I-69 Implementation Strategy and Update Report
Total Page:16
File Type:pdf, Size:1020Kb
I-69 Implementation Strategy Update Report February 2018 Transportation Planning and Programming Division Report Revision History The following table tracks revisions and changes made to this report over time. Date Revision Explanation March 2016 First edition of the report February 2018 • Updates Statewide and District Summaries based on fiscal year (FY) 2018 Unified Transportation Program (UTP) and its December 2017 revision as well as TxDOT’s other internal planning and programming systems as of January 3, 2018 • Includes Advisory Committee $2B project prioritization exercise results I-69 Implementation Strategy Update Report – February 2018 ii Table of Contents Page Preface ....................................................................................................................................... iv List of Acronyms ......................................................................................................................... v Introduction ............................................................................................................................... 1 I-69 System ............................................................................................................................... 1 Importance of the I-69 System to Texas ........................................................................ 3 I-69 System Project Prioritization ............................................................................................. 6 I-69 System Implementation Strategy Update ...................................................................... 10 Components ................................................................................................................... 10 Next Steps - How the Implementation Strategy Update Will Be Used ........................ 11 Conclusion ...................................................................................................................... 13 I-69 Implementation Strategy Update Summary Information and Data ............................. 13 Tables Table 1. I-69 Advisory Committee Priority Projects to Meet Interstate Standards – Funding Status ............................................................................................................................. 7 Table 2. I-69 Program Development Project Status Categories .......................................... 10 Table 3. Remaining I-69 Texas System to be Constructed .................................................. 12 Figures Figure 1. I-69 System ................................................................................................................ 2 Figure 2. I-69 System Routes in Texas .................................................................................... 4 Figure 3. I-69 Interstate and Multi-Modal Connectivity .......................................................... 5 Figure 4: I-69 Advisory Committee Project Prioritization Process ......................................... 6 Appendix – Statewide and District Summaries Section 1 – Statewide Summary Section 2 – Atlanta District Section 3 – Lufkin District Section 4 – Beaumont District Section 5 – Houston District Section 6 – Yoakum District Section 7 – Corpus Christi District Section 8 – Laredo District Section 9 – Pharr District I-69 Implementation Strategy Update Report – February 2018 iii Preface The Interstate 69 (I-69) Implementation Strategy was prepared in March 2016 to manage the continued development and designation of the I-69 system in Texas. It is intended to be a living document with periodic updates. This first update report incorporates the latest I-69 system project development status information available in the fiscal year (FY) 2018 Unified Transportation Program (UTP) and its December 2017 revision as well as TxDOT’s other internal planning and programming systems as of January 3, 2018. To date, approximately 161 miles of the I-69 system in Texas have been designated as interstate. The following table highlights additional key information depicting the progress made on the I-69 system since March 2016. March 2016 February 2018 Key Highlights Strategy Update Committed funding amount (not including projects under $331,455,825 $1,723,890,426 construction) Projects with committed funding (not including projects 12 36 under construction) Length of the I-69 system route under construction or 91.1 Miles 98.9 Miles constructed to meet interstate standards In addition, this update report summarizes the February 2017 I-69 Advisory Committee prioritization exercise results that included the identification of 36 priority projects to be advanced to meet interstate standards. The following table highlights key information regarding these priority projects. I-69 Advisory Committee Priority Projects Summary February 2018 Update Projects identified as priority 36 Estimated construction cost of priority projects $2,185,918,099 Priority projects with committed construction funding 27 Committed construction funding $1,420,006,659 Priority projects under construction or scheduled for construction by 10 August 31, 2018 I-69 Implementation Strategy Update Report – February 2018 iv List of Acronyms FAST Act Fixing America’s Surface Transportation Act FM Farm to Market Road FY Fiscal Year GIS Geographic Information System I-69 Interstate 69 ISTEA Intermodal Surface Transportation Efficiency Act of 1991 MAP 21 Moving Ahead for Progress in the 21st Century Act ROW Right-of-way SH State Highway TPP Transportation Planning and Programming Division TxDOT Texas Department of Transportation US U.S. Highway UTP Unified Transportation Program I-69 Implementation Strategy Update Report – February 2018 v Introduction In March 2016, the Texas Department of Transportation (TxDOT) prepared an Interstate 69 (I-69) Implementation Strategy to manage the continued development and designation of the I-69 system in Texas. The Strategy was developed to serve as a tool setting forth an organized framework to identify, plan, prioritize, program and track the remaining upgrade and relief route projects to extend and complete the I-69 system. It established a comprehensive system-wide approach for TxDOT districts to use in coordinating and managing the advancement of these projects, including securing and allocating needed funding to execute the Strategy. It also served as an information tool that citizen committees could use to inform stakeholders about the status and progress of I-69 system development in Texas. Finally, the Strategy represented a snapshot in time and was intended to be updated as the I-69 program unfolds and evolves. This report updates the March 2016 I-69 Implementation Strategy report. The update is based on the most current project information available in the fiscal year (FY) 2018 Unified Transportation Program (UTP) and its December 2017 revision as well TxDOT’s other internal planning and programming systems as of January 3, 2018. The UTP is TxDOT’s 10-year plan to guide transportation project development. It is a listing of projects and programs that are planned to be constructed and/or developed within ten years. It is important to note that the UTP is neither a budget nor a guarantee that projects will or can be built. This report also provides updated information on TxDOT’s progress to complete the I-69 system in Texas, including the estimated construction costs for the remaining I-69 projects in 2018 dollars. The sections in the Appendix at the back of this report include an updated Implementation Strategy summary for the I-69 system in Texas and for each TxDOT district involved with I-69 system development. This summary includes 1) the identification and status of TxDOT planned and programmed projects, 2) future potential projects with no current planning and programming status, and 3) descriptive information for each project. I-69 System Sections 1105(c) and 1105(e)(5) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), as amended, established High Priority Corridors 18 and 20 to become part of the I-69 system. The I-69 system will extend through Texas, Louisiana, Arkansas, Mississippi, Tennessee, Kentucky, Indiana and Michigan, thereby providing a continuous new interstate corridor connecting Mexico, the United States and Canada (Figure 1). I-69 Implementation Strategy Update Report – February 2018 1 Figure 1. I-69 System I-69 Implementation Strategy Update Report – February 2018 2 The I-69 system within Texas will eventually extend along the following highways: ▪ U.S. Highway (US) 59 from I-30 in Texarkana to Laredo ▪ US 84 from the Louisiana border to US 59 in Timpson ▪ US 77 from US 59 in Victoria to Brownsville ▪ US 281 from US 59 in George West to I-2 in Pharr ▪ State Highway (SH) 44 from SH 358 in Corpus Christi to US 59 in Freer ▪ SH 550 (formerly Farm to Market Road [FM] 511) from I-69E to SH 48 at the Port of Brownsville Figure 2 provides a map of the I-69 system routes in Texas. The network of highways identified to serve as the I-69 system in Texas is nearly 1,088 miles long. With the enactment of the Moving Ahead for Progress in the 21st Century Act (MAP 21) and the Fixing America’s Surface Transportation Act (FAST Act), sections of these highways within the limits specified in Section 1105(c), as amended, may be added to the I-69 system when they meet the interstate design standards approved under Section 109(b) of Title 23, United States Code. The highway sections must also connect to or be planned to connect to an existing interstate system section by