Osprey Nest Queen Size Page 2 LC Cutting Correction

Total Page:16

File Type:pdf, Size:1020Kb

Osprey Nest Queen Size Page 2 LC Cutting Correction Template Layout Sheets Organizing, Bags, Foundation Papers, and Template Layout Sheets Sort the Template Layout Sheets as shown in the graphics below. Unit A, Temp 1 Unit A, Temp 1 Layout UNIT A TEMPLATE LAYOUT SHEET CUT 3" STRIP BACKGROUND FABRIC E E E ID ID ID S S S Please read through your original instructions before beginning W W W E E E Sheet. Place (2) each in Bag S S S TEMP TEMP TEMP S S S E E A-1 A-1 A-1 E W W W S S S I I I D D D E E E C TEMP C TEMP TEMP U U T T A-1 A-1 T A-1 #6, #7, #8, and #9 L L I the queen expansion set. The instructions included herein only I C C C N N U U U T T T T E E L L L I I I N N N E E replace applicable information in the pattern. E Unit A, Temp 2, UNIT A TEMPLATE LAYOUT SHEET Unit A, Temp 2 Layout CUT 3" STRIP BACKGROUND FABRIC S S S E E E The Queen Foundation Set includes the following Foundation Papers: W W W S S S ID ID ID E TEMP E TEMP E TEMP Sheet. Place (2) each in Bag A-2 A-2 A-2 E E E D D D I I TEMP I TEMP TEMP S S S A-2 A-2 A-2 W W W C E C E E S S S U C C U C U U U T T T T T T L L L L IN IN L IN I I N #6, #7, #8, and #9 E E N E E NP 202 (Log Cabin Full Blocks) ~ 10 Pages E NP 220 (Log Cabin Half Block with Unit A Geese) ~ 2 Pages NP 203 (Log Cabin Half Block with Unit B Geese) ~ 1 Page Unit B, Temp 1, ABRIC F BACKGROUND Unit B, Temp 1 Layout E E T SHEE YOUT LA TE TEMPLA A T UNI E D I D I D I S S STRIP 3" T CU S W W E W TP 101 (Template Layout Sheets for Log Cabins and Geese) ~ 2 Pages E S S E S TEMP TEMP TEMP S S S E E E 1 A- 1 A- 1 A- W W W S S S I I I D D D E E E C C Sheet. Place (2) each in Bag TEMP TEMP TEMP U U T 1 A- T 1 A- 1 A- L L I I C C C N N U U U T T T E E L L L I I I N N N E E E #6, #7, #8, and #9 Note that the original pattern does not have NP220, but in- stead, has NP 204. DO NOT USE NP 204 in the Queen Unit B, Temp 2 3" STRIP 3" T CU Unit B, Temp 2 Layout ABRIC F BACKGROUND S S S E E E W T SHEE W YOUT LA TE TEMPLA A T UNI W S S S pattern. I I I Replace the NP 204 sheet with both NP 220 sheets D D D P M E T E P M E T E P M E T E 2 - A 2 - A 2 - A E E E D D D I I P M E T P M E T I P M E T S S Sheet. Place (2) each in Bag S 2 - A 2 - A 2 - A W W W E C C E E S S S U C U C C U U U T T T T T L L L L N I L N I N I I to complete a Queen-sized Pattern. The reason why is because I N E N E E E #6, #7, #8, and #9 E the Queen size design adds a row in the vertical direction. This new row uses A Arcs with the Half Block instead of B Arcs. TEMP SEC 21 Additionally, all of the half blocks are HLC-A in this pattern. SEW SIDE CUT LINE 1 Light Fabric TEMP SEC 17 Template Layout Sheet SEW SIDE CUT LINE 3 Bags E TEMP SEC 13 T E G M P 5 SEW SID SEW SIDE CUT LINE 5 LINE LINE T Units LC and HLC-A Unit LC, Light CU Nine (9) Large Ziploc bags are needed to organize this project. Bags TEMP SEC 9 SEW SIDE CUT LINE 7 TEMP SEW SID SEC 2 P M 0 G E T TEMP SEC 5 TEMP T E Place (2) layout sheets with #1 to #4 go with the log cabin units, Bag #5 will be a temporary bag SEC 1 SHEE T P 6 OU I SEW SIDE CUT LINE 9 LAY E G AT 2 1/2 " STR L T CU 2 TEMP each Bag #1, #2, #3, and #4 4 LINE 1 T used to keep the fabrics for the half log cabin units organized, and 2 P LINE CU T SEC 1 TEMP SEC 1 U E TEMP C SCRA T E G SEW SIDE SEW SIDE SEW SIDE SEW SIDE SEW SIDE M P SEC 8 SEW SID TEMP Bags #6 to #9 are for the A and B Arc units. 