RALP Project List

Total Page:16

File Type:pdf, Size:1020Kb

RALP Project List Rhine-Alpine TEN-T Core Network Corridor – Project list, 31/05/2017 Disclaimer: this list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter. Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Dutch Ministry of Infrastructure PHS Amsterdam CS Rail NL 433.00 12/2026 and the Environment Princess Beatrix Lock and Lek Canal IWW Rijkswaterstaat NL 234.00 12/2020 Capacity Volkeraklock IWW Rijkswaterstaat NL 155.00 12/2026 New Sealock Ijmuiden IWW Rijkswaterstaat NL 815.00 12/2019 New location for transhipment of bulk goods, Maritime Rijkswaterstaat NL 65.00 12/2018 IJmuiden, Averijhavendepot Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Traffic management system Hollandsch Diep- Dutch Ministry of Infrastructure IWW NL 10.00 12/2027 Dordtsche Kil and the Environment Theemsweg railway connection upgrade Maritime Havenbedrijf Rotterdam N.V. NL 299.65 12/2020 Safe & Secure Truck Parking Areas on the Core Road P.V.L. B.V. NL 6.47 01/2018 Network in the Netherlands ViA15 road project, missing link study - Rhine- Dutch Ministry of Infrastructure Road NL 5.81 12/2016 Alpine Core Network Corridor and the Environment High efficient container terminal boosting multimodal freight between Rotterdam and the Multimodal APM Terminals Maasvlakte II NL 27.30 unknown European hinterland Building the 'Meteren Boog' rail connection between the Betuweroute and the existing rail Rail Prorail NL 650 (787 incl. VAT) 12/2025 network alternative "Brabant Route" to intensify rail freight on the Betuweline. PHS (Programme High-Frequent Rail Services) to increase the capacity/reliability on the section Rail MinIenM NL 233.00 12/2020 Driebergen-Zeist; Ede. Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date ERTMS deployment RALP Corridor Rail ERTMS ProRail NL 235.00 Beyond 2023 Pro Danube Management LNG Masterplan for Rhine-Main-Danube IWW NL 80.00 12/2020 GmbH Capacity expansion of mooring locations IWW Rijkswaterstaat NL 20.00 12/2017 Gorinchem - Dordrecht Rail connections Maasvlakte 2. Upgrade along Maritime Rijkswaterstaat NL 217.00 12/2015 port railway line. Identified missing element in 2014 work plans: Connect Rotterdam The Hague Airport to the Airport Prorail NL 200.00 01/2030 rail network Redesign Waalhaven Zuid freight yard for Maritime Public+EU NL unknown 12/2019 containers Change catenary supply from 1.5 kV to 25 kV Rail Public+EU NL unknown 12/2029 Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Partial completion of minor Ministry of Infrastructure and Route East. Railways upgrade Rail NL 233.00 projects. Final Environment project finished before 2030. A12/A15 Ressen-Oudbroeken (ViA15). Extend Ministry of Infrastructure and Road NL 840.00 2021-2023 A15 motorway (missing link south of Arnhem) Environment Multifunctional secure truck parking solution in Maritime Flavenbedrijf Rotterdam N.V. NL 12.91 unknown Rotterdam Harbourline - Oude Maas river crossing Maritime Prorail NL unknown 12/2028 Amsterdam Dijksgracht - free level crossing Rail Prorail NL unknown 12/2025 Improving capacity Sophiatunnel Rail Prorail NL unknown 12/2028 Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Rail freight terminal at core Port of Moerdijk. Multimodal Havenschap Moerdijk NL 2.56 08/2018 Future vision Waal. Fairway depth and cross- IWW Rijkswaterstaat NL 131.00 12/2023 border mooring places. Dutch Ministry of Infrastructure