANCE PUBLIC RESIDENTIAL LOADING LOBBY DOCK 131 DARTMOUTH STREET COLUMBUS AVENUE BASE SCHEME - DARTMOUTH / CLARENDON STREETS LEVEL 32 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE STATION AIR RIGHTS IMAGE: GOOGLE MAPS EXISTING VIEW FROM DARTMOUTH STREET 34 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 BASE SCHEME VIEW FROM DARTMOUTH STREET 35 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 ALTERNATE SCHEME VIEW FROM DARTMOUTH STREET 36 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 POTENTIAL FUTURE BRIDGE STUART STREET TO 200 CLARENDON OFFICE LOBBY BELOW RETAIL THE TRINITY PLACE 40 TRINITY U-CLUB YWCA CLARENDON COPLEY RETAIL PLACE TOWER DARTMOUTH STREET STANHOPE STREET CLARENDON STREET RETAIL RES LOBBY 14.5% NEW GARAGE EXIT BELOW RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE EXISTING GARAGE UP UP STANHOPE STREET DN COPLEY DN PLACE FRIEDA GARCIA PARK RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE STATION CONCOURSE TURNPIKE WESTBOUND RETAIL UP UP SOUTHWEST TURNPIKE EASTBOUND CORRIDOR STATION PARK RETAIL ENTRANCE RESIDENTIAL LOADING LOBBY DOCK 131 DARTMOUTH STREET COLUMBUS AVENUE • COMPOSITE PROJECT-WIDE CONCOURSE LEVEL RETAIL PLAN STATION WEST, STATION EAST AND GARAGE WEST CONCOURSE 37 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE STUART STREET THE TRINITY PLACE 40 TRINITY U-CLUB YWCA CLARENDON COPLEY PLACE TOWER DARTMOUTH STREET RETAIL STANHOPE STREET CLARENDON STREET BELOW MECH RESIDENTIAL AMENITY RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE EXISTING ROOF UP UP STANHOPE STREET TERRACE GARAGE LEVEL 2 DN COPLEY DN TERRACESPLACE FOR RETAIL/ POTENTIAL RESTAURANTFUTURE BRIDGEUSE RETAIL FRIEDA GARCIA PARK RAILROAD EASEMENT LINE TO COPLEY RAILROAD EASEMENT LINE PLACE TURNPIKE WESTBOUND BRIDGE UP UP MECH DN SOUTHWEST DN TURNPIKE EASTBOUND ROOF BRIDGE CORRIDOR TERRACE RETAIL SKYLIGHT PARK LEVEL 2 RETAIL ROOF BELOW 131 DARTMOUTH STREET COLUMBUS AVENUE SECOND LEVEL RETAIL AT STATION WEST - BASE (AND ALTERNATE) PLAN 38 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 14.5% RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE UP UP DN DN RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE UP UP RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILROAD EASEMENT LINE RAILRO AD EA SEM ENT LINE STUART STREET THE TRINITY PLACE 40 TRINITY U-CLUB YWCA CLARENDON COPLEY PLACE TOWER DARTMOUTH STREET STANHOPE STREET CLARENDON STREET REBUILT GARAGE RESIDENTIAL EXISTING TERRACE FOR RETAIL/ RAILROAD EASEMENT LINE GARAGE STANHOPE STREET RESTAURANT USE COPLEY DN PLACE FRIEDA GARCIA PARK ROOF TERRACE RAILROAD EASEMENT LINE LEVEL 3 TURNPIKE WESTBOUND RETAIL SOUTHWEST DN TURNPIKE EASTBOUND CORRIDOR PARK RESIDENTIAL ROOF TERRACE 131 DARTMOUTH LEVEL 3 STREET COLUMBUS AVENUE • THIRD LEVEL OF RETAIL CAN BE LARGER FORMAT STORE. THIRD LEVEL RETAIL OVER STATION 39 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 RAILROAD EASEMENT LINE UP UP DN DN RAILROAD EASEMENT LINE UP UP DN DN RAILROAD EASEMENT LINE UP UP DN DN RAILROAD EASEMENT LINE UP UP RAILROAD EASEMENT LINE RAILRO AD EA SEM ENT LINE LANDSCAPE / STREETSCAPE IMPROVEMENTS STREET LEVEL PLAN 41 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 REALIGNED, SIGNALED CROSSING INTERIOR/EXTERIOR ARRIVAL PLAZA VEHICULAR DROP-OFF BOSTON COMPLETE STREETS CONTINUOUS STREET TREE CANOPY STEP-OFF ZONE (2’) ENHANCED FURNISHINGS ZONE (8’) GENEROUS PEDESTRIAN ZONE (13’-18’) DARTMOUTH STATION PLAZA 42 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 STRONG CONNECTIONS TO RETAIL UNIVERSALLY ACCESSIBLE VEHICULAR DROP-OFF BOSTON COMPLETE STREETS CONTINUOUS STREET TREE CANOPY STEP-OFF ZONE (2’) ENHANCED FURNISHINGS ZONE (8’) GENEROUS PEDESTRIAN ZONE (8’-12’) DARTMOUTH STREET RETAIL 43 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 UPGRADE NON-COMPLIANT CONDITIONS UNIVERSALLY ACCESSIBLE SIDEWALKS UNDER 5% SLOPE VEHICULAR DROP-OFF DIRECT CONNECTION TO ORANGE LINE LINK TO BACK BAY STATION BOSTON COMPLETE