3 LINE T T CU CUT LINE 11 SEC 4 LIGHT FABRIC TEMP Note: The Template Layout 0 UNITS LC, HLC-A, HLC-B TEMPLATE LAYOUT SHEET LINE 2 LINE 4 LINE 6 LINE 8 CUT 14 1/2" x 13 1/2" RECTANGLES LINE 1 T T T T T STACK FABRICS RIGHT SIDE UP CU CU CU CU CU SCRAP SEW SID Sheets reference HLC-B, but P M G E Foundation Papers T E there are no HLC-B in the P T 2 P NGLES SIDE U TA LINE 1 T SHEE LINE 3 LINE 5 LINE 7 LINE 9 T LINE T T T T The foundation papers are found on the newsprint sheets labeled: Queen Size pattern. Ignore SCRA ABRIC YOUT CU CU CU CU CU CUT E TE LA BRICS RIGH DARK F T FA E G 13 1/2" x 13" REC M UNITS LC, HLC-A, HLC-B T P ACK TEMPLA CU ST SEW SID LINE 1 LINE T T SEC 3 CU this reference. P TEM E E E E E E SID SEW 0 1 LINE T CU SEC 7 P SEW SID SEW SID SEW SID SEW SID SEW SID 2 SEC P TEM TEM NP 202: Cut out (56) LC Units, (56) A Units, (56) B Units. 11 SEW SID SEC P P M TEM E SID SEW 8 LINE T G CU E T Dark Fabric Unit LC, Dark E SEC 15 P 6 SEC P NP 203: Cut out (4) HLC-A Units, (4) B Units. TEM TEM SEC 19 P Template Layout Sheet TEM E SID SEW 6 LINE T CU SEC 10 SEC NP 220: Cut out (4) HLC-A Units, (4) A Units. TEMP Temp G Layout Sheet. Place (4) Units LC and HLC-A each in Bag #6, #7, #8, and #9 E SID SEW 4 LINE T CU SEC 14 SEC TEMP E SID SEW 2 LINE T The queen package has the exact number of NP 202 (no extras!), Place (8) layout sheets with CU 8 1 SEC TEMP and a couple extra pieces for NP220 and NP204. There are extra Bag #5 template layout sheets as well. Divide the LC and HLC units as shown in the graphics below. Sorting and Cutting your Fabrics SEC 15 SEC 19 USE STRIPS FOR TEMP SEC 18 LINE 18 Place (14) each of the LC LINE 14 SEC 12 SEC 15 USE STRIPS FOR TEMP SEC 14 Unit LCLINE 14 LINE 11 SEC 9 SEC 11 Units in Bags #1, #2, #3, USE STRIPS FOR TEMP SEC 10 LINE 10 LINE 8 FOUNDATIONCUT LINE PIECING AFTER IS C SEC 6 SEC 7 O MPLETE USE STRIPS FOR TEMP SEC 6 UNIT HLC LINE 6 F LINE 5 O C U U N T These in- Log Cabin Fabrics for the Queen Size Layout: D LI and #4. IS A N T E SEC 2 SEC 3 C I A O O F M N T USE STRIPS FOR TEMP SEC 2 P P E LE I R T E E C -A IN G USE STRIPS FOR TEMP SEC LINE 2 LINE 1 1 3 SEC UNIT LC LINE 5 LINE 17 LINE 13 5 LINE SEC 14 SEC 10 SEC 18 LINE USE STRIPS FOR TEMP SEC 17 USE STRIPS FOR TEMP SEC 21 USE STRIPS FOR TEMP SEC 13 SEC SEC structions have been written to expand on the color layout of the 6 2 1 3 9 1 1 SEC 1 LINE 1 LINE 1 LINE 1 3 LINE 4 SEC SEC 17 SEC 14 SEC SEC 11 LINE 2 8 4 USE STRIPS FOR TEMP SEC 5 SEC SEC SEC 16 SEC 12 LINE SEC 20 7 LINE 1 LINE 19 LINE 15 0 6 3 F O Place (2) each of the half I S U N USE STRIPS FOR TEMP SEC C USE STRIPS FOR TEMP SEC O D C SEC LINE M U A T T P L I L E O I T N N 8 E E P LINE 7 I LINE 4 LINE A LINE 3 LINE E F C T G I E N N R G I E C T E E R quilt shown on the coversheet of the original pattern.