Schiphol Plaza. Passenger terminal capacity. Airport NL unknown unknown and the Environment Diabolo project Airport Infrabel BE 64.00 12/2023 Rail connection of the future Liège-Carex Infrabel terminal and adaptation of existing HSL to allow Airport BE n/a unknown Liège Carex the circulation of high- speed freight C-ITS for Trucks (CITRUS) Road Be-Mobile NV BE 1.82 09/2019 Flemish Department of Mobility C-Roads Belgium/Flanders Road BE 3.18 12/2020 and Public Works (MOW) Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Connecting Brussels airport Airport De Lijn BE 88.86 unknown OPTI CONNECT Maritime NV ITC Rubis Terminal Antwerp BE 15.00 unknown Vopak Chemical Terminals More Liguid Bulk 4 Rail Maritime BE 8.01 unknown Belgium NV ANTwerp Waterbus Exploration and Realisation IWW Stad Antwerpen BE 16.58 unknown Park&Ride building (ANTWERP) INtoLNG - Innovative LNG solutions to provide Engie LNG Solutions Antwerp Innovation BE 19.34 unknown clean transport fuel bvba Pilot deployment of a smart (bio-) LNG/CNG Innovation DRIVE SYSTEMS BE 2.93 06/2019 network in Flanders New dock Noordlandbrug IWW NV De Scheepvaart BE 15.99 unknown Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Internal port rail infrastructure and Maritime Private and port authority BE 5.50 12/2016 development of a multimodal terminal Upgrading shunting yards and junctions; freight Maritime Port of Antwerp BE 100.00 12/2020 transport services Removal of level crossings Rail Infrabel BE 329.40 12/2025 Increasing capacity on the Rhine-Alpine Corridor between Denderleeuw and Brussels by adding 2 Rail Infrabel BE 68.80 12/2017 tracks on the line 50A Optimization of the Brussels Ring road Road Agentschap Wegen en Verkeer BE 2,300.00 12/2023 A11 Brugge-Westkapelle Road Agentschap Wegen en Verkeer BE 578.00 12/2017 Beheersmaatschappij Antwerp Oosterweel connection Antwerp Road BE 3,250.00 03/2023 Mobiel (BAM) Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Advanced Surface Movement Guidance and Control Systems (A-SMGCS) in Charleroi and Airport Belgocontrol BE 10.52 unknown Liege airports Upgrading Inland Navigation Infrastructure in Maritime Port of Gent BE 14.45 12/2015 Port of Ghent Private promoter and Service Liège-Carex terminal project (feasability study) Airport BE 2.20 12/2014 Public de Wallonie Increase in the capacity of access to the port of Maritime Infrabel BE 224.40 12/2025 Antwerp Improving the multimodal logistic platform of the Zeebrugge port in order to a ccommodate Maritime Infrabel BE 7.99 01/2019 long freight trains ETCS deployment: retrofitting of 94 diesel motor Rail ERTMS NMBS/SNCB BE 24.76 unknown units Safe and secure parking areas for trucks in Road Total BE 4.04 09/2017 Kruishoutem and Kalken Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Waterwegen en Zeekanaal NV, Watertruck+ Innovation BE 23.01 12/2019 NV De Scheepvaart, VIM Feasibility study on the extension of the capacity Rail Infrabel and SNCB BE 1.00 12/2017 of the Brussels North-South link Safe and secure infrastructure in Flanders Road Agentschap Wegen en Verkeer BE 2.62 12/2019 Upgrading of existing multimodal terminal with Multimodal Ghent Port Company BE n/a 12/2017 rail access Increasing the capacity, robustness and safety of Rail Infrabel BE 288.90 unknown the Brussels North-South link ETCS deployment on the Core Network Rail Infrabel BE 935.50 12/2025 Increase in capacity of the Ghent-Zeebrugge line Rail Infrabel