STREETS PROTECTED PEDESTRIAN CROSSINGS GENEROUS PEDESTRIAN ZONE (10’) STUART STREET 44 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 ENHANCED PEDESTRIAN ZONE SAFE PEDESTRIAN CROSSINGS VEHICULAR DROP-OFF BOSTON COMPLETE STREETS FRONTAGE ZONE (2.5’) GENEROUS PEDESTRIAN ZONE (9’) CLARENDON STREET 45 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 SHARED VEHICULAR DROP-OFF INTERIOR/EXTERIOR ARRIVAL PLAZA PEDESTRIAN-ORIENTED PLAZA DIRECT CONNECTION TO ORANGE LINE LINK TO BACK BAY STATION TREES + GREENSPACE BOSTON COMPLETE STREETS SAFE PEDESTRIAN CROSSINGS ENHANCED PEDESTRIAN ZONE (8’) CLARENDON COURT 46 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 STREET LEVEL PLAN 47 18 MAY 2016 C O P Y R I G H T © 2 O 1 6 THANK YOU!.
Recommended publications
  • Actions to Transform Mobility
    Actions to Transform Mobility TRANSPORT KENDALL Navigating the Growth and Transformation of Kendall Square Introduction The Kendall Square has undergone a dramatic transformation over the past 40 years. The scientists, engineers and entrepreneurs in Kendall Square together have created one of the most dynamic innovation districts in the world. Kendall’s innovation ecosystem is dependent on the talent and resources of institutions and companies located in close proximity. Close connections to Boston’s medical centers, investment resources, and education institutions have likewise been invaluable. Kendall Square has become central to Massachusetts’s economy attracting talent from every corner of the state, however Kendall is not as geographically central within the regional transit system as downtown Boston. Despite this, Kendall has grown from one red line station into a model transit-oriented development district with a truly multi-modal commute pattern, supported by the City of Cambridge’s progressive parking and transportation demand policies. Kendall has spurred the emergence of new districts focused on life science and technology innovation throughout the region. The state’s economic growth is dependent on reliable transportation connections between where people live and work. Transport Kendall seeks to maintain and enhance the transit-oriented development model in Cambridge. To do this, Transport Kendall promotes future investment in the transit system to serve this economic hub, while relieving congestion and supporting regional
    [Show full text]
  • Transit Advisory Committee Minutes November 2014
    CITY OF CAMBRIDGE TRANSIT ADVISORY COMMITTEE MEETING NOTES Date, Time & Place: November 5, 2014, 5:30-7:30 PM Cambridge Citywide Senior Center, 2nd floor Kitchen Classroom Attendance Committee Members John Attanucci, Kelley Brown, Brian Dacey, Charles Fineman, Jim Gascoigne, Eric Hoke, Doug Manz, George Metzger, Katherine Rafferty, Simon Shapiro, Saul Tannenbaum, Ritesh Warade City of Cambridge Adam Shulman (Traffic, Parking and Transportation); Tegin Teich Bennett, Susanne Rasmussen, Jennifer Lawrence, and Cleo Stoughton (Community Development Department) 1 member of the public was present. Committee Introductions and Approve Minutes Attachment: Draft October minutes Committee Updates Kendall Square Mobility Task Force RFR released Tegin informed the Committee that MassDOT had released an RFR to form a Kendall Square Transportation Task Force to identify short-, medium-, and long-term projects and policy initiatives to improve transportation in Kendall Square. BRT Study Group meeting October 17, 2014 Tegin updated the Committee on the progress of a study group to look at the feasibility of implementing BRT in Boston. Updates on MBTA coordination: Transit Service Analysis, EV technology The City has been discussing the progress of implementing bus priority treatments at a couple locations in Boston and has asked for information on their effectiveness. The MBTA is interested in piloting electric vehicle technology and the City is working with them to help identify possible funding sources. Pearl Street Reconnection and Dana Park Hubway solicitation for input The City is seeking input on the Pearl Street Reconstruction project. More information can be found here: https://www.cambridgema.gov/theworks/cityprojects/2014/pearlstreetreconstruction.aspx. The City is seeking input on options for the long-term location of the Dana Park Hubway station.