Recommended publications
  • Form W-4, Employee's Withholding Certificate
    Employee’s Withholding Certificate OMB No. 1545-0074 Form W-4 ▶ (Rev. December 2020) Complete Form W-4 so that your employer can withhold the correct federal income tax from your pay. ▶ Department of the Treasury Give Form W-4 to your employer. 2021 Internal Revenue Service ▶ Your withholding is subject to review by the IRS. Step 1: (a) First name and middle initial Last name (b) Social security number Enter Address ▶ Does your name match the Personal name on your social security card? If not, to ensure you get Information City or town, state, and ZIP code credit for your earnings, contact SSA at 800-772-1213 or go to www.ssa.gov. (c) Single or Married filing separately Married filing jointly or Qualifying widow(er) Head of household (Check only if you’re unmarried and pay more than half the costs of keeping up a home for yourself and a qualifying individual.) Complete Steps 2–4 ONLY if they apply to you; otherwise, skip to Step 5. See page 2 for more information on each step, who can claim exemption from withholding, when to use the estimator at www.irs.gov/W4App, and privacy. Step 2: Complete this step if you (1) hold more than one job at a time, or (2) are married filing jointly and your spouse Multiple Jobs also works. The correct amount of withholding depends on income earned from all of these jobs. or Spouse Do only one of the following. Works (a) Use the estimator at www.irs.gov/W4App for most accurate withholding for this step (and Steps 3–4); or (b) Use the Multiple Jobs Worksheet on page 3 and enter the result in Step 4(c) below for roughly accurate withholding; or (c) If there are only two jobs total, you may check this box.
    [Show full text]
  • Shanghai Lumina Shanghai (100% Owned)
    Artist’s impression LUMINA GUANGZHOU GUANGZHOU Artist’s impression Review of Operations – Business in Mainland China Progress of Major Development Projects Beijing Lakeside Mansion (24.5% owned) Branch of Beijing High School No. 4 Hou Sha Yu Primary School An Fu Street Shun Yi District Airport Hospital Hou Sha Yu Hou Sha Yu Station Town Hall Tianbei Road Tianbei Shuang Yu Street Luoma Huosha Road Lake Jing Mi Expressway Yuan Road Yuan Lakeside Mansion, Beijing (artist’s impression) Hua Li Kan Station Beijing Subway Line No.15 Located in the central villa area of Houshayu town, Shunyi District, “Lakeside Mansion” is adjacent to the Luoma Lake wetland park and various educational and medical institutions. The site of about 700,000 square feet will be developed into low-rise country-yard townhouses and high-rise apartments, complemented by commercial and community facilities. It is scheduled for completion in the third quarter of 2020, providing a total gross floor area of about 1,290,000 square feet for 979 households. Beijing Residential project at Chaoyang District (100% owned) Shunhuang Road Beijing Road No.7 of Sunhe Blocks Sunhe of Road No.6 Road of Sunhe Blocks of Sunhe Blocks Sunhe of Road No.4 Road of Sunhe Blocks Road No.10 Jingping Highway Jingmi Road Residential project at Chaoyang District, Beijing (artist’s impression) Huangkang Road Sunhe Station Subway Line No.15 Located in the villa area of Sunhe, Chaoyang District, this project is adjacent to the Wenyu River wetland park, Sunhe subway station and an array of educational and medical institutions.