BE 463.00 12/2025 Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Renovation of the Royers lock in the Port of Flemish Government - IWW BE 142.80 12/2023 Antwerp Mobiliteit en Openbare Werken ABS Köln - Aachen, Upgrade section II Rail BMVI (DB Netz) DE 52.0 12/2030 (Ausbauabschnitt II) Düren-Aachen Corridor programme 4 (CPR 4): A 1/A 2/A 3 : ITS Road BMVI DE 19.00 12/2020 implementation Corridor programme 4 (CPR 4): A 1/A 2/A 3, Road BMVI DE 2.3 12/2020 equipment for ITS implementation Upgrade measures at combined transport/shunting yards in Gremberg and Rail BMVI (DB Netz) DE 97.00 12/2015 Seelze A4 Düren - Kerpen, extension of lanes Road BMVI (NW) DE 107.3 12/2016 Upgrade of Junction Aachen A4 / A44 / A544 Road BMVI (NW) DE 91.00 12/2017 Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date C-Roads Germany Road ITS automotive nord GmbH DE 9.9 12/2020 National Policy Framework on electric energy Road BMVI DE 100.00 12/2020 supply on road infrastructure of corridor(s) National Policy Framework on hydrogen energy Road BMVI DE 50.00 12/2025 supply on road infrastructure of corridor(s) Upgraded line (ABS) (Amsterdam) - DE/NL Rail BMVI (DB Netz) DE 67.48 12/2019 border - Emmerich - Oberhausen Upgraded line (ABS) (Amsterdam) - DE/NL border - Emmerich - Oberhausen (1. Phase) Rail BMVI (DB Netz) DE 2,012.00 12/2030 ABS Grenze DE/NL-Emmerich-Oberhausen (1. Baustufe) ERTMS Zevenaar - Oberhausen Rail ERTMS DB Netz DE 110.00 12/2022 ERTMS Germany (Basel-Oberhausen) Rail ERTMS DB Netz DE 284.00 12/2022 Project name Project Project promoter Member States / Total costs in Million Project end category Countries involved Euro (estimate) date Noise reduction measures at different sections Rail DB Netz DE n/a unknown of RALP corridor Frankfurt/Main node, upgrade of railway infrastructure
Recommended publications
  • Public-Private Partnerships Financed by the European Investment Bank from 1990 to 2020
    EUROPEAN PPP EXPERTISE CENTRE Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Terms of Use of this Publication The European PPP Expertise Centre (EPEC) is part of the Advisory Services of the European Investment Bank (EIB). It is an initiative that also involves the European Commission, Member States of the EU, Candidate States and certain other States. For more information about EPEC and its membership, please visit www.eib.org/epec. The findings, analyses, interpretations and conclusions contained in this publication do not necessarily reflect the views or policies of the EIB or any other EPEC member. No EPEC member, including the EIB, accepts any responsibility for the accuracy of the information contained in this publication or any liability for any consequences arising from its use. Reliance on the information provided in this publication is therefore at the sole risk of the user. EPEC authorises the users of this publication to access, download, display, reproduce and print its content subject to the following conditions: (i) when using the content of this document, users should attribute the source of the material and (ii) under no circumstances should there be commercial exploitation of this document or its content. Purpose and Methodology This report is part of EPEC’s work on monitoring developments in the public-private partnership (PPP) market. It is intended to provide an overview of the role played by the EIB in financing PPP projects inside and outside of Europe since 1990.
