“Current and Future Bridge Health Monitoring Systems in Hong Kong”

Total Page:16

File Type:pdf, Size:1020Kb

“Current and Future Bridge Health Monitoring Systems in Hong Kong” HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION “Current and Future Bridge Health Monitoring Systems in Hong Kong” by Eur Ing Dr. WONG, Kai-Yuen TMCA Division, Highways Department The Government of the Hong Kong Special Administrative Region 1 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Why Bridge Health Monitoring System is needed? • Monitoring Structural Performance and Applied Loads • Facilitating the Planning of Inspection and Maintenance • Validating Design Assumptions and Parameters • Updating and Revising Design Manuals and Standards 2 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION WASHMS BRIDGE HEALTH SECTION 1. WASHMS refers to Wind And Structural Health Monitoring System. 2. Application: “wind sensitivity structures”, i.e. frequency lower than 1 Hz. 3. Existing Bridges with WASHMS: (i) Tsing Ma & Kap Shui Mun Bridges - LFC-WASHMS. (ii) Ting Kau Bridge - TKB-WASHMS. 4. Future Bridges with WASHMS: (i) The Cable-Stayed Bridge (Hong Kong Side) in Shenzhen Western Corridor - SWC-WASHMS. (ii) Stonecutters Bridge - SCB-WASHMS. 3 ShenzhenShenzhen HIGHWAYS AREA DIVISION DEPARTMENT TSING MA CONTROL BRIDGE HEALTH SECTION ShekouShekou Shenzhen Western YuenYuen LongLong Corridor NewNew TerritoriesTerritories Ting Kau Bridge TuenTuenMun Mun ShaShaTin Tin Tsing Ma Bridge TsingTsingYi Yi Kap Shui Mun Bridge KowloonKowloon Hong Kong HongHong KongKong Stonecutters Bridge InternationalInternational AirportAirport LantauLantau HongHong KongKong IslandIsland IslandIsland 4 Tsing Ma Bridge 5 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Kap Shui Mun Bridge 6 Ting Kau Bridge 7 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION View of the 3 bridges from Southwest Corner of TMCA Ting Kau Bridge Tsing Ma Bridge Kap Shui Mun Bridge 8 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION The two cable-stayed bridges in Shenzhen Western Corridor 9 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Stonecutters Bridge HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Part 2 System Architecture and Operation of WASHMS 11 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION System Architecture of WASHMS The four WASHMSs, i.e. LFC-WASHMS, TKB-WASHMS, SWC-WASHMS and SCB-WASHMS, are all configured into six integrating modules: • Sensory System (SS) • Data Acquisition and Transmission System (DATS) • Portable Data Acquisition System (PDAS) • Data Processing and Control System (DPCS) • Structural Health Evaluation System (SHES) • Portable Inspection and Maintenance System (PIMS) 12 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Part 3 Current WASHMS 13 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Layout of Sensory System (SS) 14 Layout of SS and DAS in LFC-WASHMS (TMB Part) Layout of SS and DAS in LFC-WASHMS (KSMB Part) Layout of SS and DAS in TKB-WASHMS HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Details of Different Types of Sensory System 18 Detail of Accelerometers Accelerometers Accelerometers on Main Cable HIGHWAYS DEPARTMENT 19 TSING MA CONTROL AREA DIVISION Accelerometers on Main Cable of Tsing Ma