    [Show full text]
  • SOHO CHINA LIMITED Interim Report 2013
    SOHO CHINA LIMITED Interim Report 2013 Stock Code : 410 CONTENTS 2 • Business Review / 15 • Business Review and Market Outlook / 17 • Management Discussion & Analysis / 21 • Other Information / 31 • Corporate Information / 33 • Unaudited Interim Financial Report / The board (the “Board”) of directors (the “Directors”) of SOHO China Limited (the “Company” or “we”) announces the unaudited condensed consolidated interim results of the Company and its subsidiaries (collectively, the “Group”) for the six months ended 30 June 2013 (the “Period”), which have been prepared in accordance with the Hong Kong Accounting Standard 34 “Interim Financial Reporting” issued by the Hong Kong Institute of Certified Public Accountants and the relevant provisions of the Rules (the “Listing Rules”) Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited (the “Stock Exchange”). The 2013 interim results of the Group have been reviewed by the audit committee of the Company (the “Audit Committee”) and approved by the Board on 20 August 2013. The interim financial report is unaudited, but has been reviewed by the Company’s auditor, PricewaterhouseCoopers. For the six months ended 30 June 2013, the Group achieved a turnover of approximately RMB2,478 million, representing an increase of approximately 103% compared with that for the same period of 2012, mainly due to more gross floor area (“GFA”) booked during the Period. The gross profit margin for the Period was approximately 54%. Net profit attributable to equity shareholders of the Company for the Period was approximately RMB2,094 million, representing an increase of approximately 242% compared with that during the same period of 2012.
    [Show full text]
  • Enchanting Hospitality
    enchanting hospitality The Langham, Shanghai, Xintiandi is located at the gateway to the vibrant Xintiandi entertainment area surrounded by fashionable dining, luxury retail shopping and also adjacent to key businesses situated along Huai Hai Road. The Hotel offers enchanting hospitality in an ambience of modern luxury and elegance along with up-to-date technology suitable for both business and leisure travellers. refreshing accommodation Since 1865, exceptional service, luxury and innovative design have been the hallmarks of the Langham legacy. Those traditions continue today at The Langham, Shanghai, Xintiandi. The luxurious rooms feature the following amenities: Signature Blissful Bed Floor to ceiling windows Wired and wireless broadband Nespresso coffee machine and mini bar Internet access 2 washbasins with adjustable mirrors 40” LCD television Electric toilet Smart phone docking station Separate rain shower Iron and ironing board Heated bathroom floor Room Type No.of Rooms Size(sqm) Size(sqft) Superior Room 126 40 430 Deluxe Room 117 40~43 430~460 Deluxe Studio 9 48 515 Executive Room* 54 40 430 Executive Studio* 10 48 515 Junior Suite* 19 55 590 One Bedroom Suite* 18 55 590 Executive Suite* 2 90 970 Presidential Suite*(duplex) 1 180 1,940 Chairman Suite*(duplex) 1 345 3,715 Total 357 - - the langham club Located on Level 27, The Langham Club offers an intimate Club Lounge experience for guests looking to relax or catch up on the day’s business. Guests staying in Club guestrooms and suites can enjoy complimentary access to The
    [Show full text]
  • Rail Transport in the World's Major Cities
    Feature Evolution of Urban Railways (part 2) Rail Transport in The World’s Major Cities Takao Okamoto and Norihisa Tadakoshi Many of the world’s large cities grew in development, particularly with regard to American city; and Hong Kong, Seoul and conjunction with railways, and today, the following: Tokyo representing Asian cities. large cities cannot depend only on motor • The correlation between railways and vehicles for transportation. With worries urban growth over global environmental issues, public • The location of terminals for intercity London transportation systems are increasingly and intra-city transport seen as an important way to expand and • Examination of various public transit Located in southeast England near the revitalize large cities, while consuming systems, including non-infrastructure mouth of the River Thames, London less energy and other resources. • Strategic planning of rail networks expanded during the Industrial Revolution This article looks at public transportation based on urban development trends (1760–1850) and secured its dominance systems in some major cities of the world and future models as the heart of the British Empire during and identifies similarities and differences The cities selected for this comparative the Victorian era (1837–1901). It’s in areas such as history of development, study are: London as the first city to adapt population grew from about 500,000 in railway networks, and method of rail technology to public transport; Paris, the 17th century to 4.5 million by the end operation. Our aim is to explore the future Berlin and Moscow as three major of the 19th century. The modern relationship between urban and transport European cities; New York as a North- metropolis of Greater London consists of The London Railway Network King’s Cross/St.Pancras Paddington LCY Victoria Waterloo LHR R.