    [Show full text]
  • Influential Parameters of Surface Waters on the Formation of Coating Onto Tio2 Nanoparticles Under Natural Conditions
    Electronic Supplementary Material (ESI) for Environmental Science: Nano. This journal is © The Royal Society of Chemistry 2021 Influential parameters of surface waters on the formation of coating onto TiO2 nanoparticles under natural conditions Narjes Tayyebi Sabet Khomami a, Parthvi Mayurbhai Patel a, Cynthia Precious Jusi a, Vanessa Trouillet b, Jan Davida, Gabrielle. E. Schaumanna, Allan Philippe a* * Corresponding author a iES Landau, Institute for Environmental Sciences, Koblenz-Landau University, Fortstrasse 7, 76829 Landau, Germany. b Institute for Applied Materials (IAM) and Karlsruhe Nano Micro Facility (KNMF), Karlsruhe Institute of Technology (KIT), 76344 Eggenstein-Leopoldshafen, Germany. 1 Table S1: The locations of surface water (SW) sites and their descriptions. Abbr. Site GPS Location Type of Description landscape SW1 Rehbach 49° 21′ 20″ N urban Is tributary of the Speyerbach river which flows through the Winziger 8° 9′ 19″ E Wassergescheid in Neustadt Weinstrasse. SW2 Speyerbach 49°19'04.8"N urban The Speyerbach is a left tributary of the Rhine river and flows through the 8°26'49.5"E southern palatinate forest as splits into smaller water courses before emptying out into the Rhine. SW3 Bischofsweiher 49°20'40.4"N forest Bischofsweier is an artificial lake dammed from inflows from the 8°05'18.2"E Kaltenbrunnertalbach stream and serves as a recreational fishing lake. SW4 Kaltenbrunnertal 49°20'40.4"N forest Kaltenbrunnertalbach is a stream that flows from the northern summit of -bach 8°05'18.2"E Hüttenhohl and maintains its course through the southern palatinate forest before emptying into Rehbach. SW5 Modenbach 49°16'12.4"N agricultural Modenbach is a stream, just under 30 kilometers long, and a right-hand tributary 8°10'58.4'' E of the Speyerbach.
    [Show full text]
  • DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website
    EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor.
    [Show full text]
  • 2019 Annual Report Annual 2019
    a force for good. 2019 ANNUAL REPORT ANNUAL 2019 1, cours Ferdinand de Lesseps 92851 Rueil Malmaison Cedex – France Tel.: +33 1 47 16 35 00 Fax: +33 1 47 51 91 02 www.vinci.com VINCI.Group 2019 ANNUAL REPORT VINCI @VINCI CONTENTS 1 P r o l e 2 Album 10 Interview with the Chairman and CEO 12 Corporate governance 14 Direction and strategy 18 Stock market and shareholder base 22 Sustainable development 32 CONCESSIONS 34 VINCI Autoroutes 48 VINCI Airports 62 Other concessions 64 – VINCI Highways 68 – VINCI Railways 70 – VINCI Stadium 72 CONTRACTING 74 VINCI Energies 88 Eurovia 102 VINCI Construction 118 VINCI Immobilier 121 GENERAL & FINANCIAL ELEMENTS 122 Report of the Board of Directors 270 Report of the Lead Director and the Vice-Chairman of the Board of Directors 272 Consolidated nancial statements This universal registration document was filed on 2 March 2020 with the Autorité des Marchés Financiers (AMF, the French securities regulator), as competent authority 349 Parent company nancial statements under Regulation (EU) 2017/1129, without prior approval pursuant to Article 9 of the 367 Special report of the Statutory Auditors on said regulation. The universal registration document may be used for the purposes of an offer to the regulated agreements public of securities or the admission of securities to trading on a regulated market if accompanied by a prospectus or securities note as well as a summary of all 368 Persons responsible for the universal registration document amendments, if any, made to the universal registration document. The set of documents thus formed is approved by the AMF in accordance with Regulation (EU) 2017/1129.
