Project Title: Reinsurance of the Industrial All Risk with Business Interruption and Equipment Floater Insurance of the Light Rail Transit Authority

Total Page:16

File Type:pdf, Size:1020Kb

Project Title: Reinsurance of the Industrial All Risk with Business Interruption and Equipment Floater Insurance of the Light Rail Transit Authority GSIS INSURANCE BIDS AND AWARDS COMMITTEE Project Title: Reinsurance of the Industrial All Risk with Business Interruption and Equipment Floater Insurance of the Light Rail Transit Authority Bid Bulletin No. 1 26 November 2019 This bid bulletin is issued to respond to the bidder’s queries for the Reinsurance of the Industrial All Risk with Business Interruption and Equipment Floater Insurance of the Light Rail Transit Authority. This shall form an integral part of the Bidding Documents. BIDDER’S QUERIES Item Bidder’s Queries GSIS’ Responses No. 1 To calculate the maximum possible loss Pertinent information/documents will be when two trains collide at the station, please available on November 29, 2019. provide a breakdown of sum insured The same will be sent to the bidders who including the BI and EEI of the following: purchased the bidding documents. a. One whole carriage/train b. All the carriage/train at the depot c. Line 2 (11 stations) d. Santolan Station e. Katipunan Station f. Anonas Station g. Araneta Center, Cubao Station h. Betty Go, Belmonte Station i. Gilmore Station j. J. Ruiz Station k. V. Mapa Station l. Pureza Station m. Legarda Station n. Recto Station o. Depot compound at Santolan, Pasig City to Recto Station (vice versa) 2 Survey reports for the top value stations. The Survey Report shall be provided only to bidders who purchased the Bidding Documents. For the guidance and information of all concerned. (Signed Original) ASVP EDUARDO V. FERNANDEZ Chairperson GSIS Insurance Bids and Awards Committee Bid Bulletin No. 1 CM of FM200 and Pre-Action Double Interlock System 30 July 2019 Page 1 of 1 .
Recommended publications
  • Infrastructure Tracker – RAILS
    TAPP II: Infrastructure Tracker as of November 20, 2017 Funding Type Cost Private (GPH, ODA, Phase/Status No. Sector Location Project Name (in PhP or Agency Description Date of Information Counterpart PPP, Private, (Completion Date) US$ B) PDMF) Rails Projects Phase 1: 50.5 km from the Malolos end of North-South Commuter Railway up to Clark Rails North-South Railway Project (north line) Phase 1 construction: Q2 2019 1 Luzon DOTr airport will have five stations—Malolos, ODA/GOJ 06-Jun-17 Projects (Malolos-Clark Railway Phase 1) Completion: Q2 2022 Apalit, San Fernando City, Clark and Clark ₱ 211.42 International Airport. Phase 2: 19 km railway to connect airport to Rails North-South Railway Project (north line) Clark Green City through three more 2 Luzon DOTr ODA/GOJ 06-Jun-17 Projects (Malolos-Clark Railway Phase 2) stations—Calumpit, Angeles City and Clark Green City. Financing, design, construction, operation & maintenance of 23km elevated railway line with 14 stations from San Jose Del Monte, Under Construction Rails 3 NCR MRT Line 7 Project ₱ 69.30 DOTr SMC Bulacan to MRT 3 North Avenue in Quezon PPP (unsolicited) On-going civil works 20-Oct-17 Projects City and 22km asphalt road from Bocaue (10.35% complete) Interchange of NLEX to intermodal terminal in Tala. A Brown Construction, operation and maintenance of Company Inc., Rails 11-station East-West Rail (EWR), a mostly 4 NCR East-West Rail Project $ 1.00 PNR and MTD PPP (unsolicited) For evaluation by ICC-TWG 20-Nov-17 Projects elevated 9.4km railway line from Diliman, Philippines, Quezon City to Lerma, Manila.