Bridge BRIDGE HEALTH SECTION Accelerometers Accelerometers Mounted on Longitudinal Detail of Accelerometers on Longitudinal Stabilizing Cable Stabilizing Cable Bi-axial Accelerometers on Longitudinal Stabilizing Cable of Ting Kau Bridge HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION 20 BRIDGE HEALTH SECTION HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Dynamic Weigh-in-Motion Sensors 21 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION Traffic Direction BRIDGE HEALTH SECTION HIGHWAYS DEPARTMENT Dynamic Weigh-in-Motion Sensors for Lantau Fixed Crossing TSING MA CONTROL AREA DIVISION 22 BRIDGE HEALTH SECTION HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Portable Data Acquisition System (PDAS) 23 PDAS and Portable Accelerometers Remote Control Unit UPS Unit Battery Unit 1 Isolation Battery Unit 2 Transformer Main Controller Signal Conditioner (32 No. Channels) Communication Unit Accelerometers Mounting Portable Accelerometers for Suspenders Field Measurement Works on Tsing Ma Bridge HIGHWAYS DEPARTMENT Portable Data Acquisition System for Field Vibration Measurement Works TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION 24 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Data Processing and Control System (DPCS) 25 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION The DPCS in LFC-WASHMS & TKB-WASHMS • One UNIX-Based 64-bit Alpha Server equipped with SPIDAR (Modified), Customized MATLAB Software and MATLAB Data Analysis Suite for overall control of SS and DAs in LFC-WASHMS • One UNIX-Based 64-bit Alpha Server equipped with SPIDAR (Modified), Customized MATLAB Software and MATLAB Data Analysis Suite for overall control of Ss and DAS in TKB-WASHMS • Two 32-bit SGI Intel-Based (Quad-CPU) Visual Workstations equipped GPS Monitoring Software and MATLAB Data Analysis Suite for overall control of GPS including processing, analysis, display, archiving and storage of GPS data and Video Signals from CCTV Cameras 26 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Structural Health Evaluation System (SHES) 27 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION The SHES for LFC-WASHMS & TKB-WASHMS • One 64-bit UNIX-Based (Quad-CPU) Alpha Server equipped with MSC/NASTRAN, ANSYS/Multiphysics, ANSYS/LS-DYNA, ANSYS/FE-SAFE, Structural Dynamic-Tools and MSC/PATRAN • One 64-bit UNIX-Based (Dual-CPU) Alpha Server equipped with Customized SPIDAR and MATLAB Data Processing Software • One 64-bit UNIX-Based Alpha Workstation equipped with MSC/PATRAN 28 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Part 4 Limitations of Current WASHMS 29 HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION Limitations of Current WASHMS • No Corrosion Monitoring • Insufficient Software Facilities for Automatic Data Processing and Analysis • No Automatic Facilities for Correlation between Measured Results and Performance Criteria given in Bridge Rating System* • Insufficient Screens for Instant Display of Monitoring Results 30 Section of Deck Level Accelerometer & Seismometer 48 Displacement Sensor 34 Anemometer 40 Strain Gauge 515 Temperature Sensor 388 Weigh-In-Motion Sensor 12 Temperature & Relative Humidity 28 Digital Video Cameras 16 GPS Sensor 20 Corrosion Cells 30 Section of Tower Stonecutters