INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 [Public Law 102–240; December 18, 1991] [As Amended Through P.L

Total Page:16

File Type:pdf, Size:1020Kb

INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 [Public Law 102–240; December 18, 1991] [As Amended Through P.L G:\COMP\INFRA\INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ....XML INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991 [Public Law 102–240; December 18, 1991] [As Amended Through P.L. 116–94, Enacted December 20, 2019] øCurrency: This publication is a compilation of Public Law 102–240. It was last amended by the public law listed in the As Amended Through note above and below at the bottom of each page of the pdf version and reflects current law through the date of the enactment of the public law listed at https:// www.govinfo.gov/app/collection/comps/¿ øNote: While this publication does not represent an official version of any Federal statute, substantial efforts have been made to ensure the accuracy of its contents. The official version of Federal law is found in the United States Statutes at Large and in the United States Code. The legal effect to be given to the Statutes at Large and the United States Code is established by statute (1 U.S.C. 112, 204).¿ AN ACT To develop a national intermodal surface transportation system, to author- ize funds for construction of highways, for highway safety programs, and for mass transit programs, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, TABLE OF CONTENTS 1 Sec. 1. Short title. Sec. 2. øRepealed.¿ Sec. 3. Secretary defined. TITLE I—SURFACE TRANSPORTATION PART A—TITLE 23 PROGRAMS Sec. 1001. Completion of interstate system. Sec. 1002. Obligation ceiling. Sec. 1003. Authorization of appropriations. Sec. 1004. Budget compliance. Sec. 1006. National highway system. Sec. 1009. Interstate maintenance program. Sec. 1012. Toll roads, bridges, and tunnels. Sec. 1013. Minimum allocation. Sec. 1014. Reimbursement for segments of the interstate system constructed with- out Federal assistance. Sec. 1015. Apportionment adjustments. Sec. 1016. Program efficiencies. Sec. 1017. Acquisition of rights-of-way. Sec. 1021. Federal share. Sec. 1023. Gross vehicle weight restriction. Sec. 1029. National maximum speed limit compliance program. Sec. 1030. Road sealing on Indian reservation roads. Sec. 1032. Federal lands highways program. Sec. 1036. National high-speed ground transportation programs. 1 This table of contents is not part of the law. It is included only for the convenience of the reader. Certain sections and headings were left out of the table of contents because they amend other laws. 1 September 17, 2021 As Amended Through P.L. 116-94, Enacted December 20, 2019 VerDate Nov 24 2008 10:56 Sep 17, 2021 Jkt 000000 PO 00000 Frm 00001 Fmt 9001 Sfmt 6611 G:\COMP\INFRA\ISTEAO1.BEL HOLC G:\COMP\INFRA\INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ....XML ISTEA91 2 Sec. 1038. Use of recycled paving material. Sec. 1039. Highway timber bridge research and demonstration program. Sec. 1040. øRepealed.¿ Sec. 1041. Regulatory interpretations. Sec. 1042. øRepealed.¿ Sec. 1043. Report to Congress on quality improvement. Sec. 1044. Credit for non-Federal share. Sec. 1045. Substitute project. Sec. 1047. Scenic byways program. Sec. 1049. Design standards. Sec. 1050. Transportation in parklands. Sec. 1051. Work zone safety. Sec. 1052. New Hampshire Federal-aid payback. Sec. 1054. Temporary matching fund waiver. Sec. 1057. Erosion control guidelines. Sec. 1058. Roadside barrier technology. Sec. 1059. Use of tourist oriented directional signs. Sec. 1060. Private sector involvement program. Sec. 1061. Uniform traffic control devices. Sec. 1062. Molly Ann’s Brook, New Jersey. Sec. 1063. Presidential highway, Fulton County, Georgia. Sec. 1064. Construction of ferry boats and ferry terminal facilities. Sec. 1065. Orange County toll pilot projects. Sec. 1066. øRepealed.