    [Show full text]
  • Comprehensive Analysis of the Existing Cross-Border Rail Transport Connections and Missing Links on the Internal EU Borders Final Report
    Comprehensive analysis of the existing cross-border rail transport connections and missing links on the internal EU borders Final report Ludger Sippel, Julian Nolte, Simon Maarfield, Dan Wolff, Laure Roux March 2018 EUROPEAN COMMISSION Directorate-General for Regional and Urban Policy Directorate D: European Territorial Cooperation, Macro-regions, Interreg and Programme Implementation I Unit D2: Interreg, Cross-Border Cooperation, Internal Borders Contact: Ana-Paula LAISSY (head of unit), Robert SPISIAK (contract manager) E-mail: [email protected] European Commission B-1049 Brussels EUROPEAN COMMISSION Comprehensive analysis of the existing cross-border rail transport connections and missing links on the internal EU borders Final report Directorate-General for Regional and Urban Policy 2018 EN Europe Direct is a service to help you find answers to your questions about the European Union. Freephone number (*): 00 800 6 7 8 9 10 11 (*) The information given is free, as are most calls (though some operators, phone boxes or hotels may charge you). LEGAL NOTICE The information and views set out in this publication are those of the author(s) and do not necessarily reflect the official opinion of the Commission. The Commission does not guarantee the accuracy of the data included in this study. Neither the Commission nor any person acting on the Commission’s behalf may be held responsible for the use which may be made of the information contained therein. More information on the European Union is available on the Internet (http://www.europa.eu). Luxembourg: Publications Office of the European Union, 2018 ISBN 978-92-79-85821-5 doi: 10.2776/69337 © European Union, 2018 Reproduction is authorised provided the source is acknowledged.
    [Show full text]
  • Transport Operators • Marketing Strategies for Ridership and Maximising Revenue • LRT Solutions for Mid-Size Towns
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com FEBRUARY 2015 NO. 926 NEW TRAMWAYS: CHINA EMBRACES LIGHT RAIL Houston: Two new lines for 2015 and more to come Atlanta Streetcar launches service Paris opens T6 and T8 tramlines Honolulu metro begins tracklaying ISSN 1460-8324 UK devolution San Diego 02 £4.25 Will regional powers Siemens and partners benefit light rail? set new World Record 9 771460 832043 2015 INTEGRATION AND GLOBALISATION Topics and panel debates include: Funding models and financial considerations for LRT projects • Improving light rail's appeal and visibility • Low Impact Light Rail • Harnessing local suppliers • Making light rail procurement more economical • Utilities replacement and renewal • EMC approvals and standards • Off-wire and energy recovery systems • How can regional devolution benefit UK LRT? • Light rail safety and security • Optimising light rail and traffic interfaces • Track replacement & renewal – Issues and lessons learned • Removing obsolescence: Modernising the UK's second-generation systems • Revenue protection strategies • Big data: Opportunities for transport operators • Marketing strategies for ridership and maximising revenue • LRT solutions for mid-size towns Do you have a topic you’d like to share with a forum of 300 senior decision-makers? We are still welcoming abstracts for consideration until 12 January 2015. June 17-18, 2015: Nottingham, UK Book now via www.tautonline.com SUPPORTED BY 72 CONTENTS The official journal of the Light Rail Transit Association FEBRUARY 2015 Vol. 78 No. 926 www.tramnews.net EDITORIAL 52 EDITOR Simon Johnston Tel: +44 (0)1733 367601 E-mail: [email protected] 13 Orton Enterprise Centre, Bakewell Road, Peterborough PE2 6XU, UK ASSOCIATE EDITOR Tony Streeter E-mail: [email protected] WORLDWIDE EDITOR Michael Taplin Flat 1, 10 Hope Road, Shanklin, Isle of Wight PO37 6EA, UK.
    [Show full text]
  • Joint Meeting of Working Groups 1, 3 and 5 of INLA
    Joint Meeting of Working Groups 1, 3 and 5 of INLA WHEN: 03-04 May 2017 WHERE: Karlsruhe - Germany Organizer: International Nuclear Law Association We are pleased to announce that the next Joint Meeting of Working Group 1 (Safety & Regulation), Working Group 3 (New Build) and Working Group 5 (Waste Management) of INLA will take place on Wednesday, 3rd May and Thursday, 4th May 2017 at the Joint Research Centre of the European Commission in Karlsruhe. REGISTRATION Please report your availability for attendance to Ms Alexandra Van Kalleveen (Alexandra.VAN- [email protected]) before end of March 2017. Participation is free of charge. VENUE European Commission Joint Research Centre (JRC) Directorate G - Nuclear Safety and Security JRC Karlsruhe Site Hermann-von-Helmholtz-Platz 1 76344 Eggenstein-Leopoldshafen Germany SECURITY POLICY Everyone requesting access to the site must be registered in advance therefore registration forms will be sent to you upon confirming your participation. Also a copy of identity card or passport has to be provided. Nuclear installations are subject to strict security rules. In this context, it is prohibited to take pictures or movies within the premises of the JRC Karlsruhe unless an explicit derogation has been delivered. In order to implement this requirement, visitors entering the site are, as a general rule, not allowed to bring with them any mobile phones with cameras or other technical equipment for taking pictures or movies (laptops included). If, nevertheless, this is absolutely necessary you should fill in the form indicating the reason why the devices are needed. Please indicate this to the meeting secretary ([email protected]).