    [Show full text]
  • 8Th Metro World Summit 201317-18 April
    30th Nov.Register to save before 8th Metro World $800 17-18 April Summit 2013 Shanghai, China Learning What Are The Series Speaker Operators Thinking About? Faculty Asia’s Premier Urban Rail Transit Conference, 8 Years Proven Track He Huawu Chief Engineer Record: A Comprehensive Understanding of the Planning, Ministry of Railways, PRC Operation and Construction of the Major Metro Projects. Li Guoyong Deputy Director-general of Conference Highlights: Department of Basic Industries National Development and + + + Reform Commission, PRC 15 30 50 Yu Guangyao Metro operators Industry speakers Networking hours President Shanghai Shentong Metro Corporation Ltd + ++ Zhang Shuren General Manager 80 100 One-on-One 300 Beijing Subway Corporation Metro projects meetings CXOs Zhang Xingyan Chairman Tianjin Metro Group Co., Ltd Tan Jibin Chairman Dalian Metro Pak Nin David Yam Head of International Business MTR C. C CHANG President Taoyuan Metro Corp. Sunder Jethwani Chief Executive Property Development Department, Delhi Metro Rail Corporation Ltd. Rachmadi Chief Engineering and Project Officer PT Mass Rapid Transit Jakarta Khoo Hean Siang Executive Vice President SMRT Train N. Sivasailam Managing Director Bangalore Metro Rail Corporation Ltd. Endorser Register Today! Contact us Via E: [email protected] T: +86 21 6840 7631 W: http://www.cdmc.org.cn/mws F: +86 21 6840 7633 8th Metro World Summit 2013 17-18 April | Shanghai, China China Urban Rail Plan 2012 Dear Colleagues, During the "12th Five-Year Plan" period (2011-2015), China's national railway operation of total mileage will increase from the current 91,000 km to 120,000 km. Among them, the domestic urban rail construction showing unprecedented hot situation, a new round of metro construction will gradually develop throughout the country.
    [Show full text]
  • Tramway Renaissance
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com OCTOBER 2018 NO. 970 FLORENCE CONTINUES ITS TRAMWAY RENAISSANCE InnoTrans 2018: Looking into light rail’s future Brussels, Suzhou and Aarhus openings Gmunden line linked to Traunseebahn Funding agreed for Vancouver projects LRT automation Bydgoszcz 10> £4.60 How much can and Growth in Poland’s should we aim for? tram-building capital 9 771460 832067 London, 3 October 2018 Join the world’s light and urban rail sectors in recognising excellence and innovation BOOK YOUR PLACE TODAY! HEADLINE SUPPORTER ColTram www.lightrailawards.com CONTENTS 364 The official journal of the Light Rail Transit Association OCTOBER 2018 Vol. 81 No. 970 www.tautonline.com EDITORIAL EDITOR – Simon Johnston [email protected] ASSOCIATE EDITOr – Tony Streeter [email protected] WORLDWIDE EDITOR – Michael Taplin 374 [email protected] NewS EDITOr – John Symons [email protected] SenIOR CONTRIBUTOR – Neil Pulling WORLDWIDE CONTRIBUTORS Tony Bailey, Richard Felski, Ed Havens, Andrew Moglestue, Paul Nicholson, Herbert Pence, Mike Russell, Nikolai Semyonov, Alain Senut, Vic Simons, Witold Urbanowicz, Bill Vigrass, Francis Wagner, Thomas Wagner, 379 Philip Webb, Rick Wilson PRODUCTION – Lanna Blyth NEWS 364 SYSTEMS FACTFILE: bydgosZCZ 384 Tel: +44 (0)1733 367604 [email protected] New tramlines in Brussels and Suzhou; Neil Pulling explores the recent expansion Gmunden joins the StadtRegioTram; Portland in what is now Poland’s main rolling stock DESIGN – Debbie Nolan and Washington prepare new rolling stock manufacturing centre. ADVertiSING plans; Federal and provincial funding COMMERCIAL ManageR – Geoff Butler Tel: +44 (0)1733 367610 agreed for two new Vancouver LRT projects.