    [Show full text]
  • 1. Introduction
    Republic of the Philippines Department of Transportation and Communications and the Light Rail Transit Authority MANILA LRT1 EXTENSION, OPERATIONS AND MAINTENANCE PROJECT Preliminary Information Memorandum June 2012 Transaction Advisors With Assistance From DOTC/LRTA – Manila LRT1 Extension, Operations and Maintenance Project: Preliminary Information Memorandum June 2012 Disclaimer This Preliminary Information Memorandum (PIM) has been prepared by the Development Bank of the Philippines (DBP) and the International Finance Corporation (IFC) on behalf of their clients, the Department of Transportation and Communications (DOTC) and the Light Rail Transit Authority (LRTA), in line with their mandate as Transaction Advisors to the DOTC in the development, structuring and tendering of the Manila LRT1 Extension, Operations and Maintenance Project as a Solicited Transaction under the Philippine Build-Operate-Transfer (BOT) Law or Republic Act (RA) 6957, as amended by RA 7718. This PIM does not purport to be all-inclusive or to contain all of the information that a prospective participant may consider material or desirable in making its decision to participate in the tender. No representation or warranty, express or implied, is made, or responsibility of any kind is or will be accepted by the DBP, IFC, LRTA, the DOTC, or the Government of the Republic of the Philippines (ROP) or any of its agencies, with respect to the accuracy and completeness of this preliminary information. The DOTC and LRTA, by themselves or through their Advisors the DBP and IFC, may amend or replace any of the information contained in this PIM at any time, without giving any prior notice or providing any reason.
    [Show full text]
  • P 2.396 B Lrt Line 2 East (Masinag) Extension Project Package 1 – Construction of Viaduct
    In line with DOTC’s aim of providing the people with a Convenient, LIGHT Affordable, Reliable, Efficient and Safe transport system, the RAIL Department is inviting qualified bidders to participate in the OPEN and DOTC TRANSPARENT bidding process for the procurement of the following Department of Transportation & Communications TRANSIT Ligtas, Maaasahan at Abot-Kaya! project: AUTHORITY P 2.396 B LRT LINE 2 EAST (MASINAG) EXTENSION PROJECT PACKAGE 1 – CONSTRUCTION OF VIADUCT The project is the Construction of Elevated Guideway/Viaduct for the extension of the existing LRT Line 2 System by 3.934 kilometers eastward from the existing Santolan Station along Marcos Highway, Pasig City, beginning from Station 23+181.041, and terminating at Station 27+090.041 at the intersection of Marcos Highway and Sumulong Highway at Masinag, Cainta, Rizal. Completion of works is required within five hundred forty (540) calendar days. The Department of Transportation and Communications (DOTC), has funds from the Government of the Philippines (GOP) through the FY 2014 General Appropriations Act (GAA) and intends to apply the sum of Two Billion Three Hundred Ninety Six Million Eight Hundred Fifty Thousand Pesos (PhP 2,396,850,000.00), being the Approved Budget for the Contract (ABC) for the construction of 3.934 kilometers elevated guideway, inclusive of all duties, taxes, and/or other charges. Bids received in excess of the ABC shall be automatically rejected at bid opening. DOTC now invites bids from prospective/interested bidders for the Contract for the Civil Works of LRT Line 2 East (Masinag) Extension Project, Package 1 – Construction of Viaduct.
    [Show full text]
  • JEEP Bus Time Schedule & Line Route
    JEEP bus time schedule & line map JEEP Aurora Blvd, Quezon City, Manila →Radial Road View In Website Mode 10 / Moriones Intersection, Manila The JEEP bus line (Aurora Blvd, Quezon City, Manila →Radial Road 10 / Moriones Intersection, Manila) has 2 routes. For regular weekdays, their operation hours are: (1) Aurora Blvd, Quezon City, Manila →Radial Road 10 / Moriones Intersection, Manila: 12:00 AM - 11:00 PM (2) Radial Road 10 / Moriones Intersection, Manila →Aurora Blvd, Quezon City, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest JEEP bus station near you and ƒnd out when is the next JEEP bus arriving. Direction: Aurora Blvd, Quezon City, JEEP bus Time Schedule Manila →Radial Road 10 / Moriones Intersection, Aurora Blvd, Quezon City, Manila →Radial Road 10 / Manila Moriones Intersection, Manila Route Timetable: 38 stops Sunday 12:00 AM - 10:00 PM VIEW LINE SCHEDULE Monday 12:00 AM - 11:00 PM Aurora Blvd, Quezon City, Manila Tuesday 12:00 AM - 11:00 PM General Romulo Ave / Aurora Blvd Intersection, Wednesday 12:00 AM - 11:00 PM Quezon City, Manila Thursday 12:00 AM - 11:00 PM Aurora Blvd / General Aguinaldo Ave Intersection, Friday 12:00 AM - 11:00 PM Quezon City, Manila Saturday 12:00 AM - 10:00 PM Aurora Blvd / Epifanio De Los Santos Avenue Intersection, Quezon City, Manila U-Turn Slot, Philippines Aurora Blvd / N Domingo Intersection, Quezon JEEP bus Info City, Manila Direction: Aurora Blvd, Quezon City, Manila →Radial Road 10 / Moriones Intersection, Manila Aurora Blvd / Betty Go-Belmonte Intersection, Stops: 38 Quezon City, Manila Trip Duration: 65 min 760 Aurora Boulevard, Philippines Line Summary: Aurora Blvd, Quezon City, Manila, General Romulo Ave / Aurora Blvd Intersection, Saint Paul University Of Quezon City, Aurora Quezon City, Manila, Aurora Blvd / General Aguinaldo Boulevard Cor.