    [Show full text]
  • Deutsche Bahn Integrated Interim Report January – June 2019 Germany Needs a Strong Rail System MORE ROBUST, MORE POWERFUL, MORE MODERN
    Deutsche Bahn Integrated Interim Report January – June 2019 Germany needs a strong rail system MORE ROBUST, MORE POWERFUL, MORE MODERN STRONG RAIL Germany needs a strong rail system more than ever before. This will enable DB Group to fully focus on making a strong rail system possible in Germany in the future. Further Information µ3 ff. A strong rail system for our climate [ 1 ] A strong rail system for our climate means: a reduction in total CO₂ emis­ sions by 10 million tons per year. This corresponds to the annual CO₂ foot­ print of one million people. A strong rail system for the people [ 2 ] A strong rail system for the people means: twice as many rail passengers and five million car trips and 14,000 air flights less in Germany every day. A strong rail system for the economy [ 3 ] A strong rail system for the economy means: increasing the rail freight transport market share in Germany to 25%. This corresponds to 13 million fewer truck trips per year on German roads. A strong rail system for Europe [ 4 ] A strong rail system for Europe means: a joint implementation of European networking by means of a strong rail system, which is the decisive factor for achiev ing European climate protection targets and economic growth. At a glance H 1 Change Selected key figures 2019 2018 absolute % KEY FINANCIAL FIGURES (€ MILLION) Revenues adjusted 22,013 21,548 + 465 + 2.2 Revenues comparable 21,926 21,548 + 378 + 1.8 Profit before taxes on income 277 560 – 283 – 50.5 Net profit (after taxes) 205 562 – 357 – 63.5 EBITDA adjusted 1) 2,534 2,304
    [Show full text]
  • 'It Is Therefore Both in the German and in the Dutch Interest...'
    'It is therefore both in the German and in the Dutch interest...' Dutch-German relations after the Great War. Interwoven economies and political détente, 1918-1933 Jeroen Euwe ‘Het is dus zoowel een Duitsch als een Nederlandsch belang…’ Hendrik Colijn aan de Raad van Bijstand van Economische Zaken, Departement Buitenlandsche Zaken, Den Haag, 28-2-1920. 'It is therefore both in the German and in the Dutch interest...' Dutch-German relations after the Great War. Interwoven economies and political détente, 1918-1931 ‘Het is dus zoowel een Duitsch als een Nederlandsch belang…’ Nederlands-Duitse betrekkingen na de Eerste Wereldoorlog. Verweven economieën en politieke detente, 1918-1931 Proefschrift ter verkrijging van de graad van doctor aan de Erasmus Universiteit Rotterdam op gezag van de rector magnificus prof.dr. H.G. Schmidt en volgens besluit van het College voor Promoties. De openbare verdediging zal plaatsvinden op vrijdag 21 december 2012 om 15.30 uur door Jilles Jeroen Euwe geboren te Vlaardingen Promotiecommissie: Promotor: Prof.dr. H.A.M.Klemann Overige leden: Prof.dr. A. de Jong Prof.dr. J.P.B. Jonker Prof.dr. P.T. van de Laar Contents Acknowledgements i Chapter 1 – Introduction 1.1 Introduction 4 1.2 The Dutch-German economic bonds 7 1.3 The historiography of Dutch-German (economic) relations 11 1.4 Theoretical framework: interdependence theory 17 Proving themselves right: liberal and neo-realist models 20 1.5 Interdependence theories: relevance to this study 24 Complicating factors 26 1.6 Central research question, sub-questions,
    [Show full text]
  • Polish General Report 39Th Asecap Study and Information Days Brussels, 30 – 31 May 2011