¿ Sec. 1067. Prior demonstration projects. Sec. 1068. Stormwater permit requirements. Sec. 1069. Miscellaneous highway project authorizations. Sec. 1071. Peace Bridge truck inspection facilities. Sec. 1072. Vehicle proximity alert system. Sec. 1073. Roadside barriers and safety appurtenances. Sec. 1074. Designation of United States Route 69. Sec. 1075. Special provisions regarding certain hydroelectric projects. Sec. 1076. Shoreline protection. Sec. 1077. Revision of manual. Sec. 1078. Declaration of nonnavigability of portion of Hudson River, New York. Sec. 1079. Cleveland Harbor, Ohio. Sec. 1080. Deauthorization of a portion of the Canaveral Harbor, Florida, project. Sec. 1081. Infrastructure investment commission. Sec. 1082. Deauthorization of Academy Creek feature of the Brunswick Harbor, Georgia, project. Sec. 1083. Namings. Sec. 1084. Signing of United States Highway 71. Sec. 1085. Continuation of authorization for Rhode Island navigation project. Sec. 1086. Pensacola, Florida. Sec. 1088. Handicapped parking system. Sec. 1089. Feasibility of international border highway infrastructure discretionary program. Sec. 1090. Methods to reduce traffic congestion during construction. Sec. 1091. Study of value engineering. Sec. 1092. Pilot program for uniform audit procedures. Sec. 1093. Rental rates. Sec. 1094. Study on State compliance with requirements for revocation and suspen- sion of drivers’ licenses. Sec. 1095. Brooklyn courthouse. Sec. 1096. Border station International Falls, Minnesota. Sec. 1097. Miller Highway. Sec. 1098. Allocation formula study. Sec. 1099. Establishment of interstate study commission. Sec. 1100. Effective date; applicability; certain unobligated balances. Sec. 1101–1102. Study on impact of climatic conditions. Sec. 1103. High cost bridge projects. Sec. 1104. Congestion relief projects. Sec. 1105. High priority corridors on National Highway System. Sec. 1106. Rural and urban access projects. Sec. 1107. Innovative projects. Sec. 1108. Priority intermodal projects. Sec. 1109. Infrastructure awareness program. September 17, 2021 As Amended Through P.L. 116-94, Enacted December 20, 2019 VerDate Nov 24 2008 10:56 Sep 17, 2021 Jkt 000000 PO 00000 Frm 00002 Fmt 9001 Sfmt 6611 G:\COMP\INFRA\ISTEAO1.BEL HOLC G:\COMP\INFRA\INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ....XML 3 ISTEA91 PART B—NATIONAL RECREATIONAL TRAILS FUND ACT Sec. 1301. Short title. Sec. 1302. øRepealed.¿ Sec. 1303. National Recreational Trails Advisory Committee. TITLE II—HIGHWAY SAFETY PART A—HIGHWAY SAFETY GRANT PROGRAMS Sec. 2001. Short title. Sec. 2005. Authorization of appropriations. Sec. 2006. Drug recognition expert training program. Sec. 2008. Effective date; applicability. Sec. 2009. Obligation ceilings. PART B—NHTSA AUTHORIZATIONS AND GENERAL PROVISIONS Sec. 2500. Short title. Sec. 2502. General provisions. Sec. 2503. Matters before the secretary. Sec. 2506. Rear seatbelts. Sec. 2507. Brake performance standards for passenger cars. Sec. 2509. Head injury impact study. TITLE III—FEDERAL TRANSIT ACT AMENDMENTS OF 1991 Sec. 3001. Short title. Sec. 3004. Federal Transit Administration. Sec. 3031. New Jersey urban core project. Sec. 3032. Multiyear funding for San Francisco Bay area rail extension program. Sec. 3033. Queens local/express connection. Sec. 3034. Multiyear contract for metro rail project. Sec. 3035. Miscellaneous multiyear contracts. Sec. 3036. Unobligated M account balances. Sec. 3037. Technical accounting provisions. Sec. 3038. Reduction in authorizations for budget compliance. Sec. 3039. Petroleum violation escrow account funds. Sec. 3040. Charter services demonstration program. Sec. 3041. GAO report on charter service regulations. Sec. 3042. 