    [Show full text]
  • Bom Madrid 2016 Travel Guide
    madrid 26/27/28 FEBRUARY EUROPEAN BOM TOUR 2016 2 TABLE OF CONTENTS 1. INTRODUCTION WELCOME TO MADRID LANGUAGE GENERAL TIPS 2. EASIEST WAY TO ARRIVE TO MADRID BY PLANE - ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT (MAD) BY TRAIN BY BUS BY CAR 3. VENUE DESCRIPTION OF THE VENUE HOW TO GET TO THE VENUE 4. PUBLIC TRANSPORTATION SYSTEM UNDERGROUND METRO BUS TRAIN “CERCANÌAS TURISTIC TICKET 5. HOTELS 01. 6. SIGHTSEEING WELCOME TO MADRID TURISTIC CARD MONUMENTS MUSEUMS Madrid is the capital city of Spain and with a population of over 3,2 million people it is also the largest in Spain and third in the European Union! Located roughly at the center of the Iberian GARDENS AND PARKS Peninsula it has historically been a strategic location and home for the Spanish monarchy. Even today, it hosts mayor international regulators of the Spanish language and culture, such 7. LESS KNOWN PLACES as the Royal Spanish Academy and the Cervantes Institute. While Madrid has a modern infrastructure it has preserved the look and feel of its vast history including numerous landmarks and a large number of National 8. OTHERS CITIES AROUND MADRID Museums. 9. FOOD AND DRINK 10. NIGHTLIFE 11. LOCAL GAME STORES 12. CREDITS MADRID 4 LAN- GUAGE GENERAL TIPS The official language is Spanish and sadly a lot of people will have trouble communicating INTERNATIONAL PHONE CODE +34 in English. Simple but Useful Spanish (real and Magic life): TIME ZONE GMT +1 These words and phrases will certainly be helpful. They are pronounced exactly as written with the exception of letter “H”, which isn’t pronounced at all.
    [Show full text]
  • Analyzing Physics Students' Ethical Reasoning During a Unit On
    ANALYZING PHYSICS STUDENTS’ ETHICAL REASONING DURING A UNIT ON THE DEVELOPMENT OF THE ATOMIC BOMB: A CALL FOR MACRO-ETHICAL DISCUSSIONS IN THE PHYSICS CLASSROOM by Egla K. Ochoa-Madrid, B.S A thesis submitted to the Graduate Council of Texas State University in partial fulfillment of the requirements for the degree of Master of Science with a Major in Physics August 2020 Committee Members: Alice Olmstead, Chair Eleanor Close Hunter Close Ayush Gupta COPYRIGHT by Egla K. Ochoa-Madrid 2020 FAIR USE AND AUTHOR’S PERMISSION STATEMENT Fair Use This work is protected by the Copyright Laws of the United States (Public Law 94-553, section 107). Consistent with fair use as defined in the Copyright Laws, brief quotations from this material are allowed with proper acknowledgement. Use of this material for financial gain without the author’s express written permission is not allowed. Duplication Permission As the copyright holder of this work I, Egla K. Ochoa-Madrid, authorize duplication of this work, in whole or in part, for educational or scholarly purposes only. DEDICATION I dedicate this page to my beautiful mother. Todo lo que hago, lo hago en su honor. ACKNOWLEDGEMENTS I’d like to acknowledge my advisor Dr. Alice Olmstead and my research partner Dr. Brianne Gutmann. I’d like to acknowledge the rest of my committee Dr. Ayush Gupta, Dr. Eleanor Close, & Dr. Hunter Close for offering their expertise and guidance v TABLE OF CONTENTS Page ACKNOWLEDGEMENT ..............................................................................................
    [Show full text]
  • The Urban Rail Development Handbook
    DEVELOPMENT THE “ The Urban Rail Development Handbook offers both planners and political decision makers a comprehensive view of one of the largest, if not the largest, investment a city can undertake: an urban rail system. The handbook properly recognizes that urban rail is only one part of a hierarchically integrated transport system, and it provides practical guidance on how urban rail projects can be implemented and operated RAIL URBAN THE URBAN RAIL in a multimodal way that maximizes benefits far beyond mobility. The handbook is a must-read for any person involved in the planning and decision making for an urban rail line.” —Arturo Ardila-Gómez, Global Lead, Urban Mobility and Lead Transport Economist, World Bank DEVELOPMENT “ The Urban Rail Development Handbook tackles the social and technical challenges of planning, designing, financing, procuring, constructing, and operating rail projects in urban areas. It is a great complement HANDBOOK to more technical publications on rail technology, infrastructure, and project delivery. This handbook provides practical advice for delivering urban megaprojects, taking account of their social, institutional, and economic context.” —Martha Lawrence, Lead, Railway Community of Practice and Senior Railway Specialist, World Bank HANDBOOK “ Among the many options a city can consider to improve access to opportunities and mobility, urban rail stands out by its potential impact, as well as its high cost. Getting it right is a complex and multifaceted challenge that this handbook addresses beautifully through an in-depth and practical sharing of hard lessons learned in planning, implementing, and operating such urban rail lines, while ensuring their transformational role for urban development.” —Gerald Ollivier, Lead, Transit-Oriented Development Community of Practice, World Bank “ Public transport, as the backbone of mobility in cities, supports more inclusive communities, economic development, higher standards of living and health, and active lifestyles of inhabitants, while improving air quality and liveability.