Bridge - Locations of Sensors HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION 31 ) Weight (Tonnes Note : The measured bogie loads are derived from strain 7 - Car LAR Trains gauges installed in way-beams at Chainage 24662 Bogie Number Tsing Ma Bridge – Comparison between Measured and Design Bogie HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION 32 BRIDGE HEALTH SECTION Loads Screen Display of Instantaneous Displacement of Tsing Ma Bridge: HIGHWAYS DEPARTMENT Bridge-Deck, Suspension Cables and Tower-Tops TSING MA CONTROL AREA DIVISION 33 BRIDGE HEALTH SECTION Screen Display of Time Series Displacement of Tsing Ma Bridge : Bridge-Deck HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION 34 BRIDGE HEALTH SECTION Comparison ofVerticalDeck by GPS,Accelerometers LevelSensorMeasurement and Displacement at TMB Mid-Span atTMBMid-Span Displacement Temperature (oC) Di spl acement (mm) Di spl acement (mm) for two consecutivedays from 03-Aug-200300:00 Measurement Sensor withTemperatureLevel Variation and GPS by Mid-Span TMB at Displacement Deck Vertical of Comparison 4600 4650 4700 4750 4800 4850 4900 4950 5000 5050 5100 1000 1050 1100 1150 1200 1250 1300 20 25 30 35 40 800 850 900 950 00: 00: 00 00: 00 00: 00 03: 00: 00 03: 00 03: 00 06: 00: 00 06: 00 06: 00 09: 00: 00 09: 00 09: 00 12: 00: 00 12: 00 12: 00 15: 00: 00 15: 00 15: 00 18: 00: 00 18: 00 18: 00 GPS (TMB Mid Span) Mid (TMB GPS Time (hours) Effective Temperature Air Temperature 21: 00: 00 Time (hours) Time (hours) 21: 00 21: 00 Level SensorLevel 00: 00: 00 00: 00 00: 00 03: 00: 00 03: 00 03: 00 06: 00: 00 06: 00 06: 00 09: 00: 00 09: 00 09: 00 12: 00: 00 12: 00 12: 00 15: 00: 00 15: 00 15: 00 18: 00: 00 18: 00 18: 00 21: 00: 00 21: 00 21: 00 Deck Train Effect ignored Section A B C D Travel Direction of Heavy Vehicle AB C D Tsing Ma Bridge - Deck Displacement Influence Lines by GPS HIGHWAYS DEPARTMENT TSING MA CONTROL AREA DIVISION BRIDGE HEALTH SECTION M.W Tower T.Y Tower CH23623 CH25000 Sensor Location Sensor Location CH23623 + ve µε Compression strain -veµε Tension strain Designed stress due to Live Load at SLS = ±60 MPa 37 Time-series acceleration data for points A1 and A2 Auto power spectrum for points A1 and A2 0.385Hz A1 0.385Hz A2 MSC. Patran 2001 r3 07-Apr-03 14:53:43 Fringe: NORMAL_MODE, Mode 1:Freq.=0.38619: Eigenvectors, Translational – (NON-LAYERED) (MAG) Deform: NORMAL_MODE, Mode 1:Freq.=0.38619: Eigenvectors, Translational 0.385Hz 1 0.9 0.8 A1 0.7 A2 0.6 0.5 0.4 0.3 0.2 0.1 0 0 0.5 1 1.5 2 2.5 3 3.5 4 Theoretical FEM for Kap Shui Mun Bridge (Theoretical frequency = 0.38619Hz) Coherence for points A1 and A2 Total No. of Grids = 10,914 Total No. of Grids = 10,914 Total No. of CBAR/ CBEAM = 24,234 Total No. of CBAR/ CBEAM = 24,234 Total No. of CQUAD4 = 42,906 Total No. of CQUAD4 = 42,906 Total No. of RBAR = 2,854 Total No. of RBAR = 2,854 Modulus 11 2 E cable = 1.95 x 10 N/m 11 2 E steel = 2.05 x 10 N/m 10 2 E concrete = 2.60 x 10 N/m Mass Density 3 ρcable = 8,200 kg/m 3 ρsteel = 8,800 kg/m 3 ρconcrete = 2,500 kg/m The Finite Element Model of Tsing Ma Bridge and HIGHWAYS DEPARTMENT 3 TSING MA CONTROL AREA DIVISION List of Modelling Information BRIDGE HEALTH SECTION 9 1st Vertical Flexural Deck and 1st Vertical Cable Mode HIGHWAYS DEPARTMENT (Mode No.