    [Show full text]
  • Country Report
    10th Regional EST Forum in Asia, 14-16 March 2017, Vientiane, Lao PDR Intergovernmental Tenth Regional Environmentally Sustainable Transport (EST) Forum in Asia 2030 Road Map for Sustainable Transport ~Aligning with Sustainable Transport Development Goals (SDGs)~ Country Report (Draft) The Philippines ------------------------------------- This country report was prepared by the Government of The Philippines as an input for the Tenth Regional EST Forum in Asia. The views expressed herein do not necessarily reflect the views of the United Nations. 10th Regional EST Forum in Asia, 14-16 March 2017, Vientiane, Lao-PDR a) Philippines Country EST Report b) Department of Transportation (covering from Nepal EST c) List other Line Ministries/Agencies contributing to preparation of the Country Forum 2015 to Lao EST Report: Forum 2017) d) Reporting period: 2015-2017 With the objective of demonstrating the renewed interest and commitment of Asian countries towards realizing a promising decade (2010-2020) of sustainable actions and measures for achieving safe, secure, affordable, efficient, and people and environment-friendly transport in rapidly urbanizing Asia, the participating countries of the Fifth Regional EST Forum in Asia discussed and agreed on a goodwill and voluntary declaration - “Bangkok Declaration for 2020 – Sustainable Transport Goals for 2010-2020.” At the Seventh Regional EST Forum held in Bali in 2013, the participating countries adopted the “Bali Declaration on Vision Three Zeros- Zero Congestion, Zero Pollution and Zero Accidents towards Next Generation Transport Systems in Asia” reinforcing the implementation of Bangkok 2020 Declaration (2010-2020) with emphasis to zero tolerance towards congestion, pollution and road accidents in the transport policy, planning and development.
    [Show full text]
  • Study on Medium Capacity Transit System Project in Metro Manila, the Republic of the Philippines
    Study on Economic Partnership Projects in Developing Countries in FY2014 Study on Medium Capacity Transit System Project in Metro Manila, The Republic of The Philippines Final Report February 2015 Prepared for: Ministry of Economy, Trade and Industry Ernst & Young ShinNihon LLC Japan External Trade Organization Prepared by: TOSTEMS, Inc. Oriental Consultants Global Co., Ltd. Mitsubishi Heavy Industries, Ltd. Japan Transportation Planning Association Reproduction Prohibited Preface This report shows the result of “Study on Economic Partnership Projects in Developing Countries in FY2014” prepared by the study group of TOSTEMS, Inc., Oriental Consultants Global Co., Ltd., Mitsubishi Heavy Industries, Ltd. and Japan Transportation Planning Association for Ministry of Economy, Trade and Industry. This study “Study on Medium Capacity Transit System Project in Metro Manila, The Republic of The Philippines” was conducted to examine the feasibility of the project which construct the medium capacity transit system to approximately 18km route from Sta. Mesa area through Mandaluyong City, Ortigas CBD and reach to Taytay City with project cost of 150 billion Yen. The project aim to reduce traffic congestion, strengthen the east-west axis by installing track-guided transport system and form the railway network with connecting existing and planning lines. We hope this study will contribute to the project implementation, and will become helpful for the relevant parties. February 2015 TOSTEMS, Inc. Oriental Consultants Global Co., Ltd. Mitsubishi Heavy
    [Show full text]
  • 4) Shops Around LRT Stairs at All LRT Stations, Food Stall and Copying
    MMUTIS Appendices 4) Shops around LRT stairs At all LRT stations, food stall and copying service are operating under the LRT stairs. They occupy the space not only under the stair but also in the outer area depriving space for passengers and pedestrians. 5) Loading and unloading activities of jeepneys Jeepneys are more convenient for passengers because they stop at any point along the route to pick up or unload passengers. From the viewpoint of efficient traffic operation, disorderly behaviour of jeepney is a main factor that reduces the capacity. The problem is often observed at the exit side of intersection and in front of LRT station. In the former case, vehicles queuing inside the intersection block the flow on the crossing street. In the latter case, jeepney even waits on the busy street until they get enough passengers. They pay little attention to the impact that they give on the traffic flow. 9.9 Proposed Improvement Plan Improvement plans have been prepared for the bottleneck and problematic intersection/area along the route. In addition, rehabilitation of street lighting facility, application of pavement markings and removal of shops around LRT stairs are proposed for the entire route. Measures that can be implemented under the existing condition are selected and proposed here. Further study is necessary for some measures, as there are other projects or plans such as LRT Line 2 or EDSA LRT at these locations, which create additional demand or change in the pattern of vehicular and pedestrian movements. As mentioned above, congestion is created by the fact that there are many pedestrians along the route, particularly near LRT stations, while sidewalk is narrow and often occupied by street vendors.