1993 World University Games. Sec. 3043. Operating assistance limitation for Staten Island ferry. Sec. 3044. Forgiveness of certain outstanding obligations. Sec. 3045. Forgiveness of loan repayment. Sec. 3046. Modified bus service to accommodate the needs of students. Sec. 3047. Eligibility determinations for disability. Sec. 3048. Milwaukee alternatives analysis approval. TITLE IV—MOTOR CARRIER ACT OF 1991 Sec. 4001. Short title. Sec. 4007. Training of drivers; longer combination vehicle regulations, studies, and testing. Sec. 4012. Brake performance standards. Sec. 4013. FHWA positions. TITLE V—INTERMODAL TRANSPORTATION * * * * * * * Sec. 5002. Duties of Secretary; Office of Intermodalism. Sec. 5004. Surface Transportation Administration. TITLE VI—RESEARCH PART A—PROGRAMS, STUDIES, AND ACTIVITIES * * * * * * * Sec. 6007. Advisory Council on Transportation Statistics. Sec. 6008. Dot data needs. Sec. 6009. Surface transportation research and development planning. Sec. 6010. National Council on Surface Transportation Research. Sec. 6011. Research advisory committee. September 17, 2021 As Amended Through P.L. 116-94, Enacted December 20, 2019 VerDate Nov 24 2008 10:56 Sep 17, 2021 Jkt 000000 PO 00000 Frm 00003 Fmt 9001 Sfmt 6611 G:\COMP\INFRA\ISTEAO1.BEL HOLC G:\COMP\INFRA\INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ....XML Sec. 1 ISTEA91 4 Sec. 6012. Commemoration of Dwight D. Eisenhower National System of Interstate and Defense Highways. Sec. 6013. State level of effort. Sec. 6014. Evaluation of State procurement practices. Sec. 6015. Border crossings. Sec. 6016. Fundamental properties of asphalts and modified asphalts. * * * * * * * PART B—øREPEALED¿ PART C—ADVANCED TRANSPORTATION SYSTEMS AND ELECTRIC VEHICLES Sec. 6071. Advanced transportation system and electric vehicle research and devel- opment consortia. Sec. 6072. Definitions. Sec. 6073. Funding. SECTION 1. ø49 U.S.C. 101 note¿ SHORT TITLE. This Act may be cited as the ‘‘Intermodal Surface Transpor- tation Efficiency Act of 1991’’. øSection 2 repealed by section 7(b) of P.L. 103–272 (108 Stat. 1379).¿ SEC. 3. ø49 U.S.C. 101 note¿ SECRETARY DEFINED. As
Recommended publications
  • I-69 Implementation Strategy and Update Report
    I-69 Implementation Strategy Update Report February 2018 Transportation Planning and Programming Division Report Revision History The following table tracks revisions and changes made to this report over time. Date Revision Explanation March 2016 First edition of the report February 2018 • Updates Statewide and District Summaries based on fiscal year (FY) 2018 Unified Transportation Program (UTP) and its December 2017 revision as well as TxDOT’s other internal planning and programming systems as of January 3, 2018 • Includes Advisory Committee $2B project prioritization exercise results I-69 Implementation Strategy Update Report – February 2018 ii Table of Contents Page Preface ....................................................................................................................................... iv List of Acronyms ......................................................................................................................... v Introduction ............................................................................................................................... 1 I-69 System ............................................................................................................................... 1 Importance of the I-69 System to Texas ........................................................................ 3 I-69 System Project Prioritization ............................................................................................. 6 I-69 System Implementation Strategy Update .....................................................................