Recommended publications
  • COI MTR-HH Day40 14Jan2019
    Commission of Inquiry into the Diaphragm Wall and Platform Slab Construction Works at the Hung Hom Station Extension under the Shatin to Central Link Project Day 40 Page 1 Page 3 1 Monday, 14 January 2019 1 COMMISSIONER HANSFORD: And maybe if we could look it -- 2 (10.02 am) 2 I don't know, something like 25 January; bring it as 3 MR PENNICOTT: Good morning, sir. 3 up-to-date as we possibly can. 4 CHAIRMAN: Good morning. 4 MR BOULDING: It may well even be the case that we could 5 MR PENNICOTT: Sir, you will see around the room this 5 take it up to 29 January. We will see what can be done 6 morning that there are some perhaps unfamiliar faces to 6 and we will update it as much as we possibly can. 7 you. That is because we are starting the structural 7 COMMISSIONER HANSFORD: Thank you very much. 8 engineering expert evidence this morning, and I think, 8 CHAIRMAN: Good. 9 although I haven't counted, that most if not all of the 9 MR PENNICOTT: Sir, before we get to Prof Au -- good 10 structural engineering experts are in the room. 10 morning; we'll be with you shortly, Prof Au -- could 11 CHAIRMAN: Yes. 11 I just mention this. I think it's a matter that has 12 MR PENNICOTT: As you know, Prof McQuillan is sat next to 12 been drawn to the Commission's attention, but there have 13 me, I can see Mr Southward is there, and I think 13 been some enquiries from the media, and in particular 14 Dr Glover is at the back as well, and at the moment 14 the Apple Daily, in relation to questions concerning the 15 Prof Au is in the witness box.
    [Show full text]
  • Initial Transport Assessment of Development Options
    This subject paper is intended to be a research paper delving into different views and analyses from various sources. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not necessarily represent the views of the HKSARG. WORKING PAPER NO. 35 INITIAL TRANSPORT ASSESSMENT OF DEVELOPMENT OPTIONS Purpose 1. The purpose of this paper is to provide information on the reference transport demand forecasts, assessment of Reference Scenario and framework for option evaluations. Background 2. Under Stage 3 of the HK2030 Study, Development Scenario and Development Options are formulated. The Development Options are then subject to transport, economic, financial as well as environmental assessments. Under the integrated approach adopted for the Study, the transport requirements identified for the Development Options are also assessed in terms of the environmental, economic and financial implications in order that a meaningful comparison of the Development Options could be made. 3. Under the Reference Scenario, various development choices have been considered to satisfy the land requirements. They can broadly be categorised into two different options of development patterns, namely Decentralisation and Consolidation. The details are presented in the paper on Development Options under the Reference Scenario. Assessments have been carried out to identify the transport requirements of the two Development Options in 2010, 2020 and 2030. The findings are summarised in the following sections. Development Options 4. Under the Reference Scenario, the population in 2030 could be in the region of 9.2 million which is only marginally more than the population of 8.9 million for 2016 adopted in the previous strategic planning.
    [Show full text]
  • 931/01-02(01) Route 3 Country Park Section Invitation For
    CB(1)931/01-02(01) COPY ROUTE 3 COUNTRY PARK SECTION INVITATION FOR EXPRESSIONS OF INTEREST PROJECT OUTLINE TRANSPORT BRANCH HONG KONG GOVERNMENT MARCH 1993 INVITATION FOR EXPRESSIONS OF INTEREST IN DEVELOPING THE COUNTRY PARK SECTION OF ROUTE 3 ("THE PROJECT") Project Outline N.B. This Outline is issued for information purposes only, with a view to inviting expressions of interest for the finance. design, construction and operation of the Project. 1 Introduction 1.1 Route 3, to be constructed to expressway standard between Au Tau in Yuen Long and Sai Ying Pun on Hong Kong Island, is a key element in the future road infrastructure in the Territory. 1.2 The primary function of Route 3 is to serve the growing traffic demand in the North West New Territories. the Kwai Chung Container Port and western Kowloon. The southern portion of Route 3 forms part of the principal access to the Chek Lap Kok Airport. This comprises the Tsing Yi and Kwai Chung Sections from northwest Tsing Yi to Mei Foo, the West Kowloon Expressway and the Western Harbour Crossing to Hong Kong Island, all of which are included in the Airport Core Programme. 1.3 The northern portion of Route 3, namely the Country Park Section. consists of the following principal elements:- (a) The Ting Kau Bridge and the North West Tsing Yi Interchange; (b) The Tai Lam Tunnel including the Ting Kau interchange; and (c) The Yuen Long Approach from Au Tau to Tai Lam Tunnel including the connections to the roads in the area including the Yuen Long Southern By-pass.