    [Show full text]
  • View in Website Mode Mesa, Manila
    JEEP bus time schedule & line map General Romulo Ave / Aurora Blvd Intersection, JEEP Quezon City, Manila →Internet Cafe, Old Sta. View In Website Mode Mesa, Manila The JEEP bus line (General Romulo Ave / Aurora Blvd Intersection, Quezon City, Manila →Internet Cafe, Old Sta. Mesa, Manila) has 2 routes. For regular weekdays, their operation hours are: (1) General Romulo Ave / Aurora Blvd Intersection, Quezon City, Manila →Internet Cafe, Old Sta. Mesa, Manila: 12:00 AM - 11:00 PM (2) Internet Cafe, Old Sta. Mesa, Manila →General Romulo Ave / Aurora Blvd Intersection, Quezon City, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest JEEP bus station near you and ƒnd out when is the next JEEP bus arriving. Direction: General Romulo Ave / Aurora Blvd JEEP bus Time Schedule Intersection, Quezon City, Manila →Internet Cafe, General Romulo Ave / Aurora Blvd Intersection, Old Sta. Mesa, Manila Quezon City, Manila →Internet Cafe, Old Sta. Mesa, 18 stops Manila Route Timetable: VIEW LINE SCHEDULE Sunday 12:00 AM - 10:00 PM Monday 12:00 AM - 11:00 PM General Romulo Ave / Aurora Blvd Intersection, Quezon City, Manila Tuesday 12:00 AM - 11:00 PM Aurora Blvd / General Aguinaldo Ave Intersection, Wednesday 12:00 AM - 11:00 PM Quezon City, Manila Thursday 12:00 AM - 11:00 PM Aurora Blvd / Epifanio De Los Santos Avenue Friday 12:00 AM - 11:00 PM Intersection, Quezon City, Manila U-Turn Slot, Philippines Saturday 12:00 AM - 10:00 PM Aurora Blvd / N Domingo Intersection, Quezon City, Manila Aurora Blvd / Betty Go-Belmonte Intersection, JEEP bus Info Quezon City, Manila Direction: General Romulo Ave / Aurora Blvd 760 Aurora Boulevard, Philippines Intersection, Quezon City, Manila →Internet Cafe, Old Sta.
    [Show full text]
  • The 2014 Sona Technical Report
    THE 2014 SONA TECHNICAL REPORT Prepared by: The Office of the President of the Philippines CONTENTS I. Institutionalized Good Governance to Achieve Results A. Strengthened and Sustained Good Governance Reforms 1. Institutionalized Public Accountability .............................................................. 1 2. Improved Doing Business and Public Sector Service Delivery ........................ 7 3. Pursued a Just and Lasting Peace ................................................................ 10 B. Inspired Investor Confidence 1. Investment Grade Ratings and Enhanced Investments ................................ 12 2. Resilient Philippine Economy ........................................................................ 15 II. Investing in People A. Targeting Economic Vulnerability 1. Empowering the Poor towards Self-Reliance ................................................ 17 2. Investing in Expanded Access to Health Care .............................................. 22 3. Enhancing Education and Training for a Skilled and Productive Workforce .. 28 4. Employment Facilitation ................................................................................ 33 5. Protection of Workers’ Rights and Welfare.................................................... 33 6. Promoting Growth Across Sectors for More Employment Opportunities ....... 40 B. Promoting Economic and Physical Mobility 1. Investing in Transport Infrastructure for Greater Mobility .............................. 50 2. Sustaining Wider and Long-Term Access to Energy and
    [Show full text]
  • Procurement Monitoring Report As of 30 June 2018
    LAND BANK OF THE PHILIPPINES 2018 Procurement Monitoring Report - First Semester Code Procurement Program/Project PMO/ Mode of Actual Procurement Activity Source of (UACS/PAP) Procurement Funds End-User Pre-Proc Ads/Post of Pre-bid Eligibility Sub/Open of Bid Post Contract Contract Notice to Delivery/ Inspection & Conference IAEB Conference Check Bids Evaluation Qualification Award Signing Proceed Completion Acceptance COMPLETED PROCUREMENT ACTIVITIES 20171016-01 Supply and Delivery of Various CISCO ONE Routers: LANDBANK PB - Goods and 26-Oct-17 09-Nov-17 23-Nov-17 07-Dec-17 07-Dec-17 07-Dec-17 21-Dec-17 08-Feb-18 12-Mar-18 12-Mar-18 - - LBP-Corp. Lot 1 - CISCO ONE - ISR 4321 Services Funds 