    [Show full text]
  • 4207380880Mcp
    I I I WAMPUM COMPREHENSIVE PLAN I WAMPUM BOROUGH I LAWRENCE COUNTY, PENNSYLVANIA WAMPUM BOROUGH COUNCIL Anthony D'Arrigo, Mayor I Milton Gene Cody, President Karolee Loughhead, Vice Resident Eugene Bessell I Emelene Deitrick Charles Kelly Peggy Rychlicki I Victor Short, Sr. WAMPUM BOROUGH PLANNING I COMMISSION Karolee Loughhead, Chairperson Shirely Grymes, Secretary Louis Ferrante I Milton Gene Cody Eleanore Mecklem ~I WAMPUM BOROUGH SECRETARY Susan Beall I WAMPUM BOROUGH CONSULTANT Mourice Waltz Planners and Consultants I I 'I I I I 1 I I TABLE OF CONTENTS I COMMUNITY DEVELOPMENT GOALS AND OBJECTIVES .... 1 THE PEOPLE POPULATION STUDY ...................... 9 I HOUSING INVENTORY AND PLAN ............. 14 THE LAND I PHYSICAL GEOGRAPHIC & ENVIRONMENT STUDY . 23 LAND USE STUDY ........................ 28 I THE INFRASTRUCTURE COMMUNITY FACILITIES AND UTILITIES ........ 30 I TRANSPORTATION ....................... 36 THE PLAN PROPOSED LAND USE ...................... 49 I CAPITAL IMPROVEMENTS PLAN .............. 51 DOWNTOWN REVITALIZATION PLAN ........... 53 I HISTORICAL PRESERVATION PLAN ............ 61 ECONOMIC DEVELOPMENT OPPORTUNITIES PLAN . 85 I EXHIBITS FOLLOWINGPAGE ........................ 117 I I I I I I I I 1 I I COMMUNlTY DEVELOPMENT GOALS AND OBECTIVES Fundamentally, the community planning process involves the intelligent guidance and I confrol of a municipality's growth and improvement. Community planning is based on the I premise that existing conditions can be improved, future needs can be fulfiied and steps can I be undertaken to development and maintain a desirable physical, social and economic environment within the community. I In planning, it is an axiom that every municipality is unique, and no standardized I concepts or patterns of development can be expected to validly apply to all Communities.
    [Show full text]
  • Transportation
    visionHagerstown 2035 5 | Transportation Transportation Introduction An adequate vehicular circulation system is vital for Hagerstown to remain a desirable place to live, work, and visit. Road projects that add highway capacity and new road links will be necessary to meet the Comprehensive Plan’s goals for growth management, economic development, and the downtown. This chapter addresses the City of Hagerstown’s existing transportation system and establishes priorities for improvements to roads, transit, and pedestrian and bicycle facilities over the next 20 years. Goals 1. The city’s transportation network, including roads, transit, and bicycle and pedestrian facilities, will meet the mobility needs of its residents, businesses, and visitors of all ages, abilities, and socioeconomic backgrounds. 2. Transportation projects will support the City’s growth management goals. 3. Long-distance traffic will use major highways to travel around Hagerstown rather than through the city. Issues Addressed by this Element 1. Hagerstown’s transportation network needs to be enhanced to maintain safe and efficient flow of people and goods in and around the city. 2. Hagerstown’s network of major roads is generally complete, with many missing or partially complete segments in the Medium-Range Growth Area. 3. Without upgrades, the existing road network will not be sufficient to accommodate future traffic in and around Hagerstown. 4. Hagerstown’s transportation network needs more alternatives to the automobile, including transit and bicycle facilities and pedestrian opportunities. Existing Transportation Network Known as “Hub City,” Hagerstown has long served as a transportation center, first as a waypoint on the National Road—America’s first Dual Highway (US Route 40) federally funded highway—and later as a railway node.
    [Show full text]
  • Process for Congestion Relief Link and Project Priority Ranking for CIS FY 1322
    Process for Congestion Relief Link and Project Priority Ranking for CIS FY 1322 Congestion Management System (CMS) congestion link priority rankings were developed for all the links in the CMS. These link rankings serve two purposes. First is to rank the links so that priority can be established by location so that the highest priority congested locations can be identified. Second, for highway projects that have already been identified, they can be prioritized for congestion. The link rankings were developed using scores from “0” to “10” for each measure and the weighted by the percent for each measure to obtain a 100% score. A score of “10” was given for the highest priority values for each given measure used. The Congestion Relief priority rankings are primarily based on congestion performance measures, with consideration also given to related roadway usage characteristics. Congestion performance measures include volume to capacity (V/C) ratios and delays. Roadway usage characteristics include AADT traffic volumes, function class and strategic network. The congestion performance measures comprise 70% of the ranking while the roadway usage characteristics comprise the remaining 30%. As V/C ratios have been the most common performance measure used for congestion priority rankings, the V/C ratio scores were given 40% of the overall weight for the overall score, split evenly between AM and PM V/C ratios. The highest one‐way AM V/C was given 20% of the overall weight, while the highest one‐way PM V/C was also given 20% of the overall weight. Delays were given 30% of the overall weight, split by two types of delays.