    [Show full text]
  • South Station Expansion Project
    On page 2 of the WWTR, the Proponent reports in the Boston Water & Sewer Commission's (BWSC) assessment that there is adequate capacity in its sewer mains to collect and convey the Project's new wastewater flows, which could increase wastewater fl ow contribution from the site by as much as 453,150 gallons per day (gpd) at the South Station site, an increase of 122% from existing conditions, according to the WWTR. This may be true for 5.1 dry weather flow conditions, but downstream BWSC and MWRA sewer systems serving South Station and the other project areas can surcharge and overflow during large storms, due to large volumes of stormwater entering combined sewer systems. Any increase in sanitary flow, if not offset with infiltration/inflow ("III") or stormwater removal from hydraulically related sewer systems can be expected to worsen system surcharging and overflows. The WWTR separately describes local and state regulations requiring I/I removal at a ratio of 4 gallons III removed for every new gallon of sanitary flow to ensure the mitigation of these potential impacts. The Proponent commits to 4: 1 I/I removal to offset new wastewater flows generated at the South Station site. I/I removal from hydraulically related systems may occur remote from the project site. It is imperative that the Proponent evaluate how the local sewers to which the project's flows will be connected will perform with the large added flows from the project and the III reduction that may occur far afield. Connections to the BWSC sewer 5.2 pipes should be carefully selected to ensure that any local sewer surcharging is not worsened by the new flows in a way that causes greater CSO discharges at nearby CSO regulators and outfalls,.notwithstanding the removal of extraneous flows elsewhere.
    [Show full text]
  • I-90 Allston Scoping Report 11-6-19
    TABLE OF CONTENTS 1.0 INTRODUCTION ..................................................................................................................................... 1 1.1 Project Background ...................................................................................................................................... 1 1.1.1 Project Area and Elements ............................................................................................................... 2 1.1.2 Project History .................................................................................................................................... 4 1.2 Regulatory Framework ................................................................................................................................. 4 1.2.1 Overview of the NEPA Process.......................................................................................................... 4 1.2.2 Purpose of the Scoping Report ......................................................................................................... 5 1.3 Opportunity for Public Comment ................................................................................................................ 6 2.0 PURPOSE AND NEED ........................................................................................................................... 7 2.1 Introduction ................................................................................................................................................... 7 2.2 Project Need .................................................................................................................................................