20171016-01 Supply and Delivery of Various CISCO ONE Routers: LANDBANK PB - Goods and 26-Oct-17 09-Nov-17 23-Nov-17 07-Dec-17 07-Dec-17 07-Dec-17 21-Dec-17 08-Feb-18 12-Mar-18 12-Mar-18 - - LBP-Corp. Lot 2 - CISCO ONE - ASR 1004 Core Routers Services Funds 20171016-01 Supply and Delivery of Various CISCO ONE Routers: LANDBANK PB - Goods and 26-Oct-17 09-Nov-17 23-Nov-17 07-Dec-17 07-Dec-17 07-Dec-17 21-Dec-17 08-Feb-18 12-Mar-18 12-Mar-18 - - LBP-Corp. Lot 3 - CISCO ONE - ISR 3945E Services Funds 20171017-01 Data Retention Storage LANDBANK PB - Goods and 19-Oct-17 26-Oct-17 09-Nov-17 14-Dec-17 14-Dec-17 14-Dec-17 21-Dec-17 13-Feb-18 22-Feb-18 22-Feb-18 - - LBP-Corp.
    [Show full text]
  • Asia Infrastructure Snapshot
    COLLIERS INSIGHTS VALUATION & ADVISORY SERVICES | ASIA | DECEMBER 2019 ASIA INFRASTRUCTURE SNAPSHOT An Overview of Infrastructure Projects across Asia P.4-9 CHINA 37 4 143 FOREWORD AIRPORTS RAIL LINES METRO LINES 57.7M+ 65 2,100 1,754 2,800 additional passenger capacity stations km+ stations km+ During the next decade Asia will see massive investment in transportation infrastructure as cities become more connected and districts within cities P.10-15 become more accessible. The major investment will be in China and India, supported by their large populations, but many of the ASEAN countries are INDIA also investing in their transportation infrastructure. 18 1 18 AIRPORTS RAIL LINE METRO LINES Many of the airports built in Asia in the past 20 years have now reached or exceeded their design capacities leading to a programme of expansion 336M+ 12 508 884 1,130 in many of the leading cites, while the smaller cities are seeing the additional passenger capacity stations km stations km development of new airports either to replaced outdated facilities or to improve their connectivity with the major population centres. P.16-17 High speed rail has proven to be a viable substitute for air travel in China and other markets in the region are now expanding their rail development INDONESIA programmes, but it is mass transit systems in cities that are making the 3 1 5 AIRPORTS RAIL LINE METRO LINES greatest difference to urban travel to both reduce road congestion in city centres, and to open up suburban and fringe areas for new development. 40M 4 142 65 100 stations km+ The common thread across all the projects is real estate.
    [Show full text]
  • 1 the Cost of Fare-Free Public Transit in the COVID Economy
    The Cost of Fare-Free Public Transit in the COVID Economy: Looking into the Case of the EDSA Carousel Bus System in the Philippines Ivan Harris Tanyag University of the Philippines, Diliman ([email protected]) Abstract Transportation costs in public transit are usually fixed to provide mobility to the largest segment of the public. Subsidies are also provided in the form of discounts to students, the elderly, and persons with disabilities. Operators are subjected to follow a fare matrix based on the travel distance between two points. Subsidizing the full transportation costs would require the government to allot funding to cover the operation costs. Businesses may also provide free transit, though most of their operation is funded through corporate sponsorships. Only a few cities in the world currently operate on this scheme, most likely due to the resistance against fare-free public transit policies (FFPT). In the Philippines, this was introduced in a newly-built bus rapid transit (BRT) throughout the Epifanio de los Santos Avenue (EDSA), one of the major thoroughfares in Metro Manila during the onslaught of the coronavirus pandemic. This paper analyzes the contributory effect of an FFPT in the country's economy through a cost-benefit analysis. As most of the stations throughout the bus line are found in central business districts across the region, it has incentivized workers who heavily depend on public transit. It has also increased the level of mobility throughout the area, thus increasing the household consumption made. However, it has affected other public transit in the area, such as the Metro Rail Transit (MRT-3), whose operation also relies on government expenditures.
    [Show full text]