    [Show full text]
  • Emission Station List by County for the Web
    Emission Station List By County for the Web Run Date: June 20, 2018 Run Time: 7:24:12 AM Type of test performed OIS County Station Status Station Name Station Address Phone Number Number OBD Tailpipe Visual Dynamometer ADAMS Active 194 Imports Inc B067 680 HANOVER PIKE , LITTLESTOWN PA 17340 717-359-7752 X ADAMS Active Bankerts Auto Service L311 3001 HANOVER PIKE , HANOVER PA 17331 717-632-8464 X ADAMS Active Bankert'S Garage DB27 168 FERN DRIVE , NEW OXFORD PA 17350 717-624-0420 X ADAMS Active Bell'S Auto Repair Llc DN71 2825 CARLISLE PIKE , NEW OXFORD PA 17350 717-624-4752 X ADAMS Active Biglerville Tire & Auto 5260 301 E YORK ST , BIGLERVILLE PA 17307 -- ADAMS Active Chohany Auto Repr. Sales & Svc EJ73 2782 CARLISLE PIKE , NEW OXFORD PA 17350 717-479-5589 X 1489 CRANBERRY RD. , YORK SPRINGS PA ADAMS Active Clines Auto Worx Llc EQ02 717-321-4929 X 17372 611 MAIN STREET REAR , MCSHERRYSTOWN ADAMS Active Dodd'S Garage K149 717-637-1072 X PA 17344 ADAMS Active Gene Latta Ford Inc A809 1565 CARLISLE PIKE , HANOVER PA 17331 717-633-1999 X ADAMS Active Greg'S Auto And Truck Repair X994 1935 E BERLIN ROAD , NEW OXFORD PA 17350 717-624-2926 X ADAMS Active Hanover Nissan EG08 75 W EISENHOWER DR , HANOVER PA 17331 717-637-1121 X ADAMS Active Hanover Toyota X536 RT 94-1830 CARLISLE PK , HANOVER PA 17331 717-633-1818 X ADAMS Active Lawrence Motors Inc N318 1726 CARLISLE PIKE , HANOVER PA 17331 717-637-6664 X 630 HOOVER SCHOOL RD , EAST BERLIN PA ADAMS Active Leas Garage 6722 717-259-0311 X 17316-9571 586 W KING STREET , ABBOTTSTOWN PA ADAMS Active
    [Show full text]
  • __History of Kew Depot and It's Routes
    HISTORY OF KEW DEPOT AND ITS ROUTES Page 1 HISTORY of KEW DEPOT and the ROUTES OPERATED by KEW Compiled and written by Hugh Waldron MCILT CA 1500 The word tram and tramway are derived from Scottish words indicating the type of truck and the tracks used in coal mines. 1807 The first Horse tram service in the world commences operation between Swansea and Mumbles in Wales. 12th September 1854 At 12.20 pm first train departs Flinders Street Station for Sandridge (Port Melbourne) First Steam operated railway line in Australia. The line is eventually converted to tram operation during December 1987 between the current Southbank Depot and Port Melbourne. The first rail lines in Australia operated in Newcastle Collieries operated by horses in 1829. Then a five-mile line on the Tasman Peninsula opened in 1836 and powered by convicts pushing the rail vehicle. The next line to open was on 18/5/1854 in South Australia (Goolwa) and operated by horses. 1864 Leonard John Flannagan was born in Richmond. After graduating he became an Architect and was responsible for being the Architect building Malvern Depot 1910, Kew Depot 1915 and Hawthorn Depot 1916. He died 2nd November 1945. September 1873 First cable tramway in the world opens in Clay Street, San Francisco, USA. 1877 Steam tramways commence. Victoria only had two steam tramways both opened 1890 between Sorrento Pier to Sorrento Back Beach closed on 20th March 1921 (This line also operated horse trams when passenger demand was not high.) and Bendigo to Eaglehawk converted to electric trams in 1903.