    [Show full text]
  • Chapter 3 I-90 Allston Interchange Project DEIR
    1 3 Alternatives Analysis Summary of Preferred Alternative Concept Development The Preferred Alternative Urban Interchange 3K was developed sequentially, beginning ENF 3 Chapter with the results of the Alternatives Analysis described in Attachment 9 of the DEIR FEIR Environmental Notification Form (ENF). The ENF described the then-preferred Urban (PUBLISHED OCTOBER 2014) Interchange 3J Series concept, which included three components: the reconstruction and realignment of the I-90 interchange, the reconstruction of a rail layover facility at Beacon Park Yard (BPY), and the construction of a new commuter rail station, designated as West Station. The features of the ENF 3J Series Preferred Alternative Group 1 & 2 | Suburban Style Interchange are illustrated in Figure 3-1 (provided at the end of the chapter). Secretary’s After the publication of the ENF, the Massachusetts Department of Transportation Dismissed from further study: Certificate MassDOT (MassDOT) continued refining and enhancing the Project concept. The Secretary’s – on the ENF Occupied a large amount of space modifies Task Force requests Certificate on the ENF provided guidance and suggestions to improve the 3J Series –Did not fit the urban context 3J Series Member MassDOT concept. Project stakeholder input from the Task Force, ongoing public participation, to address Alternative –Did not accommodate future land development to evaluate inter-agency collaboration, and coordination with Harvard University and abutters Secretary’s Concepts –Did not accommodate multi-modal connections a modified provided additional approaches and ideas. comments 3J Alternative Taking all of this input into consideration, MassDOT developed the current 3K Preferred in DEIR Alternative with three variations for the Throat Area.
    [Show full text]
  • Page 1 of 2 Meeting of the Ad Hoc Town Council
    Meeting of the Ad Hoc Town Council Committee on Transportation March 29, 2017 – Philip Pane Lower Conference Room Summary Report for May 9, 2017 The Ad Hoc Committee on Transportation was asked to engage the MBTA on a list of questions to improve the transit rider experience in Watertown. The meeting convened at 6:30 pm and the full list of guests from the MBTA, VHB, elected officials and the general public is available in a more detailed report from Committee Secretary Palomba (Attachment A). The published agenda and list of topics is included in Attachment B. In a general sense, the discussed items included, 1. The transit-related recommendations from the MassDOT Arsenal Corridor Study- (a) A proposed express bus route from Watertown Square to the Boston Landing commuter rail station in Allston; (b) More frequent 70/70A bus trips; (c) Splitting up of the 70/70A routes into 3 separate smaller routes. The relevant PowerPoint slides or interest that came from VHB’s last project working group meeting are attached (Attachment C). 2. The MBTA's Service Delivery Planning Policy- The speaker described the distinct elements of the MBTA’s new Service Delivery Plan Policy: the Service Plan changes and Quarterly Service changes. Watertown may be able to work with the MBTA to see some of the recommendations from the MassDOT/VHB Study in both of these types of service planning. The slides presented by the MBTA across all of the topics at the meeting are appended to the report in Attachment D. 3. The MBTA's next generation of fare-collection technology- The agenda item of off-bus fare collection was covered with this presentation from the MBTA.
    [Show full text]
  • Expanded Comments on the City of Boston Placemaking Study Comments Submitted to the BRA on July 14, 2016
    Expanded Comments on the City of Boston Placemaking Study Comments submitted to the BRA on July 14, 2016 A Better City is pleased to comment on the Placemaking Study conducted by the City of Boston and its consultants, supported by MassDOT, as presented to the I-90 Allston Interchange Task Force on June 27, 2016 and further discussed with the Task Force on July 13, 2016. The Placemaking Study places due emphasis on the Interchange project as both a transportation initiative and a community development opportunity that over time will immeasurably improve the immediate Allston Neighborhood as well as create a vital new quarter for the City and region as a whole. We hope that the dialogue begun by the Placemaking Study will continue during the preparation of the Draft EIR and beyond as the designs for the area are further developed and implemented. The listed placemaking issues cover and summarize the range well. A Better City has developed and advanced an at-grade alternative in the “throat” area, which we believe is a key issue that will affect constructability, initial construction and on- going maintenance costs, and the nature of connections across the area, and we are pleased that your analysis has indicated that this is a key placemaking issue. Each of the other issues listed is also very important, several of which are critical to the success of West Station as a multi-modal hub that will support future development as well as enhance transit service for the adjacent neighborhoods and institutions. The listed goals are all laudable and necessary.