    POLISH GENERAL REPORT 39TH ASECAP STUDY AND INFORMATION DAYS BRUSSELS, 30 – 31 MAY 2011 Network length The total length of the Polish Motorways network in December 2010, including the State-owned network is 846 km. (300 km tolled and 546 km non-tolled) Year A1 A2 A4 Non-tolled State-owned 2006 none Nowy Katowice – A1, Tuszyn – Piotrkow Tomysl – Krakow Trybunalski 17 km; Konin 61 km A2, Konin - Strykow I 104 km; 149 km A4 st. border – Jedrzychowice 2 km, Krzywa – Katowice 278 km, Krakow by-pass 24 km; A6, st. border Kolbaskowo – Kijewo 22 km; A18, Golnice Krzywa 17 km; TOTAL 464 km 2007 25 km 149 km 61 km as above (temporary non- tolled in 2007: TOTAL 464 km Rusocin – Swarozyn) 2008 Tolling on 25 km 149 km 61 km as above plus 65 km non-tolled in 2008 A2, Strykow I – Strykow II 3 km (Swarozyn - Nowe Marzy) TOTAL 467 km 2009 Tolling on 65 km 149 km 61 km as above plus started in A4, Zgorzelec - Krzyzowa 50 km; January 2009 A4, Krakow - Szarow 20 km; TOTAL 90 km TOTAL 537 km 2010 Tolling on 90 km 149 km 61 km as above plus A1, Belk – Zory 7 km; Sosnica interchange 2 km; TOTAL 546 km The Polish membership of ASECAP consists of three Companies: Autostrada Wielkopolska SA (AWSA), Stalexport Autostrada Malopolska SA (SAM) and Gdansk Transport Company SA (GTC). AWSA has been the first company in Poland with an objective to finance, develop and operate A2 toll Motorway and was awarded with two concessions on the sections from Swiecko (boundary with Germany) to Nowy Tomysl (105 km) and from Nowy Tomysl to Konin (149 km).
    [Show full text]
  • Welcome to the Rhine Cycle Route! from the SOURCE to the MOUTH: 1,233 KILOMETRES of CYCLING FUN with a RIVER VIEW Service Handbook Rhine Cycle Route
    EuroVelo 15 EuroVelo 15 Welcome to the Rhine Cycle Route! FROM THE SOURCE TO THE MOUTH: 1,233 KILOMETRES OF CYCLING FUN WITH A RIVER VIEW Service handbook Rhine Cycle Route www.rhinecycleroute.eu 1 NEDERLAND Den Haag Utrecht Rotterdam Arnhem Hoek van Holland Kleve Emmerich am Rhein Dordrecht EuroVelo 15 Xanten Krefeld Duisburg Düsseldorf Neuss Köln BELGIË DEUTSCHLAND Bonn Koblenz Wiesbaden Bingen LUXEMBURG Mainz Mannheim Ludwigshafen Karlsruhe Strasbourg FRANCE Offenburg Colmar Schaff- Konstanz Mulhouse Freiburg hausen BODENSEE Basel SCHWEIZ Chur Andermatt www.rheinradweg.eu 2 Welcome to the Rhine Cycle Route – EuroVelo 15! FOREWORD Dear Cyclists, Discovering Europe on a bicycle – the Rhine Cycle Route makes it possible. It runs from the Alps to a North Sea beach and on its way links Switzerland, France, Germany and the Netherlands. This guide will point the way. Within the framework of the EU-funded “Demarrage” project, the Rhine Cycle Route has been trans- formed into a top tourism product. For the first time, the whole course has been signposted from the source to the mouth. Simply follow the EuroVelo15 symbol. The Rhine Cycle Route is also the first long distance cycle path to be certified in accordance with a new European standard. Testers belonging to the German ADFC cyclists organisation and the European Cyclists Federation have examined the whole course and evaluated it in accordance with a variety of criteria. This guide is another result of the European cooperation along the Rhine Cycle Route. We have broken up the 1233-kilometre course up into 13 sections and put together cycle-friendly accom- modation, bike stations, tourist information and sightseeing attractions – the basic package for an unforgettable cycle touring holiday.