    [Show full text]
  • Islands District Council Traffic and Transport Committee Paper T&TC
    Islands District Council Traffic and Transport Committee Paper T&TC 41/2020 2020 Hong Kong Cyclothon 1. Objectives 1.1 The 2020 Hong Kong Cyclothon, organised by the Hong Kong Tourism Board, is scheduled to be held on 15 November 2020. This document outlines to the Islands District Council Traffic and Transport Committee the event information and traffic arrangements for 2020 Hong Kong Cyclothon, with the aim to obtain the District Council’s continuous support. 2. Event Background 2.1. Hong Kong Tourism Board (HKTB) is tasked to market and promote Hong Kong as a travel destination worldwide and to enhance visitors' experience in Hong Kong, by hosting different mega events. 2.2. The Hong Kong Cyclothon was debuted in 2015 in the theme of “Sports for All” and “Exercise for a Good Cause”. Over the past years, the event attracted more than 20,000 local and overseas cyclists to participate in various cycling programmes, as well as professional cyclists from around the world to compete in the International Criterium Race, which was sanctioned by the Union Cycliste Internationale (UCI) and The Cycling Association of Hong Kong, China Limited (CAHK). The 50km Ride is the first cycling activity which covers “Three Tunnels and Three Bridges (Tsing Ma Bridge, Ting Kau Bridge, Stonecutters Bridge, Cheung Tsing Tunnel, Nam Wan Tunnel, Eagle’s Nest Tunnel)” in the route. 2.3. Besides, all the entry fees from the CEO Charity and Celebrity Ride and Family Fun Ride and partial amount of the entry fee from other rides/ races will be donated to the beneficiaries of the event.
    [Show full text]
  • Paper on the Operational Arrangements for the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong
    立法會 Legislative Council LC Paper No. CB(4)1072/17-18(04) Ref. : CB4/PL/TP Panel on Transport Meeting on 18 May 2018 Background brief on the operational arrangements for the Hong Kong-Zhuhai-Macao Bridge and the Hong Kong Port Purpose This paper provides background information on the Hong Kong-Zhuhai-Macao Bridge ("HZMB") project and related Hong Kong projects. It also summarizes the major views and concerns expressed by Legislative Council ("LegCo") Members on the traffic and transport arrangements and related operational issues of HZMB upon its commissioning in past discussions. Background Hong Kong-Zhuhai-Macao Bridge and related Hong Kong projects 2. HZMB is a dual three-lane carriageway in the form of bridge-cum-tunnel structure sea-crossing, linking Hong Kong, Zhuhai and Macao. The project is a major cross-boundary transport infrastructure project. According to the Administration, the construction of HZMB will significantly reduce transportation costs and time for travellers and goods on roads. It has very important strategic value in terms of further enhancement of the economic development between Hong Kong, the Mainland and Macao. 3. With the connection by HZMB, the Western Pearl River Delta will fall within a reachable three-hour commuting radius of Hong Kong. The entire HZMB project consists of two parts: - 2 - (a) the HZMB Main Bridge (i.e. a 22.9 km-long bridge and 6.7 km-long subsea tunnel) situated in Mainland waters which is being taken forward by the HZMB Authority1; and (b) the link roads and boundary crossing facilities under the responsibility of the governments of Guangdong, Hong Kong and Macao ("the three governments").