    [Show full text]
  • Division Highlights
    2017-2021 Capital Investment Plan Letter from the Secretary & CEO On behalf of the Massachusetts Department of Transportation (MassDOT) and the Massachusetts Bay Transportation Authority (MBTA), I am pleased to present the 2017-2021 Capital Investment Plan (CIP). Shaped by careful planning and prioritization work as well as by public participation and comment, this plan represents a significant and sustained investment in the transportation infrastructure that serves residents and businesses across the Commonwealth. And it reflects a transformative departure from past CIPs as MassDOT and the MBTA work to reinvent capital planning for the Commonwealth’s statewide, multi-modal transportation system. This CIP contains a portfolio of strategic investments organized into three priority areas of descending importance: system reliability, asset modernization, and capacity expansion. These priorities form the foundation of not only this plan, but of a vision for MassDOT and the MBTA where all Massachusetts residents and businesses have access to safe and reliable transportation options. For the first time, formal evaluation and scoring processes were used in selecting which transportation investments to propose for construction over the next five years, with projects prioritized based on their ability to efficiently meet the strategic goals of the MassDOT agencies. The result is a higher level of confidence that capital resources are going to the most beneficial and cost-effective projects. The ultimate goal is for the Commonwealth to have a truly integrated and diversified transportation investment portfolio, not just a “capital plan.” Although the full realization of this reprioritization of capital investment will be an ongoing process and will evolve through several CIP cycles, this 2017-2021 Plan represents a major step closer to true performance-based capital planning.
    [Show full text]
  • The Transportation Dividend Transit Investments And
    REPORT FEBRUARY 2018 THE TRANSPORTATION DIVIDEND TRANSIT INVESTMENTS AND THE MASSACHUSETTS ECONOMY II A BETTER CITY THE TRANSPORTATION DIVIDEND ACKNOWLEDGMENTS A Better City managed the preparation of this report thanks to the generous funding of the Barr Foundation and the Boston Foundation. We are also grateful to James Aloisi for his invaluable editorial counsel. REPORT TEAM A Better City • Richard Dimino • Thomas Nally • Kathryn Carlson AECOM • Alden Raine • Toni Horst A Better City is a diverse group of business leaders united AECOM is a global network of design, around a common goal—to enhance Boston and the region’s engineering, construction and management economic health, competitiveness, vibrancy, sustainability and professionals partnering with clients to quality of life. By amplifying the voice of the business community imagine and deliver a better world. Today through collaboration and consensus across a broad range of listed at #161 on the Fortune 500 as one stakeholders, A Better City develops solutions and influences of America’s largest companies, AECOM’s policy in three critical areas central to the Boston region’s economic talented employees serve clients in more competitiveness and growth: transportation and infrastructure, than 150 countries around the world. AECOM land use and development, and energy and environment. is a leader in the US transportation industry. To view a hyperlinked version of this report online, go to http://www.abettercity.org/docs-new/ TransportationDividend.pdf. Concept: Minelli, Inc. Design:
    [Show full text]
  • West Station Area Transit Study November 14 Public Meeting Boards
    West Station Area Transit Study Public Meeting The West Station Area Transit Study is a scenario planning analysis to assess the land use and transit future of West Station in Allston. Key Study Questions The study will evaluate various transportation improvements and land use policies to examine which options might maximize the • Which new/improved transit number of walking, bicycling, and transit trips under possible connections and service might attract development scenarios around West Station. Key transportation routes connecting West Station to and from major population and employment the most riders? nodes in Boston, Cambridge, and Brookline will be studied as well. • What is the optimal sequencing of development and transit The study will provide municipal and state governments, as well as the improvements? development community, with an objective evaluation of the strategies that could best improve access to jobs, labor, housing, healthcare, and • How might pedestrian and bicycle other major destinations under different potential development futures infrastructure, as well as on-demand both around West Station and the surrounding community. The results of mobility services, impact travel this study will help municipal and state governments to proactively plan for and implement regional mobility improvements as the realigned behavior? Allston I-90 interchange area is developed. • What are the best measures for determining if a scenario is effective? Finally, a direct outcome of this study will be transit services concepts that the Massachusetts Department of Transportation (MassDOT) can use to • What partnerships, parking, land inform the design of the new West Station. development, and other policies and regulations might be most effective to advance the most promising options? This study is sponsored by a generous grant from the Barr Foundation.