    [Show full text]
  • A Contextual Transit- Oriented Development Typology of Beijing Metro Station Areas
    A CONTEXTUAL TRANSIT- ORIENTED DEVELOPMENT TYPOLOGY OF BEIJING METRO STATION AREAS YU LI June, 2020 SUPERVISORS: IR. MARK BRUSSEL DR. SHERIF AMER A CONTEXTUAL TRANSIT-ORIEND DEVELOPMENT TYPOLOGY OF BEIJING METRO STATION AREAS YU LI Enschede, The Netherlands, June, 2020 Thesis submitted to the Faculty of Geo-Information Science and Earth Observation of the University of Twente in partial fulfilment of the requirements for the degree of Master of Science in Geo-information Science and Earth Observation. Specialization: Urban Planning and Management SUPERVISORS: IR. MARK BRUSSEL DR. SHERIF AMER THESIS ASSESSMENT BOARD: Dr. J.A. Martinez (Chair) Dr. T. Thomas (External Examiner, University of Twente) DISCLAIMER This document describes work undertaken as part of a programme of study at the Faculty of Geo-Information Science and Earth Observation of the University of Twente. All views and opinions expressed therein remain the sole responsibility of the author, and do not necessarily represent those of the Faculty. ABSTRACT With the development of urbanization, more and more people live in cities and enjoy a convenient and comfortable life. But at the same time, it caused many issues such as informal settlement, air pollution and traffic congestions, which are both affecting residents and stressing the environment. To achieve intensive and diverse social activities, the demand for transportation also increased, the proportion of cars travelling is getting higher and higher. However, the trend of relying too much on private cars has caused traffic congestion, lack of parking spaces and other issues, which is against the goal of sustainable development. Transit-oriented development (TOD) aims to integrate the development of land use and transportation, which has been seen as a strategy to address some issues caused by urbanization.
    [Show full text]
  • Transportation the Conference Will Be Held in North Zhongshan Road
    Transportation The conference will be held in North Zhongshan Road campus of East China Normal University (ECNU). The address is: No. 3663, North Zhongshan Road, Putuo, Shanghai. The hotel where all participants will stay is Yifu Building (逸夫楼) located on the campus. Arrival by flights: There are two airports in Shanghai: the Pudong Airport in east Shanghai and the Hongqiao Airport in west Shanghai. Both are convenient to get to the North Zhongshan Road campus of ECNU. At the airport, you can take taxi or metro to North Zhongshan Road Campus of ECNU. Taxi is recommended in terms of its convenience and time saving. Our students will be there for helping you to find the taxi. By taxi From Pudong Airport: about one hour and 200 CNY when traffic is not busy. From Hongqiao Airport: about 30 minutes and 60 CNY when traffic is not busy. Please print the following tips if you like “请带我去华东师范大学中山北路校区正门” in advance and show it to the taxi driver. The Chinese words in tips mean "Please take me to the main gate of North Zhongshan Road Campus of ECNU". By metro From Pudong Airport: 1. Metro Line 2 (6:00 - 22:00)->Zhongshan Park (中山公园) station (Note: exchange at Guanglan Road station(广兰路)), then take taxi for about 10 minutes and 14 CNY cost to North Zhongshan Road Campus of ECNU, or take the bus 67 for 2 stops and get off at ECNU station(华东师大站)instead. 2. Metro Line 2->Jiangsu Road (江苏路) station-> Metro Line 11->Longde Road (隆德路) station->Metro Line 13-> Jinshajiang Road (金沙江路) Station->10 minutes walk.
    [Show full text]