    [Show full text]
  • Better Safe Than Worry
    VSLnews MONITORING OF STRUCTURES BETTER SAFE THAN WORRY SPECIAL REPORT Match-cast segmental bridge piers ABERDEEN CHANNEL BRIDGE Full-scope construction VSLnews ISSUE ONE • 2013 Anticipating structural behaviour VSL has built its reputation by providing services of high added-value Daniel Rigout, through the technical expertise of its strong worldwide network, backed Chairman and up by a dynamic R&D effort. From the earliest project phases until the end Chief Executive Officer of a structure’s life, VSL’s experts provide consultancy and engineering services that produce cost-effective, durable and sustainable solutions for our clients. The life of any structure is divided into three key phases: planning, construction and maintenance. VSL’s engineers are of invaluable support to designers carrying out feasibility studies at the planning stage, and, if relevant, can propose alternative solutions to achieve what is best for the project. How to build the structure becomes the critical issue once the design is optimised and here VSL’s teams take up the challenge to ensure fast-track and safe construction. Monitoring of structural behaviour may be required either during construction or later, when the structure is in service, in order to forecast maintenance works and allocate the corresponding budgets. In each case, our experts respond to the requirements by providing a monitoring system that is adapted to the needs and economic constraints. Once the inspection plan has been established, VSL can also handle any corresponding strengthening and repair works required. True turnkey and full-scope projects covering all phases of a structure’s life are at the heart of our business.
    [Show full text]
  • Special Traffic and Transport Arrangements for Hong Kong Cyclothon
    TRANSPORT DEPARTMENT NOTICE SPECIAL TRAFFIC AND TRANSPORT ARRANGEMENTS FOR HONG KONG CYCLOTHON Notice is hereby given that special traffic and transport arrangements will be implemented on 10 October 2015 (Saturday) and 11 October 2015 (Sunday) to facilitate the holding of the Hong Kong Cyclothon: I. TRAFFIC ARRANGEMENTS FOR THE RACES ON 10 OCTOBER 2015 (Please refer to Plan 1) (A) Road Closures The following major roads will be closed to all vehicular traffic at the time specified below (except vehicles with closed road permits issued by the Transport Department): From 4 pm on 10 October 2015 to about 1.00 am on 11 October 2015 (depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) Both bounds of Hung Hom Bypass between Hung Hom Road and Salisbury Road ; (ii) Princess Margaret Road Link southbound between Metropolis Drive and Hung Hom Bypass; (iii) Salisbury Road westbound between Chatham Road South and Cheong Wan Road; (iv) Both bounds of Salisbury Road Underpass; (v) Salisbury Road southbound between Cross Harbour Tunnel Administration Building and Science Museum Road; (vi) Both bounds of Mody Lane; (vii) Both bounds of Mody Road between Mody Lane and Science Museum Road; (viii) Salisbury Road eastbound between Chatham Road South and entrance of the Tsim Sha Tsui East (Mody Road) Bus Terminus. (except slow lane for exclusive use of franchised bus only); (ix) Science Museum Road northbound between Salisbury Road and Science Museum Square. (x) The 3rd and 4th lanes of Salisbury Road eastbound between Nathan Road and Chatham Road South; and (xi) The 4th and 5th lanes of Salisbury Road westbound between Nathan Road and Chatham Road South.
    [Show full text]
  • Development of Tung Chung New Town in Hong Kong H. Wang, W
    Transactions on the Built Environment vol 33, © 1998 WIT Press, www.witpress.com, ISSN 1743-3509 Development of Tung Chung New Town in Hong Kong H. Wang, W. Wong Department of Civil and Structural Engineering, The Hong Kong Polytechnic University, Hung Horn, Kowloon, Hong Kong Email: [email protected] Email: [email protected]. hk Abstract Hong Kong's new airport at Chek Lap Kok is scheduled to open on July 6, 1998. At present, construction of all major projects is either at the last stage or in completion. Tung Chung New Town, one of the Airport Core Programme (ACP), has been initially set up for housing 216,000 people by 2006 and providing living area for servicing staff of the new airport. Based on the case study on the development of Tung Chung New Town, this paper illustrates the relationship between transport system and land use development. In the paper, referring to many survey data and research results, the development of Tung Chung New Town is shown to be essential due to the relocation of the Hong Kong Airport. On the other hand, comparing with other new towns in Hong Kong, Tung Chung New Town is provided with better transport system links that minimize the travel time and improve the comfort and accessibility to other parts of the territory. This makes Tung Chung New Town a more attractive new town for people to reside. 1 Introduction In the past twenty years, the Hong Kong International Airport at Kai Tak has commenced a series of improvement to cater for the continuous growth in passengers and cargo.