    [Show full text]
  • East-West Passenger Rail Study: to Much of the Commonwealth’S Population
    passenger rail connections among the Corridor communities. 2. Introduction • Summarizes the projected benefits, costs, impacts, and trade-offs of the improvement alternatives. 2.1. Study Rationale • Was guided by an Advisory Committee. Community leaders, transportation stakeholders, and members of the • Identified potential Next Steps and Recommendations for public have expressed a desire for an enhanced passenger rail link consideration to advance a project. among communities in western Massachusetts, central Massachusetts, MassDOT recognizes that a robust transportation system is essential to and the Boston area. This desire reflects dissatisfaction with the multi- providing residents, businesses, and visitors with mobility to satisfy their modal transportation options west of Worcester, which make economic, personal, and recreational needs. Passenger rail Massachusetts communities west of Worcester reliant on motor vehicle transportation can be an important component of a multi-modal travel via highways that are frequently congested east of Worcester. transportation system that increases travel options and reduces This can represent a significant barrier to travel from the western part of greenhouse gas emissions. the Commonwealth. Fast and frequent passenger rail service in the East-West Rail Corridor In response to these issues and concerns, the 2018 Massachusetts could enhance mobility and connectivity for Corridor communities, State Rail Plan included a recommendation for evaluation of a “Western provide residents and stakeholders with additional travel options, and Massachusetts to Boston Passenger Rail Service Study.” The East catalyze new economic opportunities, such as development around – West Passenger Rail Study, initiated by MassDOT in late 2018, stations. Improved connectivity among job centers and better mobility represents the implementation of that recommendation.
    [Show full text]
  • East – West Passenger Rail Study [DRAFT] Final Report
    • Evaluates potential improvement alternatives for enhancing 2. Introduction transportation connections among western, central, and eastern 2.1. Study Rationale Massachusetts. • Presents the findings of the analysis, including the projected Community leaders, transportation stakeholders, and members of the benefits, costs, and impacts of the improvement alternatives. public have expressed a desire for an enhanced passenger rail link • among communities in western Massachusetts, central Was guided by an Advisory Committee review and comments. • Identifieq potential Next Steps for consideration to advance a Massachusetts, and the Boston area. This desire is the result of a lack project. of robust, multi-modal transportation options, which makes Massachusetts communities west of Worcester reliant on motor A robust transportation system, with a range of modal choices for vehicle travel via highways that are frequently congested east of residents, businesses, and visitors, is essential to creating and Worcester. This is especially true of the highway network in eastern sustaining economic growth in the 21st century. Passenger rail service, Massachusetts, which can represent a significant barrier to travel from when thoughtfully planned and implemented with meaningful levels the western part of the Commonwealth. of service, can be an important component of a robust multimodal In response to these issues and concerns, the 2018 Massachusetts transportation system that both supports and stimulates development. State Rail Plan included a recommendation for evaluation of a Expansion of modal options in the East-West Rail Corridor would “Western Massachusetts to Boston Passenger Rail Service Study.” The enhance mobility and connectivity for Corridor communities, and East – West Passenger Rail Study represents the implementation of enable them to grow and prosper.
    [Show full text]