    [Show full text]
  • TOP ROUTE CHANGE PROPOSALS Turn-By-Turn Directions
    TOP ROUTE CHANGE PROPOSALS Turn-by-Turn Directions Direction sheets are included here only for routes with proposed routing changes as part of the Transit Optimization Plan (TOP). It excludes routes with only proposed schedule changes and routes with no changes proposed. Please note that these directions should be considered DRAFT only. They are subject to change prior to final recommendations and implementation, depending on turning constraints, bus capacity and other factors. They are intended to be a general guide to assist in visualizing the proposals. Routes included are: Routes 1, 7, 11, 12, 14, 18, 20, 24, 25, 27, 31, 35, 44, 50, 52, 83, 84, 85, 105, 120, 237, 703, 704, 707, 709, 815, 816, 832, 834, 838, 848, 851, 854, 856, 864, 870, 871/872, 874/875, 894, 905, 923, 929, 936, 944, 945, 955, 962, 963, 965, 967, 968 and 969. ROUTE 1 EASTBOUND: From the terminal at Fashion Valley Transit Center: LEFT on Fashion Valley Road LEFT on Hotel Circle North RIGHT on Hotel Circle South RIGHT on Interstate 8 Eastbound EXIT to State Route 163 Southbound EXIT to Sixth Avenue/University Avenue LEFT on University Avenue LEFT on Park Boulevard RIGHT on El Cajon Boulevard RIGHT on La Mesa Boulevard LEFT on University Avenue RIGHT on Spring Street RIGHT on Allison Avenue To the terminal on westbound Allison Avenue at Date Street WESTBOUND: From the terminal on westbound Allison Avenue at Date Street: LEFT on University Avenue RIGHT on La Mesa Boulevard LEFT on El Cajon Boulevard LEFT on Park Boulevard RIGHT on University Avenue RIGHT on Sixth Avenue
    [Show full text]
  • Transit Management Committees Transit TMC/RMC Management Rail Management Joint Meeting Committee (TMC) Committee (RMC)
    MEETINGS OF THE Transit Management Committees Transit TMC/RMC Management Rail Management Joint Meeting Committee (TMC) Committee (RMC) Date Wednesday, September 6, 2017 Starting time 11:00 a.m. Meetings to occur sequentially Location Valley Metro Lake Powell Conference Room (10A) 101 N. 1st Avenue, 10th Floor Phoenix If you require assistance accessing the meetings on the 10th floor, please go to the 13th floor or call 602-262-7433. VALLEY METRO • 101 N 1ST AVE • STE 1300 • PHOENIX AZ • 85003 • 602-262-7433 August 30, 2017 Joint Meeting Agenda Transit Management Committee and Rail Management Committee Wednesday, September 6, 2017 Lake Powell Conference Room 101 N. 1st Avenue, 10th Floor 11:00 a.m. Action Recommended 1. Items from Citizens Present (yellow card) 1. For information An opportunity will be provided to members of the public at the beginning of the meeting to address the Board on non-agenda items. Up to three minutes will be provided per speaker or a total of 15 minutes for all speakers. 2. Chief Executive Officer’s (CEO) Report 2. For information Scott Smith, CEO, will brief the TMC/RMC on current issues. 3. Minutes 3. For action Minutes from the August 2, 2017 Joint TMC/RMC meeting are presented for approval. 4. Public Comment on Agenda Action Items (blue card) 4. For information The public will be provided with an opportunity at this time to address the Board on all action agenda items. Up to three minutes will be provided per speaker to address all agenda items unless the Chair allows more at his/her discretion.