    [Show full text]
  • ICE Breaker Newsletter of ICE Hong Kong 2018 Issue 1 Messages and News Together We Can!
    ICE Breaker Newsletter of ICE Hong Kong 2018 Issue 1 Messages and News Together we can! ear Fellow members and friends, D We are now into the final quarter of the 2017/18 session for the ICE HKA committee. It has been a remarkably challenging and fruitful time for the committee. On top of our usual suite of high quality learned society activities, we have been exceedingly bold in launching an ambitious ICE 200 programme around three strands, namely knowledge, branding and inspiration. Our vision for this milestone year of the ICE bicentenary is to enthuse the profession, enhance our public image and inspire the next generation. Our ICE 200 events are centred around the TECH (ie technology, engineering, climate and humanitarian) themes. Some of our flagship events to date are as follows: (a) Innovation Summit on 12 January 2018. The Honourable Mrs Carrie Lam, Chief Executive of HKSAR Government, gave the opening address as the Guest of Honour. (b) Distinguished Lecture on 13 March 2018 delivered by Dr Robin Sham, CBE, and Dr Ana Ruiz-Teran from Imperial College London. Mr Andrew Heyn, British Consul-General to Hong Kong and Macao, gave the opening address as the Guest of Honour. (c) Grand Opening of the World’s Longest Span LEGO® bridge on 21 March 2018. The Honourable Mr Matthew Cheung, Chief Secretary for Administration, was the Guest of Honour for the Grand Opening Ceremony. About 80 students from 8 schools contributed to pre-assembling the bridge components. The LEGO® bridge was displayed to the public in ELEMENTS for one month.
    [Show full text]
  • 17 November 2009 Legislative Council Panel on Transport
    LC Paper No. CB(1)417/09-10(01) 17 November 2009 Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Airport Railway Capacity Introduction 1. Suggestions have been made that the proposed terminus of the Express Rail Link should be located at Kam Sheung Road, rather than at West Kowloon and that an extension of the Airport Express from Tsing Yi be constructed and operated as a bifurcated service, serving both HK Airport and the alternative location for the Express Rail Link terminus. This report assesses whether the Airport Express can accommodate such a bifurcated service. Airport Railway Signalling Design 2. The Airport Railway comprises two interleaved train services, the Airport Express and the Tung Chung Line. These services share common tracks at two critical sections; the harbour crossing between Hong Kong and Kowloon stations, and the section from Tsing Yi station across the Tsing Ma and Kap Shui Mun bridges. These two sections of the alignment constrain the maximum capacity of the Airport Express and the Tung Chung Line. 3. The signalling system controls the movement of trains and is designed as a safety critical system to ensure safe separation between trains at all times. The original objective for the design of the signalling system for the Airport Railway, taking the above track configuration into account, was for a maximum signalled capacity of one Airport Express train every 4.5 minutes and one Tung Chung Line train every 2.25 minutes, equivalent to 39 trains per hour at the critical section between 1 Hong Kong and Kowloon stations, using the following service pattern (Pattern A): Tung Chung Line – to Tung Chung Airport Express – to Airport Tung Chung Line – to Tsing Yi repeat The full service was envisaged between Hong Kong and Tsing Yi and the constraint imposed by the Tsing Ma bridge (only 1 train on each track at any time) accommodated by running alternate Tung Chung Line trains from Hong Kong to Tsing Yi only.