    [Show full text]
  • A Ctivit Y Repor T 2011
    ACTIVITY REPORT 2011 ACTIVITY REPORT 2011 FOREWORD 4 CONTENTS ORGANISATIONAL CHART 12 KEY EVENTS 17 EUROPE Belgium TPF Engineering 18 Bagon Ingénieurs-Conseils 22 Louis Engineering 24 TPF-Utilities 26 TTR Energy 29 TPF-Basse Sambre 30 France Beterem Ingénierie 32 Ouest Coordination 35 Secmo 37 TPF-Utilities Sarl 38 Grand-Duchy of Luxembourg TPF Luxembourg 39 Poland TPF [formerly E&L Architects] 40 Portugal TPF Planege 42 ProSistemas 46 Romania TPF Romania 48 Activity report 2011 Ukraine TPF Ukraine TPF GROUP / 50 CONTENTS AFRICA Algeria TPF Algérie 52 Angola TPF Angola 54 Morocco Pyramide Ingénierie 56 Save Project 58 Senegal Setico 60 Tunisia TPF Tunisie 62 AMERICA Brazil Projetec - Projetos Tecnicos Ltda 63 ASIA India S.N. Bhobe 66 Cetest Pvt. Ltd. & Survtech Pvt. Ltd. 68 PRESENTATION OF THE ACCOUNTS 71 CONSOLIDATED BALANCE SHEET 72 PROFIT AND LOSS ACCOUNT 74 page 3 page FOREWORD 3 14 19 9 8 16 7 11 18 1 15 17 POLOGNE 20 13 UKRAINE BELGIQUE 6 4 GRAND-DUCHÉ DE LUXEMBOURG ROUMANIE FRANCE 5 ESPAGNE 2 12 PORTUGAL INDE TUNISIE ALGÉRIE MAROC SÉNÉGAL VENEZUELA PANAMA Activity report 2011 ÉQUATEUR BRÉSIL ANGOLA TPF GROUP / MOZAMBIQUE FOREWORD POLOGNE 10 UKRAINE BELGIQUE 1 3 GRAND-DUCHÉ DE LUXEMBOURG 2 4 6 5 ROUMANIE FRANCE 7 ESPAGNE 10 12 11 8 PORTUGAL INDE TUNISIE ALGÉRIE 13 ALGERIA 1 9 14 MAROCANGOLA 15 2 BELGIUM 3 SÉNÉGAL BRAZIL 16 17 4 VENEZUELA CONGO-BRAZZAVILLE 5 PANAMA ECUADOR 6 ÉQUATEUR SPAIN 7 BRÉSILFRANCE 8 18 ANGOLAGRAND-DUCHY OF LUXEMBOURG 9 19 MOZAMBIQUE 10 INDIA MOROCCO 11 12 MOZAMBIQUE 13 PANAMA 14 POLAND 15 PORTUGAL 16 ROMANIA 17 SENEGAL 18 TUNISIA 19 UKRAINE 20 VENEZUELA page 5 2011, A GOOD yEAR FOREWORD Due to recent acquisitions, the financial accounts presented at the yearend do not take into account all the changes in TPF’s sphere of activity in 2011.
    [Show full text]