    [Show full text]
  • I-69 Implementation Strategy Report – March 2016 Ii
    I-69 Implementation Strategy Report March 2016 Transportation Planning and Programming Division Table of Contents Page Preface ....................................................................................................................................... iii List of Acronyms ........................................................................................................................ iv I-69 System Introduction .......................................................................................................... 1 Importance of the I-69 System to Texas ........................................................................ 1 I-69 System Progress ....................................................................................................... 5 I-69 Implementation Strategy .................................................................................................. 6 Development .................................................................................................................... 7 Components ..................................................................................................................... 9 Next Steps - How the Implementation Strategy Will Be Used ..................................... 11 Conclusion ...................................................................................................................... 12 I-69 Implementation Strategy Summary Information and Data .......................................... 13 Tables Table 1. I-69 System Activities Since September
    [Show full text]
  • Countywide Bus Rapid Transit Study Consultant’S Report (Final) July 2011
    Barrier system (from TOA) Countywide Bus Rapid Transit Study Consultant’s Report (Final) July 2011 DEPARTMENT OF TRANSPORTATION COUNTYWIDE BUS RAPID TRANSIT STUDY Consultant’s Report (Final) July 2011 Countywide Bus Rapid Transit Study Table of Contents Executive Summary .............................................................................................................. ES-1 1 Introduction ......................................................................................................................... 1 1.1 Key additional elements of BRT network ...................................................................... 2 1.1.1 Relationship to land use ........................................................................................ 2 1.1.2 Station access ...................................................................................................... 3 1.1.3 Brand identity ........................................................................................................ 4 1.2 Organization of report .................................................................................................. 5 1.3 Acknowledgments ........................................................................................................ 5 2 Study Methodology ............................................................................................................. 7 2.1 High-level roadway screening ...................................................................................... 9 2.2 Corridor development and initial
    [Show full text]
  • Resolution #20-9
    BALTIMORE METROPOLITAN PLANNING ORGANIZATION BALTIMORE REGIONAL TRANSPORTATION BOARD RESOLUTION #20-9 RESOLUTION TO ENDORSE THE UPDATED BALTIMORE REGION COORDINATED PUBLIC TRANSIT – HUMAN SERVICES TRANSPORTATION PLAN WHEREAS, the Baltimore Regional Transportation Board (BRTB) is the designated Metropolitan Planning Organization (MPO) for the Baltimore region, encompassing the Baltimore Urbanized Area, and includes official representatives of the cities of Annapolis and Baltimore; the counties of Anne Arundel, Baltimore, Carroll, Harford, Howard, and Queen Anne’s; and representatives of the Maryland Departments of Transportation, the Environment, Planning, the Maryland Transit Administration, Harford Transit; and WHEREAS, the Baltimore Regional Transportation Board as the Metropolitan Planning Organization for the Baltimore region, has responsibility under the provisions of the Fixing America’s Surface Transportation (FAST) Act for developing and carrying out a continuing, cooperative, and comprehensive transportation planning process for the metropolitan area; and WHEREAS, the Federal Transit Administration, a modal division of the U.S. Department of Transportation, requires under FAST Act the establishment of a locally developed, coordinated public transit-human services transportation plan. Previously, under MAP-21, legislation combined the New Freedom Program and the Elderly Individuals and Individuals with Disabilities Program into a new Enhanced Mobility of Seniors and Individuals with Disabilities Program, better known as Section 5310. Guidance on the new program was provided in Federal Transit Administration Circular 9070.1G released on June 6, 2014; and WHEREAS, the Federal Transit Administration requires a plan to be developed and periodically updated by a process that includes representatives of public, private, and nonprofit transportation and human services providers and participation by the public.
    [Show full text]
  • Transit Optimization Plan September 2017
    Transit Optimization Plan September 2017 Prepared by: Contents Introduction ................................................................................................................................6 Goals and Focus ........................................................................................................... 6 Study Process ............................................................................................................... 7 Report Contents ........................................................................................................... 8 Existing Conditions .....................................................................................................................9 Market Assessment ...................................................................................................... 9 Population ..........................................................................................................................9 Employment .......................................................................................................................9 Development Patterns ........................................................................................................9 Regional Growth ............................................................................................................... 10 Growth in Senior Population ............................................................................................. 10 Transit’s Role in Mobility ..................................................................................................