    [Show full text]
  • Hansard (English)
    LEGISLATIVE COUNCIL ─ 7 June 2006 7999 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 7 June 2006 The Council met at Eleven o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE MRS RITA FAN HSU LAI-TAI, G.B.S., J.P. THE HONOURABLE JAMES TIEN PEI-CHUN, G.B.S., J.P. THE HONOURABLE ALBERT HO CHUN-YAN IR DR THE HONOURABLE RAYMOND HO CHUNG-TAI, S.B.ST.J., J.P. THE HONOURABLE LEE CHEUK-YAN THE HONOURABLE MARTIN LEE CHU-MING, S.C., J.P. DR THE HONOURABLE DAVID LI KWOK-PO, G.B.S., J.P. THE HONOURABLE FRED LI WAH-MING, J.P. DR THE HONOURABLE LUI MING-WAH, S.B.S., J.P. THE HONOURABLE MARGARET NG THE HONOURABLE MRS SELINA CHOW LIANG SHUK-YEE, G.B.S., J.P. THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE CHEUNG MAN-KWONG THE HONOURABLE CHAN YUEN-HAN, J.P. 8000 LEGISLATIVE COUNCIL ─ 7 June 2006 THE HONOURABLE BERNARD CHAN, J.P. THE HONOURABLE CHAN KAM-LAM, S.B.S., J.P. THE HONOURABLE MRS SOPHIE LEUNG LAU YAU-FUN, S.B.S., J.P. THE HONOURABLE LEUNG YIU-CHUNG THE HONOURABLE SIN CHUNG-KAI, J.P. DR THE HONOURABLE PHILIP WONG YU-HONG, G.B.S. THE HONOURABLE WONG YUNG-KAN, J.P. THE HONOURABLE JASPER TSANG YOK-SING, G.B.S., J.P. THE HONOURABLE HOWARD YOUNG, S.B.S., J.P. DR THE HONOURABLE YEUNG SUM THE HONOURABLE LAU CHIN-SHEK, J.P. THE HONOURABLE LAU KONG-WAH, J.P. THE HONOURABLE LAU WONG-FAT, G.B.M., G.B.S., J.P.
    [Show full text]
  • Economic Competitiveness
    Brand Hong Hong’s visual identity — a powerful and energetic dragon — was designed to communicate the city’s historic link with a mythical icon. The blue and green ribbons that extend from the dragon symbolise blue sky and a sustainable environment, while Lion Rock — the famous landmark that represents the Hong Kong people’s “can-do” spirit — is silhouetted by the red ribbon. The fluid shape of the ribbons evokes versatility, and the multiple colours signify the city’s diversity and dynamism. C A Lo P La C In G In F S M T A H E E E In E L G Le E E H H Tr P La Ta M T Te C To Im Le Tr T A In H U Contents ABOUT HONG KONG 4 Location Population Language Climate International Trading Centre Global Services Centre International Corporate Base Free Trade and Free Market Small Government Monetary System The Rule of Law Airport Hong Kong Port ECONOMIC COMPETITIVENESS 9 Economic Development Economic Policy International Financial Centre Economic Links with the Mainland LIVING IN HONG KONG 16 Government Structure Legal System Employment Education Health Housing Transport Pollution and Environmental Control Law and Order Tax System Mandatory Provident Fund The Media Telecommunications COMING TO HONG KONG 32 Tourism Immigration Leisure and Culture Traditional Festivals THE FUTURE OF HONG KONG 38 Asia’s Cyber City for the Cyber Century Infrastructure Projects for the 21st Century HONG KONG: THE FACTS 44 USEFUL CONTACTS 47 3 ABOUT HONG KONG About Hong Kong La Ch Described as a ‘barren the rock’ some 150 years En ago, Hong Kong is today wit a world-class financial, an trading and business pro centre and, indeed, bu a great world city.
    [Show full text]